Is there enough qualified work force to execute new project along with
existing project. List of employees by each trade incl Permanent &
1.1.2
Contracts (Scaffolder, welder, fitter, rigger, foreman, technicians etc) -
If No have they plan to ramp up work force for new project?
Are sufficient Infrastructure like, Office, Fabrication shop (Open /
Close), Material Handling Equipments, tools & tackles, IT and etc
1.1.2
available to execute project. If No do they have plan to procure plants
and tools?
Are sufficient Infrastructure like, Office, Fabrication shop (Open /
Close), Material Handling Equipments, tools & tackles, IT and etc
1.1.2
available to execute project. If No do they have plan to procure plants
and tools?
List of Past project, Present, project details, with Key personnel who
1.1.4
handled or lead the project.
Verify Customer Satisfaction by feedback / appreciation notes or letter
1.1.3
from previous client
1.2 PLANNING
Does the planning dept have sufficient qualified planners / lead
1.2.2 planners? How many projects could be handled simultaneously with
present resources?
Are planning done by Primavera if not what software being used for
1.2.3
project planning.
Verify existing project sample Planning report like Level 1,2 and 3
1.2.4
planning, S curve , Manning, Histogram and etc
Are sufficient Infrastructure like, Office, Fabrication shop (Open /
Close), Material Handling Equipments, tools & tackles, IT and etc
1.1.2
available to execute project. If No do they have plan to procure plants
and tools?
1.3 WORKLOAD / CAPACITY
Current projects and forthcoming projects status expected finish and
1.3.1
start date respectively
Is current capacity on basis of human resources and infrastructure
1.3.2 adequate to handle new project. If yes give detailed evidence to support
this statement?
1.4 TRAINING
Are procedures available to identify training requirements of
1.4.1
employees?
2.0 PROCUREMENT
3.5.3
Are up-to-date records maintained which reflect the current and
authorised condition and configuration of operating systems?
3.5.4
How would management be made aware of either error conditions,
abnormal events or the use of "privilege user" facilities?
Has management established an agreed back-up procedures which
3.5.5 defines, inter alia, the following elements? (back-up frequency,
numbers of copies and retention period)
3.6.5 How are updates to designs (or drawings) managed to ensure that only
current and authorised versions are utilised?
4.3 QA / QC PROCEDURE
Verify documented procedure index and its effective implementation by
4.3.1
verifying present project QA/QC procedure index
Verify inspection reports / QCR forms and its sufficiency for entire
4.5.4
scope of work
7.1.2 What is the max project value in USD handled by this company in past?
8.7.2
Is Internal Audits covering all departments, divisions and projects
8.8 Risk Assessment
8.8.1 Was there any new process/equipment introduced
8.8.2
If yes, has the Risk Assessment carried and Risk Register updated
Are sufficient Infrastructure like, Office, Fabrication shop (Open /
Close), Material Handling Equipments, tools & tackles, IT and etc
1.1.2
available to execute project. If No do they have plan to procure plants
and tools?
8.8 Safety Inspection
8.8.1 Are inspections carried out as per procedure requirements