BOM (Bill Of Material)

Harga
No
Material Spesifikasi Jumlah Satuan Total (Rp)
.
(Rp)
30 mm x 30 mm x 6 m
1 Besi Hollow 1 87.000 87.000
(tebal 1,5 mm)
2080 x 900 x 910 mm
2 Bed Pasien 1 2.300.000 2.300.000
with back raise

3 Besi Hollow 25 x 25 x 3 4 120.000 480.000

4 Besi Plat 4' x 8' (tebal 1 mm) 2 245.000 490.000


5 Besi Plat 4' x 8' (tebal 2 mm) 1 420.000 420.000
6 Besi Plat 4' x 8' (tebal 3 mm) 1 455.000 455.000
40 mm x 40 mm x 6 m
7 Plat Besi Siku 1 80.000 80.000
(tebal 3 mm)
1" x 2 mm (panjang 6
8 Pipa Besi Pejal 1 121.500 121.500
m)
9 Besi Kanal U 50 x 38 x 6 1 187.000 187.000
10 Besi Beton Diameter 12 mm 1 80.000 80.000

11 Plat Aluminium 1000 x 2000 x 3 1 271.000 271.000

13 Mur dan Baut M8 4 2000 8000

14 Mur dan Baut M12 2 4000 8000


TOTAL #NAME?

BOP ( Bill of Process)


No Jasa Waktu pemakaian Harga/hari Harga
1 Desain 2 Hari Rp0,00 Rp500.000,00
2 Cutting 3 Hari Rp100,00 Rp300.000,00
3 Drilling 3 Hari Rp50,00 Rp150.000,00
4 Las 3 Hari Rp166,27 Rp469.847,00
5 Finishing 0 0 Rp0,00
TOTAL Rp 1.419.847