Abstract:
A future vision of the electrical transmission and distribution systlem is discussed in this paper. The
content is based on the results from the ELFORSK project - Vision 21 performed during 1995-1996,
where over 100 creative idCas were recieved from 45 participators. The: visions are describing both system
aspects, new business concepts, advanced components and customer services 20 - 30 years ahead. This
paper highlights and comments some of the visions. A brief ana1:ysis of some benfit value is also
presented.
Keywords: Research and development, future visions, creative study, electricity, transmission, distribution,
new materials, information technology, AC, DC, power quality, energy storage
T aking a look back 20-30 years ago, most without any significant risk of health.
of us could not imagine the dramatic Injuries and accidents related to electricity
impact of computers and new materials. should be reduced by 50%.
There were in fact almost no microprocessors and Storage of electricity with a return
no power electronic devices at all in the power efficiency better than 90% should be
network. It is therefore quite difficult to predict possible
what can be the situation an equal time ahead.
The study concentrated on the transmission and
Vision 21 a collaborative creative study distribution questions only. (Another study were
In 1995 ELFORSK, the Swedish utilities recently performed looking into the future energy
common R&D company, initiated a visionary system [l]).
project, aiming at coordination of creative
thinking to formulate desirable goals for common The visions albout the future, described in [2] are
R&D in the future. The target was the T&D divided into four sections. The first section
system after year 2010. Invited into this process describes the power network and its main
were the R&D community represented by the components. The second section describes the
Swedish governmental organization NUTEK and new business; as it can be envisioned today. The
the world leading manufacturer ABB Power third section, conceming improved power quality
SystemdABB Corporate Research, the describes new components and new topologies
universities, technical consultants and experts in and the fourth section elaborates on new electrical
the electrical utilities. storage technologies. Some of the visions from
Vision 21 are highlighted and commented here:
Focusing on new possibilities
Vision 21 focused on generic and global Flexible electrical power networks:
problems and possibilities. Some key issues were V i s i o n : "In the future the electrical networks
chosen as guidelines in the project. The key look different from today. The power network is
issues were rather simple. E:g. "What would be much more flexible and at the same time more
needed to achieve the following ?' complex. We have e.g. introduced more DC
technologies and power electronics in order to
Transmission and distribution of electricity cope with stronger environmental standards, but
should be performed by reducing losses to also to secure transmission and distribution
50% of today's losses. capability to establish a free electricity market.
Key components should be reduced in The network include most of Europe.
weight and volume by at least 50%.
ClRED 97,2-5 June 1997, Conference Publication No. 438, 0 IEE, 1997
6.4.2
In urban areas power networks are typically Another program for basic research in High
cablified and/or using compacted DC transmission Voltage outdoor insulation technology (ISOLDE)
systems. New insulating towers have been is under progress [4]. A coordinated nordic
designed from advanced composite materials and program for applied high temperature
they are well integrated into the environment.” superconductivity, research activities concerning
advanced battery concepts and studies concerning
C o m m e n t : A deregulated electricity market is new fexible networks using both AC- and DC are
only possible if network constraints are removed. also under formulation.
Flexibility in transmission and distribution over
time and space is therefore a necessity for a ”free” Silicon Carbide Power Electronics:
market to be fully developed. V i s i o n : ”The AC networks can be flexible
controlled through semi-conducting IGBT or GTO
New materials and design methods: devices (FACTS). Devices, that in the future
V i si o n : ”By advanced electrical insulation mainly are designed from silicon carbide
technology and new design principles electrical materials, thus allowing high temperature
equipment is manufactured in dimensions much operation without expensive forced cooling. The
smaller than today. The power network can by future power system, based on both AC and DC
this withstand much higher environmental hazards are utilizing super conductive transformers in its
than today. Over-voltage and induced currents are AC parts needs another type of protection against
suppressed to acceptable levels by new EMC- failures. It will not be accepted to disconnect large
control methodologies. The new flexible areas due to e.g. short circuits. New types of fault
networks are easier to control, they allow single current limiters and fault controllers are
phase failures without any degradation in power introduced. Some related to super conductive
supply, and they gives the consumers higher technology and others relaying on new semi-
power quality, with less interruptions, less conducting polymeric materials.
noise, flicker, swell etc. DC technologies gives
in general higher efficiencies and thus also acts C o m m e n t : A strategic research program
for a better environment. (SiCEPS) has newly been established in Sweden.
Researchers at Universities and Industry are now
Far ahead we assume that quite new conducting exploring the basic theory, synthesis and design
materials are developed. Most likely there are of power electronic components, based on Silicon
light-weight polymeric conductors, with better Carbide.
conductivity than FeIA1, showing less corrosion
and require almost no maintenance”. Intelligent and safe networks:
V i s i o n : ”The electric power network are much
Comment: Some important R&D projects are safer in the future. Appliances connected to the
already under v, ay. One example is a competence network communicate by standard protocols with
program called ELEKTRA [3], now supporting and over the network itself before voltage is
about 45 Ph.D students at Swedish universities. applied to the equipment. This means both an
simplification and increased complexity. Load
management have been accepted throughout the
whole network and customers can choose to price
out heavy load if shortage of power is expected.
Motors, and in principle all appliances are
protected by inherent sensors, control and
communication processors, that not only check
\
the component but also its environment.
Comment: The number of electrically related One vision, on a free market, is that power
accidents have recently started to increase in providers, use the common network as transparent
Sweden again. From 200 per year in 1990 the virtual networks, similar to telephone companies
number in 1996 seems to be more than 280. Over are doing todlay. The responsibility, in terms of,
70 % of the accidents are related to 230/400 V customer agreements are much more
distribution systems. The number of electrically differentiated. Due to the increasing amount of
related fires are more than 5000/year. Information local electricity production, users will be much
technology has a potential to significantly reduce more involvcd in supply in the future. Trading of
these problems and save a substantial amount of power and energy will take new forms.”
costs.
the network the on-board computer gives The benefit of system changes.
possibilities to download optimal routings for It is very difficult to make precise calculations on
e.g. commercial urban and highway traffic. cost/benefit of system changes related to the
visions above. However, some rough estimations
Based on existing DC/DC switching can give an indication on which order of
technologies, also quite new components are magnitude changes can achieve.
developed, that switch currents up to hundreds of
kHz and allow energy storage at intermediate In Sweden, maintenance and renovation costs
SMES or super capacitor devices, to achieve both about 3 and 2 billion SEK per year respectively.
local storage and power smoothing functionality Electrical energy losses of 10 TWh amounts to
at distribution and end-use levels. Hybrid storage 1.5 billion SEK and cost of accidents/fires related
systems that acts both as both fuel cells and to electricity about 2 billion SEK per year. If the
batteries are developed and distributed locally in visions could be reality, a potential thus exists
the electrical power system.” for savings up to maybe 4 billion SEK per year.
If we assume that the distribution system
Comment: Power Quality issues are for the accounts for most injuriedfires and losses, (say
time beeing one of the hottest topics for many 75%), the benefit value would be more than 3
utilities. Many investigations are now in progress billion SEIUyear in distribution only.
studying the potential for product developement
of the electricity itself. Assuming that new technology never would
compete with existing on f more expensive, we
A new distribution system topology: could for our calculation
Vision: ”In the future new storage devices gives costs are equal those of today.
the power network another topology. Due to the
progress in electrical storage technology, new A simple conclusion would be that any
devices have been developed that can handle long investment into future technology that has a
and short time storage of electricity. New High potential of saving losses, increase flexibility,
Temperature Super Conducting Magnetic Storage reduce maintenance costs and lower accident rates
devices (SMES) and advanced battery systems would pay back in a very short time.
allow smooth operation, with load factors close
to unity. These storage devices are later on further Conclusion
compacted, thus integrating not only e.g. A study concerning the visions of the future
cryogenic cooling system, but also its control distribution system was performed. Many new
based on cryogenic operating semiconductors”. ideas were developed. The Swedish utilities,
together with manufacturers and researchers at
universities are now trying to implement these
visions into long term R&D programs, as well as
into technology demonstration projects.
References
[l] A Sustainable Electricity System for
Sweden. A vision for 2050. ELFORSK 96:9
121 Vision 21 : A technology vision and
Research agenda on T&D for Sweden’s electrical
utilities. ELFORSK 96: 11
[3] ELEKTRA-R&D Program, Sept. 96
[4] ISOLDE- High Performance Outdoor
Insulation R&D Program, ELFORSK Nov. 96
A future perspective of distributed storage devices
like Superconductive Magnetic storage