Professional Documents
Culture Documents
Historical Case Well PN3-1; Pumping Treatment Thru BLT Gas Lift Installation
in Offshore Rigless Operation.
INDEX
• Objectives
• Introduction
• Candidate Selection
• Description
• Results
• Technical & Economic Contribution
• Applications and Conclusions
Compañía:
OBJECTIVES
Share…
- Ways of looking for candidates (reservoir and completion).
Compañía:
INTRODUCTION
Compañía:
INTRODUCTION
Compañía:
CANDIDATE SELECTION
- Type of completion.
- Structural position (KEY OF SUCCESS: depletion degree), EOR response, so on. Retroactive
With
Stimulation
PILOT WELL Response
- Perform intallation test (ensure good mechanical condition).
- Reservoir fluid characterization.
- Reservoir pressure analysis.
TREATMENT DESIGN
- Chose treatment system.
- Define fluid placement strategy (volumen and rate).
- Economic evaluation (production increase profile vs investment).
Compañía:
DESCRIPTION
Frac Simulation Rigless Resources
• Stimulation Vessel.
• Field Boat.
• Slickline.
Compañía:
DESCRIPTION: Ensure Operation
Compañía:
DESCRIPTION: From Acid to Breakdown (KK-17 Well)
FLUIDOS BOMBEADOS
VOLUMEN TOTAL BOMBEADO 390 bbl
VOL SALMUERA DE AMONIO 3%: 150 bbl
VOL S3 ACID 15%: 60 bbl
VOL SANDSTONE ACID HCl 12% & HF 3%: 100 bbl
VOL SALMUERA POTASIO 2% 80 bbl
2000
100
80 bbl Salmuera Amonio .
1000
50
0 0 0
100 150
Elapsed Time (min)
Compañía:
DESCRIPTION: From Acid to Breakdown (KK-17 Well)
A Step-Rate-Test was performed to determine the Fracture Extension Pressure and Flow, which had
a value of 3.67 bpm, therefore the treatment was performed at a lower rate (3.5 bpm) to maintain
the matrix flow during acid treatment and above this value for breakdown.
Compañía:
DESCRIPTION: From Acid to Breakdown (KK-17 Well)
Oil Rate = 63 bbl/d Water Rate = 1 bbl/d Gas Rate = 124 Mcf/d
Oil Cum = 3724 Mbls Water Cum = 17 Mbls Gas Cum =13300 MMcf
KK-17
KK-17
5000 Oil Rate (Cal. Day) ( bbl/d )
Water Rate (Cal. Day) ( bbl/d )
Gas Rate (Cal. Day) ( Mcf/d )
Test Oil ( bbl )
Test Water ( bbl )
Test Gas ( Mcf )
Inj.GasCalday_Tubos ( Mcf/d )
1000 Inj.GasCalday_Forros ( Mcf/d )
Water.InjCalDay ( bbl )
500
100
50
1. PN:4266'-3152' &UpCB:2600'-2472' thru Tbg @2364';2 1/8"gun,1spf
2. Conventional GL @ 2578'
3. Inspct Conv.GL@2464';Lw CB:2750'-2601'thruTbg;1 11/16"gun;1spf
4. POH inst. w/carb;Changed by BLT @ 3639'
5. Rigless: Control with treated water (Ann) and change lateral valv
10 6. Rigless: pumped solvent matrix treatmnt PN-CB 119 bbl Paravan;1St
7. Close to reduce Back Pressure in Area.
8. Open 5 1/2'' annular (Gas)
5
9. POH inst. w/carb;Squeeze:2615'-2472';BLT @ 4024'
10. POOH BLT Inst.;RIH BLT inst @3139'
11. Inspect BLT @ 4036'
12. Changed to BLT w/Pkr @ 3110'
13. RiglessAcid+Breakdown:HCl15% 60bbl,HCl12%HF3% 100 bbl (Tbg)
Date
12 3 4 56 7 89 11
10
12 13
1
1975 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 2000 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19
Compañía:
DESCRIPTION: From Acid to Breakdown (KK-17 Well)
Oil Rate = 63 bbl/d Water Rate = 1 bbl/d Gas Rate = 124 Mcf/d
Oil Cum = 3724 Mbls Water Cum = 17 Mbls Gas Cum =13300 MMcf
KK-17
1000
500 KK-17
Oil Rate (Cal. Day) ( bbl/d ) Δ= + 64 BOPD
Water Rate (Cal. Day) ( bbl/d )
Gas Rate (Cal. Day) ( Mcf/d ) Investment= +/- 100 MU$D
Test Oil ( bbl )
Test Water ( bbl )
Test Gas ( Mcf )
Inj.GasCalday_Tubos ( Mcf/d )
Inj.GasCalday_Forros ( Mcf/d )
100 Water.InjCalDay ( bbl )
50
10
Date
123 4
1
2015 16 17 18 19
Compañía:
RESULTS: Modeling & Response (PN3-1 Well)
Perforations:
Compañía:
RESULTS: Modeling & Response (PN3-1 Well)
Compañía:
RESULTS: Modeling & Response (PN3-1 Well)
ACIDIFICACION PN3-1
2000 20 10 400
PRESION RAM (psi)
Desplazamiento NH4CL
Concentración (psa)
1000 10 5 200
Bombeo Tratamiento SSA .
PRESION RAM (psi)
0 0 0 0
40 60 80 100 120
Elapsed Time (min)
ACID HEAD: Aimed to clean fines migration and initial completion damage issues of perforations.
Compañía:
RESULTS: Modeling & Response (PN3-1 Well)
Surf Pressure (psi) Observed Net (psi)
Slurry Rate (bpm) Btm Prop Conc (ppg)
5000 Surf Total Proppant Conc (ppg) Net Pressure (psi) 2000
80.00 20.00
20.00 2000
4000 1600
64.00 16.00
16.00 1600
Depleted zone??
3000 1200
48.00 12.00 FLUIDOS BOMBEADO
12.00 1200 VOLUMEN TOTAL BOMBEADOS 576.0 bbl
S3 ACID 15% 60.0 bbl
SSA 120.0 bbl
2000 800.0
32.00 8.000 SPECTRA FRAC 25 396.0 bbl
8.000 800.0
1000 400.0
16.00 4.000
4.000 400.0
0.0 0.0
0.0 0.0
0.0 120.0 136.0 152.0 168.0 184.0 200.0 0.0
Time (min)
Pumping Parameter - Interval #1
Compañía:
RESULTS: Modeling & Response (PN3-1 Well)
ETAPA Nº 1 INTERVALO 2655' - 3024' MD PROF. MEDIA 2840' MD H. NETO: 350
INTERVALO 2205' - 2493' TVD PROF. MEDIA 2349' TVD
VOLUMEN VOLUMEN DOSIFICACIÓN ARENA IMPORTADA FLUIDO ACUMULADO DESCRIPCIÓN
HORA ETAPA TIPO DE FLUIDO
MEZCLA LIMPIO de - a Malla Sacos Acum. Limpio Mezcla Qi Qf Pi Pf
FRACTURAMIENTO SPECTRA STAR 2500
65 bbl 65 bbl Minifrac 65 bbl 65 bbl 10.0 bpm 10.0 bpm 957 psi 1345 psi SPECTRA STAR 2500
Parada por Declinación.
60 bbl 60 bbl Pad 1 - - - 0 0 125 bbl 125 bbl 0.0 bpm 13.0 bpm 1500 psi 2042 psi SPECTRA STAR 2500
49 bbl 48 bbl 1° Etapa 0.50 - 0.50 16/30 10 10 173 bbl 174 bbl 13.0 bpm 13.0 bpm 2042 psi 2132 psi SPECTRA STAR 2500
73 bbl 71 bbl 2° Etapa 0.50 - 1.00 16/30 23 33 244 bbl 247 bbl 13.0 bpm 13.0 bpm 2132 psi 2143 psi SPECTRA STAR 2500
75 bbl 71 bbl 3° Etapa 1.00 - 1.50 16/30 38 71 315 bbl 322 bbl 13.0 bpm 13.0 bpm 2143 psi 1985 psi SPECTRA STAR 2500
77 bbl 71 bbl 4° Etapa 1.50 - 2.50 16/30 60 130 386 bbl 399 bbl 13.0 bpm 13.0 bpm 1985 psi 2100 psi SPECTRA STAR 2500
17:00 10 bbl 10 bbl Desplazamiento 0 - 0 16/30 0 130 396 bbl 409 bbl 13.0 bpm 0.0 bpm 2100 psi 2047 psi GEL LINEAL
Compañía:
RESULTS: Modeling & Response (PN3-1 Well)
Compañía:
RESULTS: Modeling & Response (PN3-1 Well)
Compañía:
RESULTS: Modeling & Response (PN3-1 Well)
Oil Rate = 53 bbl/d Water Rate = 1 bbl/d Gas Rate = 235 Mcf/d
Oil Cum = 593 Mbls Water Cum = 11 Mbls Gas Cum = 1471 MMcf
PN3-1
1000 1. Mog:5888'-4948';3 3/8" gun;3 spf;Frac 848 Bw*830 Sx;1 Stg.
2. Conv GL=7109'
3. Conventional GL @ 4960'
4. Changed by BLT @ 5692'
500 5. RBP=2000'.Hel:1908'-1808';4" gun;3 spf;Frac:Tbg/pkr;421 BO*560 Sx
6. Fish RBP. BLT=5675'
7. POH inst. w/corrosion;Inspect BLT @ 5628'
8. BP=4880'; Lw Ost:4744'-4420'; 4" gun;3 spf. Drill BP, push=5780'.
9. BLT=5683'
10. BP=3130';Up Ost:3024'-2655';4" gun;3 spf;Tbg/pkr=2575'. Flowing
11. POOH Tbg w/pkr. RIH BLTw/pkr @ 2577'
12. RiglessAcid+Frac:60 Bbl HCl15%,120 HCl12%:HF3%,130Sxs*409 BW
100
50
PN3-1
Oil Rate (Cal. Day) ( bbl/d )
10 Water Rate (Cal. Day) ( bbl/d )
Gas Rate (Cal. Day) ( Mcf/d )
Test Oil ( bbl )
Test Water ( bbl )
5 Test Gas ( Mcf )
Inj.GasCalday_Tubos ( Mcf/d )
Inj.GasCalday_Forros ( Mcf/d )
Water.InjCalDay ( bbl )
Date
2 3
1 4 56 7 8
9 10 11 12
1
1986 87 88 89 90 91 92 93 94 95 96 97 98 99 2000 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19
Compañía:
RESULTS: Modeling & Response (PN3-1 Well)
Oil Rate = 53 bbl/d Water Rate = 1 bbl/d Gas Rate = 235 Mcf/d
Oil Cum = 593 Mbls Water Cum = 11 Mbls Gas Cum = 1471 MMcf
PN3-1
1000
Δ= + 80 BOPD
Investment= +/- 115 MU$D
500
100
50
PN3-1
Oil Rate (Cal. Day) ( bbl/d )
Water Rate (Cal. Day) ( bbl/d )
Gas Rate (Cal. Day) ( Mcf/d )
Test Oil ( bbl )
Test Water ( bbl )
Test Gas ( Mcf )
Inj.GasCalday_Tubos ( Mcf/d ) 1. RiglessAcid+Frac:60 Bbl HCl15%,120 HCl12%:HF3%,130Sxs*409 BW
Inj.GasCalday_Forros ( Mcf/d )
Water.InjCalDay ( bbl )
Date
1
10
2017 18 19
Compañía:
TECHNICAL CONTRIBUTIONS
• Signs of depletion during minifrac is not a barrier for hydraulic fracturing (>0.03
psi/ft).
Compañía:
CONCLUTIONS
Thanks!!
Compañía: