18 In the Coordination Review dialog, do the following:
■ Expand New/Unresolved ➤ Grids ➤ Maintain relative position of Grids ➤ Grid moved.
■ Click the message m_RBD_After.rvt: Grids: Grid B. Grid B from the architect’s model is highlighted on the Level 3 window.
■ For Action, select Modify Grid B, and click Apply.
The grid line is adjusted to accommodate the architect’s change.
Review location of elevator walls
19 On the Toolbar, click , and draw a zoom box around the elevator shaft in the plan view.
20 In the Coordination Review dialog, do the following:
■ Under New/Unresolved ➤ Walls ➤ expand Maintain wall position.
There are 4 changes involving the elevator shaft walls. Select one of the messages and notice the wall is highlighted on the Structural Plan: Level 3 plan view.