18 In the Coordination Review dialog, do the following:

■ Expand New/Unresolved ➤ Grids ➤ Maintain relative position of Grids ➤ Grid moved.


■ Click the message m_RBD_After.rvt: Grids: Grid B.
Grid B from the architect’s model is highlighted on the Level 3 window.

■ For Action, select Modify Grid B, and click Apply.


The grid line is adjusted to accommodate the architect’s change.

Review location of elevator walls

19 On the Toolbar, click , and draw a zoom box around the elevator shaft in the plan view.

20 In the Coordination Review dialog, do the following:

■ Under New/Unresolved ➤ Walls ➤ expand Maintain wall position.


There are 4 changes involving the elevator shaft walls. Select one of the messages and notice the wall
is highlighted on the Structural Plan: Level 3 plan view.