ON THE JOB TRAINING CHECKLIST

TRAINEE’S NAME : MAULANA YOGA TRIHARTANTO


NIK : 200021 TRAINING TITLE : OJT – HEAT TREATMENT
JOB TITLE : REPAIR PROCESS ASSISTANT TRAINING CODE :
DEPARTMENT : REPAIR PROCESS TRAINING METHOD : ON THE JOB TRAINING
METHODS OF INSTRUCTOR’S
SPENT TRAINEE’S TRAINEE’S
TASK# ACCOMPLISHMENT TASK / CASE DESCRIPTION DATE NAME &
TIME PERFORMANCE SIGNATURE
(MOA*: P/S/O/D/R) SIGNATURE

O, D Tour Area NTP 03 Feb 20 4.00


Maulana Y. Deden .M
Read CT7-SPM 70-00-00
R 04 Feb 20 0.50
How To Use Manual
Maulana Y. Deden .M

O, D Welding Introduction 13 Feb 20 2.00


Maulana Y. Mujiyono
Blending The Welded Area on
#451534 / 21 O 13 Feb 20 1.00
Tay Discharge Nozzle
Maulana Y. Mujiyono
Tig Weld The Crack using
#459177 / 09 O AMS 5786 Filler Wire on 13 Feb 20 0.50
CT7 Cowl Turbine Case Maulana Y. Mujiyono
Blending The Welded Area on
#459177 / 10 P 13 Feb 20 0.50
CT7 Cowl Turbine Case
Maulana Y. Mujiyono

P Welding Preparation 17 Feb 20 1.00


Maulana Y. Mujiyono
Welding Practice Fusion
P, S 17 Feb 20 4.00
Low Carbon Steel AMS 6593
Maulana Y. Mujiyono

P Welding Preparation 18 Feb 20 1.00


Maulana Y. Mujiyono
Welding Practice Fusion
P, S 18 Feb 20 4.00
Low Carbon Steel AMS 6593
Maulana Y. Mujiyono
Tig Weld The Crack using
#459289 / 26 O AMS 5786 Filler Wire on 18 Feb 20 0.75
CT7 Exhaust Frame Maulana Y. Mujiyono

#459289 / 29 O Masking off CT7 Exhaust Frame 18 Feb 20 1.00


Maulana Y. Mujiyono
METHODS OF INSTRUCTOR’S
SPENT TRAINEE’S TRAINEE’S
TASK# ACCOMPLISHMENT TASK / CASE DESCRIPTION DATE NAME &
TIME PERFORMANCE SIGNATURE
(MOA*: P/S/O/D/R) SIGNATURE

P Welding Preparation 19 Feb 20 1.00


Maulana Y. Mujiyono
Welding Practice Bead on Plate
P, S 19 Feb 20 4.00
Low Carbon Steel AMS 6593
Maulana Y. Mujiyono

P Welding Preparation 20 Feb 20 1.00


Maulana Y. Mujiyono
Welding Practice Bead on Plate
P, S 20 Feb 20 4.00
Low Carbon Steel AMS 6593
Maulana Y. Mujiyono

P Welding Preparation 21 Feb 20 1.00


Maulana Y. Mujiyono
Welding Practice Bead on Plate
P, S 21 Feb 20 4.00
Low Carbon Steel AMS 6593
Maulana Y. Mujiyono

P Welding Preparation 24 Feb 20 1.50


Maulana Y. Mujiyono
Welding Practice Butt Joint 1G
P, S 24 Feb 20 0.50
Low Carbon Steel AMS 6593
Maulana Y. Mujiyono
Form Copper Plate for
P 24 Feb 20 3.75
Welding Fixture
Maulana Y. Mujiyono
Welding Practice Butt Joint 2G
P, S 24 Feb 20 0.50
Low Carbon Steel AMS 6593
Maulana Y. Mujiyono

P Welding Preparation 25 Feb 20 3.50


Maulana Y. Mujiyono
Welding Practice Butt Joint 2G
P, S 25 Feb 20 2.75
Low Carbon Steel AMS 6593
Maulana Y. Mujiyono

P Welding Preparation 26 Feb 20 1.25


Maulana Y. Mujiyono
Welding Practice Butt Joint 2G
P, S 26 Feb 20 3.50
Low Carbon Steel AMS 6593
Maulana Y. Mujiyono
METHODS OF INSTRUCTOR’S
SPENT TRAINEE’S TRAINEE’S
TASK# ACCOMPLISHMENT TASK / CASE DESCRIPTION DATE NAME &
TIME PERFORMANCE SIGNATURE
(MOA*: P/S/O/D/R) SIGNATURE
Built up Lock Adjuster for
P 26 Feb 20 1.50
Welding Fixture
Maulana Y. Mujiyono
Tig Weld The Crack using
#459569 / 09 O AMS 5786 Filler Wire on 27 Feb 20 1.50
CT7 Cowl Turbine Case Maulana Y. Mujiyono
Preparation The Crack Area on
#459538 / 09 P CT7 Cowl Turbine Case for 27 Feb 20 1.25
Tig Weld Maulana Y. Mujiyono
Tig Weld The Crack using AMS
#459538 / 09 O 5786 Filler Wire on 27 Feb 20 1.50
CT7 Cowl Turbine Case Maulana Y. Mujiyono
Prepare Damaged Area for
#459480 / 24 P Welding (Removing Crack) on 27 Feb 20 0.75
CT7 Exhaust Frame Maulana Y. Mujiyono
Tig Weld The Crack using
#459538 / 09 O AMS 5786 Filler Wire on 28 Feb 20 1.50
CT7 Cowl Turbine Case Maulana Y. Mujiyono

P Welding Practice Preparation 28 Feb 20 1.00


Maulana Y. Mujiyono
Welding Practice Butt Joint 2G
P, S 28 Feb 20 1.00
Low Carbon Steel AMS 6593
Maulana Y. Mujiyono
Prepare for Rebabbit The ID
#459583 / 04 O 02 Mar 20 1.00
Surface by Tig Weld
Maulana Y. Mujiyono
Prepare for Rebabbit The ID
#459584 / 04 O 02 Mar 20 1.00
Surface by Tig Weld
Maulana Y. Mujiyono
Prepare for Rebabbit The ID
#459585 / 04 O 02 Mar 20 1.00
Surface by Tig Weld
Maulana Y. Mujiyono
Prepare for Rebabbit The ID
#459586 / 04 O 02 Mar 20 1.00
Surface by Tig Weld
Maulana Y. Mujiyono
Tig Weld Local Areas Only of
#459319 / 305 O 02 Mar 20 2.00
Accelelator Housing Aft. Edge
Maulana Y. Mujiyono
Rebabbit The ID Surface by Tig
#459584 / 04 O Weld Method and Sprababbit 02 Mar 20 2.00
Filler Rod Material Maulana Y. Mujiyono
METHODS OF INSTRUCTOR’S
SPENT TRAINEE’S TRAINEE’S
TASK# ACCOMPLISHMENT TASK / CASE DESCRIPTION DATE NAME &
TIME PERFORMANCE SIGNATURE
(MOA*: P/S/O/D/R) SIGNATURE
Revising Tool Control Sheet for
P 03 Mar 20 1.00
Welding Shop 3
Maulana Y. Mujiyono

R Read ASM Handbook Vol. 1 03 Mar 20 0.50


Maulana Y. Deden M.
Rebabbit The ID Surface by Tig
#459584 / 04 O Weld Method and Sprababbit a 03 Mar 20 2.00
Filler Rod Material Maulana Y. Mujiyono
Rebabbit The ID Surface by Tig
#459587 / 04 O Weld Method and Sprababbit a 03 Mar 20 2.00
Filler Rod Material Maulana Y. Mujiyono
Blend The Welded Area on
#459587 / 04 P 03 Mar 20 1.00
Tilt Pad Bearing
Maulana Y. Mujiyono
Blend Edge Area on
P 04 Mar 20 1.00
Tilt Pad Bearing
Maulana Y. Mujiyono
Renumbering PN using ¼” Steel
#459666 / 065 P 04 Mar 20 0.50
Stamp on Solar Centaur
Maulana Y. Rian H.
Chase All Threads using
#459666 / 16 P 04 Mar 20 1.75
½” X 13 and 5/8” X 11
Maulana Y. Rian H.
Apply Metco 480 on Dia. A of
#457863 / 14 O 04 Mar 20 2.00
CT7 PT Stator Housing
Maulana Y. Agin G.
Learn SPM 70-71-09
R 05 Mar 20 0.50
Para. 1 & 2
Maulana Y. Deden M.
Blend after Rebabbit on
#459585 / 04 P 05 Mar 20 1.25
Sleeve Bearing Pinion Gear
Maulana Y. Bambang R.
Learn PMP-WS-006
R 05 Mar 20 1.50
Para. 1 - 5
Maulana Y. Deden M.

P Blending Thrust Pinion Gear 05 Mar 20 0.50


Maulana Y. Mujiyono

P Welding Practice Preparation 06 Mar 20 2.75


Maulana Y. Mujiyono
METHODS OF INSTRUCTOR’S
SPENT TRAINEE’S TRAINEE’S
TASK# ACCOMPLISHMENT TASK / CASE DESCRIPTION DATE NAME &
TIME PERFORMANCE SIGNATURE
(MOA*: P/S/O/D/R) SIGNATURE
Welding Practice Butt Joint 2G
P, S 06 Mar 20 2.00
Low Carbon Steel AMS 6593
Maulana Y. Mujiyono
Learn PMP-WS-006
R 06 Mar 20 0.50
Para. 6.1 – 6.6
Maulana Y. Deden M.
Prepare for Welding on
#459870 / 03 P 09 Mar 20 0.50
TPE-331 Exhaust Duct Flange
Maulana Y. Mujiyono
Tig Weld The Crack using
#459870 / 06 O AMS 5786 Filler Wire on 09 Mar 20 2.00
TPE-331 Exhaust Duct Flange Maulana Y. Mujiyono
Blend Over Welded on
#459870 / 11 P 09 Mar 20 1.00
TPE-331 Exhaust Duct Flange
Maulana Y. Mujiyono
Check Conformity Between
P Control Sheet and Tools on 10 Mar 20 3.00
Welding Shop 3 Maulana Y. Mujiyono
Revising Tool Control Sheet
P 11 Mar 20 1.25
Welding Shop 3
Maulana Y. Mujiyono
Learn SPM 70-71-09
R 11 Mar 20 1.50
Para. 3 – 4
Maulana Y. Deden M.

P Welding Practice Preparation 12 Mar 20 0.75


Maulana Y. Mujiyono
Welding Practice Butt Joint 2G
P, S 12 Mar 20 0.75
Low Carbon Steel AMS 6593
Maulana Y. Mujiyono
Learn PMP-WS-006
R 12 Mar 20 0.33
Appendix Table 1
Maulana Y. Deden M.
Learn SPM 70-71-09
R 12 Mar 20 0.50
Para. 6
Maulana Y. Deden M.
Check DWC of Personnel
P 13 Mar 20 1.50
6/3 – 12/3
Maulana Y. Deden M.
Fill in Recapitulation
P 13 Mar 20 2.75
Machine Hour of RP Area
Maulana Y. Deden M.
METHODS OF INSTRUCTOR’S
SPENT TRAINEE’S TRAINEE’S
TASK# ACCOMPLISHMENT TASK / CASE DESCRIPTION DATE NAME &
TIME PERFORMANCE SIGNATURE
(MOA*: P/S/O/D/R) SIGNATURE
Provide Machine Hour Record
P Form for GTAW-05, MIG and 17 Mar 20 0.50
Portable GTAW Maulana Y. Deden M.
Check DWC of Personnel
P 17 Mar 20 0.33
13/3 – 16/3
Maulana Y. Deden M.
Check DWC of Personnel
P 18 Mar 20 0.50
13/3 – 17/3
Maulana Y. Deden M.

P Check Machine Hours Occupies 18 Mar 20 0.50


Maulana Y. Deden M.

P Welding Practice Preparation 19 Mar 20 1.50


Maulana Y. Mujiyono
Welding Practice Butt Joint 2G
P, S 19 Mar 20 1.00
Low Carbon Steel AMS 6593
Maulana Y. Mujiyono
Check DWC of Personnel
P 20 Mar 20 0.25
13/3 – 19/3
Maulana Y. Deden M.

P Check Machine Hours Occupies 20 Mar 20 0.50


Maulana Y. Deden M.
Apply Bond Coat and Top Coat
#454007 / 16 O 23 Mar 20 4.75
on CT7 Stg. 2 Blade Disk
Maulana Y. Agin G.
Apply Bond Coat and Top Coat
#454007 / 16 O 24 Mar 20 3.00
on CT7 Stg. 2 Blade Disk
Maulana Y. Agin G.
Apply Bond Coat and Top Coat
#454008 / 21 O 24 Mar 20 3.00
on CT7 Stg. 3-4 Blade Disk
Maulana Y. Agin G.
Check DWC of Personnel
P 31 Mar 20 1.00
27/3 – 31/3
Maulana Y. Deden M.
Tig Weld Local Areas Only of
#460070 / 305 O 31 Mar 20 1.00
Accelelator Housing CT7
Maulana Y. Mujiyono
METHODS OF INSTRUCTOR’S
SPENT TRAINEE’S TRAINEE’S
TASK# ACCOMPLISHMENT TASK / CASE DESCRIPTION DATE NAME &
TIME PERFORMANCE SIGNATURE
(MOA*: P/S/O/D/R) SIGNATURE
Removing Crack and Porosity
P 02 Apr 20 1.00
on ID Surface of Bearing
Maulana Y. Mujiyono
Blend Broken End of Nozzle
#460269 / 105 P 02 Apr 20 2.00
Ring to Make V Groove Area
Maulana Y. Mujiyono
Form Copper for Nozzle Ring
P 02 Apr 20 1.00
Welding Fixture
Maulana Y. Mujiyono
Check DWC of Personnel
P 02 Apr 20 1.00
27/3 – 2/4
Maulana Y. Deden M.

P Check Machine Hours Occupies 02 Apr 20 1.00


Maulana Y. Deden M.
5R Document Check in MJTS
P 06 Apr 20 1.50
Area
Maulana Y. Deden M.
Blend Broken End of Nozzle
#460269 / 105 P 06 Apr 20 0.67
Ring to Make V Groove Area
Maulana Y. Mujiyono
Revise Tool Inventory Sheet
P 08 Apr 20 1.50
Cabinet Welding Shop 3
Maulana Y. Deden M.
Blend to Remove Over Weld on
#459772 / 10 P 13 Apr 20 0.50
CT7 Cowl-Turbine Case
Maulana Y. Mujiyono
Prepare The ID Surface of
#460307 P 13 Apr 20 0.25
Bearing Pad for Rebabbit
Maulana Y. Mujiyono
Check DWC of Personnel
P 13 Apr 20 1.50
10/4 – 13/4
Maulana Y. Deden M.
Removing Crack on CT7
#460417 O 15 Apr 20 0.50
Exhaust Frame
Maulana Y. Mujiyono
Check DWC of Personnel
P 15 Apr 20 1.00
14/4 – 15/4
Maulana Y. Deden M.
Check DWC of Personnel
P 17 Apr 20 1.00
10/4 – 16/4
Maulana Y. Deden M.
METHODS OF INSTRUCTOR’S
SPENT TRAINEE’S TRAINEE’S
TASK# ACCOMPLISHMENT TASK / CASE DESCRIPTION DATE NAME &
TIME PERFORMANCE SIGNATURE
(MOA*: P/S/O/D/R) SIGNATURE

P Check Machine Hours Occupies 17 Apr 20 0.50


Maulana Y. Deden M.
Fill in Recapitulation
P 17 Apr 20 1.00
Machine Hour of MJTS Area
Maulana Y. Deden M.
th
Blend Nick/Dent on 6 Comp.
#460492 / 06 P 17 Apr 20 0.50
Rotor of Solar Turbine
Maulana Y. Andriyana M.
Check DWC of Personnel
P 21 Apr 20 0.50
17/4 – 21/4
Maulana Y. Deden M.
Check DWC of Personnel
P 23 Apr 20 0.50
17/4 – 23/4
Maulana Y. Deden M.
Check Machine Hours Occupies
P 23 Apr 20 0.50
April Week 4
Maulana Y. Deden M.
Rebabbit The ID Surface by Tig
#459585 / 04 O 23 Apr 20 0.50
Welding
Maulana Y. Mujiono

P Production Control WIP 41155 27 Apr 20 2.00


Maulana Y. Deden M.
Check DWC of Personnel
P 27 Apr 20 0.50
24/4 – 27/4
Maulana Y. Deden M.
Check Machine Hours Occupies
P 27 Apr 20 0.50
April Week 5
Maulana Y. Deden M.
Check DWC of Personnel
P 30 Apr 20 1.00
Month April
Maulana Y. Deden M.
Check Machine Hours Occupies
P 30 Apr 20 0.50
Month April
Maulana Y. Deden M.

P Production Control WIP 41155 30 Apr 20 2.00


Maulana Y. Deden M.
Evaluation of PR in Repair
P 30 Apr 20 3.50
Process Area
Maulana Y. Deden M.
METHODS OF INSTRUCTOR’S
SPENT TRAINEE’S TRAINEE’S
TASK# ACCOMPLISHMENT TASK / CASE DESCRIPTION DATE NAME &
TIME PERFORMANCE SIGNATURE
(MOA*: P/S/O/D/R) SIGNATURE

P Production Control WIP 41155 04 May 20 2.00


Maulana Y. Deden M.
Prepare for Spray Dia-BA
#459857 / 525 P 04 May 20 3.00
TPE331 G/B Housing
Maulana Y. Andriyana M.
Over Spray Removal on CT7
#452982 / 24 P 04 May 20 0.50
Stg.5 Blade Disk
Maulana Y. Andriyana M.
Blend to Remove Crack on CT7
#460606 / 27 P 06 May 20 0.50
Exhaust Frame
Maulana Y. Mujiono
Check DWC of Personnel
P 06 May 20 0.50
May Week 1
Maulana Y. Deden M.
Check Machine Hours Occupies
P 06 May 20 0.50
May Week 1
Maulana Y. Deden M.
Create Monthly Activity Report
P 06 May 20 3.50
of Special Process Area
Maulana Y. Deden M.
Prepare for Spray Dia-GA
#460155 / 50 P 11 May 20 3.50
TPE331 G/B Housing
Maulana Y. Andriyana M.
Update Tool Control Sheet for
P 11 May 20 1.00
Welding Shop no 3
Maulana Y. Deden M.
Check DWC of Personnel
P 11 May 20 0.50
8/5-11/5
Maulana Y. Deden M.
#459857 / 50, 52, Prepare for Spray Dia-GA, BA
P 13 May 20 0.50
525 and CB TPE331 G/B Housing
Maulana Y. Andriyana M.

P Production Control 700B Area 13 May 20 1.00


Maulana Y. Deden M.
Check DWC of Personnel
P 13 May 20 0.50
8/5-13/5
Maulana Y. Deden M.
Check DWC of Personnel
P 15 May 20 1.00
May Week 2
Maulana Y. Deden M.
METHODS OF INSTRUCTOR’S
SPENT TRAINEE’S TRAINEE’S
TASK# ACCOMPLISHMENT TASK / CASE DESCRIPTION DATE NAME &
TIME PERFORMANCE SIGNATURE
(MOA*: P/S/O/D/R) SIGNATURE
Check Machine Hours Occupies
P 15 May 20 0.50
May Week 1
Maulana Y. Deden M.
Make a Test Speciment for Dia-
#460155 / 54, 55 O 19 May 20 1.00
GA TPE331 G/B Housing
Maulana Y. Agin G.
Check DWC of Personnel
P 19 May 20 1.00
May Week 3
Maulana Y. Deden M.
Hand Blend Over Plated as
#459345 / 23 P 27 May 20 0.50
Required
Maulana Y. Andriyana M.
Check DWC of Personnel
P 27 May 20 1.00
May Week 4
Maulana Y. Deden M.
Inspect Actual Dia-GA, Dia-CB,
#459857 P, S 29 May 20 0.50
Dia-BA
Maulana Y. Deden M.
Create Monthly Activity Report
P 29 May 20 3.50
of Special Process Area
Maulana Y. Deden M.
Check DWC of Personnel
P 29 May 20 1.00
Month May
Maulana Y. Deden M.
Check Machine Hours Occupies
P 29 May 20 0.50
Month May
Maulana Y. Deden M.

P Production Control in 700B 03 Jun 20 1.00


Maulana Y. Deden M.
Update Tool Control Sheet for
P 03 Jun 20 0.50
Welding Shop no 3
Maulana Y. Deden M.
Clean The Tapped Hole with Air
#460636 / 04 O, P 03 Jun 20 0.50
Pressure Gun
Maulana Y. Rian H.

#460636 / 41 O, P Inspect The Tapped Hole 03 Jun 20 0.50


Maulana Y. Agin G.
Install The Replacement
#460636 / 425 O, P 03 Jun 20 1.00
Wirethread
Maulana Y. Rian H.
METHODS OF INSTRUCTOR’S
SPENT TRAINEE’S TRAINEE’S
TASK# ACCOMPLISHMENT TASK / CASE DESCRIPTION DATE NAME &
TIME PERFORMANCE SIGNATURE
(MOA*: P/S/O/D/R) SIGNATURE
Spray Area X on CT7 1st Stage
#454006 / 18 O 03 Jun 20 2.50
Blade Disk
Maulana Y. Agin G.
Apply Adhesive and Install
#459644 / 14 O, P 03 Jun 20 1.00
Sleeve to Hole
Maulana Y. Rian H.
Consumable Materials Review
P 05 Jun 20 0.50
for Thermal Spray CT7 Engine
Maulana Y. Deden M.
Check DWC of Personnel
P 05 Jun 20 0.50
June Week 1
Maulana Y. Deden M.
Check Machine Hours Occupies
P 05 Jun 20 0.50
June Week 1
Maulana Y. Deden M.
Replace Cracked Rivets on 2nd
#460762 / 02 O 05 Jun 20 0.50
Turbine Wheel TPE331 Engine
Maulana Y. Agin G.
Component Repair Status
P 05 Jun 20 1.00
Control
Maulana Y. Deden M.
Make a Test Specimen for 1st
O 05 Jun 20 1.00
Stage Blisk CT7 Engine
Maulana Y. Agin G.
Visual Inspect Reworked Area
#460606 / 37 O, P 08 Jun 20 0.50
on CT7 Exhaust Frame
Maulana Y. Agin G.
Troubleshooting Blasting
P 08 Jun 20 0.50
Machine
Maulana Y. Agin G.
Prepare for Spray
#458518 / 16 O 08 Jun 20 0.50
Stg. 5 Blade Disk CT7 Engine
Maulana Y. Agin G.
Apply Bond Coat and Top Coat
#458518 / 17 O 08 Jun 20 1.00
to Stg.5 Blade Disk CT7 Engine
Maulana Y. Agin G.
Revise Monthly Activity Report
P 09 Jun 20 1.00
of Special Process
Maulana Y. Deden M.
Controlling Repair Status of PT6
P 09 Jun 20 1.00
Engine WOM:455823
Maulana Y. Deden M.
METHODS OF INSTRUCTOR’S
SPENT TRAINEE’S TRAINEE’S
TASK# ACCOMPLISHMENT TASK / CASE DESCRIPTION DATE NAME &
TIME PERFORMANCE SIGNATURE
(MOA*: P/S/O/D/R) SIGNATURE
Visual Inspect and Verify
#459966 / 19 O 09 Jun 20 0.50
Dimension Turb. Wheel TPE331
Maulana Y. Agin G.
Inspect Wirethread on HPT
#460636 / 43 O, P 10 Jun 20 0.50
Nozzle Case Engine Tay
Maulana Y. Agin G.
Verify Concentricity on Torsion
#460813 / 05 O 10 Jun 20 0.50
Shaft Assy. Engine TPE331
Maulana Y. Agin G.
Blend High Metal on Bulkhead
#460660 / 06 P 10 Jun 20 0.50
PGB Engine CT-7
Maulana Y. Rian H.

P, S Welding Practice Preparation 10 Jun 20 1.00


Maulana Y. Mujiyono
Welding Practice Butt Joint 2G
P, S 10 Jun 20 1.00
on Low Carbon Steel
Maulana Y. Mujiyono

P, S Welding Practice Preparation 11 Jun 20 1.00


Maulana Y. Mujiyono
Welding Practice Butt Joint 2G
P, S 11 Jun 20 1.00
on Low Carbon Steel
Maulana Y. Mujiyono
Check DWC of Personnel
P 11 Jun 20 0.50
Month June Week 2
Maulana Y. Deden M.
Check Machine Hours Occupies
P 11 Jun 20 0.50
Month June Week 2
Maulana Y. Deden M.
Learn CNC Lathe Process on ID
#458346 / 59 O 15 Jun 20 7.00
RUB Comp. Case Engine CT-7
Maulana Y. Deden M.
Remove Retaining Ring on PT6
#460953 / 07 O, P 16 Jun 20 0.50
Gas Generator Case
Maulana Y. Rian H.
Remove Comp. Stator Air Seal
#460953 / 08 O, P 16 Jun 20 0.50
on PT6 Gas Generator Case
Maulana Y. Rian H.
Hand Blend and Touch-up Bare
#460155 / 59, 1, 61 P 16 Jun 20 3.50
Metal with DOW-19
Maulana Y. B. Lobolado
METHODS OF INSTRUCTOR’S
SPENT TRAINEE’S TRAINEE’S
TASK# ACCOMPLISHMENT TASK / CASE DESCRIPTION DATE NAME &
TIME PERFORMANCE SIGNATURE
(MOA*: P/S/O/D/R) SIGNATURE
Blend Broken End of Nozzle
#460952 / 10 P 17 Jun 20 1.00
Ring Turbocharger
Maulana Y. Mujiyono
Blend to Remove Crack on 17 – 18
#460952 / 11 P 8.00
Nozzle Ring Turbocharger Jun 20
Maulana Y. Mujiyono
Check DWC of Personnel
P 18 Jun 20 0.50
Month June Week 3
Maulana Y. Deden M.
Check Machine Hours Occupies
P 18 Jun 20 0.50
Month June Week 3
Maulana Y. Deden M.
Make a Test Specimen for
#460155 / 54, 55 O 22 Jun 20 0.50
Dia-GA TPE-331 G/B Housing
Maulana Y. Agin G.
Blend Broken End of Nozzle
#461000 / 10 P 23 Jun 20 1.00
Ring Turbocharger
Maulana Y. Mujiyono
Blend to Remove Crack on
#461000 / 11 P 23 Jun 20 4.00
Nozzle Ring Turbocharger
Maulana Y. Mujiyono

P Production Control in 700B 23 Jun 20 1.00


Maulana Y. Deden M.
Equipment Troubleshooting
P 24 Jun 20 2.00
Welding Shop 1
Maulana Y. B. Lobolado

P, S Welding Practice Preparation 24 Jun 20 1.00


Maulana Y. Mujiyono
Welding Practice Butt Joint 2G
P, S 24 Jun 20 1.50
on Low Carbon Steel
Maulana Y. Mujiyono
Grind Low Carbon Steel
P 25 Jun 20 1.00
Specimen
Maulana Y. Mujiyono
Blend using Dies and Chase
#461143 / 02 P 25 Jun 20 0.50
The Thread on CT-7 Oil Tubes
Maulana Y. Rian H.

P Welding Practice Preparation 25 Jun 20 1.00


Maulana Y. Mujiyono
METHODS OF INSTRUCTOR’S
SPENT TRAINEE’S TRAINEE’S
TASK# ACCOMPLISHMENT TASK / CASE DESCRIPTION DATE NAME &
TIME PERFORMANCE SIGNATURE
(MOA*: P/S/O/D/R) SIGNATURE
Welding Practice Butt Joint 2G
P 25 Jun 20 1.50
on Low Carbon Steel
Maulana Y. Mujiyono
Check DWC of Personnel
P 25 Jun 20 0.50
Month June Week 4
Maulana Y. Deden M.
Check Machine Hours Occupies
P 25 Jun 20 0.50
Month June Week 4
Maulana Y. Deden M.
#441306 / 03, 04, Prepare for Welding Crack on
P 29 Jun 20 0.50
05 Discharge Nozzle Engine Tay
Maulana Y. B. Lobolado

P Production Control in 700B 29 Jun 20 1.00


Maulana Y. Deden M.
Cold Work Comp. Rotor Vortex
#461080 / 03 P 30 Jun 20 1.00
Engine CT-7 to Original Contour
Maulana Y. Rian H.
Install New Pin to Ring-IGV
#460576 / 03 P 30 Jun 20 1.00
Actuating Engine CT-7
Maulana Y. Rian H.
Check DWC of Personnel
P 30 Jun 20 0.50
Month June
Maulana Y. Deden M.
Check Machine Hours Occupies
P 30 Jun 20 0.50
Month June
Maulana Y. Deden M.
Read QI RP17-004 Material
R 30 Jun 20 1.00
Joint Operation
Maulana Y. Deden M.
METHODS OF INSTRUCTOR’S
SPENT TRAINEE’S TRAINEE’S
TASK# ACCOMPLISHMENT TASK / CASE DESCRIPTION DATE NAME &
TIME PERFORMANCE SIGNATURE
(MOA*: P/S/O/D/R) SIGNATURE
Revise Tool Box Control Sheet
P 01 Jul 20 0.50
of Welding Shop 3
Maulana Y. B. Lobolado
Routine Equipment
P 01 Jul 20 0.50
Maintenance Bench Repair
Maulana Y. B. Lobolado
Controlling Quantity of Bench
P 01 Jul 20 1.00
Repair Consumable Material
Maulana Y. B. Lobolado
Controlling Quantity of Welding
P 01 Jul 20 2.00
Consumable Material
Maulana Y. B. Lobolado
Read QI RP17-011 Special
R 01 Jul 20 0.50
Tooling and Hand Tools Control
Maulana Y. Deden M.
Remove Locknut and Washer
#461255 / 06 P 02 Jul 20 0.50
Filler Oil Cap Engine PT6A
Maulana Y. Agin G.
Install New Keywasher Filler Oil
#461255 / 07 P 02 Jul 20 0.50
Cap Engine PT6A
Maulana Y. Agin G.
Cut Oil Tank Gage Filler Oil Cap
#461255 / 09 P 02 Jul 20 0.50
Engine PT6A
Maulana Y. Agin G.
Assemble Combustion Liner
#461151 / 02 P 02 Jul 20 0.50
and Discharge Nozzle Tay
Maulana Y. Agin G.
Blend High Metals Pin Holes
P 02 Jul 20 0.50
Torsion Shaft Engine CT-7
Maulana Y. Agin G.
Updating BR 09 Cabinet of
P 02 Jul 20 1.00
Consumable Materials
Maulana Y. B. Lobolado
Prepare Specimen for Welding
P 02 Jul 20 0.50
Practice
Maulana Y. B. Lobolado
Routine Equipment
P 03 Jul 20 0.50
Maintenance Bench Repair
Maulana Y. B. Lobolado
Support and Learn Robotic
P 03 Jul 20 4.00
Thermal Spray Process
Maulana Y. Agin G.
METHODS OF INSTRUCTOR’S
SPENT TRAINEE’S TRAINEE’S
TASK# ACCOMPLISHMENT TASK / CASE DESCRIPTION DATE NAME &
TIME PERFORMANCE SIGNATURE
(MOA*: P/S/O/D/R) SIGNATURE
Check DWC of Personnel July
P 03 Jul 20 0.50
Week 1
Maulana Y. Deden M.
Check Machine Hours Occupies
P 03 Jul 20 0.50
July Week 1
Maulana Y. Deden M.

P, S Welding Practice Preparation 06 Jul 20 2.00


Maulana Y. B. Lobolado
Welding Practice Butt Joint 2G
P, S 06 Jul 20 3.00
on Low Carbon Steel
Maulana Y. B. Lobolado

P, S Welding Practice Preparation 07 Jul 20 1.00


Maulana Y. B. Lobolado
Welding Practice Butt Joint 2G
P, S 07 Jul 20 2.00
on Low Carbon Steel
Maulana Y. B. Lobolado
Routine Maintenance Check of
P 08 Jul 20 0.50
Equipment in Bench Repair
Maulana Y. B. Lobolado
Create a Gas Consumable
P 08 Jul 20 0.50
Control Form in Welding Shop
Maulana Y. B. Lobolado

P, S Welding Practice Preparation 08 Jul 20 2.00


Maulana Y. B. Lobolado
Welding Practice Butt Joint 2G
P, S 08 Jul 20 3.00
on Low Carbon Steel
Maulana Y. B. Lobolado
Routine Maintenance Check of
P 09 Jul 20 0.50
Equipment in Bench Repair
Maulana Y. B. Lobolado

P, S Welding Practice Preparation 09 Jul 20 1.50


Maulana Y. B. Lobolado
Welding Practice Butt Joint 2G
P, S 09 Jul 20 3.00
on Low Carbon Steel
Maulana Y. B. Lobolado
Assemble Pin to The Jaw of
#461398 / 03 P 09 Jul 20 0.50
Tool CT-7 Spanner Wrench
Maulana Y. Rian H.
METHODS OF INSTRUCTOR’S
SPENT TRAINEE’S TRAINEE’S
TASK# ACCOMPLISHMENT TASK / CASE DESCRIPTION DATE NAME &
TIME PERFORMANCE SIGNATURE
(MOA*: P/S/O/D/R) SIGNATURE
Check DWC of Personnel July
P 09 Jul 20 0.50
Week 2
Maulana Y. Deden M.
Check Machine Hours Occupies
P 09 Jul 20 0.50
July Week 2
Maulana Y. Deden M.

P, S Welding Practice Preparation 10 Jul 20 2.00


Maulana Y. B. Lobolado
Welding Practice Fillet Joint 2F
P, S 10 Jul 20 4.00
on Low Carbon Steel
Maulana Y. B. Lobolado
Remove Old Spring Pins on
#461047 / 08 P 13 Jul 20 0.50
RGB Engine PT6T
Maulana Y. Rian H.
Install Headless Shoulder Pin to
#461047 / 085 P 13 Jul 20 0.50
RGB Engine PT6T
Maulana Y. Rian H.
Apply Epoxy PWA 457 to RGB
#461047 / 14 P 13 Jul 20 1.50
Engine PT6T
Maulana Y. Rian H.
Routine Maintenance Check of
P 13 Jul 20 0.50
Equipment in Bench Repair
Maulana Y. B. Lobolado
Routine Maintenance Check of
P 14 Jul 20 0.50
Equipment in Bench Repair
Maulana Y. B. Lobolado

P, S Welding Practice Preparation 14 Jul 20 2.00


Maulana Y. B. Lobolado
Welding Practice Fusion Beam
P, S 14 Jul 20 0.50
on Aluminum
Maulana Y. B. Lobolado
Blend Flared End to Remove
#461507 / 02 P 15 Jul 20 0.50
Pin on Actuating Ring CT7
Maulana Y. Rian H.

P, S Welding Practice Preparation 15 Jul 20 2.00


Maulana Y. B. Lobolado
Blend Nick, Dent and High
#461549 / 04 P 16 Jul 20 0.50
Metals on Tie Rod Nut CT7
Maulana Y. Rian H.
METHODS OF INSTRUCTOR’S
SPENT TRAINEE’S TRAINEE’S
TASK# ACCOMPLISHMENT TASK / CASE DESCRIPTION DATE NAME &
TIME PERFORMANCE SIGNATURE
(MOA*: P/S/O/D/R) SIGNATURE

P Chase Thread IGV Engine CT7 16 Jul 20 0.50


Maulana Y. Rian H.
Check DWC of Personnel July
P 16 Jul 20 0.50
Week 3
Maulana Y. Deden M.
Check Machine Hours Occupies
P 16 Jul 20 0.50
July Week 3
Maulana Y. Deden M.
Welding Practice Fillet Joint 2F
P, S 17 Jul 20 3.00
on Low Carbon Steel
Maulana Y. B. Lobolado
Tig Weld The Crack Area on
#461542 / 33 O 17 Jul 20 2.00
Exhaust Frame Engine CT7
Maulana Y. B. Lobolado
Blend Welded Area to 0.020”
#461542 / 33 P 17 Jul 20 1.00
from Original Contour
Maulana Y. B. Lobolado

P, S Welding Practice Preparation 20 Jul 20 1.00


Maulana Y. B. Lobolado
Welding Practice Butt Joint 2G
P, S 20 Jul 20 2.00
on Low Carbon Steel
Maulana Y. B. Lobolado

P, S Welding Practice Preparation 21 Jul 20 0.25


Maulana Y. B. Lobolado
Welding Practice Butt Joint 2G
P, S 21 Jul 20 0.75
on Low Carbon Steel
Maulana Y. B. Lobolado

P, S Welding Practice Preparation 22 Jul 20 1.00


Maulana Y. B. Lobolado
Welding Practice Butt Joint 2G
P, S 22 Jul 20 2.00
on Low Carbon Steel
Maulana Y. B. Lobolado

P, S Welding Practice Preparation 23 Jul 20 1.00


Maulana Y. B. Lobolado
Welding Practice Butt Joint 2G
P, S 23 Jul 20 2.00
on Low Carbon Steel
Maulana Y. B. Lobolado
METHODS OF INSTRUCTOR’S
SPENT TRAINEE’S TRAINEE’S
TASK# ACCOMPLISHMENT TASK / CASE DESCRIPTION DATE NAME &
TIME PERFORMANCE SIGNATURE
(MOA*: P/S/O/D/R) SIGNATURE
Check DWC of Personnel July
P 23 Jul 20 0.50
Week 4
Maulana Y. Deden M.
Check Machine Hours Occupies
P 23 Jul 20 0.50
July Week 4
Maulana Y. Deden M.
Check Work Schedule Repair
P 23 Jul 20 2.50
Process Shop
Maulana Y. Deden M.
Check Work Schedule Repair
P 23 Jul 20 2.50
Process Shop
Maulana Y. Deden M.
Check Work Schedule Repair
P 24 Jul 20 4.50
Process Shop
Maulana Y. Deden M.
Routine Maintenance Check of
P 24 Jul 20 1.00
Equipment in Bench Repair
Maulana Y. B. Lobolado
Controlling Consumable
P 27 Jul 20 1.00
Material Welding Shop
Maulana Y. B. Lobolado

P, S Welding Practice Preparation 27 Jul 20 1.00


Maulana Y. B. Lobolado
Welding Practice Butt Joint 2G,
P, S 27 Jul 20 3.00
3G on Nickel Base Alloy
Maulana Y. B. Lobolado

P Bench Work Practice 27 Jul 20 2.00


Maulana Y. B. Lobolado

P, S Welding Practice Preparation 28 Jul 20 1.00


Maulana Y. B. Lobolado
Welding Practice Butt Joint 2G,
P, S 28 Jul 20 4.00
3G on Nickel Base Alloy
Maulana Y. B. Lobolado

P Bench Work Practice 28 Jul 20 2.00


Maulana Y. B. Lobolado

P, S Welding Practice Preparation 29 Jul 20 1.00


Maulana Y. B. Lobolado
METHODS OF INSTRUCTOR’S
SPENT TRAINEE’S TRAINEE’S
TASK# ACCOMPLISHMENT TASK / CASE DESCRIPTION DATE NAME &
TIME PERFORMANCE SIGNATURE
(MOA*: P/S/O/D/R) SIGNATURE
Welding Practice Butt Joint 2G,
P, S 29 Jul 20 4.00
3G on Nickel Base Alloy
Maulana Y. B. Lobolado

P Bench Work Practice 29 Jul 20 2.00


Maulana Y. B. Lobolado

P, S Welding Practice Preparation 30 Jul 20 1.00


Maulana Y. B. Lobolado
Welding Practice Fillet T Joint
P, S 30 Jul 20 3.00
2F on Nickel Base Alloy
Maulana Y. B. Lobolado

P Bench Work Practice 30 Jul 20 2.00


Maulana Y. B. Lobolado
Check DWC of Personnel
P 30 Jul 20 0.50
Month July
Maulana Y. Deden M.
Check Machine Hours Occupies
P 30 Jul 20 0.50
Month July
Maulana Y. Deden M.
METHODS OF INSTRUCTOR’S
SPENT TRAINEE’S TRAINEE’S
TASK# ACCOMPLISHMENT TASK / CASE DESCRIPTION DATE NAME &
TIME PERFORMANCE SIGNATURE
(MOA*: P/S/O/D/R) SIGNATURE

P, S Welding Practice Preparation 03 Aug 20 1.00


Maulana Y. B. Lobolado
Welding Practice Fillet T Joint
P, S 03 Aug 20 2.00
2F on Nickel Base Alloy
Maulana Y. B. Lobolado
Create Monthly Activity Report
P 04 Aug 20 3.50
of Special Process Area
Maulana Y. Deden M.

P, S Welding Practice Preparation 04 Aug 20 1.00


Maulana Y. B. Lobolado
Welding Practice Fillet T Joint
P, S 04 Aug 20 2.00
2F on Nickel Base Alloy
Maulana Y. B. Lobolado

P, S Welding Practice Preparation 05 Aug 20 2.00


Maulana Y. B. Lobolado
Welding Practice Fillet T Joint
P, S 05 Aug 20 4.00
2F on Nickel Base Alloy
Maulana Y. B. Lobolado

P, S Welding Practice Preparation 06 Aug 20 2.00


Maulana Y. B. Lobolado
Welding Practice Fillet T Joint
P, S 06 Aug 20 4.00
2F on Nickel Base Alloy
Maulana Y. B. Lobolado
Check DWC of Personnel
P 06 Aug 20 0.50
Auguts Week 1
Maulana Y. Deden M.
Check Machine Hours Occupies
P 06 Aug 20 0.50
August Week 1
Maulana Y. Deden M.

P, S Welding Practice Preparation 07 Aug 20 1.00


Maulana Y. B. Lobolado
Welding Practice Fillet T Joint
P, S 07 Aug 20 2.00
2F on Nickel Base Alloy
Maulana Y. B. Lobolado
Support and Learn Robotic
P 07 Aug 20 3.00
Thermal Spray Process
Maulana Y. Andriyana M.
METHODS OF INSTRUCTOR’S
SPENT TRAINEE’S TRAINEE’S
TASK# ACCOMPLISHMENT TASK / CASE DESCRIPTION DATE NAME &
TIME PERFORMANCE SIGNATURE
(MOA*: P/S/O/D/R) SIGNATURE

P, S Welding Practice Preparation 10 Aug 20 2.00


Maulana Y. B. Lobolado
Welding Practice Fillet T Joint
P, S 10 Aug 20 4.00
2F on Nickel Base Alloy
Maulana Y. B. Lobolado

P, S Welding Practice Preparation 11 Aug 20 2.00


Maulana Y. B. Lobolado
Welding Practice Fillet T Joint
P, S 11 Aug 20 4.00
2F on Nickel Base Alloy
Maulana Y. B. Lobolado

P, S Welding Practice Preparation 12 Aug 20 2.00


Maulana Y. B. Lobolado
Welding Practice Fillet T Joint
P, S 12 Aug 20 4.00
2F on Nickel Base Alloy
Maulana Y. B. Lobolado

P, S Welding Practice Preparation 13 Aug 20 1.50


Maulana Y. B. Lobolado
Welding Practice Fillet T Joint
P, S 13 Aug 20 3.00
2F on Nickel Base Alloy
Maulana Y. B. Lobolado
Check DWC of Personnel
P 13 Aug 20 0.50
Auguts Week 2
Maulana Y. Deden M.
Check Machine Hours Occupies
P 13 Aug 20 0.50
August Week 2
Maulana Y. Deden M.

P, S Welding Practice Preparation 14 Aug 20 1.00


Maulana Y. B. Lobolado
Welding Practice Fillet T Joint
P, S 14 Aug 20 3.00
2F on Nickel Base Alloy
Maulana Y. B. Lobolado

P, S Welding Practice Preparation 19 Aug 20 0.50


Maulana Y. B. Lobolado
Welding Practice Fillet T Joint
P, S 19 Aug 20 1.00
2F on Nickel Base Alloy
Maulana Y. B. Lobolado
METHODS OF INSTRUCTOR’S
SPENT TRAINEE’S TRAINEE’S
TASK# ACCOMPLISHMENT TASK / CASE DESCRIPTION DATE NAME &
TIME PERFORMANCE SIGNATURE
(MOA*: P/S/O/D/R) SIGNATURE
Check DWC of Personnel
P 19 Aug 20 0.50
Auguts Week 3
Maulana Y. Deden M.
Check Machine Hours Occupies
P 19 Aug 20 0.50
August Week 3
Maulana Y. Deden M.
Measure Thickness of Winglet
#462190 / 02 O 24 Aug 20 0.50
Before Spray
Maulana Y. Agin G.
Measure Thickness of Winglet
#462191 / 02 O 24 Aug 20 0.50
Before Spray
Maulana Y. Agin G.
Apply Aluminum 1100 Coating
#462190 / 04 P 25 Aug 20 4.00
to The Winglet
Maulana Y. Andriyana M.
Apply Aluminum 1100 Coating
#462191 / 04 P 25 Aug 20 4.00
to The Winglet
Maulana Y. Andriyana M.
Inspect and Measure Thickness
#462190 / 07 O 26 Aug 20 0.50
of Winglet After Spray
Maulana Y. Agin G.
Inspect and Measure Thickness
#462191 / 07 O 26 Aug 20 0.50
of Winglet After Spray
Maulana Y. Agin G.

P, S Welding Practice Preparation 27 Aug 20 1.00


Maulana Y. B. Lobolado
Welding Practice Fillet T Joint
P, S 27 Aug 20 3.00
2F on Nickel Base Alloy
Maulana Y. B. Lobolado
Check DWC of Personnel
P 27 Aug 20 0.50
Auguts Week 3
Maulana Y. Deden M.
Check Machine Hours Occupies
P 27 Aug 20 0.50
August Week 3
Maulana Y. Deden M.

P, S Welding Practice Preparation 28 Aug 20 1.00


Maulana Y. B. Lobolado
Welding Practice Fillet T Joint
P, S 28 Aug 20 3.00
2F on Nickel Base Alloy
Maulana Y. B. Lobolado
METHODS OF INSTRUCTOR’S
SPENT TRAINEE’S TRAINEE’S
TASK# ACCOMPLISHMENT TASK / CASE DESCRIPTION DATE NAME &
TIME PERFORMANCE SIGNATURE
(MOA*: P/S/O/D/R) SIGNATURE

O Heat Treat Blade PT6 31 Aug 20 1.00


Maulana Y. Muchsin K.
Controlling Incoming Parts
P 31 Aug 20 1.00
Queue 700 B Area
Maulana Y. Deden M.
Read QI RP17-023 Heat
R 31 Aug 20 0.50
Treatment Operation
Maulana Y. Deden M.
Check DWC of Personnel
P 31 Aug 20 0.50
Month August
Maulana Y. Deden M.
Check Machine Hours Occupies
P 31 Aug 20 0.50
Month August
Maulana Y. Deden M.
METHODS OF INSTRUCTOR’S
SPENT TRAINEE’S TRAINEE’S
TASK# ACCOMPLISHMENT TASK / CASE DESCRIPTION DATE NAME &
TIME PERFORMANCE SIGNATURE
(MOA*: P/S/O/D/R) SIGNATURE
Create Monthly Activity Report
P 01 Sep 20 3.00
of Special Process Area
Maulana Y. Deden M.

462125 P Prepare for Welding 02 Sep 20 0.50


Maulana Y. B. Lobolado
Build Up Erroded Area on
462125 / 09 P 02 Sep 20 2.50
Channel Ring Crude Oil Pump
Maulana Y. B. Lobolado

P, S Welding Practice Preparation 03 Sep 20 1.00


Maulana Y. B. Lobolado
Welding Practice Fillet T Joint
P, S 03 Sep 20 3.00
2F on Nickel Base Alloy
Maulana Y. B. Lobolado
Check DWC of Personnel
P 03 Sep 20 0.50
September Week 1
Maulana Y. Deden M.
Check Machine Hours Occupies
P 03 Sep 20 0.50
September Week 1
Maulana Y. Deden M.
Read ULVAC Vacuum HT
R 04 Sep 20 0.50
Furnace Manual Chapter 5-6
Maulana Y. Deden M.
Stress Relieve After Welding on
462083 / 16 O 04 Sep 20 8.00
Nozzle RingTurbocharger
Maulana Y. Muchsin K.
Stress Relieve After Welding on
462074 / 16 O 04 Sep 20 8.00
Nozzle RingTurbocharger
Maulana Y. Muchsin K.
Stress Relieve After Welding on
462079 / 16 O 04 Sep 20 8.00
Nozzle RingTurbocharger
Maulana Y. Muchsin K.
Stress Relieve Power Turbine
462262 / 10 O 07 Sep 20 6.00
Shaft Engine PT6A
Maulana Y. Muchsin K.
Stress Relieve Carbon Seal
462294 / 116 O 08 Sep 20 4.50
Housing Steam Turbine Unit
Maulana Y. Muchsin K.

P, S Welding Practice Preparation 08 Sep 20 0.50


Maulana Y. B. Lobolado
METHODS OF INSTRUCTOR’S
SPENT TRAINEE’S TRAINEE’S
TASK# ACCOMPLISHMENT TASK / CASE DESCRIPTION DATE NAME &
TIME PERFORMANCE SIGNATURE
(MOA*: P/S/O/D/R) SIGNATURE
Welding Practice Fillet T Joint
P, S 08 Sep 20 2.00
2F on Nickel Base Alloy
Maulana Y. B. Lobolado
Tig Weld The Crack on Flange
461889 / 03 P 09 Sep 20 0.25
Turbine Case Engine CT7
Maulana Y. B. Lobolado
Blend The Welded Area to
461889 / 05 P 09 Sep 20 0.16
Contour of Flange
Maulana Y. B. Lobolado
Check DWC of Personnel
P 10 Sep 20 0.50
September Week 2
Maulana Y. Deden M.
Check Machine Hours Occupies
P 10 Sep 20 0.50
September Week 2
Maulana Y. Deden M.
Visually Inspect Welded Area
461892 / 06 O 14 Sep 20 0.50
on Turbine Case Engine CT7
Maulana Y. Agin G.
Visually Inspect Welded Area
461887 / 15 O 14 Sep 20 0.50
on Cowl Turbine Case CT7
Maulana Y. Agin G.
Learn to Program ULVAC
R 15 Sep 20 4.00
Vacuum HT Furnace Machine
Maulana Y. Deden M.
Stress Relieve After Welding on
462455 / 16 O 16 Sep 20 8.00
Nozzle RingTurbocharger
Maulana Y. Muchsin K.
Stress Relieve After Welding on
462458 / 16 O 16 Sep 20 8.00
Nozzle RingTurbocharger
Maulana Y. Muchsin K.
Stress Relieve After Welding on
462459 / 16 O 16 Sep 20 8.00
Nozzle RingTurbocharger
Maulana Y. Muchsin K.
Tack Weld Wear Ring Stage
462595 / 02 P 16 Sep 20 2.00
Casing on Crude Oil Pump
Maulana Y. B. Lobolado
Install Thermo Couple to HT
P 17 Sep 20 2.50
Vacuum Furnace Machine
Maulana Y. Muchsin K.
Learn Silver Plating Process on
O 17 Sep 20 1.50
AISI 4130
Maulana Y. Helmi A.
METHODS OF INSTRUCTOR’S
SPENT TRAINEE’S TRAINEE’S
TASK# ACCOMPLISHMENT TASK / CASE DESCRIPTION DATE NAME &
TIME PERFORMANCE SIGNATURE
(MOA*: P/S/O/D/R) SIGNATURE

P Prepare Specimen for Plating 17 Sep 20 2.00


Maulana Y. Dede Y.
Check DWC of Personnel
P 17 Sep 20 0.50
September Week 3
Maulana Y. Deden M.
Check Machine Hours Occupies
P 17 Sep 20 0.50
September Week 3
Maulana Y. Deden M.
Tack Weld Wear Ring Stage
462645 / 09 P 18 Sep 20 0.16
Casing on Crude Oil Pump
Maulana Y. B. Lobolado
Tack Weld Wear Ring Stage
462362 / 02 P 18 Sep 20 0.33
Casing on Crude Oil Pump
Maulana Y. B. Lobolado
Learn How to Weld Crack on
O, D 18 Sep 20 4.00
Combustion Liner Engine CT7
Maulana Y. B. Lobolado
Blast per PMP MC-0004 to
456970 / 05 P 21 Sep 20 0.25
Sleeve Engine DART7
Maulana Y. Agus S.
Apply Black Oxide Coat to All
456970 / 06 P 21 Sep 20 0.50
Cover of Sleeve Engine DART7
Maulana Y. Dede Y.
Tig Weld The Cracks on
462572 / 24 O 21 Sep 20 6.00
Combustion Liner Engine CT7
Maulana Y. B. Lobolado
Blend Welded Area of
462572 / 29 P 22 Sep 20 2.00
Combustion Liner Engine CT7
Maulana Y. B. Lobolado
Tig Weld The Cracks on
462391 / 24 O 22 Sep 20 6.00
Combustion Liner Engine CT7
Maulana Y. B. Lobolado
Blend Welded Area of
462391 / 29 P 23 Sep 20 2.00
Combustion Liner Engine CT7
Maulana Y. B. Lobolado
Tig Weld The Cracks on
462588 / 24 O 23 Sep 20 6.00
Combustion Liner Engine CT7
Maulana Y. B. Lobolado
Check DWC of Personnel
P 24 Sep 20 0.50
September Week 3
Maulana Y. Deden M.
METHODS OF INSTRUCTOR’S
SPENT TRAINEE’S TRAINEE’S
TASK# ACCOMPLISHMENT TASK / CASE DESCRIPTION DATE NAME &
TIME PERFORMANCE SIGNATURE
(MOA*: P/S/O/D/R) SIGNATURE
Check Machine Hours Occupies
P 24 Sep 20 0.50
September Week 3
Maulana Y. Deden M.
Production Control for WIP
P 24 Sep 20 6.00
462588; Combustion Liner CT7
Maulana Y. Deden M.
Production Control for WIP
P 25 Sep 20 6.00
462588; Combustion Liner CT7
Maulana Y. Deden M.
Blend Welded Area of
462588 / 29 P 25 Sep 20 1.00
Combustion Liner Engine CT7
Maulana Y. B. Lobolado
Translate QI RP17-001 as
R, P 25 Sep 20 1.00
preparation for QI Interpretation
Maulana Y. Deden M.
QI Interpretation Meeting for QI
R, D 28 Sep 20 1.00
RP17-001 CC&P Operation
Maulana Y. Deden M.
Translate QI RP17-002 as
R, P 28 Sep 20 3.00
preparation for QI Interpretation
Maulana Y. Deden M.
QI Interpretation Meeting for QI
R, D 28 Sep 20 1.00
RP17-002 Brush Plating Opr.
Maulana Y. Deden M.
Translate QI RP17-003 as
R, P 28 Sep 20 3.00
preparation for QI Interpretation
Maulana Y. Deden M.
QI Interpretation Meeting for QI
R, D 29 Sep 20 1.00
RP17-003 Electro Plating Opr.
Maulana Y. Deden M.
Grind TBC on Combustion Liner
462864 / 18 P 29 Sep 20 2.00
Engine CT7
Maulana Y. B. Lobolado
Translate QI AS17-004 as
R, P 29 Sep 20 3.00
preparation for QI Interpretation
Maulana Y. Deden M.
QI Interpretation Meeting for QI
R, D 29 Sep 20 1.00
AS17-004 Tools Handling
Maulana Y. Deden M.
QI Interpretation Meeting for QI
R, D 30 Sep 20 1.00
RP17-005 Thermal Spray Opr.
Maulana Y. Deden M.
METHODS OF INSTRUCTOR’S
SPENT TRAINEE’S TRAINEE’S
TASK# ACCOMPLISHMENT TASK / CASE DESCRIPTION DATE NAME &
TIME PERFORMANCE SIGNATURE
(MOA*: P/S/O/D/R) SIGNATURE
Translate QI RP17-004 as
R, P 30 Sep 20 3.00
preparation for QI Interpretation
Maulana Y. Deden M.
QI Interpretation Meeting for QI
R, D 30 Sep 20 1.00
RP17-004 Material Joint Opr.
Maulana Y. Deden M.
Check DWC of Personnel
P 30 Sep 20 0.50
Month September
Maulana Y. Deden M.
Check Machine Hours Occupies
P 30 Sep 20 0.50
Month September
Maulana Y. Deden M.
METHODS OF INSTRUCTOR’S
SPENT TRAINEE’S TRAINEE’S
TASK# ACCOMPLISHMENT TASK / CASE DESCRIPTION DATE NAME &
TIME PERFORMANCE SIGNATURE
(MOA*: P/S/O/D/R) SIGNATURE
Translate QI RP17-010 as
R, P 01 Oct 20 2.00
preparation for QI Interpretation
Maulana Y. Deden M.
QI Interpretation Meeting for QI
R, D 01 Oct 20 1.00
RP17-010 Bench Repair Opr.
Maulana Y. Deden M.
QI Interpretation Meeting for QI
R, D 01 Oct 20 1.00
AS17-004 Tools Handling
Maulana Y. Deden M.
Check DWC of Personnel
P 01 Oct 20 0.50
October Week 1
Maulana Y. Deden M.
Check Machine Hours Occupies
P 01 Oct 20 0.50
October Week 1
Maulana Y. Deden M.
Create Monthly Activity Report
P 01 Oct 20 2.00
of Special Process Area
Maulana Y. Deden M.
QI Interpretation Meeting for QI
R, D 05 Oct 20 1.00
RP17-006 Shot Peening Opr.
Maulana Y. Deden M.
Create Monthly Activity Report
P 05 Oct 20 1.00
of Special Process Area
Maulana Y. Deden M.
Translate QI RP17-007 as
R, P 05 Oct 20 2.00
preparation for QI Interpretation
Maulana Y. Deden M.
QI Interpretation Meeting for QI
R, D 05 Oct 20 1.00
RP17-007 Heat Treatment Opr.
Maulana Y. Deden M.
Translate QI RP17-011 as
R, P 06 Oct 20 3.00
preparation for QI Interpretation
Maulana Y. Deden M.
QI Interpretation Meeting for QI
R, D 06 Oct 20 1.00
RP17-009 Painting Operation
Maulana Y. Deden M.
QI Interpretation Meeting for QI
R, D 06 Oct 20 1.00
AS17-004 Tools Handling
Maulana Y. Deden M.
QI Interpretation Meeting for QI
R, D 07 Oct 20 1.00
RP17-011 Tool Inventory Cont.
Maulana Y. Deden M.
METHODS OF INSTRUCTOR’S
SPENT TRAINEE’S TRAINEE’S
TASK# ACCOMPLISHMENT TASK / CASE DESCRIPTION DATE NAME &
TIME PERFORMANCE SIGNATURE
(MOA*: P/S/O/D/R) SIGNATURE
QI Interpretation Meeting for QI
R, D 07 Oct 20 1.00
AS17-004 Tools Handling
Maulana Y. Deden M.

P, S Welding Practice Preparation 07 Oct 20 1.00


Maulana Y. B. Lobolado
Welding Practice Fillet T Joint
P, S 07 Oct 20 2.00
2F on Nickel Base Alloy
Maulana Y. B. Lobolado
Check DWC of Personnel
P 08 Oct 20 0.50
October Week 2
Maulana Y. Deden M.
Check Machine Hours Occupies
P 08 Oct 20 0.50
October Week 2
Maulana Y. Deden M.

P, S Welding Practice Preparation 08 Oct 20 1.00


Maulana Y. B. Lobolado
Welding Practice Fillet T Joint
P, S 08 Oct 20 2.00
2F on Nickel Base Alloy
Maulana Y. B. Lobolado
Inspect Nickel Alloy Welding
P 09 Oct 20 1.00
Test Coupon
Maulana Y. P. Diksi
Grind TBC on Combustion Liner
462587 / 225 P 09 Oct 20 2.00
Engine CT7
Maulana Y. B. Lobolado

P, S Welding Practice Preparation 09 Oct 20 1.00


Maulana Y. B. Lobolado
Welding Practice Fillet T Joint
P, S 09 Oct 20 2.00
2F on Nickel Base Alloy
Maulana Y. B. Lobolado
Reporting QI Interpretation at
P 12 Oct 20 3.00
Repair Process Area
Maulana Y. Deden M.

P, S Welding Practice Preparation 13 Oct 20 1.00


Maulana Y. B. Lobolado
Welding Practice Fillet T Joint
P, S 13 Oct 20 2.00
2F on Nickel Base Alloy
Maulana Y. B. Lobolado
METHODS OF INSTRUCTOR’S
SPENT TRAINEE’S TRAINEE’S
TASK# ACCOMPLISHMENT TASK / CASE DESCRIPTION DATE NAME &
TIME PERFORMANCE SIGNATURE
(MOA*: P/S/O/D/R) SIGNATURE
Per 2-Weeks Periodic Check
P 14 Oct 20 1.00
Consumable Material Welding
Maulana Y. B. Lobolado
Vibro Peen P/N Machining
462636 / 05 P 14 Oct 20 0.10
Fixture for PT6 Engine
Maulana Y. Andriyana M.
Chase Thread Turn Buckle
463178 / 03 P 14 Oct 20 0.20
Lever of Solar Centaur Engine
Maulana Y. Andriyana M.
Vibro Peen P/N Turn Buckle
463178 / 055 P 14 Oct 20 0.10
Lever of Solar Centaur Engine
Maulana Y. Andriyana M.
Renumbering P/N Retainer Ring
463182 / 035 P 14 Oct 20 0.25
of Solar Centaur Engine
Maulana Y. Andriyana M.
Renumbering P/N 3rd
463188 / 035 P 14 Oct 20 0.15
Diaphragm Assy. Solar Engine
Maulana Y. Andriyana M.
nd
Renumbering P/N 2
463190 / 04 P 14 Oct 20 0.15
Diaphragm Assy. Solar Engine
Maulana Y. Andriyana M.
Chase Thread 1st Inner Ring of
463151 / 025 P 14 Oct 20 0.75
Solar Centaur Engine
Maulana Y. Andriyana M.
Chase Thread IGV Inner Ring
463147 / 03 P 15 Oct 20 0.75
Set of Solar Centaur Engine
Maulana Y. Andriyana M.
Assembly & Alignment IGV
463147 / 04 P 15 Oct 20 0.25
Inner Ring of Solar Engine
Maulana Y. Andriyana M.
nd
Renumbering P/N 2 Inner Ring
463154 / 055 P 15 Oct 20 0.20
Set of Solar Centaur Engine
Maulana Y. Andriyana M.
Chase Thread 2nd Inner Ring
463154 / 07 P 15 Oct 20 0.25
Set of Solar Centaur Engine
Maulana Y. Andriyana M.
nd
Assembly & Alignment 2 Inner
463154 / 09 P 15 Oct 20 0.50
Ring Set of Solar Engine
Maulana Y. Andriyana M.
Assembly & Alignment 1st Inner
463151 / 03 P 15 Oct 20 0.25
Ring of Solar Centaur Engine
Maulana Y. Andriyana M.
METHODS OF INSTRUCTOR’S
SPENT TRAINEE’S TRAINEE’S
TASK# ACCOMPLISHMENT TASK / CASE DESCRIPTION DATE NAME &
TIME PERFORMANCE SIGNATURE
(MOA*: P/S/O/D/R) SIGNATURE
Check DWC of Personnel
P 15 Oct 20 0.50
October Week 3
Maulana Y. Deden M.
Check Machine Hours Occupies
P 15 Oct 20 0.50
October Week 3
Maulana Y. Deden M.
th
Mark P/N and S/N on 9 Disk
463132 / 03 P 16 Oct 20 0.20
Compressor Rotor Solar
Maulana Y. Andriyana M.
Blend High Metal on 9th Disk
463132 / 09 P 16 Oct 20 0.50
Compressor Rotor Solar
Maulana Y. Andriyana M.
Chase All Thread on Forward
463104 / 175 P 16 Oct 20 0.50
Cone Compressor Solar Engine
Maulana Y. Andriyana M.
Vibro Peen P/N and S/N on
463104 / 18 P 16 Oct 20 0.20
FWD Cone Compressor Solar
Maulana Y. Andriyana M.
nd
Steel Stamp P/N and S/N on 2
463153 / 02 P 16 Oct 20 0.20
Outer Ring Solar Centaur
Maulana Y. Andriyana M.
Blend High Metal on 2nd Outer
463153 / 06 P 16 Oct 20 1.00
Ring Solar Centaur Engine
Maulana Y. Andriyana M.
st
Mark P/N and S/N on 1 Outer
463150 / 03 P 16 Oct 20 0.20
Ring Solar Centaur Engine
Maulana Y. Andriyana M.
Blend High Metal on 1st Outer
463150 / 06 P 16 Oct 20 1.00
Ring Solar Centaur Engine
Maulana Y. Andriyana M.
Mark P/N and S/N on IGV Outer
463146 / 03 P 16 Oct 20 0.20
Ring Solar Centaur Engine
Maulana Y. Andriyana M.
Blend High Metal on IGV Outer
463146 / 11 P 16 Oct 20 1.00
Ring Solar Centaur Engine
Maulana Y. Andriyana M.
nd
Vibro Pen P/N and S/N on 2
463111 / 04 P 16 Oct 20 0.10
Disk Compressor Rotor Solar
Maulana Y. Andriyana M.
Vibro Pen P/N and S/N on 3rd
463112 / 04 P 16 Oct 20 0.10
Disk Compressor Rotor Solar
Maulana Y. Andriyana M.
METHODS OF INSTRUCTOR’S
SPENT TRAINEE’S TRAINEE’S
TASK# ACCOMPLISHMENT TASK / CASE DESCRIPTION DATE NAME &
TIME PERFORMANCE SIGNATURE
(MOA*: P/S/O/D/R) SIGNATURE
Chase Thread Actuator Support
463175 / 06 P 16 Oct 20 0.50
for Solar Centaur Engine
Maulana Y. Andriyana M.
Vibro Pen P/N and S/N on 7th
463124 / 105 P 16 Oct 20 0.10
Disk Compressor Rotor Solar
Maulana Y. Andriyana M.
nd
Vibro Pen P/N and S/N on 2
463167 / 06 P 16 Oct 20 0.10
Compressor Stator Solar
Maulana Y. Andriyana M.
Vibro Pen P/N and S/N on 11 th
463169 / 035 P 16 Oct 20 0.10
Compressor Stator Solar
Maulana Y. Andriyana M.
th
Vibro Pen P/N and S/N on 6
463166 / 06 P 16 Oct 20 0.10
Compressor Stator Solar
Maulana Y. Andriyana M.
Vibro Pen P/N and S/N on 3rd
463157 / 06 P 16 Oct 20 0.10
Compressor Stator Solar
Maulana Y. Andriyana M.
th
Vibro Pen P/N and S/N on 5
463165 / 05 P 16 Oct 20 0.10
Compressor Stator Solar
Maulana Y. Andriyana M.
Vibro Pen P/N and S/N on 4th
463160 / 06 P 16 Oct 20 0.10
Compressor Stator Solar
Maulana Y. Andriyana M.
th
Vibro Pen P/N and S/N on 8
463125 / 04 P 16 Oct 20 0.10
Disk Compressor Rotor Solar Maulana Y. Andriyana M.

Inspect Nickel Alloy Welding


P 19 Oct 20 1.00
Test Coupon Maulana Y. P. Diksi

P, S Welding Practice Preparation 20 Oct 20 1.00


Maulana Y. B. Lobolado

Welding Practice Fillet T Joint


P, S 20 Oct 20 2.00
2F on Nickel Base Alloy Maulana Y. B. Lobolado

Blend Defective Area for


462974 / 03 P 20 Oct 20 0.50
Welding Turbine Case CT7 Maulana Y. B. Lobolado

Blend The Crack Prepare for


462984 P 20 Oct 20 1.00
Welding Cowl-Turbine Case Maulana Y. B. Lobolado
METHODS OF INSTRUCTOR’S
SPENT TRAINEE’S TRAINEE’S
TASK# ACCOMPLISHMENT TASK / CASE DESCRIPTION DATE NAME &
TIME PERFORMANCE SIGNATURE
(MOA*: P/S/O/D/R) SIGNATURE
Preheat The Inlet Frame of CT7
459480 / 33 P 21 Oct 20 1.10
Engine at 121.1 – 148.8oC Maulana Y. B. Lobolado

Weld The Crack on Inlet Frame


459480 / 34 O 21 Oct 20 2.00
CT7 Engine Maulana Y. B. Lobolado

P, S Welding Practice Preparation 21 Oct 20 1.00


Maulana Y. B. Lobolado

Welding Practice Fillet T Joint


P, S 21 Oct 20 2.00
2F on Nickel Base Alloy Maulana Y. B. Lobolado

P, S Welding Practice Preparation 22 Oct 20 1.00


Maulana Y. B. Lobolado

Welding Practice Fillet T Joint


P, S 22 Oct 20 2.00
2F on Nickel Base Alloy Maulana Y. B. Lobolado

Check DWC of Personnel


P 22 Oct 20 0.50
October Week 4 Maulana Y. Deden M.

Check Machine Hours Occupies


P 22 Oct 20 0.50
October Week 4 Maulana Y. Deden M.

Blend Outer Pilot Flange of


463180 P 23 Oct 20 1.50
Comp. Diffuser Solar Engine Maulana Y. B. Lobolado

Weld To Build Up Outer Pilot


463180 / 07 O 23 Oct 20 3.00
Flange Comp. Diffuser Solar Maulana Y. B. Lobolado

Vibro Pen P/N and S/N on


463438 / 065 P 26 Oct 20 0.15
Spacer No. 7 of Solar Engine Maulana Y. Andriyana M.

Vibro Pen P/N and S/N on


463445 / 065 P 26 Oct 20 0.15
Spacer No. 4 of Solar Engine Maulana Y. Andriyana M.

Vibro Pen P/N and S/N on


463446 / 065 P 26 Oct 20 0.15
Spacer No. 5 of Solar Engine Maulana Y. Andriyana M.

Vibro Pen P/N and S/N on


463447 / 065 P 26 Oct 20 0.15
Spacer No. 6 of Solar Engine Maulana Y. Andriyana M.
METHODS OF INSTRUCTOR’S
SPENT TRAINEE’S TRAINEE’S
TASK# ACCOMPLISHMENT TASK / CASE DESCRIPTION DATE NAME &
TIME PERFORMANCE SIGNATURE
(MOA*: P/S/O/D/R) SIGNATURE
Vibro Pen P/N and S/N on
463448 / 065 P 26 Oct 20 0.15
Spacer No. 8 of Solar Engine Maulana Y. Andriyana M.

Vibro Pen P/N and S/N on


463449 / 065 P 26 Oct 20 0.15
Spacer No. 9 of Solar Engine Maulana Y. Andriyana M.

Vibro Pen P/N and S/N on


463450 / 065 P 26 Oct 20 0.15
Spacer No. 10 of Solar Engine Maulana Y. Andriyana M.

Chase Thread on Igniter


463482 / 19 P 26 Oct 20 0.50
Housing of Solar Engine Maulana Y. Andriyana M.

Vibro Pen P/N and S/N on


463473 / 025 P 26 Oct 20 0.15
Cover Plate Act. of Solar Engine Maulana Y. Andriyana M.

Chase Thread on Oil Inlet Tube


463478 / 07 P 26 Oct 20 0.50
of Solar Engine Maulana Y. Andriyana M.

Chase All Thread on IGV Inner


463454 / 03 P 26 Oct 20 0.50
Ring of Solar Engine Maulana Y. Andriyana M.

Chase All Thread on Turn


463475 / 03 P 26 Oct 20 0.50
Buckle Lever of Solar Engine Maulana Y. Andriyana M.

Chase All Thread on Turn


463476 / 04 P 26 Oct 20 0.50
Buckle Vane of Solar Engine Maulana Y. Andriyana M.

Vibro P/N and S/N on Turn


463476 / 055 P 26 Oct 20 0.15
Buckle Vane of Solar Engine Maulana Y. Andriyana M.

Per 2-Weeks Periodic Check


P 26 Oct 20 1.00
Consumable Material Welding Maulana Y. B. Lobolado

Chase All Thread on Air Inlet


463428 / 16 P 27 Oct 20 1.00
Housing of Solar Engine Maulana Y. Andriyana M.

Check DWC of Personnel


P 27 Oct 20 0.50
Month October Maulana Y. Deden M.

Check Machine Hours Occupies


P 27 Oct 20 0.50
Month October Maulana Y. Deden M.
METHODS OF INSTRUCTOR’S
SPENT TRAINEE’S TRAINEE’S
TASK# ACCOMPLISHMENT TASK / CASE DESCRIPTION DATE NAME &
TIME PERFORMANCE SIGNATURE
(MOA*: P/S/O/D/R) SIGNATURE
Create Monthly Activity Report
P 02 Nov 20 2.00
of Special Process Area Maulana Y. Deden M.

P, S Welding Practice Preparation 02 Nov 20 2.00


Maulana Y. B. Lobolado

Welding Practice Fillet T Joint


P, S 02 Nov 20 4.00
2F on Nickel Base Alloy Maulana Y. B. Lobolado

Create Monthly Activity Report


P 04 Nov 20 4.00
of Special Process Area Maulana Y. Deden M.

P, S Welding Practice Preparation 05 Nov 20 2.00


Maulana Y. B. Lobolado

Welding Practice Fillet T Joint


P, S 05 Nov 20 4.00
2F on Nickel Base Alloy Maulana Y. B. Lobolado

Check DWC of Personnel


P 05 Nov 20 0.50
November Week 1 Maulana Y. Deden M.

Check Machine Hours Occupies


P 05 Nov 20 0.50
November Week 1 Maulana Y. Deden M.

Chase All Thread on Turn


463687 / 03 P 06 Nov 20 2.00
Buckle Lever Solar Engine Maulana Y. Andriyana M.

Chase All Thread on Turn


463726 / 04 P 06 Nov 20 2.00
Buckle Vane Solar Engine Maulana Y. Andriyana M.

Chase All Thread on Igniter


463695 / 19 P 06 Nov 20 2.00
Housing Solar Engine Maulana Y. Andriyana M.

Chase All Thread on


463673 / 09 P 09 Nov 20 2.00
Compressor Case Solar Engine Maulana Y. Andriyana M.

Chase All Thread on 1st


463668 / 16 P 09 Nov 20 2.00
Actuator Ring Solar Engine Maulana Y. Andriyana M.

Chase All Thread on Actuator


463684 / 06 P 09 Nov 20 2.00
Support Solar Engine Maulana Y. Andriyana M.
METHODS OF INSTRUCTOR’S
SPENT TRAINEE’S TRAINEE’S
TASK# ACCOMPLISHMENT TASK / CASE DESCRIPTION DATE NAME &
TIME PERFORMANCE SIGNATURE
(MOA*: P/S/O/D/R) SIGNATURE
Install Honeycomb to 3rd
463698 / 08 P 10 Nov 20 1.00
Diaphragm Assy Solar Engine Maulana Y. Andriyana M.

Install Oil Fitting to Cap Assy


463701 / 07 P 10 Nov 20 1.00
Trans. Tube Solar Engine Maulana Y. Andriyana M.

P, S Welding Practice Preparation 10 Nov 20 2.00


Maulana Y. B. Lobolado

Welding Practice Fillet T Joint


P, S 10 Nov 20 4.00
2F on Nickel Base Alloy Maulana Y. B. Lobolado

Remove Blades on 7th Stage


463047 / 04 P 11 Nov 20 3.00
Compressor Rotor Engine JT8D Maulana Y. Agin G.

Remove Blades on 2nd Stage


463032 / 05 P 11 Nov 20 4.00
Compressor Fan Engine JT8D Maulana Y. Agin G.

P Make Welder Activity Report 12 Nov 20 4.00


Maulana Y. Deden M.

Check DWC of Personnel


P 12 Nov 20 0.50
November Week 2 Maulana Y. Deden M.

Check Machine Hours Occupies


P 12 Nov 20 0.50
November Week 2 Maulana Y. Deden M.

Per 2-Weeks Periodic Check


P 13 Nov 20 1.00
Consumable Material Welding Maulana Y. B. Lobolado

P, S Welding Practice Preparation 13 Nov 20 2.00


Maulana Y. B. Lobolado

Welding Practice Fillet T Joint


P, S 13 Nov 20 4.00
2F on Nickel Base Alloy Maulana Y. B. Lobolado

P, S Welding Practice Preparation 16 Nov 20 2.00


Maulana Y. B. Lobolado

Welding Practice Fillet T Joint


P, S 16 Nov 20 4.00
2F on Nickel Base Alloy Maulana Y. B. Lobolado
METHODS OF INSTRUCTOR’S
SPENT TRAINEE’S TRAINEE’S
TASK# ACCOMPLISHMENT TASK / CASE DESCRIPTION DATE NAME &
TIME PERFORMANCE SIGNATURE
(MOA*: P/S/O/D/R) SIGNATURE

P, S Welding Practice Preparation 17 Nov 20 2.00


Maulana Y. B. Lobolado

Welding Practice Fillet T Joint


P, S 17 Nov 20 4.00
2F on Nickel Base Alloy Maulana Y. B. Lobolado

P, S Welding Practice Preparation 18 Nov 20 2.00


Maulana Y. B. Lobolado

Welding Practice Fillet T Joint


P, S 18 Nov 20 4.00
2F on Nickel Base Alloy Maulana Y. B. Lobolado

P, S Welding Practice Preparation 19 Nov 20 1.50


Maulana Y. B. Lobolado

Welding Practice Fillet T Joint


P, S 19 Nov 20 3.00
2F on Nickel Base Alloy Maulana Y. B. Lobolado

Check DWC of Personnel


P 19 Nov 20 0.50
November Week 3 Maulana Y. Deden M.

Check Machine Hours Occupies


P 19 Nov 20 0.50
November Week 3 Maulana Y. Deden M.

Monitor Production Process


P 19 Nov 20 2.00
Status in Repair Process Area Maulana Y. Deden M.

P, S Welding Practice Preparation 20 Nov 20 2.00


Maulana Y. B. Lobolado

Welding Practice Fillet T Joint


P, S 20 Nov 20 4.00
2F on Nickel Base Alloy Maulana Y. B. Lobolado

P, S Welding Practice Preparation 23 Nov 20 2.00


Maulana Y. B. Lobolado

Welding Practice Fillet T Joint


P, S 23 Nov 20 4.00
2F on Nickel Base Alloy Maulana Y. B. Lobolado

P, S Welding Practice Preparation 24 Nov 20 2.00


Maulana Y. B. Lobolado
METHODS OF INSTRUCTOR’S
SPENT TRAINEE’S TRAINEE’S
TASK# ACCOMPLISHMENT TASK / CASE DESCRIPTION DATE NAME &
TIME PERFORMANCE SIGNATURE
(MOA*: P/S/O/D/R) SIGNATURE
Welding Practice Fillet T Joint
P, S 24 Nov 20 4.00
2F on Nickel Base Alloy Maulana Y. B. Lobolado

P, S Welding Practice Preparation 25 Nov 20 2.00


Maulana Y. B. Lobolado

Welding Practice Fillet T Joint


P, S 25 Nov 20 4.00
2F on Nickel Base Alloy Maulana Y. B. Lobolado

Vibro Pen P/N and S/N Inner


P 25 Nov 20 0.30
Ring of Solar Centaur Engine Maulana Y. Andriyana M.

P, S Welding Practice Preparation 26 Nov 20 2.00


Maulana Y. B. Lobolado

Welding Practice Fillet T Joint


P, S 26 Nov 20 4.00
2F on Nickel Base Alloy Maulana Y. B. Lobolado

Check DWC of Personnel


P 26 Nov 20 0.50
November Week 4 Maulana Y. Deden M.

Check Machine Hours Occupies


P 26 Nov 20 0.50
November Week 4 Maulana Y. Deden M.

P, S Welding Practice Preparation 27 Nov 20 2.00


Maulana Y. B. Lobolado

Welding Practice Fillet T Joint


P, S 27 Nov 20 4.00
2F on Nickel Base Alloy Maulana Y. B. Lobolado

Per 2-Weeks Periodic Check


P 30 Nov 20 1.00
Consumable Material Welding Maulana Y. B. Lobolado

P, S Prepare Specimen for Welding 30 Nov 20 2.00


Maulana Y. B. Lobolado

Check DWC of Personnel


P 30 Nov 20 0.50
Month November Maulana Y. Deden M.

Check Machine Hours Occupies


P 30 Nov 20 0.50
Month November Maulana Y. Deden M.
METHODS OF INSTRUCTOR’S
SPENT TRAINEE’S TRAINEE’S
TASK# ACCOMPLISHMENT TASK / CASE DESCRIPTION DATE NAME &
TIME PERFORMANCE SIGNATURE
(MOA*: P/S/O/D/R) SIGNATURE
Create Monthly Activity Report
P 02 Dec 20 4.00
of Special Process Area Maulana Y. Deden M.

Create Monthly Activity Report


P 03 Dec 20 2.00
of Special Process Area Maulana Y. Deden M.

Record Document; Continous


R, P 03 Dec 20 1.00
Assessment Maulana Y. Deden M.

Record Document; Corrective


R, P 03 Dec 20 1.00
Action Request Maulana Y. Deden M.

Record Document; Training


R, P 03 Dec 20 1.00
Evaluation Maulana Y. Deden M.

Check Conformity Personnel


R, P 03 Dec 20 2.00
Roster of Repair Process Area Maulana Y. Deden M.

Check DWC of Personnel


P 04 Dec 20 1.00
December Week 1 Maulana Y. Deden M.

Check Machine Hours Occupies


P 04 Dec 20 1.00
December Week 1 Maulana Y. Deden M.

Check Tools Record Form


P 04 Dec 20 3.00
RP11-3 Maulana Y. Deden M.

Check Welding Equipment


P 07 Dec 20 1.00
Conditon and Qualification Maulana Y. Deden M.

Controlling Production in 700B


P 07 Dec 20 3.00
Area; Arrange for PR and PO Maulana Y. Deden M.

Controlling Tool Exchange per


P 07 Dec 20 2.00
RP11-2 R4 Maulana Y. Deden M.

P, S Welding Practice Preparation 08 Dec 20 2.00


Maulana Y. B. Lobolado

Welding Practice Fillet T Joint


P, S 08 Dec 20 4.00
2F on Nickel Base Alloy Maulana Y. B. Lobolado
METHODS OF INSTRUCTOR’S
SPENT TRAINEE’S TRAINEE’S
TASK# ACCOMPLISHMENT TASK / CASE DESCRIPTION DATE NAME &
TIME PERFORMANCE SIGNATURE
(MOA*: P/S/O/D/R) SIGNATURE
Check DWC of Personnel
P 10 Dec 20 1.00
December Week 2 Maulana Y. Deden M.

Check Machine Hours Occupies


P 10 Dec 20 1.00
December Week 2 Maulana Y. Deden M.

Record Work Schedule in 300,


P 10 Dec 20 3.00
700 and 800 Area Maulana Y. Deden M.

Per 2-Weeks Periodic Check


P 10 Dec 20 2.00
Consumable Material Welding Maulana Y. B. Lobolado

Record Machine Hours Usage


P 14 Dec 20 3.00
Repair Process Area Maulana Y. Deden M.

Check Conformity Between W/C


P 14 Dec 20 2.00
Queue and MA30 in 700B Area Maulana Y. Deden M.

Report Evidence for Quality


P 15 Dec 20 3.00
Audit Finding at Area U3430 Maulana Y. Deden M.

Record Workload in Welding


P 15 Dec 20 4.00
Shop Area Jan-Jun 2020 Maulana Y. Deden M.

Record Workload in Welding


P 16 Dec 20 3.00
Shop Area Jul-Nov 2020 Maulana Y. Deden M.

Record CAR 2019-2020 Repair


P 16 Dec 20 1.00
Process Area Maulana Y. Deden M.

Record Form HS06-1 2020


P 16 Dec 20 1.00
Repair Process Area Maulana Y. Deden M.

P, S Welding Practice Preparation 16 Dec 20 0.50


Maulana Y. B. Lobolado

Welding Practice Fillet T Joint


P, S 16 Dec 20 1.00
2F on Nickel Base Alloy Maulana Y. B. Lobolado

Check DWC of Personnel


P 17 Dec 20 1.00
December Week 3 Maulana Y. Deden M.
METHODS OF INSTRUCTOR’S
SPENT TRAINEE’S TRAINEE’S
TASK# ACCOMPLISHMENT TASK / CASE DESCRIPTION DATE NAME &
TIME PERFORMANCE SIGNATURE
(MOA*: P/S/O/D/R) SIGNATURE
Check Machine Hours Occupies
P 17 Dec 20 1.00
December Week 3 Maulana Y. Deden M.

P, S Welding Practice Preparation 17 Dec 20 1.00


Maulana Y. B. Lobolado

Welding Practice Fillet T Joint


P, S 17 Dec 20 3.00
2F on Nickel Base Alloy Maulana Y. B. Lobolado

P, S Welding Practice Preparation 18 Dec 20 1.00


Maulana Y. B. Lobolado

Welding Practice Fillet T Joint


P, S 18 Dec 20 3.00
2F on Nickel Base Alloy Maulana Y. B. Lobolado

Monitor Work Schedule Queue


P 21 Dec 20 1.00
in Welding Shop Area Maulana Y. Deden M.

P, S Welding Practice Preparation 21 Dec 20 1.00


Maulana Y. B. Lobolado

Welding Practice Fillet T Joint


P, S 21 Dec 20 4.00
2F on Nickel Base Alloy Maulana Y. B. Lobolado

Controlling Production Needed


P
(Man, Material, Machine

P, S Welding Practice Preparation 22 Dec 20 1.00


Maulana Y. B. Lobolado

Welding Practice Fillet T Joint


P, S 22 Dec 20 4.00
2F on Nickel Base Alloy Maulana Y. B. Lobolado

Record Productivy of Machine


P 22 Dec 20 2.00
in RP Area Jan-Nov 2020 Maulana Y. Deden M.

P, S Welding Practice Preparation 23 Dec 20 1.00


Maulana Y. B. Lobolado

Welding Practice Fillet T Joint


P, S 23 Dec 20 4.00
2F on Nickel Base Alloy Maulana Y. B. Lobolado
METHODS OF INSTRUCTOR’S
SPENT TRAINEE’S TRAINEE’S
TASK# ACCOMPLISHMENT TASK / CASE DESCRIPTION DATE NAME &
TIME PERFORMANCE SIGNATURE
(MOA*: P/S/O/D/R) SIGNATURE
Check DWC of Personnel
P 23 Dec 20 1.00
December Week 4 Maulana Y. Deden M.

Check Machine Hours Occupies


P 23 Dec 20 1.00
December Week 4 Maulana Y. Deden M.

Record Productivy of Machine


P 28 Dec 20 4.00
in RP Area Jan-Dec 2020 Maulana Y. Deden M.

Produce Test Coupon GTAW


P 29 Dec 20 3.00
Group IIIA/B Nickel Alloy Maulana Y. P. Diksi

Check DWC of Personnel


P 29 Dec 20 1.00
December Week 4 Maulana Y. Deden M.

Check Machine Hours Occupies


P 29 Dec 20 1.00
December Week 4 Maulana Y. Deden M.
METHODS OF INSTRUCTOR’S
SPENT TRAINEE’S TRAINEE’S
TASK# ACCOMPLISHMENT TASK / CASE DESCRIPTION DATE NAME &
TIME PERFORMANCE SIGNATURE
(MOA*: P/S/O/D/R) SIGNATURE
Create Annual Report of
P 04 Jan 21 6.00
Machine Utilization RP 2020 Maulana Y. Deden M.

Create Annual Consumables


P 04 Jan 21 1.00
Material Expense Report 2020 Maulana Y. Deden M.

Create Annual Consumables


P 05 Jan 21 1.00
Material Expense Report 2020 Maulana Y. Deden M.

Prepare Speciment for


465496 / 04 P 05 Jan 21 6.00
Certification Welding Group 3 Maulana Y. B. Lobolado

Weld Speciment for


465496 / 08 P 06 Jan 21 6.00
Certification Welding Group 3 Maulana Y. B. Lobolado

Create Monthly Activity Report


P 07 Jan 21 4.00
of Special Process Area Maulana Y. Deden M.

Check DWC of Personnel


P 07 Jan 21 1.00
Januari Week 1 Maulana Y. Deden M.

Check Machine Hours Occupies


P 07 Jan 21 1.00
Januari Week 1 Maulana Y. Deden M.

Create Monthly Activity Report


P 08 Jan 21 2.00
of Special Process Area Maulana Y. Deden M.

Record Workload in 300, 700


P 08 Jan 21 3.00
and 800 Area Maulana Y. Deden M.

Update Production Schedule


P 11 Jan 21 2.00
Area 700B Maulana Y. Deden M.

Control Production for Aero


P 11 Jan 21 3.00
Engine in 700B Area Maulana Y. Deden M.

Verify FPI Result of Stg. 2


465485 / 07 P 12 Jan 21 0.20
Compressor Blisk Engine CT7 Maulana Y. Agin G.

Inspect Reworked Area of Stg.2


465485 / 08 P 12 Jan 21 0.30
Compressor Blisk Engine CT7 Maulana Y. Agin G.
METHODS OF INSTRUCTOR’S
SPENT TRAINEE’S TRAINEE’S
TASK# ACCOMPLISHMENT TASK / CASE DESCRIPTION DATE NAME &
TIME PERFORMANCE SIGNATURE
(MOA*: P/S/O/D/R) SIGNATURE
Visually Inspect Stg. 5
465503 / 03 P 12 Jan 21 0.25
Compressor Blisk Engine CT7 Maulana Y. Agin G.

Measure Diameter A, B, C of
464221 / 43 P 12 Jan 21 0.50
Compressor Case Engine CT7 Maulana Y. Agin G.

Internal Audit Special Process


P 12 Jan 21 1.50
Welding Maulana Y. P. Diksi

Analyze Order Demand for


P 13 Jan 21 2.50
Endmill Tools Maulana Y. Deden M.

Controlling Certification Process


P 13 Jan 21 2.00
for Welder Maulana Y. P. Diksi

P, S Welding Practice Preparation 14 Jan 21 1.00 Maulana Y. B. Lobolado

Welding Practice Butt Joint 2G


P, S 14 Jan 21 4.00
on Nickel Base Alloy Maulana Y. B. Lobolado

Check DWC of Personnel


P 14 Jan 21 1.00
Januari Week 2 Maulana Y. Deden M.

Check Machine Hours Occupies


P 14 Jan 21 1.00
Januari Week 2 Maulana Y. Deden M.

Report Weekly Manhour


P 15 Jan 21 2.00
Utilization RP Area Maulana Y. Deden M.

Report Weekly Machine Hour


P 15 Jan 21 2.00
Utilization RP Area Maulana Y. Deden M.

Chase Thread Stud C-Sump


465837 / 02 P 18 Jan 21 0.75
Housing Engine CT7 Maulana Y. Andriyana M.

Chase Thread and Assemble


464991 / 07, 09 P 18 Jan 21 0.75
2nd Inner Ring Set Solar Engine Maulana Y. Andriyana M.

Chase Thread 1st Bearing


465637 / 04 P 18 Jan 21 0.50
Housing Solar Engine Maulana Y. Andriyana M.
METHODS OF INSTRUCTOR’S
SPENT TRAINEE’S TRAINEE’S
TASK# ACCOMPLISHMENT TASK / CASE DESCRIPTION DATE NAME &
TIME PERFORMANCE SIGNATURE
(MOA*: P/S/O/D/R) SIGNATURE
Chase All Threads on Air Inlet
465633 / 16 P 18 Jan 21 0.25
Housing Solar Engine Maulana Y. Andriyana M.

Chase Thread Oil Transfer


464590 / 06 P 18 Jan 21 0.50
Tube Solar Engine Maulana Y. Andriyana M.

Chase Thread Fwd Cone Solar


465642 / 025 P 18 Jan 21 0.75
Engine Maulana Y. Andriyana M.

Blend High Metal Ring Thrust


465704 / 03 P 18 Jan 21 0.50
Washer Solar Engine Maulana Y. Andriyana M.

Visual Inspect Thrust Spacer


465703 / 06 P 18 Jan 21 0.25
Solar Engine Maulana Y. Agin G.

Visual Inspect Igniter Housing


465708 / 21 P 18 Jan 21 0.25
Solar Engine Maulana Y. Agin G.

Chase Thread and Assemble


464982 / 03, 04 P 19 Jan 21 1.00
IGV Inner Ring Solar Engine Maulana Y. Andriyana M.

Visual Inspect Stud Lock Ring


465738 / 04 O 20 Jan 21 0.25
Engine CT7 Maulana Y. Agin G.

Visual Inspect 1st Stator Vane


465681 / 07 P 20 Jan 21 1.00
Solar Engine Maulana Y. Agin G.

Visual Inspect IGV Stator Vane


465677 / 07 P 20 Jan 21 1.00
Solar Engine Maulana Y. Agin G.

Visual Inspect 2nd Stator Vane


465686 / 07 P 20 Jan 21 1.00
Solar Engine Maulana Y. Agin G.

Visual Inspect Actuator Support


465699 / 08 P 20 Jan 21 0.25
Solar Engine Maulana Y. Agin G.

Inspect Thread Diffuser Case


465550 / 33 O 20 Jan 21 0.30
Engine CT7 Maulana Y. Agin G.

Visual Inspect The Cup Washer


465426 / 04 O 20 Jan 21 0.70
Per OHM Engine DART7 Maulana Y. Agin G.
METHODS OF INSTRUCTOR’S
SPENT TRAINEE’S TRAINEE’S
TASK# ACCOMPLISHMENT TASK / CASE DESCRIPTION DATE NAME &
TIME PERFORMANCE SIGNATURE
(MOA*: P/S/O/D/R) SIGNATURE
Check DWC of Personnel
P 21 Jan 21 1.00
Januari Week 3 Maulana Y. Deden M.

Check Machine Hours Occupies


P 21 Jan 21 1.00
Januari Week 3 Maulana Y. Deden M.

Report Weekly Manhour


P 22 Jan 21 2.00
Utilization RP Area Maulana Y. Deden M.

Report Weekly Machine Hour


P 22 Jan 21 2.00
Utilization RP Area Maulana Y. Deden M.

Record Laboratory Test


P 25 Jan 21 2.00
Request of Welding Specimen Maulana Y. P. Diksi

Inspect Accuration of GTAW


P 25 Jan 21 1.00
Ampere Indicator Maulana Y. P. Diksi

Update Availability Consumable


P 26 Jan 21 2.00
Material Welding Shop Maulana Y. Deden M.

Inspect Rivet Hole IP Carrier


465434 / 10 O 27 Jan 21 0.25
Ring Assy Engine DART7 Maulana Y. Agin G.

Evaluate FPI Finding on Oil &


465540 / 07 P 27 Jan 21 0.25
Fuel Deff. Shield Engine TPE Maulana Y. Agin G.

Verify FPI Result of Centrifugal


465546 / 045 P 27 Jan 21 0.25
Impeller Engine CT7 Maulana Y. Agin G.

Check DWC of Personnel


P 28 Jan 21 1.00
Januari Week 4 Maulana Y. Deden M.

Check Machine Hours Occupies


P 28 Jan 21 1.00
Januari Week 4 Maulana Y. Deden M.

Check DWC of Personnel


P 29 Jan 21 1.00
Januari Week 5 Maulana Y. Deden M.

Check Machine Hours Occupies


P 29 Jan 21 1.00
Januari Week 5 Maulana Y. Deden M.
METHODS OF INSTRUCTOR’S
SPENT TRAINEE’S TRAINEE’S
TASK# ACCOMPLISHMENT TASK / CASE DESCRIPTION DATE NAME &
TIME PERFORMANCE SIGNATURE
(MOA*: P/S/O/D/R) SIGNATURE
Report Weekly Manhour
P 29 Jan 21 2.00
Utilization RP Area Maulana Y. Deden M.

Report Weekly Machine Hour


P 29 Jan 21 2.00
Utilization RP Area Maulana Y. Deden M.

Controlling Adm. Compliance of


P 29 Jan 21 1.00
Personnel Month January Maulana Y. Deden M.
METHODS OF INSTRUCTOR’S
SPENT TRAINEE’S TRAINEE’S
TASK# ACCOMPLISHMENT TASK / CASE DESCRIPTION DATE NAME &
TIME PERFORMANCE SIGNATURE
(MOA*: P/S/O/D/R) SIGNATURE
Visually Inspect The Insert at
465562 / 35 P 01 Feb 21 0.50
G/B Housing TPE331 Maulana Y. Agin G.

Visually Inspect for Corrosion


465562 / 693 P 01 Feb 21 0.50
Pit at G/B Housing TPE331 Maulana Y. Agin G.

Visual and Dimensional Inspect


465642 / 21 P 01 Feb 21 0.50
Fwd Cone Comp. Solar Engine Maulana Y. Agin G.

Visually Inspect of Bent Shroud


465841 / 125 P 01 Feb 21 0.50
LP Turbine Blade DART7 Maulana Y. Agin G.

Reinspect The Blade Disk of


465973 / 142 P 01 Feb 21 0.50
Centrifugal Impeller CT7 Maulana Y. Agin G.

Evaluate FPI Finding Oil & Fuel


465540 / 07 P 01 Feb 21 0.50
Deff. Shld TPE331 Maulana Y. Agin G.

Make Monthly Activities Report


P 02 Feb 21 4.00
of Special Process Area Maulana Y. Deden M.

Inspect Blended Area at G/B


465562 / 70 P 03 Feb 21 0.50
Housing TPE331 Maulana Y. Agin G.

Evaluate FPI Findings Exhaust


465716 / 13 P 03 Feb 21 0.50
Duct TPE331 Maulana Y. Agin G.

Reinspect The Blade Disk of


465974 / 04 P 03 Feb 21 0.50
Stg. 2 Comp. Blisk CT7 Maulana Y. Agin G.

Visually Inspect Repaired Area


464963 / 05 P 03 Feb 21 0.50
Diff. Lower Fairing JT8D Maulana Y. Agin G.

Visual and Dimensional Inspect


465547 / 09 P 04 Feb 21 0.50
Stg. 3 – 4 Blade Disk CT7 Maulana Y. Agin G.

Visually Inspect Airfoil Surface


465554 / 18 P 04 Feb 21 0.50
IP NGV Locating DART7 Maulana Y. Agin G.

Visually Inspect Airfoil Surface


465556 / 17 P 04 Feb 21 0.50
LP NGV Locating DART7 Maulana Y. Agin G.
METHODS OF INSTRUCTOR’S
SPENT TRAINEE’S TRAINEE’S
TASK# ACCOMPLISHMENT TASK / CASE DESCRIPTION DATE NAME &
TIME PERFORMANCE SIGNATURE
(MOA*: P/S/O/D/R) SIGNATURE
Visually Inspect Airfoil Surface
465560 / 17 P 04 Feb 21 0.50
LP NGV Non-Locating DART7 Maulana Y. Agin G.

Visually Inspect Airfoil Surface


465431 / 12 P 04 Feb 21 0.50
HP NGV Locating DART7 Maulana Y. Agin G.

Verify NDT Result and Chordal


464870 / 075 P 04 Feb 21 3.50
Dim. 1st Comp. Rotor JT8D Maulana Y. Agin G.

Check DWC of Personnel


P 04 Feb 21 1.00
Februari Week 1 Maulana Y. Deden M.

Check Machine Hours Occupies


P 04 Feb 21 1.00
Februari Week 1 Maulana Y. Deden M.

Report Weekly Manhour


P 05 Feb 21 2.00
Utilization RP Area Maulana Y. Deden M.

Report Weekly Machine Hour


P 05 Feb 21 2.00
Utilization RP Area Maulana Y. Deden M.

Review Assesment Evaluation


of Personnel:
1. Agin Gunawan P. /
999063
2. Roni Herdiansyah /
120001
3. Chandra Cahyadin /
P, D 08 Feb 21 6.00
120002
4. Robby Gema A. /
130002
5. M. Pujairawan A. /
200022
6. M. Daud Ibrahim /
200023 Maulana Y. Deden M.

High Volume Flushing of


465811/ 02 P 09 Feb 21 1.00
Mainframe and Inlet CT7 Maulana Y. Roni H.

Chemical Cleaning Compressor


465815 / 041 P 09 Feb 21 1.50
Stator Components CT7 Maulana Y. Roni H.
METHODS OF INSTRUCTOR’S
SPENT TRAINEE’S TRAINEE’S
TASK# ACCOMPLISHMENT TASK / CASE DESCRIPTION DATE NAME &
TIME PERFORMANCE SIGNATURE
(MOA*: P/S/O/D/R) SIGNATURE
Chemical Cleaning Cold Section
465808 / 044 P 09 Feb 21 3.00
Module CT7 Maulana Y. Roni H.

Chemical Cleaning Compressor


465818 / 038 P 10 Feb 21 2.00
Rotor Components CT7 Maulana Y. Roni H.

Chemical Cleaning Diffuser &


465822 / 06 P 10 Feb 21 2.50
Mid Frame Assy. CT7 Maulana Y. Roni H.

Carry Out Chemical Cleaning


466068 / 20 P 10 Feb 21 2.50
for Engine CT7 Maulana Y. Roni H.

Chemical Cleaning Diffuser &


466064 / 06 P 11 Feb 21 2.50
Midframe Assy. CT7 Maulana Y. Roni H.

Chemical Cleaning Diffuser &


466058 / 08 P 11 Feb 21 2.50
Midframe Assy. CT7 Maulana Y. Roni H.

Check DWC of Personnel


P 11 Feb 21 1.00
Februari Week 2 Maulana Y. Deden M.

Check Machine Hours Occupies


P 11 Feb 21 1.00
Februari Week 2 Maulana Y. Deden M.

Report Weekly Manhour


P 15 Feb 21 2.00
Utilization RP Area Maulana Y. Deden M.

Report Weekly Machine Hour


P 15 Feb 21 2.00
Utilization RP Area Maulana Y. Deden M.

Mask All Areas Not To Be Plate


465989 P 16 Feb 21 1.00
on Gearshaft Spur TPE331 Maulana Y. Dede Y.

Prepare for Quality Audit at Tool


P 17 Feb 21 4.00
Crib Area Maulana Y. Deden M.

Check DWC of Personnel


P 18 Feb 21 1.00
Februari Week 3 Maulana Y. Deden M.

Check Machine Hours Occupies


P 18 Feb 21 1.00
Februari Week 3 Maulana Y. Deden M.
METHODS OF INSTRUCTOR’S
SPENT TRAINEE’S TRAINEE’S
TASK# ACCOMPLISHMENT TASK / CASE DESCRIPTION DATE NAME &
TIME PERFORMANCE SIGNATURE
(MOA*: P/S/O/D/R) SIGNATURE
Report Weekly Manhour
P 19 Feb 21 2.00
Utilization RP Area Maulana Y. Deden M.

Report Weekly Machine Hour


P 19 Feb 21 2.00
Utilization RP Area Maulana Y. Deden M.

Controlling Work Queue in


P 22 Feb 21 5.00
Repair Process Area Maulana Y. Deden M.

Processing Data for Make


P 23 Feb 21 6.00
Annual Work Plan RP Area Maulana Y. Deden M.

Check DWC of Personnel


P 25 Feb 21 1.00
Februari Week 4 Maulana Y. Deden M.

Check Machine Hours Occupies


P 25 Feb 21 1.00
Februari Week 4 Maulana Y. Deden M.

Report Weekly Manhour


P 26 Feb 21 2.00
Utilization RP Area Maulana Y. Deden M.

Report Weekly Machine Hour


P 26 Feb 21 2.00
Utilization RP Area Maulana Y. Deden M.

Controlling Adm. Compliance of


P 26 Feb 21 3.00
Personnel Month February Maulana Y. Deden M.
METHODS OF INSTRUCTOR’S
SPENT TRAINEE’S TRAINEE’S
TASK# ACCOMPLISHMENT TASK / CASE DESCRIPTION DATE NAME &
TIME PERFORMANCE SIGNATURE
(MOA*: P/S/O/D/R) SIGNATURE
Create Consumable Control
P 01 Mar 21 7.00
Form for Tool Crib Area Maulana Y. Deden M.

Comply Personnel Capability


P Assesment Sheet of Personnel: 02 Mar 21 3.00
Agin Gunawan P. / 999063 Maulana Y. Deden M.

Comply Personnel Capability


P Assesment Sheet of Personnel: 02 Mar 21 3.00
Robby Gema A. / 130002 Maulana Y. Deden M.

Make Monthly Activities Report


P 03 Mar 21 6.00
of Special Process Area Maulana Y. Deden M.

Check DWC of Personnel


P 04 Mar 21 1.00
March Week 1 Maulana Y. Deden M.

Check Machine Hours Occupies


P 04 Mar 21 1.00
March Week 1 Maulana Y. Deden M.

Record Weekly Manhour


P 04 Mar 21 2.00
Utilization RP Area Maulana Y. Deden M.

Record Weekly Machine Hour


P 04 Mar 21 2.00
Utilization RP Area Maulana Y. Deden M.

Create Training Matrix for RP


P 05 Mar 21 4.00
Personnel Maulana Y. Deden M.

Create Repair Process


P 05 Mar 21 3.00
Organization Structure Maulana Y. Deden M.

Prepare Specimen for Cadmium


P 08 Mar 21 4.00
Plating Maulana Y. Chandra C.

P Cadmium Plating Practice 09 Mar 21 4.00


Maulana Y. Chandra C.

Check DWC of Personnel


P 10 Mar 21 1.00
March Week 1 Maulana Y. Deden M.
METHODS OF INSTRUCTOR’S
SPENT TRAINEE’S TRAINEE’S
TASK# ACCOMPLISHMENT TASK / CASE DESCRIPTION DATE NAME &
TIME PERFORMANCE SIGNATURE
(MOA*: P/S/O/D/R) SIGNATURE
Check Machine Hours Occupies
P 10 Mar 21 1.00
March Week 1 Maulana Y. Deden M.

Comply Personnel Capability


P Assesment Sheet of Personnel: 10 Mar 21 4.00
Moch. Pujairawan A. / 200022 Maulana Y. Deden M.

Comply Personnel Capability


P Assesment Sheet of Personnel: 12 Mar 21 3.00
M. Daud Ibrahim / 200023 Maulana Y. Deden M.

Record Weekly Manhour


P 12 Mar 21 2.00
Utilization RP Area Maulana Y. Deden M.

Record Weekly Machine Hour


P 12 Mar 21 2.00
Utilization RP Area Maulana Y. Deden M.

P Prepare for Cadmium Plating 15 Mar 21 3.50


Maulana Y. Chandra C.

P Cadmium Plating Practice 15 Mar 21 3.00


Maulana Y. Chandra C.

P Prepare for Cadmium Plating 16 Mar 21 3.50


Maulana Y. Chandra C.

P Cadmium Plating Practice 16 Mar 21 3.00


Maulana Y. Chandra C.

P Prepare for Cadmium Plating 17 Mar 21 3.50


Maulana Y. Chandra C.

P Cadmium Plating Practice 17 Mar 21 3.00


Maulana Y. Chandra C.

P Prepare for Cadmium Plating 18 Mar 21 3.50


Maulana Y. Chandra C.

P Cadmium Plating Practice 18 Mar 21 3.00


Maulana Y. Chandra C.
METHODS OF INSTRUCTOR’S
SPENT TRAINEE’S TRAINEE’S
TASK# ACCOMPLISHMENT TASK / CASE DESCRIPTION DATE NAME &
TIME PERFORMANCE SIGNATURE
(MOA*: P/S/O/D/R) SIGNATURE
Check DWC of Personnel
P 18 Mar 21 1.00
March Week 3 Maulana Y. Deden M.

Check Machine Hours Occupies


P 18 Mar 21 1.00
March Week 3 Maulana Y. Deden M.

Record Weekly Manhour


P 19 Mar 21 2.00
Utilization RP Area Maulana Y. Deden M.

Record Weekly Machine Hour


P 19 Mar 21 2.00
Utilization RP Area Maulana Y. Deden M.

Read PMP-EP-002 Cadmium


R 22 Mar 21 1.00
Plating Maulana Y. Deden M.

Read PMP-EP-006 Nickel-


R 22 Mar 21 1.00
Cadmium Plating Maulana Y. Deden M.

Read PMP-EP-015 Stripping


R 22 Mar 21 1.00
Cd, Si, Ni and Cu Deposit Maulana Y. Deden M.

Prepare Specimen for Cadmium


P 23 Mar 21 4.00
Plating Maulana Y. Chandra C.

P Cadmium Plating Practice 24 Mar 21 4.00


Maulana Y. Chandra C.

Provide Evidence for CAR No.


P 25 Mar 21 3.00
21-012 Maulana Y. Deden M.

Check DWC of Personnel


P 25 Mar 21 1.00
March Week 4 Maulana Y. Deden M.

Check Machine Hours Occupies


P 25 Mar 21 1.00
March Week 4 Maulana Y. Deden M.

Record Weekly Manhour


P 26 Mar 21 2.00
Utilization RP Area Maulana Y. Deden M.

Record Weekly Machine Hour


P 26 Mar 21 2.00
Utilization RP Area Maulana Y. Deden M.
METHODS OF INSTRUCTOR’S
SPENT TRAINEE’S TRAINEE’S
TASK# ACCOMPLISHMENT TASK / CASE DESCRIPTION DATE NAME &
TIME PERFORMANCE SIGNATURE
(MOA*: P/S/O/D/R) SIGNATURE
Support Staff for Completing
P 26 Mar 21 5.00
Annual Tax Report Maulana Y. Deden M.

Create Form Procedur


P 29 Mar 21 3.00
Qualification Record for Welding Maulana Y. P. Diksi

Create Form Procedur


P 30 Mar 21 3.00
Qualification Record for Welding Maulana Y. P. Diksi

Check DWC of Personnel


P 31 Mar 21 1.00
March Week 5 Maulana Y. Deden M.

Check Machine Hours Occupies


P 31 Mar 21 1.00
March Week 5 Maulana Y. Deden M.

Report Weekly Manhour


P 31 Mar 21 2.00
Utilization RP Area Maulana Y. Deden M.

Report Weekly Machine Hour


P 31 Mar 21 2.00
Utilization RP Area Maulana Y. Deden M.

Controlling Adm. Compliance of


P 31 Mar 21 2.00
Personnel Month February Maulana Y. Deden M.
METHODS OF INSTRUCTOR’S
SPENT TRAINEE’S TRAINEE’S
TASK# ACCOMPLISHMENT TASK / CASE DESCRIPTION DATE NAME &
TIME PERFORMANCE SIGNATURE
(MOA*: P/S/O/D/R) SIGNATURE

FORM No. HR04-4R1

ACKNOWLEDGED BY:

DEDEN MUNAJAT S. JATI WULARSO


MGR. REPAIR PROCESS SPV. OF TRAINING PROGRAM

Note: MOA (Method of accomplishment):


P (PERFORM) / S (SIMULATE) / O (OBSERVE) / D (DISCUSS)/ R (READING)