You are on page 1of 1

Yale overload protection device Inspection of the load chain Replacing the load chain

(optional) (acc. to DIN 685-5) The load chain must be replaced by a new
The overload protection device is set to approx. Load chains must be inspected for mechanical chain of the same dimensions and quality in
125% (±15%) of the nominal load. Its adjust- damage at annular intervals, however after the event of visible damage or deformations,
ment must only be carried out by a competent 50 operating hours, at the latest. Inspect the however, when the discarding status has been
person or an authorised service partner. load chain for sufficient lubrication and check reached, at the latest.
When the load limit is exceeded, the overload for external defects, deformations, superficial A load chain to be discarded must only be
protection device is activated and prevents cracks, wear and corrosion marks. replaced by an authorized specialist workshop.
lifting of the load by the hand chain wheel Round steel section chains must be replaced Only fit load chains which have been approved
slipping. when the original nominal thickness ´d´ on by the manufacturer. Non-compliance with this
the chain link with the worst wear has been specification will render the legal warranty or
INSPECTION, MAINTENANCE AND reduced by more than 10% or when the chain guarantee void with immediate effect.
REPAIR has elongated over one pitch ´pn´ by 5 % Note: Replacement of a load chain must be
According to national and international acci- (Fig. 16) or over 11 pitches (11 x pn) by 3 %. documented!
dent prevention and safety regulations hoisting Nominal dimensions and wear limits are ATTENTION: Chains must only be replaced
equipment must be inspected: shown in table 2. If one of the limit values is by chains of the same material, with the same
• in accordance with the risk assessment of reached, the load chain must be replaced. quality and the same dimensions.
the operating company
• prior to initial operation Maintenance of the load chain Hoist with single fall
• before the unit is put into service again In most cases, chain wear in the link points - Only pull in the new chain in no-load condi-
following a shut down is caused by insufficient care of the chain. In tion.
• after substantial changes order to ensure optimal lubrication of the link - An open load chain link is required as a
• however, at least once per year, by a contact points, lubricate the chain at regular tool. It can be obtained by using an abrasive
competent person. intervals adapted to the application with creep- wheel to cut a section from an existing link
ATTENTION: Actual operating conditions (e.g. type lubricant (e.g. gear oil). with the same dimension. The length of the
operation in galvanizing facilities) can dictate A dry film lubricant, e.g. PTFE spray, should cut section must at least correspond to the
shorter inspection intervals. be used in environments where abrasives like thickness of the link.
Repair work may only be carried out by a spe- sand, etc., occur. - Remove load hook from the old load chain
cialist workshop that uses original Yale spare The service life of the load chain can be in- and suspend open load chain link in the
parts. The inspection (mainly consisting of a creased by careful lubrication to 20 - 30 times loose end of the load chain.
visual inspection and a function check) must compared with a chain that is not serviced. - Suspend the new lubricated load chain
determine that all safety devices are complete - When lubricating the chain, make sure the also in the open link and pull it in (chain
and fully operational and cover the condition chain is in no-load condition so that the oil movement UP).
of the unit, suspension, equipment and sup- can reach the contact points of the chain - Do not fit a twisted chain. The welds must
porting structure with regard to damage, wear, links which are subject to wear. Chain link face outwards from the chain wheel.
corrosion or any other alterations. parts contacting each other must always be - When the old load chain has passed through
Initial operation and recurring inspections coated with lubricant, otherwise increased the hoist unit it can be detached together
must be documented (e.g. in the CMCO works wear on the chain results. with the open chain link and the load hook
certificate of compliance). See also the main- - It is not sufficient to lubricate the chains on can be fitted on the new load chain just
tenance and inspection intervals on page 32. the outside as this does not ensure that a pulled in.
If required, the results of inspections and ap- lubricant film can build up in the contact - Fix the end of the idle fall of the new load
propriate repairs must be verified. If the hoist points. chain on the housing or frame (depending
(from 1 t lifting weight) is fitted on or in a trolley - With a constant lifting path of the chain, the on model) of the hoist.
and if the hoist is used to move a lifted load change-over area from lifting to lowering
in one or several directions, the installation movement must be checked in particular. Hoist with several falls
is considered to be a crane and the further - Make sure that the load chain is lubricated ATTENTION: Only pull in the new chain when
inspections must be carried out, as required. over its entire length, also including the part the bottom block is unloaded, otherwise the
Paint damage should be touched up in order to of the chain in the housing of the hoist. bottom block may drop when the load chain
avoid corrosion. All joints and sliding surfaces - Clean dirty chains with petroleum or a similar is detached. Danger of injury!
should be slightly greased. In the case of heavy cleaning agent, never heat the chain. - An open load chain link is required as a
contamination, the unit must be cleaned. - When lubricating the chain, also check the tool. It can be obtained by using an abrasive
The unit must be given a general overhaul chain for wear. wheel to cut a section from an existing link
after 3 years, at the latest. with the same dimension. The length of the
ATTENTION: It must be ensured that no lub-
In particular, check the dimensions of the cut section must at least correspond to the
ricant can penetrate into the brake enclosure.
load chain, the load hook and the top hook. thickness of the link.
This may result in failure of the brake.
They must be compared with the dimensions - Detach the loaded-fall end of the load chain
specified in the table (Tab. 2, Tab. 3). from the housing of the hoist unit or the
bottom block (depending on model).
ATTENTION: After the replacement of
- Suspend prepared, open load chain link in
components, a subsequent inspection by a
the now free load chain end.
competent person is obligatory!

13 von 36

You might also like