KEY PLAN

Station
CP-2 ROAD WORK LIMIT
ROAD G11 STA 0+031.300

ROAD AA2

TRAM (Qatar Rail)


Road Road Road Road

FIRST FLOOR

BC

BC
FIRSTFLOOR
FIRST FLOOR FFL

.C

.C
BC.B-01 BC.C1/01-02 BC.C1/03-04 BC.C1/05A - 05B BC.C1/06 - 07 BC.C1/08 - 09 BC.C1 - 11 BC.D-01

1
-1

-1
+12.300 m m
+12.300

3
1 2
.4 4
6
9 1 2
.4 3
4
7 1 2
.4 4
6
9 1 2
.4 5
0 1 2
.4 5
0 1 2
.6 0 .5 9
1 2 5 .6 0
1 2

Station Station LRT(Qatar Rail)


LRT(Qatar Rail) LRT(Qatar Rail)

SSL 12.225
1 03 +5 00

LRT(Qatar Rail)
ROAD A4
THIRD FLOOR THIRDFLOOR
THIRD FLOOR FFL LRT(Qatar Rail)

LRT(Qatar Rail)
1 2
.4 5
0
Station LRT(Qatar Rail)
1 2
.4 4
6
7 1 2
.4 4
0
6
1 2
.6 0
Station .6 0
1 2 3
LRT(Qatar Rail)
.4 5
1 2 7

+22.300 m m
+22.300

4
BC.C1 - 14 BC.C1-26

-2
BC.C1 - 27
BC.B-02 BC.C1/16 - 17 BC.C1/18 - 19 BC.C1/20 - 21 BC.C1/22 - 23
SSL 22.225 BC.C1-25

1
BC.C1 - 15 BC.D-2

TRAM (Qatar Rail)

.C
7

BC
ME-HVAC-L1-01105-02
ROAD AA1 ROAD AA1
ROAD AA1
ROAD G1 0+030.800
CP-2 ROAD WORK LIMIT

GROUND MEZZANINE FLOOR GROUND MEZZANINE FLOOR FFL NOTES:


+9.300 m
SSL 9.225
1. ALL DIMENSION ARE IN MILIMETERS UNLESS OTHERWISE STATED.

SECOND FLOOR SECOND


SECOND FLOOR
FLOOR FFL
+17.300 m m
+17.300
SSL 17.225

SECOND FLOOR M01


2 6
1 : 25
ME-HVAC-L1-01105-02
GROUND FLOOR GROUND
GROUND FLOOR
FLOOR FFL
+4.300 mm
+4.300
SSL 4.200

FIRST FLOOR FIRSTFLOOR


FIRST FLOOR FFL
+12.300 m m
+12.300
SSL 12.225

7
ME-HVAC-L1-01105-02 BASEMENT 1 BASEMENT
BASEMENT 1 1
SSL -0.200 -0.200 mm
-0.200

GROUND MEZZANINE FLOOR GROUND MEZZANINE FLOOR FFL


+9.300 m
SSL 9.225
SECTION D M08
9 1 : 75

SECOND FLOOR M02


3 5
5
1 : 25

GROUND
GROUND FLOOR
FLOOR FFL
5
5
GROUND FLOOR
+4.300 mm
+4.300
SSL 4.200
FIRST FLOOR FIRSTFLOOR
FIRST FLOOR FFL
+12.300 m m
+12.300
SSL 12.225

SECTION A M01
6 1 : 75

GROUND MEZZANINE FLOOR GROUND MEZZANINE FLOOR FFL


+9.300 m
SSL 9.225
CONSULTANT'S REVIEW & APPROVAL:
8 DOCUMENT REVIEW STATUS DRAWING REVIEW STAMP
ME-HVAC-L1-01105-02
STATUS A: APPROVED
STATUS B: APPROVED WITH COMMENTS
THIRD FLOOR THIRDFLOOR
THIRD FLOOR FFL STATUS C: REVISE & RESUBMIT
+22.300 m m
+22.300
SSL 22.225 STATUS D: REJECTED

GROUND FLOOR M07


1 1 : 25
GROUND FLOOR GROUND
GROUND FLOOR
+4.300 mm
+4.300
FLOOR FFL
SSL 4.200

SECOND FLOOR SECOND


SECOND FLOOR
FLOOR FFL
+17.300 m m
+17.300
SSL 17.225

BASEMENT 1 BASEMENT
BASEMENT 1 1
SSL -0.200 -0.200 mm
-0.200

S.NO. DRAWING/DOC. NUMBER TITLE REV

REFERENCE DWG / DOC

FIRST FLOOR FIRSTFLOOR


FIRST FLOOR FFL
+12.300 m m
+12.300
9 SSL 12.225
BASEMENT 2 BASEMENT
BASEMENT 2 2 5
ME-HVAC-L1-01105-02 SSL -3.700 -3.700 mm
-3.700 5

SECTION B M02 Author Checker


Approver

GROUND FLOOR M08 7 1 : 75


REV. DESCRIPTION DRWN CHKD APRD DATE
DRAWING HISTORY
4 1 : 25 FIRST FLOOR FIRSTFLOOR
FIRST FLOOR FFL
CLIENT:

SECTION E M09 SSL 12.225


+12.300 m m
+12.300
Lusail Real Estate Development Co
10 1 : 75
P.O. Box 26060 Doha, State of Qatar
TEL: +974 4497 4444 FAX: +974 4497 7563

PROJECT MANAGER:

5
5
FIRST FLOOR FIRSTFLOOR
FIRST FLOOR FFL 5
5
GROUND MEZZANINE FLOOR GROUND MEZZANINE FLOOR FFL
+9.300 m
OFFICE NO.203 FLOOR 2, ARAFAT BUSINESS CENTER P.O.BOX: 55734,
+12.300 m m
+12.300 SSL 9.225 DOHA, QATAR TEL. +974 4423 1278 FAX. +971 4515 3401
SSL 12.225
SUPERVISION CONSULTANT:

AL SALAM TOWER, SHERATON ROUNDABOUT P.O.BOX 23593, DOHA - QATAR


TEL. +974 4480 2097 FAX. +974 4480 2128

9 GROUND MEZZANINE FLOOR GROUND MEZZANINE FLOOR FFL


DESIGN GUARDIAN:

ME-HVAC-L1-01105-02 +9.300 m
SSL 9.225
DP ARCHITECTS PTE LTD
6 RAFFLES BOULEVARD, #04-100 MARINA SQUARE, SINGAPORE 039594
TEL. +65 6338 3988 FAX. +65 6337 9989

GROUND FLOOR GROUND


GROUND FLOOR
FLOOR FFL MAIN CONTRACTOR:
+4.300 mm
+4.300
SSL 4.200

DESIGN CONSULTANT:
C-Ring Road at Al Mana Intersection
P.O. Box 18108
Doha, Qatar
D D GROUND FLOOR GROUND
GROUND FLOOR
+4.300 mm
+4.300
FLOOR FFL T: + 974 4462 6400, F: +974 4462 6500
web: http://www.keoic.com
SSL 4.200 email: info@keoic.com

STRUCTURAL CONSULTANT:
BASEMENT 1 BASEMENT
BASEMENT 1 1
10 SSL -0.200 -0.200 mm
-0.200

ME-HVAC-L1-01105-02
12
ME-HVAC-L1-01105-02 SUB CONTRACTOR:
BIN DIRHAM PLAZA BUILDING
OFFICE NO. 3 & 4, THIRD FLOOR
B-RING ROAD,
P.O. BOX 23458 DOHA, QATAR
TEL: +974-44238444; FAX: +974-44551268
BASEMENT 1 BASEMENT
BASEMENT 1 1 WEBSITE: www.voltas.com

SSL -0.200 -0.200 mm


-0.200 BASEMENT 2 BASEMENT
BASEMENT 2 2
PROJECT:
SSL -3.700 -3.700 mm
-3.700
BP 18A-DESIGN AND BUILD OF MIXED USE BUILDINGS
COMMERCIAL BOULEVARD
COORDINATION CHECK DWG. TITLE:

DISCIPLINE INITIALS SIGNATURE DATE


GROUND FLOOR M09 SECTION C M07 HVAC
5 1 : 25
8 1 : 75 GROUND FLOOR M10 PLUMBING/DRAINAGE

11 SECTION F M10 FIRE FIGHTING


BUILDING
1 : 25 12 1 : 75
ELECTRICAL
ELV
BC.C1/27 & D2 - 5 STAR HOTEL
THIS IS A CAD DRAWING AND MUST NOT BE ALTERED MANUALLY
STRUCTURAL DRAWING NUMBER: SCALE: As indicated ORIG. DWG SIZE: A0 Rev.
ARCHITECTURAL ME-HVAC-L1-01105-02 Sht. Con't. on

You might also like