9t Digger loader excavating the subsoil pipe trench. Biddim sheet laid in trench following the
perforated subsoil pipe. pour Commercial stones on top of Biddim sheet and 110mm diameter or
160mm diameter pipe.
Subsoil drainage pipes are connected to the catchpits.
Stormwater Manhole raise
After exposing manholes clean areas around manhole and add concrete on top of the brickwork and
add a pre-cast concrete frame and join with cement/mortar. Add top slab on top of frame and join
with cement/mortar.
Use massey crane tractor to pick and put down heavy pre-cast concrete materials.
On top of top slab build to a max. of 3 courses to reach the road final level.
Around manhole backfill sand layer and compact. For sub-base stabilization add 5% cement and
backfill around the manhole and thoroughly compact and wet spray.
Sidewalk construction
Problems encountered are underground services such as the anchor block in the trench and
irrigation pipe and water pipe.
Solutions to problem is to lay the pipes under and on top of underground existing services.
Sewer and stormwater manhole raise in roads
Kerbs and channel combination with catchpit construction ongoing
Road B
Road A
Subsoil drainage pipe and mole barrier
Formwork placed before reinforcement steel and concrete are in place. the formwork/
shuttering is dismantled once the concrete has set or cured with the steel reinforcement
inside the concrete.
Erect scaffold support holding wooden beams, place wood boards on top of the wooden
beams supported by the scaffolds. Place steel frame on top of wood boards and cast
concrete using the standard working procedures. Pour concrete using a teleporter crane
plant with a concrete bucket attached to it. Use concrete vibrator to transfer concrete evenly.
Remove shuttering/formwork when concrete has set and cured on top of the reinforced concrete
columns.
Engineering Exercises done at the site office
Draw unto scale longitudinal sections of Stormwater and sewer sheets. Work with invert levels,
cover levels, manhole depths, pipe diameter and distance from manhole to manhole. Chosen datum
for drawings and each manhole must have a reference from the design drawing plan.
Calculate the excavation, bedding and backfilling for the pipes and manholes on the long section
drawing.
Add calculation results in the Bill/schedule of Quantities multiplied by the rate given by the company
Burger and Wallace to obtain the total amount of costs needed for the constructional services.