Paso 5 - Realizar Un Artículo Con Los Resultados de La Auditoría
Paso 5 - Realizar Un Artículo Con Los Resultados de La Auditoría
com/noriegavargaseliecer/mv36zynx11pu
concretos el dorado
Eliecer noriega vargas 1065883703
ELIECER NORIEGA VARGAS 19 DE NOVIEMBRE DE 2019 17:30
CONCRETOS EL DORADO
It was closely understood how the processes for obtaining
concrete are carried out, which is a material used almost in
It is a Colombian company of the industrial sector created in 2009, all of the infrastructure projects in the country and see the
its main of ce is located in Bogotá whose main focus is the repercussions that this generates to the environment,
production and commercialization of concrete and its derivatives. allowing them to propose measures that help improve the
The production plant is located in the city of Valledupar-Cesar at quality of life not only of people, but of all living beings in
kilometer 3, La Popa - La Mesa. Concretos el dorado in the general, thus promoting sustainable development and also
development of its activities is committed to the social enriches our knowledge as students to later know how to
development of the community and its environment. Among the apply methods in our professional eld focused on the
main processes of the plant is crushing, concrete and asphalt. conservation of environment.
Which has a product quality laboratory to keep the daily quality
control of the sample.
RECOMMENDATIONS
The company has 2 Installed Crushing Plants with a Daily
Production of 1000 M3 Among Gravels of Caliber ¾ ”, 1”, 1 ¼ ”, and 1 Atmospheric emissions in the project are frequent, for this
½”, Natural and Crushing Sand; All materials are washed, 3 concrete reason it is necessary to implement a contingency plan to
plants with more than 6 silos for cement storage with capacity for minimize the impact generated by industry and exploitation
more than 360 tons and production of 800 m3 daily, 15 mixers and equipment.
concrete trucks of last generation for transport. We also have 3 Implementation of handling of particulate material, noise
Auto Pumps S32x (2013), S34x (2006), S34x (2000), Schwing and vibrations.
Stationary Pumps, 3 Model SP 1000 (2013), 2 Model SP 750 (2012)
Available for Concrete Pumping Service. Monitoring and environmental management
implementation.
The audit team found the following: Within the project area, circulation areas are included for
the mixer, loader, dump trucks and bulldozer with a
It is a productive process that requires high water consumption by maximum speed of 20 km / h.
crushing plants with a daily production of 1000m3 between gravel
of ¾, 1 ”, ½ and natural sand all materials are washed. Without a
control for the consumption of water in the processes, coming
from a lake that is also used as a receiver of industrial wastewater
discharges.
ANNEXES
There is an absence of a road structure or timely signaling of the
processes in the absence of industrial safety standards.
CONCLUSION