LS_INUL MIDDLE PNL3A & 3B _7X10 M

6
LS INUL MIDDLE P3 - UT600 (D200MM) (7 m X 10 m) - PPV Target :
Jarak ke Station (m): ALL LOCATION
1200
Num of holes blast at same time : Isian maksimum/ lubang = 11.62 m
DECKING NON - DECKING 429
Maximum Exp Charge tiap Lubang (Kgs) :
Dalam Isian Bawah Isian Atas Control Kuzram Analysis (% Pass < 30 cm)
Isian Control Stemming Isian Control PF Decking PF Non-Deck Decking
Lubang Stemming Isian Stemmin
(m) Deck meter kg Stemming meter kg Akhir meter kg Stemming Kg/m3 Kg/m3 Isian Bawah Isian Atas Rata-rataNon-Decking
Akhir g
3 2.5 0.6 20 2.5 0.000 0.097 #DIV/0! #DIV/0! #DIV/0! 41.9%
3.5 2.8 0.7 27 2.9 0.000 0.109 #DIV/0! #DIV/0! #DIV/0! 44.9%
4
4.5
START DECKING MULAI 3.1
3.4
0.9
1.1
33
41
3.2
3.5
0.000
0.000
0.119
0.129
#DIV/0! #DIV/0! #DIV/0! 47.3%
#DIV/0! #DIV/0! #DIV/0! 49.5%
5
5.5
KEDALAMAN 8.5 METER 3.7
4.0
1.3
1.5
47
54
3.8
4.2
0.000
0.000
0.135
0.141
#DIV/0! #DIV/0! #DIV/0! 50.6%
#DIV/0! #DIV/0! #DIV/0! 51.5%
6
6.5
(LAPOR KE T5 BILA DECKING 4.3
4.6
1.7
1.9
61
69
4.5
4.8
0.000
0.000
0.146
0.153
#DIV/0! #DIV/0! #DIV/0! 52.2%
#DIV/0! #DIV/0! #DIV/0! 53.4%
7
7.5
TIDAK DAPAT DI LAKUKAN) 4.9
5.2
2.1
2.3
77
85
5.1
5.4
0.000
0.000
0.158
0.162
#DIV/0! #DIV/0! #DIV/0! 54.2%
#DIV/0! #DIV/0! #DIV/0! 54.7%
8 5.5 2.6 94 5.7 0.000 0.168 #DIV/0! #DIV/0! #DIV/0! 55.8%
8.5 3.0 1.1 41 7.5 2.9 1.5 55 2.9 5.7 2.8 103 6.0 0.161 0.173 53.4% 61.9% 53.9% 56.4%
9 3.0 1.2 42 8.0 3.2 1.7 61 3.2 5.9 3.2 116 6.2 0.164 0.185 54.5% 61.2% 54.2% 58.5%
9.5 3.0 1.4 50 8.3 3.4 1.8 66 3.4 6.0 3.6 131 6.3 0.175 0.197 58.5% 61.9% 56.2% 60.6%
10 3.0 1.5 54 8.7 3.6 2.0 74 3.6 6.0 4.0 148 6.4 0.182 0.211 60.1% 62.6% 57.3% 62.9%
10.5 3.0 1.6 59 9.1 3.9 2.1 76 3.9 6.0 4.5 166 6.5 0.183 0.226 62.4% 60.8% 57.3% 65.1%
11 3.0 1.7 63 9.5 4.2 2.2 79 4.2 6.0 5.0 185 6.5 0.185 0.240 63.7% 59.8% 57.3% 67.0%
11.5 3.5 2.0 74 9.7 4.0 2.1 76 4.0 6.0 5.5 203 6.6 0.186 0.252 63.0% 60.1% 57.3% 68.6%
12 3.5 2.0 74 10.2 4.3 2.3 83 4.3 6.0 6.0 222 6.6 0.187 0.264 63.0% 60.1% 57.2% 70.0%
12.5 3.5 2.1 78 10.6 4.6 2.4 87 4.6 6.0 6.5 240 6.7 0.188 0.274 64.0% 59.1% 57.2% 71.2%
13 3.5 2.3 85 10.9 4.9 2.4 87 4.9 6.0 7.0 259 6.7 0.189 0.284 65.9% 57.3% 57.1% 72.2%
13.5 3.5 2.4 89 11.3 5.2 2.5 90 5.2 6.0 7.5 277 6.8 0.190 0.293 66.7% 56.5% 57.0% 73.1%
14 4.0 2.4 89 11.8 4.9 2.7 98 4.9 6.0 8.0 295 6.8 0.191 0.301 63.2% 59.6% 57.0% 73.9%
14.5 4.0 2.4 89 12.3 5.2 2.9 107 5.2 6.0 8.5 314 6.9 0.193 0.309 63.2% 60.0% 57.2% 74.6%
15 4.0 2.4 89 12.8 5.5 3.1 114 5.5 6.0 9.0 332 6.9 0.193 0.317 63.2% 59.9% 57.1% 75.2%
15.5 4.0 2.6 96 13.2 5.6 3.3 122 5.6 6.0 9.5 351 7.0 0.201 0.323 64.8% 60.7% 58.3% 75.8%
16 4.0 2.6 96 13.7 5.8 3.6 133 5.8 6.0 10.0 369 7.0 0.204 0.330 64.8% 61.6% 58.8% 76.3%
Note
LUBANG PRODUKSI
1. Loading disesuaikan dengan angka actual pita drill, angka di belakang koma semuanya dibulatkan ke LS 0.5 meter ( Contoh: 10.1 m s/d 10.9 m menggunakan isian LS: 10.5m)
2. Minimum waktu gassing adalah 35 menit sebelum di stemming, minimal adalah 20 menit dan harus approval T5
3. Stemming lubang basah 2 meter sisanya drill cutting, kering full drill cutting
4. Pada pembuatan Tie Up, echelon / sayap maksimal adalah 4 lubang dan menggunakan kontrol Zig-Zag (burning front maksimal 4 x spasi).
5. Pengaturan jumlah kontrol dalam Tie _Up disesuaikan dengan kondisi aktual setelah mendapat approval T5/ B5
6. Stemming Plug mulai digunakan pada kedalaman 9.5 m
7. Posisi pemasangan stemming plug dari dasar: (8 m - 10.5 m = 1.5 m), (11 m = 1.7 m), (11.5 m - 12 m = 2 m), (12.5 m - 13.5 m = 2.2 m), (14 m - 15 m = 2.4 m)
LUBANG TRIM
1. Stemming plug mulai digunakan pada kedalaman 6 m
2. Dibawah 9m = 1/2 Col Charge Explosive (Lubang Produksi)
3. 10m - 12m = 80 kg, 13m - 14m = 100kg, 15m - 16m = 120kg, 17m - 18m = 140kg, 19m - 20m = 160kg, 21m - 22m = 180kg, 23m - 24m = 200kg

BILA LUBANG BASAH DAN TIDAK ADA STEMMING TRUCK, LAPOR SEGERA KE T5/B5 JANGAN LANGSUNG DI SINGLE-KAN !
SINGLE DECK WAJIB 1 DETONATOR SAJA JANGAN 2 DETONATOR