LS_INUL EAST PNL3 BAWAH_7X10 M

3
LS INUL EAST PANEL 3B- NONEL (D200MM) (7 m X 10 m) - ALL LOCATIONS PPV Target :
1600
DECKING NON - DECKING
ALL LOCATION AT
Jarak ke Station (m):
INUL lubang
Isian maksimum/
Num of holes blast at same time :EAST
= _PANEL
9.64 m 3
356
Maximum Exp Charge tiap Lubang (Kgs) :
Dalam Isian Bawah Control
Isian Atas Control
Stemming
Stemming Isian Control PF Decking PF Non-Deck
Kuzram Analysis (% Pass < 30 cm)
Lubang Isian Stemming Isian Plan Decking
Deck Stemming Stemming Akhir Stemming Non-Decking
(m) meter kg Akhir meter kg meter kg Kg/m3 Kg/m3 Isian Bawah Isian Atas Rata-rata
3 1.96 2.0 1.0 38 2.5 0.000 0.182 #DIV/0! #DIV/0! #DIV/0! 59.9%
3.5 2.26 2.3 1.2 46 2.8 0.000 0.187 #DIV/0! #DIV/0! #DIV/0! 60.0%
4 2.55 2.5 1.5 54 3.0 0.000 0.192 #DIV/0! #DIV/0! #DIV/0! 60.0%
4.5 2.84 2.8 1.7 61 3.3 0.000 0.195 #DIV/0! #DIV/0! #DIV/0! 59.9%
5 3.12 3.1 1.9 69 3.6 0.000 0.198 #DIV/0! #DIV/0! #DIV/0! 59.9%
5.5 3.40 3.4 2.1 78 3.9 0.000 0.202 #DIV/0! #DIV/0! #DIV/0! 60.0%
6 3.67 3.7 2.3 86 4.2 0.000 0.205 #DIV/0! #DIV/0! #DIV/0! 60.0%
6.5 3.95 3.9 2.6 94 4.4 0.000 0.207 #DIV/0! #DIV/0! #DIV/0! 60.0%
7 4.22 4.2 2.8 103 4.7 0.000 0.210 #DIV/0! #DIV/0! #DIV/0! 59.9%
7.5 4.48 4.5 3.0 111 5.0 0.000 0.212 #DIV/0! #DIV/0! #DIV/0! 60.0%
8 4.75 4.8 3.2 120 5.3 0.000 0.214 #DIV/0! #DIV/0! #DIV/0! 59.9%
8.5 4.99 5.0 3.5 130 5.5 0.000 0.218 #DIV/0! #DIV/0! #DIV/0! 60.2%
9 5.25 5.3 3.8 138 5.8 0.000 0.220 #DIV/0! #DIV/0! #DIV/0! 60.2%
9.5 5.50 5.5 4.0 148 6.0 0.000 0.222 #DIV/0! #DIV/0! #DIV/0! 60.2%
10 5.70 5.7 4.3 159 6.2 0.000 0.227 #DIV/0! #DIV/0! #DIV/0! 60.7%
10.5 2.5 1.8 66 8.88 3.9 2.3 83 3.94 5.50 5.5 5.0 185 6.0 0.204 0.251 64.9% 57.5% 56.5% 64.2%
11 2.5 1.8 66 9.38 4.2 2.5 92 4.22 5.50 5.5 5.5 203 6.0 0.205 0.264 64.9% 57.6% 56.4% 65.8%
11.5 2.5 1.8 66 9.88 4.5 2.7 100 4.48 5.50 5.5 6.0 222 6.0 0.207 0.275 64.9% 57.9% 56.5% 67.1%
12 2.5 1.8 66 10.38 4.8 3.0 109 4.75 5.50 5.5 6.5 240 6.0 0.209 0.286 64.9% 58.0% 56.5% 68.2%
12.5 2.5 1.8 66 10.88 5.0 3.2 118 5.00 5.50 5.5 7.0 259 6.0 0.211 0.295 64.9% 58.3% 56.7% 69.2%
13 2.5 1.8 66 11.38 5.3 3.4 126 5.28 5.50 5.5 7.5 277 6.0 0.212 0.304 64.9% 58.2% 56.6% 70.0%
13.5 2.5 1.8 66 11.88 5.4 3.8 140 5.42 5.50 5.5 8.0 295 6.0 0.218 0.313 64.9% 59.5% 57.4% 70.8%
14 3.0 2.2 81 12.02 5.2 3.6 133 5.20 5.50 5.5 8.5 314 6.0 0.219 0.320 64.1% 59.6% 57.3% 71.4%
14.5 3.0 2.2 81 12.52 5.5 3.9 142 5.45 5.50 5.5 9.0 332 6.0 0.220 0.327 64.1% 59.7% 57.3% 72.0%
15 3.0 2.2 81 13.02 5.6 4.2 154 5.62 5.50 5.5 9.5 351 6.0 0.224 0.334 64.1% 60.5% 57.8% 72.5%
15.5 3.5 2.2 81 13.52 5.4 4.4 162 5.40 5.50 5.9 9.6 356 6.0 0.225 0.328 60.1% 62.5% 57.7% 71.7%
16 3.5 2.3 85 13.93 5.7 4.6 168 5.65 5.50 6.4 9.6 356 6.0 0.226 0.318 61.0% 62.0% 57.7% 70.4%
Note
LUBANG PRODUKSI
1. Loading disesuaikan dengan angka actual pita drill, angka di belakang koma semuanya dibulatkan ke LS 0.5 meter ( Contoh: 10.1 m s/d 10.9 m menggunakan isian LS: 10.5m)
2. Minimum waktu gassing adalah 35 menit sebelum di stemming, minimal adalah 20 menit dan harus approval T5
3. Stemming lubang basah 2 meter sisanya drill cutting, kering full drill cutting
4. Pada pembuatan Tie Up, echelon / sayap maksimal adalah 4 lubang dan menggunakan kontrol Zig-Zag (burning front maksimal 4 x spasi).
5. Pengaturan jumlah kontrol dalam Tie _Up disesuaikan dengan kondisi aktual setelah mendapat approval T5/ B5
6. Stemming Plug mulai digunakan pada kedalaman 10.5 m
7. Posisi pemasangan stemming plug dari dasar lubang: (10.5 m - 13 m = 1.5 m), (13.5 m = 1.6 m), (14 m - 14.5 m = 1.8 m), (15m = 2.2 m)
LUBANG TRIM
1. Stemming plug mulai digunakan pada kedalaman 6 m
2. Dibawah 9m = 1/2 Col Charge Explosive (Lubang Produksi)
3. 10m - 12m = 80 kg, 13m - 14m = 100kg, 15m - 16m = 120kg, 17m - 18m = 140kg, 19m - 20m = 160kg, 21m - 22m = 180kg, 23m - 24m = 200kg

Start decking 10.5 meter (PASTIKAN ADA STEMMING TRUCK/ AGREGAT LUBANG BASAH)
SINGLE DECK WAJIB 1 DETONATOR SAJA JANGAN 2 DETONATOR