LOADING SHEET ALL LOCATION INUL EAST PANEL 2

JIKA TERJADI OVER STEMMING MAKA ISIAN ATAS DI ADJUST MENJADI ½ DARI KOLOM ISIAN ATAS
LOADING SHEET ALL LOCATION INUL EAST PANEL 3
PPV Target : 3
LS INUL EAST PANEL 3B- NONEL (D200MM) (7 m X 10 m) - ALL LOCATIONS Jarak ke Station (m): 1300
Num of holes blast at same time :
DECKING NON - DECKING 235
Maximum Exp Charge tiap Lubang (Kgs) :
Dalam Isian Bawah Control
Isian Atas Control
Stemming
Stemming Isian Control PF Decking PF Non-Deck
Lubang Isian Stemming Isian Plan
Deck Stemming Stemming Akhir Stemming
(m) meter kg Akhir meter kg meter kg Kg/m3 Kg/m3
3 2.5 0.5 18 3.00 -0.5 0.5 18 -0.50 1.96 2.0 1.0 38 2.5 0.176 0.182
3.5 2.5 1.0 37 2.60 -1.0 1.0 37 -1.00 2.26 2.3 1.2 46 2.8 0.301 0.187
4 2.5 1.5 55 2.65 -1.5 1.5 55 -1.50 2.55 2.5 1.5 54 3.0 0.396 0.192
4.5 2.5 2.0 74 2.70 -2.0 2.0 74 -2.00 2.84 2.8 1.7 61 3.3 0.469 0.195
5 2.5 2.5 92 2.75 -2.5 2.5 92 -2.50 3.12 3.1 1.9 69 3.6 0.528 0.198
5.5 2.5 3.0 111 2.80 -3.0 3.0 111 -3.00 3.40 3.4 2.1 78 3.9 0.576 0.202
6 2.5 1.4 52 4.74 1.7 0.4 13 1.75 3.67 3.7 2.3 86 4.2 0.154 0.205
6.5 2.5 1.4 52 5.24 2.1 0.5 19 2.10 3.95 3.9 2.6 94 4.4 0.154 0.207
7 2.5 1.4 52 5.74 2.4 0.7 25 2.42 4.22 4.2 2.8 103 4.7 0.157 0.210
7.5 2.5 1.4 52 6.24 2.7 0.9 32 2.73 4.48 4.5 3.0 111 5.0 0.160 0.212
8 2.5 1.4 52 6.74 3.0 1.1 40 3.01 4.75 4.8 3.2 120 5.3 0.164 0.214
8.5 2.5 1.4 52 7.24 3.3 1.3 48 3.30 4.99 5.0 3.5 130 5.5 0.168 0.218
9 2.5 1.5 55 7.65 3.4 1.6 58 3.43 5.27 5.3 3.7 138 5.8 0.180 0.219
9.5 2.5 1.5 55 8.15 3.1 2.4 45 3.07 5.50 5.5 4.0 148 6.0 0.151 0.222
10 2.5 1.5 55 8.65 3.6 2.4 63 3.62 5.50 5.5 4.5 166 6.0 0.170 0.237
10.5 2.5 1.5 55 9.15 3.9 2.6 94 3.95 5.50 5.5 5.0 185 6.0 0.204 0.251
11 2.5 1.5 55 9.65 4.2 2.8 103 4.22 5.50 5.5 5.5 203 6.0 0.205 0.264
11.5 2.5 1.5 55 10.15 4.5 3.0 112 4.48 5.50 5.5 6.0 222 6.0 0.207 0.275
12 2.5 1.5 55 10.65 4.8 3.2 120 4.75 5.50 5.5 6.4 235 6.0 0.209 0.280
12.5 2.5 1.5 55 11.15 5.0 3.5 129 5.01 5.50 5.5 6.4 235 6.0 0.211 0.269
13 2.5 1.5 55 11.65 5.3 3.7 138 5.27 5.50 5.5 6.4 235 6.0 0.212 0.258
13.5 2.5 1.6 59 12.06 5.4 4.0 146 5.43 5.50 5.5 6.4 235 6.0 0.218 0.249
14 3.0 1.8 66 12.38 5.2 4.0 148 5.20 5.50 5.5 6.4 235 6.0 0.219 0.240
14.5 3.0 1.8 66 12.88 5.5 4.2 155 5.50 5.50 5.5 6.4 235 6.0 0.218 0.232
15 3.5 2.2 81 13.02 5.3 4.0 148 5.30 5.50 5.5 6.4 235 6.0 0.218 0.224

Note
LUBANG PRODUKSI
1. Loading disesuaikan dengan angka actual pita drill, angka di belakang koma semuanya dibulatkan ke LS 0.5 meter ( Contoh: 10.1 m s/d 10.9 m menggunakan isian LS: 10.5m)
2. Minimum waktu gassing adalah 35 menit sebelum di stemming, minimal adalah 20 menit dan harus approval T5
3. Stemming lubang basah 2 meter sisanya drill cutting, kering full drill cutting
4. Pada pembuatan Tie Up, echelon / sayap maksimal adalah 4 lubang dan menggunakan kontrol Zig-Zag (burning front maksimal 4 x spasi).
5. Pengaturan jumlah kontrol dalam Tie _Up disesuaikan dengan kondisi aktual setelah mendapat approval T5/ B5
6. Stemming Plug mulai digunakan pada kedalaman 10.5 m
7. Posisi pemasangan stemming plug dari dasar lubang: (10.5 m - 13 m = 1.5 m), (13.5 m = 1.6 m), (14 m - 14.5 m = 1.8 m), (15m = 2.2 m)
LUBANG TRIM
1. Stemming plug mulai digunakan pada kedalaman 6 m
2. Dibawah 9m = 1/2 Col Charge Explosive (Lubang Produksi)
3. 10m - 12m = 80 kg, 13m - 14m = 100kg, 15m - 16m = 120kg, 17m - 18m = 140kg, 19m - 20m = 160kg, 21m - 22m = 180kg, 23m - 24m = 200kg

Start decking 10.5 meter (DELAY ATAS-BAWAH JANGAN MELEDAK BERSAMAAN!!)


JIKA TERJADI OVER STEMMING MAKA ISIAN ATAS DI ADJUST MENJADI ½ DARI KOLOM ISIAN ATAS
IMP3 –7X8- 800m : (IM27)
PPV Target : 3
LS INUL MIDDLE P3 - UT600 (D200MM) (7 m X 8 m) - 800 m Jarak ke Station (m): 800
Num of holes blast at same time :
DECKING NON - DECKING Maximum Exp Charge tiap Lubang (Kgs)88
:
Dalam Isian Bawah Control
Isian Atas Control
Stemming
Stemming Isian Control PF Decking PF Non-Deck
Lubang Isian Stemming Isian Plan
Deck Stemming Stemming Akhir Stemming
(m) meter kg Akhir meter kg meter kg Kg/m3 Kg/m3
3 2.5 0.5 18 3.00 -0.5 0.5 18 -0.50 2.40 2.4 0.6 22 2.9 0.220 0.132
3.5 2.5 1.0 37 2.60 -1.0 1.0 37 -1.00 2.67 2.7 0.8 31 3.2 0.377 0.157
4 2.5 1.5 55 2.65 -1.5 1.5 55 -1.50 2.95 3.0 1.0 39 3.5 0.495 0.172
4.5 2.5 2.0 74 2.70 -2.0 2.0 74 -2.00 3.22 3.2 1.3 47 3.7 0.586 0.187
5 2.5 2.4 88 2.86 -2.3 2.4 88 -2.27 3.50 3.5 1.5 55 4.0 0.629 0.197
5.5 2.5 2.4 88 3.36 -1.8 2.4 88 -1.77 3.75 3.7 1.8 65 4.2 0.572 0.210
6 2.5 1.4 52 4.74 1.7 0.4 13 1.75 4.14 4.1 1.9 69 4.6 0.192 0.204
6.5 2.5 1.4 52 5.24 2.1 0.5 19 2.10 4.46 4.5 2.0 75 5.0 0.193 0.207
7 2.5 1.4 52 5.74 2.4 0.7 25 2.42 4.77 4.8 2.2 82 5.3 0.196 0.210
7.5 2.5 1.5 55 6.15 2.5 1.0 38 2.47 5.10 5.1 2.4 88 5.6 0.222 0.210
8 2.5 1.5 55 6.65 2.8 1.2 44 2.80 4.60 5.5 2.4 88 5.1 0.223 0.197
8.5 2.5 1.5 55 7.15 3.1 1.4 51 3.13 4.90 5.5 2.4 88 5.4 0.223 0.185
9 2.5 1.5 55 7.65 3.5 1.5 57 3.46 5.20 5.5 2.4 88 5.7 0.223 0.175
9.5 2.5 1.5 55 8.15 3.8 1.7 63 3.79 5.50 5.5 2.4 88 6.0 0.223 0.166
10 3.0 1.5 55 8.65 3.7 1.8 66 3.70 5.50 5.5 2.4 88 6.0 0.218 0.157
10.5 3.0 1.7 63 8.97 4.0 1.8 66 4.00 5.50 5.5 2.4 88 6.0 0.220 0.150
11 3.5 1.8 66 9.38 3.9 1.8 66 3.90 5.50 5.5 2.4 88 6.0 0.216 0.143
11.5 3.5 1.8 66 9.88 4.2 2.0 74 4.20 5.50 5.5 2.4 88 6.0 0.218 0.137
12 3.5 1.8 66 10.38 4.5 2.2 81 4.50 5.50 5.5 2.4 88 6.0 0.220 0.131
12.5 3.5 1.8 66 10.88 4.8 2.4 88 4.82 5.50 5.5 2.4 88 6.0 0.221 0.126
13 3.5 2.0 74 11.20 5.1 2.4 88 5.12 5.50 5.5 2.4 88 6.0 0.222 0.121
13.5 3.0 1.4 52 12.24 6.7 2.4 88 6.72 5.50 5.5 2.4 88 6.0 0.185 0.116
14 3.0 1.4 52 12.74 7.2 2.4 88 7.22 5.50 5.5 2.4 88 6.0 0.178 0.112
14.5 3.0 1.4 52 13.24 7.7 2.4 88 7.72 5.50 5.5 2.4 88 6.0 0.172 0.108
15 3.0 1.4 52 13.74 8.2 2.4 88 8.22 5.50 5.5 2.4 88 6.0 0.166 0.105

Note
LUBANG PRODUKSI
1. Loading disesuaikan dengan angka actual pita drill, angka di belakang koma semuanya dibulatkan ke LS 0.5 meter ( Contoh: 10.1 m s/d 10.9 m menggunakan isian LS: 10.5m)
2. Minimum waktu gassing adalah 35 menit sebelum di stemming, minimal adalah 20 menit dan harus approval T5
3. Stemming lubang basah 2 meter sisanya drill cutting, kering full drill cutting
4. Pada pembuatan Tie Up, echelon / sayap maksimal adalah 4 lubang dan menggunakan kontrol Zig-Zag (burning front maksimal 4 x spasi).
5. Pengaturan jumlah kontrol dalam Tie _Up disesuaikan dengan kondisi aktual setelah mendapat approval T5/ B5
6. Stemming Plug mulai digunakan pada kedalaman 8m
7. Posisi pemasangan Stemming Plug dari dasar: (8 m - 10 m =1.5 m), (10.5= 1.7 m), (11-12.5m = 1.8 m)
LUBANG TRIM
1. Stemming Plug mulai digunakan pada kedalaman 6 m
2. Dibawah 9m = 1/2 Col Charge Explosive (Lubang Produksi)
3. 10m - 12m = 80 kg, 13m - 14m = 100kg, 15m - 16m = 120kg, 17m - 18m = 140kg, 19m - 20m = 160kg, 21m - 22m = 180kg, 23m - 24m = 200kg

Start decking 8 meter (DELAY ATAS-BAWAH JANGAN MELEDAK BERSAMAAN!!)


JIKA TERJADI OVER STEMMING MAKA ISIAN ATAS DI ADJUST MENJADI ½ DARI KOLOM ISIAN ATAS
IMP2X –7X9- >1200m (IM10C, IM31C, IM57C, IM24C, IM25C, IM26C)
PPV Target : 3
LS INUL MIDDLE P2X - UT600 (D200MM) (7 m X 9 m) - >1200 m Jarak ke Station (m): 1200
Num of holes blast at same time :
DECKING NON - DECKING 138
Maximum Exp Charge tiap Lubang (Kgs) :
Dalam Isian Bawah Control
Isian Atas Control
Stemming
Stemming Isian Control PF Decking PF Non-Deck
Lubang Isian Stemming Isian Plan
Deck Stemming Stemming Akhir Stemming
(m) meter kg Akhir meter kg meter kg Kg/m3 Kg/m3
3 2.5 0.5 18 3.00 -0.5 0.5 18 -0.50 2.40 2.4 0.6 22 2.9 0.195 0.117
3.5 2.5 1.0 37 2.60 -1.0 1.0 37 -1.00 2.40 2.4 1.1 41 2.9 0.335 0.184
4 2.5 1.5 55 2.65 -1.5 1.5 55 -1.50 2.78 2.8 1.2 45 3.3 0.440 0.179
4.5 2.5 2.0 74 2.70 -2.0 2.0 74 -2.00 3.10 3.1 1.4 52 3.6 0.521 0.182
5 2.5 2.5 92 2.75 -2.5 2.5 92 -2.50 3.42 3.4 1.6 58 3.9 0.586 0.185
5.5 2.5 3.0 111 2.80 -3.0 3.0 111 -3.00 3.73 3.7 1.8 65 4.2 0.639 0.188
6 2.5 1.4 52 4.74 1.8 0.3 13 1.76 4.04 4.0 2.0 72 4.5 0.170 0.191
6.5 2.5 1.4 52 5.24 2.1 0.5 18 2.11 4.36 4.4 2.1 79 4.9 0.171 0.193
7 2.5 1.4 52 5.74 2.4 0.7 25 2.44 4.66 4.7 2.3 86 5.2 0.173 0.196
7.5 2.5 1.4 52 6.24 2.7 0.9 32 2.74 4.96 5.0 2.5 94 5.5 0.176 0.198
8 2.5 1.4 52 6.74 3.0 1.1 40 3.03 5.26 5.3 2.7 101 5.8 0.181 0.201
8.5 2.5 1.4 52 7.24 3.4 1.2 44 3.40 5.50 5.5 3.0 111 6.0 0.179 0.207
9 2.5 1.5 55 7.65 3.4 1.6 58 3.42 5.50 5.5 3.5 129 6.0 0.201 0.228
9.5 3.0 1.5 55 8.15 3.4 1.6 45 3.40 5.50 5.5 3.7 138 6.0 0.168 0.231
10 3.0 1.5 55 8.65 3.7 1.8 63 3.70 5.50 5.5 3.7 138 6.0 0.189 0.219
10.5 3.0 1.5 55 9.15 4.0 2.0 74 4.00 5.50 5.5 3.7 138 6.0 0.195 0.209
11 3.0 1.7 63 9.47 4.2 2.1 78 4.20 5.50 5.5 3.7 138 6.0 0.202 0.199
11.5 3.5 2.0 74 9.70 4.0 2.0 74 4.00 5.50 5.5 3.7 138 6.0 0.204 0.190
12 3.5 2.0 74 10.20 4.3 2.2 81 4.30 5.50 5.5 3.7 138 6.0 0.205 0.183
12.5 3.5 2.2 81 10.52 4.5 2.3 85 4.50 5.50 5.5 3.7 138 6.0 0.211 0.175
13 3.5 2.2 81 11.02 4.8 2.5 92 4.80 5.50 5.5 3.7 138 6.0 0.212 0.169
13.5 3.5 2.2 81 11.52 5.1 2.7 98 5.15 5.50 5.5 3.7 138 6.0 0.211 0.162
14 4.0 2.4 89 11.84 5.0 2.6 96 5.00 5.50 5.5 3.7 138 6.0 0.209 0.156
14.5 4.0 2.4 89 12.34 5.3 2.8 103 5.30 5.50 5.5 3.7 138 6.0 0.210 0.151
15 4.0 2.4 89 12.84 5.4 3.2 118 5.40 5.50 5.5 3.7 138 6.0 0.219 0.146

Note
LUBANG PRODUKSI
1. Loading disesuaikan dengan angka actual pita drill, angka di belakang koma semuanya dibulatkan ke LS 0.5 meter ( Contoh: 10.1 m s/d 10.9 m menggunakan isian LS: 10.5m)
2. Minimum waktu gassing adalah 35 menit sebelum di stemming, minimal adalah 20 menit dan harus approval T5
3. Stemming lubang basah 2 meter sisanya drill cutting, kering full drill cutting
4. Pada pembuatan Tie Up, echelon / sayap maksimal adalah 4 lubang dan menggunakan kontrol Zig-Zag (burning front maksimal 4 x spasi).
5. Pengaturan jumlah kontrol dalam Tie _Up disesuaikan dengan kondisi aktual setelah mendapat approval T5/ B5
6. Stemming Plug mulai digunakan pada kedalaman 9.5 m
7. Posisi pemasangan stemming plug dari dasar: (8 m - 10.5 m = 1.5 m), (11 m = 1.7 m), (11.5 m - 12 m = 2 m), (12.5 m - 13.5 m = 2.2 m), (14 m - 15 m = 2.4 m)
LUBANG TRIM
1. Stemming plug mulai digunakan pada kedalaman 6 m
2. Dibawah 9m = 1/2 Col Charge Explosive (Lubang Produksi)
3. 10m - 12m = 80 kg, 13m - 14m = 100kg, 15m - 16m = 120kg, 17m - 18m = 140kg, 19m - 20m = 160kg, 21m - 22m = 180kg, 23m - 24m = 200kg

Start decking 9.5 meter (DELAY ATAS-BAWAH JANGAN MELEDAK BERSAMAAN!!)


JIKA TERJADI OVER STEMMING MAKA ISIAN ATAS DI ADJUST MENJADI ½ DARI KOLOM ISIAN ATAS
IMP2X –7X8- 1000m (IM36B)
PPV Target : 3
LS INUL MIDDLE P2X - UT600 (D200MM) (7 m X 8 m) - >1000m Jarak ke Station (m): 1000
Num of holes blast at same time :
DECKING NON - DECKING Maximum Exp Charge tiap Lubang (Kgs)96
:
Dalam Isian Bawah Control
Isian Atas Control
Stemming
Stemming Isian Control PF Decking PF Non-Deck
Lubang Isian Stemming Isian Plan
Deck Stemming Stemming Akhir Stemming
(m) meter kg Akhir meter kg meter kg Kg/m3 Kg/m3
3 2.5 0.5 18 3.00 -0.5 0.5 18 -0.50 2.40 2.4 0.6 22 2.9 0.220 0.132
3.5 2.5 1.0 37 2.60 -1.0 1.0 37 -1.00 2.40 2.4 1.1 41 2.9 0.377 0.207
4 2.5 1.5 55 2.65 -1.5 1.5 55 -1.50 2.78 2.8 1.2 45 3.3 0.495 0.201
4.5 2.5 2.0 74 2.70 -2.0 2.0 74 -2.00 3.10 3.1 1.4 52 3.6 0.586 0.205
5 2.5 2.5 92 2.75 -2.5 2.5 92 -2.50 3.42 3.4 1.6 58 3.9 0.659 0.209
5.5 2.5 2.6 96 3.17 -2.2 2.6 96 -2.19 3.73 3.7 1.8 65 4.2 0.622 0.212
6 2.5 1.4 52 4.74 1.8 0.3 13 1.76 4.04 4.0 2.0 72 4.5 0.192 0.215
6.5 2.5 1.4 52 5.24 2.1 0.5 18 2.11 4.36 4.4 2.1 79 4.9 0.192 0.217
7 2.5 1.4 52 5.74 2.4 0.7 25 2.44 4.66 4.7 2.3 86 5.2 0.194 0.221
7.5 2.5 1.4 52 6.24 2.7 0.9 32 2.74 4.96 5.0 2.5 94 5.5 0.198 0.223
8 3.0 1.5 55 6.65 2.4 1.1 41 2.40 5.40 5.4 2.6 96 5.9 0.214 0.214
8.5 3.0 1.5 55 7.15 2.8 1.2 44 2.80 4.90 5.5 2.6 96 5.4 0.209 0.201
9 3.0 1.5 55 7.65 3.1 1.4 52 3.10 5.20 5.5 2.6 96 5.7 0.212 0.190
9.5 3.0 1.5 55 8.15 3.4 1.6 59 3.40 5.50 5.5 2.6 96 6.0 0.215 0.180
10 3.0 1.5 55 8.65 3.7 1.8 66 3.70 5.50 5.5 2.6 96 6.0 0.218 0.171
10.5 3.0 1.5 55 9.15 4.0 2.0 74 4.00 5.50 5.5 2.6 96 6.0 0.220 0.163
11 3.0 1.5 55 9.65 4.4 2.1 78 4.40 5.50 5.5 2.6 96 6.0 0.216 0.156
11.5 3.5 1.7 63 9.97 4.3 2.0 74 4.30 5.50 5.5 2.6 96 6.0 0.212 0.149
12 4.0 2.0 74 10.20 4.1 1.9 70 4.10 5.50 5.5 2.6 96 6.0 0.214 0.143
12.5 4.0 2.0 74 10.70 4.4 2.1 78 4.40 5.50 5.5 2.6 96 6.0 0.216 0.137
13 4.0 2.0 74 11.20 4.7 2.3 85 4.70 5.50 5.5 2.6 96 6.0 0.218 0.132
13.5 4.0 2.0 74 11.70 5.0 2.5 92 5.00 5.50 5.5 2.6 96 6.0 0.220 0.127
14 4.0 2.0 74 12.20 5.4 2.6 96 5.40 5.50 5.5 2.6 96 6.0 0.216 0.122
14.5 3.0 2.6 96 12.17 6.3 2.6 96 6.31 5.50 5.5 2.6 96 6.0 0.236 0.118
15 3.0 2.6 96 12.67 6.8 2.6 96 6.81 5.50 5.5 2.6 96 6.0 0.228 0.114

Note
LUBANG PRODUKSI
1. Loading disesuaikan dengan angka actual pita drill, angka di belakang koma semuanya dibulatkan ke LS 0.5 meter ( Contoh: 10.1 m s/d 10.9 m menggunakan isian LS: 10.5m)
2. Minimum waktu gassing adalah 35 menit sebelum di stemming, minimal adalah 20 menit dan harus approval T5
3. Stemming lubang basah 2 meter sisanya drill cutting, kering full drill cutting
4. Pada pembuatan Tie Up, echelon / sayap maksimal adalah 4 lubang dan menggunakan kontrol Zig-Zag (burning front maksimal 4 x spasi).
5. Pengaturan jumlah kontrol dalam Tie _Up disesuaikan dengan kondisi aktual setelah mendapat approval T5/ B5
6. Stemming Plug mulai digunakan pada kedalaman 8.5 m
7. Posisi pemasangan stemming plug dari dasar: (8.5 m - 11 m = 1.5 m), (11.5 m = 1.7 m), (12 m - 14 m = 2 m)
LUBANG TRIM
1. Stemming plug mulai digunakan pada kedalaman 6 m
2. Dibawah 9m = 1/2 Col Charge Explosive (Lubang Produksi)
3. 10m - 12m = 80 kg, 13m - 14m = 100kg, 15m - 16m = 120kg, 17m - 18m = 140kg, 19m - 20m = 160kg, 21m - 22m = 180kg, 23m - 24m = 200kg

Start decking 8.5 meter (DELAY ATAS-BAWAH JANGAN MELEDAK BERSAMAAN!!)


JIKA TERJADI OVER STEMMING MAKA ISIAN ATAS DI ADJUST MENJADI ½ DARI KOLOM ISIAN ATAS
IMP2X-1100 M (IM39B)
PPV Target : 3
LS INUL MIDDLE - UT600 (D200MM) (7 m X 10 m) - 1100 Jarak ke Station (m): 1100
Num of holes blast at same time :
DECKING NON - DECKING 116
Maximum Exp Charge tiap Lubang (Kgs) :
Dalam Isian Bawah Control
Isian Atas Control
Stemming
Stemming Isian Control PF Decking PF Non-Deck
Lubang Isian Stemming Isian Plan
Deck Stemming Stemming Akhir Stemming
(m) meter kg Akhir meter kg meter kg Kg/m3 Kg/m3
3 2.5 0.5 18 3.00 -0.5 0.5 18 -0.50 2.40 2.4 0.6 22 2.9 0.176 0.106
3.5 2.5 1.0 37 2.60 -1.0 1.0 37 -1.00 2.67 2.7 0.8 31 3.2 0.301 0.126
4 2.5 1.5 55 2.65 -1.5 1.5 55 -1.50 2.95 3.0 1.0 39 3.5 0.396 0.138
4.5 2.5 2.0 74 2.70 -2.0 2.0 74 -2.00 3.22 3.2 1.3 47 3.7 0.469 0.150
5 2.5 2.5 92 2.75 -2.5 2.5 92 -2.50 3.50 3.5 1.5 55 4.0 0.528 0.158
5.5 2.5 3.0 111 2.80 -3.0 3.0 111 -3.00 3.75 3.7 1.8 65 4.2 0.576 0.168
6 2.5 1.4 52 4.74 1.8 0.3 13 1.76 3.98 4.0 2.0 75 4.5 0.153 0.178
6.5 2.5 1.4 52 5.24 2.1 0.5 18 2.11 4.20 4.2 2.3 85 4.7 0.154 0.187
7 2.5 1.4 52 5.74 2.4 0.7 25 2.44 4.41 4.4 2.6 96 4.9 0.156 0.195
7.5 2.5 1.4 52 6.24 2.7 0.9 32 2.74 4.61 4.6 2.9 107 5.1 0.159 0.203
8 2.5 1.4 52 6.74 3.0 1.1 40 3.03 4.77 4.8 3.1 116 5.3 0.163 0.207
8.5 2.5 1.4 52 7.24 3.4 1.2 44 3.40 4.90 4.9 3.1 116 5.4 0.161 0.195
9 2.5 2.1 78 7.11 3.2 1.2 45 3.19 5.20 5.5 3.1 116 5.7 0.194 0.184
9.5 3.0 2.1 78 7.61 3.2 1.2 45 3.22 5.50 5.5 3.1 116 6.0 0.185 0.174
10 3.0 2.1 78 8.11 3.7 1.2 63 3.72 5.50 5.5 3.1 116 6.0 0.202 0.166
10.5 3.0 2.1 78 8.61 3.7 1.7 63 3.70 5.50 5.5 3.1 116 6.0 0.191 0.158
11 3.0 2.6 96 8.67 3.7 1.7 63 3.70 5.50 5.5 3.1 116 6.0 0.206 0.151
11.5 3.0 2.6 96 9.17 3.9 2.0 73 3.94 5.50 5.5 3.1 116 6.0 0.209 0.144
12 3.0 2.6 96 9.67 4.2 2.2 83 4.16 5.50 5.5 3.1 116 6.0 0.213 0.138
12.5 3.0 2.6 96 10.17 4.4 2.5 94 4.37 5.50 5.5 3.1 116 6.0 0.217 0.133
13 3.0 2.6 96 10.67 4.6 2.8 105 4.57 5.50 5.5 3.1 116 6.0 0.220 0.127
13.5 3.0 2.6 96 11.17 4.8 3.1 116 4.76 5.50 5.5 3.1 116 6.0 0.224 0.123
14 3.0 2.6 96 11.67 5.3 3.1 116 5.26 5.50 5.5 3.1 116 6.0 0.216 0.118
14.5 3.0 3.1 116 11.68 5.2 3.1 116 5.22 5.50 5.5 3.1 116 6.0 0.229 0.114
15 3.0 3.1 116 12.18 5.7 3.1 116 5.72 5.50 5.5 3.1 116 6.0 0.221 0.110

Note
LUBANG PRODUKSI
1. Loading disesuaikan dengan angka actual pita drill, angka di belakang koma semuanya dibulatkan ke LS 0.5 meter ( Contoh: 10.1 m s/d 10.9 m menggunakan isian LS: 10.5m)
2. Minimum waktu gassing adalah 35 menit sebelum di stemming, minimal adalah 20 menit dan harus approval T5
3. Stemming lubang basah 2 meter sisanya drill cutting, kering full drill cutting
4. Pada pembuatan Tie Up, echelon / sayap maksimal adalah 4 lubang dan menggunakan kontrol Zig-Zag (burning front maksimal 4 x spasi).
5. Pengaturan jumlah kontrol dalam Tie _Up disesuaikan dengan kondisi aktual setelah mendapat approval T5/ B5
6. Plascon mulai digunakan pada kedalaman 5 m bila tidak ada alokasi stemming truck
7. Posisi pemasangan plascon : (5 m - 7 m = 2.6 m), (7.5 m - 9 m = 3.2 m), (9.5 m - 11 m = 3.8 m), (11.5 m - 13 m = 4.2 m), (13.5 m - 15 m = 6 m), (15.5 m - 18 m = 8.5 m)
LUBANG TRIM
1. Plascon mulai digunakan pada kedalaman 6 m
2. Dibawah 9m = 1/2 Col Charge Explosive (Lubang Produksi)
3. 10m - 12m = 80 kg, 13m - 14m = 100kg, 15m - 16m = 120kg, 17m - 18m = 140kg, 19m - 20m = 160kg, 21m - 22m = 180kg, 23m - 24m = 200kg

Start decking 9 meter (DELAY ATAS-BAWAH JANGAN MELEDAK BERSAMAAN!!)


JIKA TERJADI OVER STEMMING MAKA ISIAN ATAS DI ADJUST MENJADI ½ DARI KOLOM ISIAN ATAS
KWEST – 1100m : (KW11, KW15)
PPV Target : 3
LS K WEST - UT600 (D200MM) (7 m X 10 m) - 1100 Jarak ke Station (m): 1100
Num of holes blast at same time :
DECKING NON - DECKING 121
Maximum Exp Charge tiap Lubang (Kgs) :
Dalam Isian Bawah Control
Isian Atas Control
Stemming
Stemming Isian Control PF Decking PF Non-Deck
Lubang Isian Stemming Isian Plan
Deck Stemming Stemming Akhir Stemming
(m) meter kg Akhir meter kg meter kg Kg/m3 Kg/m3
3 2.5 0.5 18 3.00 -0.5 0.5 18 -0.50 2.40 2.4 0.6 22 2.9 0.176 0.106
3.5 2.5 1.0 37 2.60 -1.0 1.0 37 -1.00 2.41 2.4 1.1 40 2.9 0.301 0.164
4 2.5 1.5 55 2.65 -1.5 1.5 55 -1.50 2.73 2.7 1.3 47 3.2 0.396 0.168
4.5 2.5 2.0 74 2.70 -2.0 2.0 74 -2.00 3.04 3.0 1.5 54 3.5 0.469 0.171
5 2.5 2.5 92 2.75 -2.5 2.5 92 -2.50 3.35 3.3 1.7 61 3.8 0.528 0.174
5.5 2.5 3.0 111 2.80 -3.0 3.0 111 -3.00 3.65 3.7 1.8 68 4.2 0.576 0.177
6 2.5 1.4 52 4.74 1.8 0.3 13 1.76 3.96 4.0 2.0 76 4.5 0.153 0.180
6.5 2.5 1.4 52 5.24 2.1 0.5 18 2.11 4.26 4.3 2.2 83 4.8 0.154 0.182
7 2.5 1.4 52 5.74 2.4 0.7 25 2.44 4.55 4.6 2.4 90 5.1 0.156 0.184
7.5 2.5 1.4 52 6.24 2.7 0.9 32 2.74 4.80 4.8 2.7 100 5.3 0.159 0.190
8 2.5 1.4 52 6.74 3.0 1.1 40 3.03 5.14 5.1 2.9 106 5.6 0.163 0.189
8.5 2.5 1.4 52 7.24 3.4 1.2 44 3.40 5.43 5.4 3.1 113 5.9 0.161 0.190
9 2.5 1.5 55 7.65 3.3 1.7 63 3.30 5.20 5.5 3.3 121 5.7 0.188 0.191
9.5 3.0 1.5 55 8.15 3.3 1.7 63 3.30 5.50 5.5 3.3 121 6.0 0.178 0.181
10 3.0 1.5 55 8.65 3.6 1.9 70 3.60 5.50 5.5 3.3 121 6.0 0.179 0.172
10.5 3.0 1.5 55 9.15 3.9 2.1 78 3.90 5.50 5.5 3.3 121 6.0 0.181 0.164
11 3.5 1.8 66 9.38 3.6 2.1 78 3.60 5.50 5.5 3.3 121 6.0 0.187 0.157
11.5 3.5 1.8 66 9.88 4.0 2.2 81 4.02 5.50 5.5 3.3 121 6.0 0.183 0.150
12 3.5 2.0 74 10.20 4.2 2.3 85 4.20 5.50 5.5 3.3 121 6.0 0.189 0.143
12.5 3.5 2.0 74 10.70 4.5 2.5 91 4.52 5.50 5.5 3.3 121 6.0 0.189 0.138
13 3.5 2.0 74 11.20 4.8 2.7 100 4.80 5.50 5.5 3.3 121 6.0 0.191 0.132
13.5 4.0 2.1 78 11.61 4.7 2.7 100 4.70 5.50 5.5 3.3 121 6.0 0.187 0.128
14 4.0 2.1 78 12.11 5.0 2.9 107 5.00 5.50 5.5 3.3 121 6.0 0.188 0.123
14.5 4.0 2.1 78 12.61 5.3 3.1 114 5.30 5.50 5.5 3.3 121 6.0 0.189 0.119
15 4.0 2.1 78 13.11 5.4 3.5 129 5.40 5.50 5.5 3.3 121 6.0 0.197 0.115

Note
LUBANG PRODUKSI
1. Loading disesuaikan dengan angka actual pita drill, angka di belakang koma semuanya dibulatkan ke LS 0.5 meter ( Contoh: 10.1 m s/d 10.9 m menggunakan isian LS: 10.5m)
2. Minimum waktu gassing adalah 35 menit sebelum di stemming, minimal adalah 20 menit dan harus approval T5
3. Stemming lubang basah 2 meter sisanya drill cutting, kering full drill cutting
4. Pada pembuatan Tie Up, echelon / sayap maksimal adalah 4 lubang dan menggunakan kontrol Zig-Zag (burning front maksimal 4 x spasi).
5. Pengaturan jumlah kontrol dalam Tie _Up disesuaikan dengan kondisi aktual setelah mendapat approval T5/ B5
6. Stemming Plug mulai digunakan pada kedalaman 9 m
7. Posisi pemasangan stemming plug dari dasar: (9 m - 10.5 m = 1.5 m), (11 m - 11.5 m = 1.8 m), (12 m - 13 m= 2 m), (13.5 m - 15 m = 2.1 m )
LUBANG TRIM
1. Stemming plug mulai digunakan pada kedalaman 6 m
2. Dibawah 9m = 1/2 Col Charge Explosive (Lubang Produksi)
3. 10m - 12m = 80 kg, 13m - 14m = 100kg, 15m - 16m = 120kg, 17m - 18m = 140kg, 19m - 20m = 160kg, 21m - 22m = 180kg, 23m - 24m = 200kg

Start decking 9 meter (DELAY ATAS-BAWAH JANGAN MELEDAK BERSAMAAN!!)


JIKA TERJADI OVER STEMMING MAKA ISIAN ATAS DI ADJUST MENJADI ½ DARI KOLOM ISIAN ATAS
KWEST UT – >1300m (KW24, KW16)
PPV Target : 3
LS K WEST - UT600 (D200MM) (7 m X 10 m) - >1300m Jarak ke Station (m): 1300
Num of holes blast at same time :
DECKING NON - DECKING 168
Maximum Exp Charge tiap Lubang (Kgs) :
Dalam Isian Bawah Control
Isian Atas Control
Stemming
Stemming Isian Control PF Decking PF Non-Deck
Lubang Isian Stemming Isian Plan
Deck Stemming Stemming Akhir Stemming
(m) meter kg Akhir meter kg meter kg Kg/m3 Kg/m3
3 2.5 0.5 18 3.00 -0.5 0.5 18 -0.50 2.40 2.4 0.6 22 2.9 0.176 0.106
3.5 2.5 1.0 37 2.60 -1.0 1.0 37 -1.00 2.41 2.4 1.1 40 2.9 0.301 0.164
4 2.5 1.5 55 2.65 -1.5 1.5 55 -1.50 2.73 2.7 1.3 47 3.2 0.396 0.168
4.5 2.5 2.0 74 2.70 -2.0 2.0 74 -2.00 3.04 3.0 1.5 54 3.5 0.469 0.171
5 2.5 2.5 92 2.75 -2.5 2.5 92 -2.50 3.35 3.3 1.7 61 3.8 0.528 0.174
5.5 2.5 3.0 111 2.80 -3.0 3.0 111 -3.00 3.65 3.7 1.8 68 4.2 0.576 0.177
6 2.5 1.4 52 4.74 1.8 0.3 13 1.76 3.96 4.0 2.0 76 4.5 0.153 0.180
6.5 2.5 1.4 52 5.24 2.1 0.5 18 2.11 4.26 4.3 2.2 83 4.8 0.154 0.182
7 2.5 1.4 52 5.74 2.4 0.7 25 2.44 4.55 4.6 2.4 90 5.1 0.156 0.184
7.5 2.5 1.4 52 6.24 2.7 0.9 32 2.74 4.80 4.8 2.7 100 5.3 0.159 0.190
8 2.5 1.4 52 6.74 3.0 1.1 40 3.03 5.14 5.1 2.9 106 5.6 0.163 0.189
8.5 2.5 1.4 52 7.24 3.4 1.2 44 3.40 5.43 5.4 3.1 113 5.9 0.161 0.190
9 2.5 2.1 78 7.11 3.2 1.2 45 3.19 5.50 5.5 3.5 129 6.0 0.194 0.205
9.5 3.0 2.1 78 7.61 3.2 1.2 45 3.22 5.50 5.5 4.0 148 6.0 0.185 0.222
10 3.0 1.5 55 8.65 3.6 1.9 63 3.60 5.50 5.5 4.5 166 6.0 0.170 0.237
10.5 3.0 1.5 55 9.15 3.9 2.1 78 3.90 5.50 5.5 4.6 168 6.0 0.181 0.229
11 3.5 1.8 66 9.38 3.6 2.1 78 3.60 5.50 5.5 4.6 168 6.0 0.187 0.219
11.5 3.5 1.8 66 9.88 4.0 2.2 81 4.02 5.50 5.5 4.6 168 6.0 0.183 0.209
12 3.5 2.0 74 10.20 4.2 2.3 85 4.20 5.50 5.5 4.6 168 6.0 0.189 0.200
12.5 3.5 2.0 74 10.70 4.5 2.5 91 4.52 5.50 5.5 4.6 168 6.0 0.189 0.192
13 3.5 2.0 74 11.20 4.8 2.7 100 4.80 5.50 5.5 4.6 168 6.0 0.191 0.185
13.5 4.0 2.1 78 11.61 4.7 2.7 100 4.70 5.50 5.5 4.6 168 6.0 0.187 0.178
14 4.0 2.1 78 12.11 5.0 2.9 107 5.00 5.50 5.5 4.6 168 6.0 0.188 0.172
14.5 4.0 2.1 78 12.61 5.3 3.1 114 5.30 5.50 5.5 4.6 168 6.0 0.189 0.166
15 4.0 2.1 78 13.11 5.4 3.5 129 5.40 5.50 5.5 4.6 168 6.0 0.197 0.160

Note
LUBANG PRODUKSI
1. Loading disesuaikan dengan angka actual pita drill, angka di belakang koma semuanya dibulatkan ke LS 0.5 meter ( Contoh: 10.1 m s/d 10.9 m menggunakan isian LS: 10.5m)
2. Minimum waktu gassing adalah 35 menit sebelum di stemming, minimal adalah 20 menit dan harus approval T5
3. Stemming lubang basah 2 meter sisanya drill cutting, kering full drill cutting
4. Pada pembuatan Tie Up, echelon / sayap maksimal adalah 4 lubang dan menggunakan kontrol Zig-Zag (burning front maksimal 4 x spasi).
5. Pengaturan jumlah kontrol dalam Tie _Up disesuaikan dengan kondisi aktual setelah mendapat approval T5/ B5
6. Stemming Plug mulai digunakan pada kedalaman 10 m
7. Posisi pemasangan stemming plug dari dasar: (10 m - 10.5 m = 1.5 m), (11 m - 11.5 m = 1.8 m), (12 m - 13 m= 2 m), (13.5 m - 15 m = 2.1 m )
LUBANG TRIM
1. Stemming plug mulai digunakan pada kedalaman 6 m
2. Dibawah 9m = 1/2 Col Charge Explosive (Lubang Produksi)
3. 10m - 12m = 80 kg, 13m - 14m = 100kg, 15m - 16m = 120kg, 17m - 18m = 140kg, 19m - 20m = 160kg, 21m - 22m = 180kg, 23m - 24m = 200kg

Start decking 10 meter (DELAY ATAS-BAWAH JANGAN MELEDAK BERSAMAAN!!)


JIKA TERJADI OVER STEMMING MAKA ISIAN ATAS DI ADJUST MENJADI ½ DARI KOLOM ISIAN ATAS
KWEST NONEL – 1500m : (KW24, KW16)
PPV Target : 3
LS K WEST - NONEL (D200MM) (7 m X 10 m) - 1500 m Jarak ke Station (m): 1500
Num of holes blast at same time :
DECKING NON - DECKING 224
Maximum Exp Charge tiap Lubang (Kgs) :
Dalam Isian Bawah Control
Isian Atas Control
Stemming
Stemming Isian Control PF Decking PF Non-Deck
Lubang Isian Stemming Isian Plan
Deck Stemming Stemming Akhir Stemming
(m) meter kg Akhir meter kg meter kg Kg/m3 Kg/m3
3 2.5 0.5 18 3.00 -0.5 0.5 18 -0.50 2.00 2.0 1.0 37 2.5 0.176 0.176
3.5 2.5 1.0 37 2.60 -1.0 1.0 37 -1.00 2.26 2.3 1.2 46 2.8 0.301 0.187
4 2.5 1.5 55 2.65 -1.5 1.5 55 -1.50 2.55 2.5 1.5 54 3.0 0.396 0.192
4.5 2.5 2.0 74 2.70 -2.0 2.0 74 -2.00 2.83 2.8 1.7 61 3.3 0.469 0.195
5 2.5 2.5 92 2.75 -2.5 2.5 92 -2.50 3.12 3.1 1.9 69 3.6 0.528 0.198
5.5 2.5 3.0 111 2.80 -3.0 3.0 111 -3.00 3.40 3.4 2.1 78 3.9 0.576 0.202
6 2.5 1.4 52 4.74 1.8 0.3 13 1.76 3.67 3.7 2.3 86 4.2 0.153 0.204
6.5 2.5 1.4 52 5.24 2.1 0.5 18 2.11 3.95 3.9 2.6 94 4.4 0.154 0.207
7 2.5 1.4 52 5.74 2.4 0.7 25 2.44 4.22 4.2 2.8 103 4.7 0.156 0.210
7.5 2.5 1.4 52 6.24 2.7 0.9 32 2.74 4.48 4.5 3.0 111 5.0 0.159 0.212
8 2.5 1.4 52 6.74 3.0 1.1 40 3.03 4.75 4.7 3.3 120 5.2 0.163 0.214
8.5 2.5 1.4 52 7.24 3.4 1.2 44 3.40 5.01 5.0 3.5 129 5.5 0.161 0.217
9 2.5 2.1 78 7.11 3.2 1.2 45 3.19 5.50 5.5 3.5 129 6.0 0.194 0.205
9.5 3.0 2.1 78 7.61 3.2 1.2 45 3.22 5.50 5.5 4.0 148 6.0 0.185 0.222
10 3.0 1.5 55 8.65 3.6 1.9 63 3.60 5.50 5.5 4.5 166 6.0 0.170 0.237
10.5 3.5 2.3 85 8.43 2.9 1.8 66 2.90 5.50 5.5 5.0 185 6.0 0.206 0.251
11 3.5 2.3 85 8.93 3.2 2.0 74 3.20 5.50 5.5 5.5 203 6.0 0.206 0.264
11.5 3.5 2.3 85 9.43 3.5 2.2 81 3.50 5.50 5.5 6.0 222 6.0 0.206 0.275
12 3.5 2.3 85 9.93 3.7 2.5 92 3.70 5.50 5.5 6.1 224 6.0 0.211 0.267
12.5 3.5 2.3 85 10.43 4.0 2.7 100 4.00 5.50 5.5 6.1 224 6.0 0.211 0.256
13 4.0 2.7 99 10.58 3.8 2.5 92 3.81 5.50 5.5 6.1 224 6.0 0.211 0.246
13.5 4.0 2.7 99 11.08 4.1 2.7 100 4.11 5.50 5.5 6.1 224 6.0 0.211 0.237
14 4.0 2.7 100 11.57 4.3 3.0 111 4.30 5.50 5.5 6.1 224 6.0 0.215 0.229
14.5 4.0 2.7 100 12.07 4.6 3.2 118 4.60 5.50 5.5 6.1 224 6.0 0.215 0.221
15 4.0 2.7 100 12.57 4.9 3.4 126 4.90 5.50 5.5 6.1 224 6.0 0.215 0.213

Note
LUBANG PRODUKSI
1. Loading disesuaikan dengan angka actual pita drill, angka di belakang koma semuanya dibulatkan ke LS 0.5 meter ( Contoh: 10.1 m s/d 10.9 m menggunakan isian LS: 10.5m)
2. Minimum waktu gassing adalah 35 menit sebelum di stemming, minimal adalah 20 menit dan harus approval T5
3. Stemming lubang basah 2 meter sisanya drill cutting, kering full drill cutting
4. Pada pembuatan Tie Up, echelon / sayap maksimal adalah 4 lubang dan menggunakan kontrol Zig-Zag (burning front maksimal 4 x spasi).
5. Pengaturan jumlah kontrol dalam Tie _Up disesuaikan dengan kondisi aktual setelah mendapat approval T5/ B5
6. Stemming Plug mulai digunakan pada kedalaman 12 m
7. Posisi pemasangan stemming plug dari dasar:(12 m - 12.5 m= 2.3 m), (13 m - 15 m = 2.7 m )
LUBANG TRIM
1. Stemming plug mulai digunakan pada kedalaman 6 m
2. Dibawah 9m = 1/2 Col Charge Explosive (Lubang Produksi)
3. 10m - 12m = 80 kg, 13m - 14m = 100kg, 15m - 16m = 120kg, 17m - 18m = 140kg, 19m - 20m = 160kg, 21m - 22m = 180kg, 23m - 24m = 200kg

Start decking 12 meter (DELAY ATAS-BAWAH JANGAN MELEDAK BERSAMAAN!!)


JIKA TERJADI OVER STEMMING MAKA ISIAN ATAS DI ADJUST MENJADI ½ DARI KOLOM ISIAN ATAS