LAPORAN PEMAKAIAN CHEMICAL BOILER

BULAN : JANUARI 2017

CHEMICAL
PHOSPHATE N – 1800 ELLIMIN-OX
TGL
Target = 87 Kg/ Bln Target = 174 Kg/ Bln Target = 57 Kg/ Bln
SHIFT I SHIFT II JUMLAH SHIFT I SHIFT II JUMLAH SHIFT I SHIFT II JUMLAH
01 2.5 0 2.5 3.3 0 3.3 0 3 3
02 2.5 2.5 7.5 3.3 3.3 9.9 1.5 1.5 6
03 2.5 2.5 12.5 3.3 3.3 16.5 1.5 3.5 11
04 2.5 2.5 17.5 3.3 6.6 26.4 0 3 14
05 2.5 2.5 22.5 3.3 3.3 33 0 1.5 15.5
06 2.5 2.5 27.5 3.3 3.3 39.6 1.5 1.5 18.5
07 2.5 2.5 32.5 3.3 6.6 49.5 0 1.5 20
08 2.5 0 35 3.3 3.3 56.1 1.5 1.5 23
09 2.5 2.5 40 3.3 3.3 62.7 0 1.5 24.5
10 2.5 2.5 45 3.3 3.3 69.3 0 1.5 26
11 0 2.5 47.5 3.3 0 72.6 1.5 1.5 29
12 2.5 2.5 52.5 3.3 3.3 79.2 0 1.5 30.5
13 2.5 0 55 3.3 6.6 89.1 0 1.5 32
14 2.5 2.5 60 3.3 3.3 95.7 0 1.5 33.5
15 2.5 0 62.5 3.3 3.3 102.3 1.5 1.5 36.5
16 2.5 2.5 67.5 0 3.3 105.6 0 1.5 38
17 2.5 0 70 3.3 3.3 112.2 1.5 1.5 41
18 5 10 85 3.3 6.6 122.1 0 3 44
19 10 7 102 3.3 6.6 132 0 1.5 45.5
20 2.5 5 109.5 0 6.6 138.6 0 3 48.5
21 2.5 5 117 3.3 3.3 145.2 0 0 48.5
22 2.5 2.5 122 6.6 6.6 158.4 1.5 3 53
23 2.5 2.5 127 3.3 6.6 168.3 0 1.5 54.5
24 5 2.5 134.5 3.3 6.6 178.2 1.5 1.5 57.5
25 2.5 2.5 139.5 3.3 3.3 184.8 0 1.5 59
26 2.5 2.5 144.5 3.3 3.3 191.4 1.5 0 60.5
27 2.5 5 152 3.3 3.3 198 0 1.5 62
28 2.5 0 154.5 3.3 6.6 207.9 0 1.5 63.5
29 2.5 2.5 159.5 3.3 3.3 214.5 1.5 1.5 66.5
30 2.5 2.5 164.5 3.3 3.3 221.1 0 1.5 68
31 2.5 2.5 169.5 3.3 3.3 227.7 1.5 1.5 71
Note :
~ Tgl. 16 Januari 2017 Pkl. 08.51 ~ 05.36 PM Stop (Ganti Roll), Boiler #2 Stop
~ Tgl. 18 Januari 2017 Pkl. 12.40 ~ 20.00 PM Sheet Break (Spoll di PM Habis)
Pkl. 22.20 ~ 03.14 PM Sheet Break (Spoll di rewinder habis)
~ Tgl. 27 Januari 2017 Pkl. 07.30 Turbine Trip (Black Out) s/d Tgl. 28 Januari 2017 Pkl. 19.45 (Turbine Syncrone), PM Stop,
Boiler #1 Stop
LAPORAN PEMAKAIAN CHEMICAL BOILER

BULAN : FEBRUARI 2017

CHEMICAL
PHOSPHATE N – 1800 ELLIMIN-OX
TGL
Target = 87 Kg/ Bln Target = 174 Kg/ Bln Target = 57 Kg/ Bln
SHIFT I SHIFT II JUMLAH SHIFT I SHIFT II JUMLAH SHIFT I SHIFT II JUMLAH
01 2.5 2.5 5 3.3 3.3 6.6 0 1.5 1.5
02 2.5 2.5 10 0 3.3 9.9 1.5 1.5 4.5
03 2.5 2.5 15 3.3 3.3 16.5 0 1.5 6
04 2.5 2.5 20 3.3 3.3 23.1 0 0 6
05 2.5 2.5 25 0 3.3 26.4 1.5 1.5 9
06 2.5 2.5 30 3.3 0 29.7 0 1.5 10.5
07 2.5 2.5 35 3.3 3.3 36.3 0 1.5 12
08 2.5 2.5 40 3.3 3.3 42.9 1.5 0 13.5
09 0 2.5 42.5 3.3 3.3 49.5 0 1.5 15
10 2.5 2.5 47.5 3.3 3.3 56.1 1.5 1.5 18
11 2.5 2.5 52.5 3.3 3.3 62.7 0 1.5 19.5
12 2.5 0 55 3.3 3.3 69.3 1.5 0 21
13 2.5 0 57.5 0 0 69.3 0 0 21
14 0 2.5 60 3.3 3.3 75.9 0 1.5 22.5
15 2.5 2.5 65 3.3 3.3 82.5 1.5 0 24
16 2.5 0 67.5 3.3 3.3 89.1 0 0 24
17 2.5 2.5 72.5 3.3 3.3 95.7 1.5 1.5 27
18 0 2.5 75 0 3.3 99 0 1.5 28.5
19 2.5 2.5 80 3.3 3.3 105.6 0 0 28.5
20 2.5 0 82.5 0 3.3 108.9 1.5 0 30
21 0 2.5 85 3.3 3.3 115.5 0 1.5 31.5
22 2.5 2.5 90 3.3 0 118.8 0 1.5 33
23 2.5 0 92.5 0 3.3 122.1 1.5 0 34.5
24 0 2.5 95 3.3 3.3 128.7 0 1.5 36
25 2.5 0 97.5 0 0 128.7 1.5 1.5 39
26 2.5 2.5 102.5 3.3 3.3 135.3 0 1.5 40.5
27 2.5 0 105 0 3.3 138.6 0 0 40.5
28 2.5 0 107.5 3.3 0 141.9 1.5 1.5 43.5
Note :
~ Tgl. 07 Februari 2017 Pkl. 01.02 ~ 06.45 PM Stop (Perbaikan coupling gear pickup roll)
~ Tgl. 11 Februari 2017 Pkl. 03.15 ~ 04.15 PM Stop (Alarm over temperature di Drive Roll)
LAPORAN PEMAKAIAN CHEMICAL BOILER

BULAN : MARET 2017

CHEMICAL
PHOSPHATE N – 1800 ELLIMIN-OX
TGL
Target = 87 Kg/ Bln Target = 174 Kg/ Bln Target = 57 Kg/ Bln
SHIFT I SHIFT II JUMLAH SHIFT I SHIFT II JUMLAH SHIFT I SHIFT II JUMLAH
01 2.5 2.5 5 0 3.3 3.3 0 1.5 1.5
02 0 2.5 7.5 3.3 3.3 9.9 1.5 1.5 4.5
03 2.5 0 10 0 0 9.9 0 0 4.5
04 0 2.5 12.5 3.3 3.3 16.5 0 1.5 6
05 2.5 0 15 0 0 16.5 1.5 1.5 9
06 2.5 2.5 20 0 3.3 19.8 0 0 9
07 0 2.5 22.5 0 0 19.8 0 1.5 10.5
08 2.5 0 25 3.3 3.3 26.4 1.5 0 12
09 2.5 2.5 30 0 3.3 29.7 0 1.5 13.5
10 0 2.5 32.5 3.3 0 33 0 1.5 15
11 2.5 0 35 3.3 3.3 39.6 1.5 0 16.5
12 0 2.5 37.5 0 3.3 42.9 0 1.5 18
13 2.5 0 40 3.3 0 46.2 1.5 1.5 21
14 0 2.5 42.5 0 0 46.2 0 0 21
15 2.5 0 45 3.3 3.3 52.8 1.5 1.5 24
16 2.5 2.5 50 0 0 52.8 0 0 24
17 0 2.5 52.5 3.3 3.3 59.4 0 1.5 25.5
18 2.5 0 55 0 3.3 62.7 1.5 1.5 28.5
19 0 2.5 57.5 3.3 3.3 69.3 0 0 28.5
20 2.5 2.5 62.5 0 3.3 72.6 1.5 1.5 31.5
21 0 0 62.5 0 0 72.6 0 1.5 33
22 2.5 0 65 3.3 3.3 79.2 1.5 1.5 36
23 0 0 65 3.3 3.3 85.8 1.5 0 37.5
24 2.5 2.5 70 0 0 85.8 0 1.5 39
25 2.5 0 72.5 3.3 3.3 92.4 1.5 1.5 42
26 0 2.5 75 0 3.3 95.7 1.5 0 43.5
27 2.5 0 77.5 3.3 0 99 1.5 1.5 46.5
28 0 2.5 80 0 3.3 102.3 1.5 1.5 49.5
29 2.5 0 82.5 3.3 3.3 108.9 1.5 0 51
30 0 2.5 85 0 3.3 112.2 1.5 1.5 54
31 2.5 2.5 90 3.3 0 115.5 0 1.5 55.5
Note :
~ Tgl. 10-11 Maret 2017 Pkl. 16.00 ~ 11.33 PM Stop (Perbaikan coupling roll centre), Boiler #2 Stop
~ Tgl. 20-21 Maret 2017 Pkl. 07.10 ~ 03.36 PM Stop, Boiler #2 Stop, Pkl. 09.15 ~ 21.10 Turbine Stop
~ Tgl. 23 Maret 2014 Pkl. 08.30 ~ 12.15 Turbine Trip, Boiler #2 Stop, PM Stop
Pkl. 00.06 ~ 04.18 Turbine Trip, Boiler #1 Stop
LAPORAN PEMAKAIAN CHEMICAL BOILER

BULAN : APRIL 2017

CHEMICAL
PHOSPHATE N – 1800 ELLIMIN-OX
TGL
Target = 87 Kg/ Bln Target = 174 Kg/ Bln Target = 57 Kg/ Bln
SHIFT I SHIFT II JUMLAH SHIFT I SHIFT II JUMLAH SHIFT I SHIFT II JUMLAH
01 2.5 0 2.5 0 3.3 3.3 1.5 0 1.5
02 0 2.5 5 3.3 0 6.6 1.5 1.5 4.5
03 2.5 2.5 10 0 3.3 9.9 1.5 0 6
04 0 2.5 12.5 3.3 0 13.2 1.5 1.5 9
05 2.5 0 15 3.3 3.3 19.8 0 0 9
06 2.5 2.5 20 0 3.3 23.1 1.5 1.5 12
07 0 2.5 22.5 3.3 0 26.4 1.5 0 13.5
08 2.5 0 25 0 3.3 29.7 0 1.5 15
09 0 2.5 27.5 3.3 0 33 0 0 15
10 2.5 2.5 32.5 0 3.3 36.3 1.5 0 16.5
11 2.5 0 35 3.3 3.3 42.9 0 1.5 18
12 0 2.5 37.5 0 0 42.9 0 0 18
13 2.5 0 40 0 3.3 46.2 1.5 1.5 21
14 0 2.5 42.5 3.3 0 49.5 1.5 1.5 24
15 2.5 0 45 0 3.3 52.8 0 0 24
16 2.5 2.5 50 3.3 3.3 59.4 1.5 1.5 27
17 0 2.5 52.5 3.3 0 62.7 1.5 1.5 30
18 2.5 0 55 0 3.3 66 1.5 0 31.5
19 2.5 2.5 60 0 3.3 69.3 0 1.5 33
20 0 2.5 62.5 3.3 0 72.6 1.5 1.5 36
21 2.5 0 65 0 3.3 75.9 0 0 36
22 2.5 2.5 70 3.3 3.3 82.5 0 1.5 37.5
23 0 2.5 72.5 0 0 82.5 1.5 1.5 40.5
24 2.5 0 75 3.3 3.3 89.1 0 1.5 42
25 0 2.5 77.5 3.3 3.3 95.7 0 0 42
26 2.5 0 80 0 3.3 99 0 1.5 43.5
27 2.5 2.5 85 3.3 0 102.3 1.5 1.5 46.5
28 0 2.5 87.5 0 3.3 105.6 0 1.5 48
29 2.5 0 90 3.3 3.3 112.2 0 0 48
31 0 2.5 92.5 0 3.3 115.5 1.5 1.5 51
Note :
~ Tgl. 12 April 2017 Pkl. 09.18 ~ 02.26 Boiler #1 Stop
Pkl. 10.32 ~ 18.15 Boiler #2 Stop
Pkl. 10.10 ~ 01.49 Turbine Stop
~ Tgl. 17 April 2017 Pkl. 11.21 ~ 19.16 Boiler #1 Stop (Pengelasan Pipa Drain yang bocor)
~ Tgl. 25 April 2017 Pkl. 09.12 ~ 15.33 PM Stop (Ganti Felt), Boiler #1 Stop
Pkl. 10.53 ~ 12.21 Turbine Trip (Manual Trip Of Control)
LAPORAN PEMAKAIAN CHEMICAL BOILER

BULAN : MEI 2017

CHEMICAL
PHOSPHATE N – 1800 ELLIMIN-OX
TGL
Target = 87 Kg/ Bln Target = 174 Kg/ Bln Target = 57 Kg/ Bln
SHIFT I SHIFT II JUMLAH SHIFT I SHIFT II JUMLAH SHIFT I SHIFT II JUMLAH
01 2.5 0 2.5 3.3 0 3.3 0 1.5 1.5
02 2.5 2.5 7.5 0 3.3 6.6 0 1.5 3
03 0 2.5 10 3.3 3.3 13.2 1.5 1.5 6
04 2.5 2.5 15 0 0 13.2 0 0 6
05 2.5 0 17.5 3.3 3.3 19.8 0 1.5 7.5
06 2.5 2.5 22.5 0 0 19.8 1.5 1.5 10.5
07 0 2.5 25 3.3 3.3 26.4 0 1.5 12
08 2.5 2.5 30 0 0 26.4 0 0 12
09 2.5 0 32.5 3.3 3.3 33 0 1.5 13.5
10 0 0 32.5 0 3.3 36.3 1.5 1.5 16.5
11 0 2.5 35 3.3 3.3 42.9 0 1.5 18
12 2.5 2.5 40 0 0 42.9 0 1.5 19.5
13 2.5 0 42.5 3.3 3.3 49.5 1.5 0 21
14 0 2.5 45 0 0 49.5 0 1.5 22.5
15 2.5 0 47.5 0 3.3 52.8 0 1.5 24
16 2.5 2.5 52.5 3.3 3.3 59.4 0 1.5 25.5
17 0 2.5 55 0 0 59.4 1.5 1.5 28.5
18 2.5 0 57.5 3.3 3.3 66 0 1.5 30
19 2.5 2.5 62.5 0 0 66 0 1.5 31.5
20 0 2.5 65 3.3 3.3 72.6 1.5 1.5 34.5
21 2.5 0 67.5 0 3.3 75.9 0 0 34.5
22 2.5 2.5 72.5 3.3 0 79.2 0 1.5 36
23 0 2.5 75 0 0 79.2 0 1.5 37.5
24 2.5 2.5 80 3.3 3.3 85.8 1.5 0 39
25 2.5 0 82.5 0 0 85.8 0 1.5 40.5
26 0 2.5 85 3.3 3.3 92.4 0 0 40.5
27 2.5 2.5 90 0 0 92.4 0 1.5 42
28 2.5 0 92.5 3.3 3.3 99 1.5 1.5 45
29 2.5 2.5 97.5 0 0 99 0 1.5 46.5
30 0 2.5 100 3.3 3.3 105.6 0 0 46.5
31 2.5 0 102.5 0 0 105.6 0 1.5 48
Note :
~ Tgl. 10 Mei 2017 Pkl. 12.30 ~ 02.48 PM Stop
Pkl. 13.40 ~ 20.45 Turbine Stop (Tegangan charger DC tidak sesuai standard, charger no.1 & 2 rusak)
Pkl. 14.00 ~ 20.47 Boiler #1 Stop
Pkl. 14.00 ~ 01.52 Boiler #2 Stop
~ Tgl. 23 Mei 2017 Pkl. 13.48 ~ 21.45 PM Stop (Ganti kanvas)
~ Tgl. 28 Mei 2017 Pkl. 17.20 ~ 19.50 PM Stop (Fun pump top wire trip)
LAPORAN PEMAKAIAN CHEMICAL BOILER

BULAN : JUNI 2017

CHEMICAL
PHOSPHATE N – 1800 ELLIMIN-OX
TGL
Target = 87 Kg/ Bln Target = 174 Kg/ Bln Target = 57 Kg/ Bln
SHIFT I SHIFT II JUMLAH SHIFT I SHIFT II JUMLAH SHIFT I SHIFT II JUMLAH
01 2.5 2.5 5 3.3 3.3 6.6 1.5 1.5 3
02 0 2.5 7.5 0 3.3 9.9 0 0 3
03 2.5 0 10 3.3 0 13.2 0 1.5 4.5
04 0 2.5 12.5 0 3.3 16.5 0 1.5 6
05 2.5 2.5 17.5 3.3 0 19.8 1.5 0 7.5
06 2.5 0 20 0 3.3 23.1 0 1.5 9
07 0 2.5 22.5 3.3 0 26.4 0 1.5 10.5
08 2.5 2.5 27.5 0 3.3 29.7 1.5 1.5 13.5
09 2.5 0 30 3.3 0 33 0 0 13.5
10 2.5 2.5 35 0 3.3 36.3 0 1.5 15
11 2.5 2.5 40 3.3 3.3 42.9 0 1.5 16.5
12 0 2.5 42.5 0 0 42.9 1.5 1.5 19.5
13 2.5 0 45 3.3 3.3 49.5 0 0 19.5
14 2.5 2.5 50 0 0 49.5 0 1.5 21
15 0 2.5 52.5 3.3 3.3 56.1 0 1.5 22.5
16 2.5 0 55 0 3.3 59.4 1.5 0 24
17 2.5 2.5 60 3.3 0 62.7 0 1.5 25.5
18 2.5 0 62.5 0 3.3 66 0 1.5 27
19 2.5 0 65 0 3.3 69.3 0 1.5 28.5
20 0 2.5 67.5 0 3.3 72.6 1.5 0 30
21 2.5 0 70 3.3 0 75.9 0 1.5 31.5
22 0 2.5 72.5 3.3 3.3 82.5 0 0 31.5
23 2.5 0 75 0 0 82.5 0 1.5 33
24 0 2.5 77.5 3.3 3.3 89.1 1.5 1.5 36
25 2.5 2.5 82.5 0 0 89.1 0 0 36
26 2.5 0 85 3.3 3.3 95.7 0 1.5 37.5
27 0 2.5 87.5 0 0 95.7 0 0 37.5
28 2.5 0 90 3.3 3.3 102.3 1.5 1.5 40.5
29 2.5 2.5 95 0 0 102.3 0 1.5 42
30 0 2.5 97.5 0 3.3 105.6 0 0 42
Note :
LAPORAN PEMAKAIAN CHEMICAL BOILER

BULAN : JULI 2017

CHEMICAL
PHOSPHATE N – 1800 ELLIMIN-OX
TGL
Target = 87 Kg/ Bln Target = 174 Kg/ Bln Target = 57 Kg/ Bln
SHIFT I SHIFT II JUMLAH SHIFT I SHIFT II JUMLAH SHIFT I SHIFT II JUMLAH
01 2.5 2.5 5 3.3 0 3.3 0 1.5 1.5
02 2.5 0 7.5 0 3.3 6.6 1.5 1.5 4.5
03 0 2.5 10 3.3 3.3 13.2 0 0 4.5
04 2.5 2.5 15 0 0 13.2 0 1.5 6
05 2.5 0 17.5 3.3 3.3 19.8 1.5 1.5 9
06 0 2.5 20 0 0 19.8 0 1.5 10.5
07 2.5 2.5 25 3.3 0 23.1 0 0 10.5
08 0 0 25 3.3 0 26.4 0 1.5 12
09 2.5 0 27.5 3.3 0 29.7 1.5 0 13.5
10 2.5 0 30 3.3 0 33 1.5 0 15
11 2.5 3 35.5 3.3 0 36.3 0 1.5 16.5
12 2.5 2.5 40.5 3.3 0 39.6 0 0 16.5
13 2.5 2.5 45.5 3.3 3.3 46.2 3 0 19.5
14 0 2.5 48 0 3.3 49.5 0 1.5 21
15 2.5 0 50.5 0 3.3 52.8 0 0 21
16 2.5 2.5 55.5 0 0 52.8 3 0 24
17 2.5 0 58 6.6 0 59.4 0 1.5 25.5
18 2.5 2.5 63 0 0 59.4 0 1.5 27
19 2.5 0 65.5 3.3 0 62.7 0 0 27
20 2.5 2.5 70.5 0 0 62.7 3 0 30
21 2.5 2.5 75.5 3.3 3.3 69.3 0 1.5 31.5
22 2.5 2.5 80.5 0 0 69.3 0 1.5 33
23 0 2.5 83 0 6.6 75.9 0 1.5 34.5
24 2.5 0 85.5 0 0 75.9 0 1.5 36
25 2.5 2.5 90.5 0 0 75.9 0 0 36
26 0 0 90.5 3.3 3.3 82.5 1.5 0 37.5
27 2.5 0 93 0 0 82.5 0 3 40.5
28 0 0 93 3.3 0 85.8 0 0 40.5
29 2.5 0 95.5 3.3 0 89.1 1.5 0 42
30 0 2.5 98 3.3 0 92.4 1.5 0 43.5
31 0 2.5 100.5 0 0 92.4 1.5 1.5 46.5
Note :
~ Tgl. 03 Juli 2017 PM Stop Pkl. 14.45 ~ 01.50 WIB (Rewinder tidak bisa gulung), Boiler #1 Stop
~ Tgl. 11 Juli 2017 tambah dosis langsung N-7208 = 0.5 Liter Tanki #2 karena Phosphate Drop (Shift II)
~ Tgl. 12 Juli 2017 Pkl. 09.20 ~ 12.38 (Ganti Paper Roll)
~ Tgl. 26 Juli 2017 Pkl. 08:30 Boiler #1 Stop
~ Tgl. 26 Juli 2017 Pkl. 08:10 PM Stop s/d Tgl. 28 Juli 2017 Pkl. 23:45 PM On Reel
LAPORAN PEMAKAIAN CHEMICAL BOILER

BULAN : AGUSTUS 2017

CHEMICAL
PHOSPHATE N – 1800 ELLIMIN-OX
TGL
Target = 87 Kg/ Bln Target = 174 Kg/ Bln Target = 57 Kg/ Bln
SHIFT I SHIFT II JUMLAH SHIFT I SHIFT II JUMLAH SHIFT I SHIFT II JUMLAH
01 0 0 0 3.3 3.3 6.6 0 1.5 1.5
02 2.5 0 2.5 0 0 6.6 0 1.5 3
03 0 0 2.5 3.3 0 9.9 0 1.5 4.5
04 0 2.5 5 3.3 0 13.2 1.5 0 6
05 0 0 5 0 0 13.2 0 1.5 7.5
06 2.5 0 7.5 6.6 0 19.8 1.5 0 9
07 0 2.5 10 0 0 19.8 0 3 12
08 0 0 10 0 6.6 26.4 0 1.5 13.5
09 2.5 0 12.5 0 0 26.4 0 0 13.5
10 2.5 0 15 0 3.3 29.7 0 1.5 15
11 0 0 15 0 3.3 33 0 1.5 16.5
12 2.5 0 17.5 0 0 33 1.5 0 18
13 2.5 0 20 3.3 0 36.3 1.5 0 19.5
14 0 2.5 22.5 3.3 0 39.6 0 0 19.5
15 0 0 22.5 3.3 0 42.9 1.5 0 21
16 2.5 0 25 0 3.3 46.2 1.5 1.5 24
17 2.5 0 27.5 0 3.3 49.5 0 0 24
18 2.5 0 30 0 0 49.5 1.5 0 25.5
19 2.5 2.5 35 3.3 3.3 56.1 0 3 28.5
20 2.5 0 37.5 0 3.3 59.4 0 1.5 30
21 2.5 2.5 42.5 0 0 59.4 0 0 30
22 2.5 0 45 6.6 0 66 1.5 0 31.5
23 2.5 2.5 50 0 0 66 0 3 34.5
24 2.5 2.5 55 6.6 0 72.6 1.5 0 36
25 0 2.5 57.5 0 0 72.6 1.5 0 37.5
26 2.5 0 60 3.3 3.3 79.2 1.5 1.5 40.5
27 2.5 2.5 65 0 0 79.2 0 1.5 42
28 2.5 0 67.5 0 6.6 85.8 0 1.5 43.5
29 2.5 2.5 72.5 0 3.3 89.1 1.5 1.5 46.5
30 2.5 2.5 77.5 0 3.3 92.4 1.5 0 48
31 2.5 0 80 3.3 0 95.7 1.5 0 49.5
Note :
~ Tgl. 14 Juli 2017 Pkl. 19:44 ~ 23:24 PM Stop (MCC Trip)
~ Tgl. 18 Juli 2017 Pkl. 13:18 ~ 16:40 PM Stop (Ganti Felt)
~ Tgl. 26 Juli 2017 s/d 18 Agst 2017 Boiler #1 Stop (Perbaikan Ruang Bakar, Cyclone & Flue Gas)
LAPORAN PEMAKAIAN CHEMICAL BOILER

BULAN : SEPTEMBER 2017

CHEMICAL
PHOSPHATE N – 1800 ELLIMIN-OX
TGL
Target = 87 Kg/ Bln Target = 174 Kg/ Bln Target = 57 Kg/ Bln
SHIFT I SHIFT II JUMLAH SHIFT I SHIFT II JUMLAH SHIFT I SHIFT II JUMLAH
01 2.5 2.5 5 0 0 0 0 3 3
02 2.5 2.5 10 3.3 0 3.3 1.5 0 4.5
03 2.5 0 12.5 3.3 0 6.6 1.5 0 6
04 2.5 2.5 17.5 0 3.3 9.9 3 0 9
05 0 2.5 20 3.3 0 13.2 1.5 0 10.5
06 2.5 0 22.5 0 3.3 16.5 1.5 0 12
07 2.5 2.5 27.5 0 0 16.5 0 3 15
08 0 0 27.5 0 3.3 19.8 0 0 15
09 2.5 0 30 3.3 0 23.1 1.5 0 16.5
10 2.5 2.5 35 0 3.3 26.4 0 3 19.5
11 2.5 0 37.5 0 3.3 29.7 0 1.5 21
12 2.5 0 40 3.3 0 33 0 0 21
13 2.5 0 42.5 0 0 33 3 0 24
14 2.5 2.5 47.5 0 6.6 39.6 1.5 1.5 27
15 0 2.5 50 0 0 39.6 1.5 1.5 30
16 2.5 0 52.5 0 3.3 42.9 0 1.5 31.5
17 2.5 0 55 0 3.3 46.2 0 0 31.5
18 2.5 2.5 60 3.3 0 49.5 0 1.5 33
19 2.5 0 62.5 0 0 49.5 0 1.5 34.5
20 2.5 2.5 67.5 0 3.3 52.8 1.5 1.5 37.5
21 0 2.5 70 3.3 0 56.1 0 1.5 39
22 2.5 0 72.5 0 3.3 59.4 0 1.5 40.5
23 2.5 2.5 77.5 0 0 59.4 1.5 0 42
24 2.5 0 80 3.3 3.3 66 0 1.5 43.5
25 5 0 85 0 3.3 69.3 0 3 46.5
26 2.5 0 87.5 0 0 69.3 0 1.5 48
27 2.5 0 90 3.3 3.3 75.9 0 1.5 49.5
28 2.5 2.5 95 0 3.3 79.2 0 3 52.5
29 2.5 0 97.5 0 0 79.2 0 0 52.5
30 2.5 2.5 102.5 3.3 0 82.5 1.5 0 54
Note :
~ Tgl. 12 Sept 2017 PM Stop Pkl. 13:30 ~ 06:42 ( Masalah di Trafo )
~ Tgl. 25 Sept 2017 PM Stop Pkl. 09:11 ~ 11:54 ( Kampas Putus )
LAPORAN PEMAKAIAN CHEMICAL BOILER

BULAN : OKTOBER 2017

CHEMICAL
PHOSPHATE N – 1800 ELLIMIN-OX
TGL
Target = 87 Kg/ Bln Target = 174 Kg/ Bln Target = 57 Kg/ Bln
SHIFT I SHIFT II JUMLAH SHIFT I SHIFT II JUMLAH SHIFT I SHIFT II JUMLAH
01 2.5 0 2.5 3.3 3.3 6.6 0 1.5 1.5
02 2.5 2.5 7.5 0 0 6.6 0 3 4.5
03 0 2.5 10 0 3.3 9.9 0 1.5 6
04 5 0 15 0 3.3 13.2 0 1.5 7.5
05 0 0 15 0 3.3 16.5 0 3 10.5
06 2.5 0 17.5 0 0 16.5 0 0 10.5
07 2.5 2.5 22.5 3.3 3.3 23.1 1.5 0 12
08 0 2.5 25 0 0 23.1 3 0 15
09 2.5 2.5 30 0 0 23.1 1.5 0 16.5
10 2.5 2.5 35 3.3 3.3 29.7 3 0 19.5
11 0 2.5 37.5 0 3.3 33 1.5 1.5 22.5
12 5 0 42.5 0 3.3 36.3 1.5 0 24
13 2.5 0 45 0 3.3 39.6 1.5 1.5 27
14 2.5 2.5 50 0 0 39.6 1.5 0 28.5
15 2.5 0 52.5 6.6 0 46.2 3 0 31.5
16 2.5 2.5 57.5 0 0 46.2 1.5 0 33
17 0 2.5 60 3.3 0 49.5 1.5 0 34.5
18 2.5 0 62.5 3.3 3.3 56.1 3 0 37.5
19 5 0 67.5 0 0 56.1 1.5 1.5 40.5
20 0 2.5 70 0 3.3 59.4 0 3 43.5
21 2.5 2.5 75 3.3 3.3 66 1.5 0 45
22 2.5 0 77.5 0 0 66 1.5 0 46.5
23 2.5 0 80 3.3 0 69.3 1.5 1.5 49.5
24 2.5 0 82.5 0 6.6 75.9 1.5 1.5 52.5
25 2.5 0 85 0 0 75.9 0 1.5 54
26 2.5 0 87.5 3.3 0 79.2 0 1.5 55.5
27 2.5 0 90 0 6.6 85.8 1.5 1.5 58.5
28 2.5 0 92.5 0 0 85.8 0 1.5 60
29 2.5 0 95 3.3 0 89.1 0 1.5 61.5
30 2.5 0 97.5 3.3 0 92.4 0 3 64.5
31 2.5 0 100 0 3.3 95.7 0 1.5 66
Note :
~ Tgl. 04-05 Oktober 2017 PM Stop
~ Tgl. 04-05 Oktober 2017 Boiler #1 Stop
~ Tgl. 08 Oktober 2017 Pkl. 20:12 – 23:09 PM Stop (Masalah di Interlock Felt)
~ Tgl. 17-18 Oktober 2017 PM Stop
~ Tgl. 18 Oktober 2017 Boiler #2 Stop
LAPORAN PEMAKAIAN CHEMICAL BOILER

BULAN : NOPEMBER 2017

CHEMICAL
PHOSPHATE N – 1800 ELLIMIN-OX
TGL
Target = 87 Kg/ Bln Target = 174 Kg/ Bln Target = 57 Kg/ Bln
SHIFT I SHIFT II JUMLAH SHIFT I SHIFT II JUMLAH SHIFT I SHIFT II JUMLAH
01 2.5 0 2.5 3.3 3.3 6.6 0 1.5 1.5
02 2.5 0 5 0 0 6.6 0 3 4.5
03 2.5 0 7.5 3.3 0 9.9 0 1.5 6
04 2.5 0 10 3.3 3.3 16.5 0 1.5 7.5
05 2.5 0 12.5 0 0 16.5 0 1.5 9
06 2.5 0 15 0 6.6 23.1 0 3 12
07 2.5 0 17.5 0 0 23.1 0 1.5 13.5
08 2.5 0 20 3.3 0 26.4 0 1.5 15
09 2.5 0 22.5 3.3 3.3 33 0 0 15
10 2.5 0 25 0 0 33 1.5 1.5 18
11 2.5 0 27.5 3.3 3.3 39.6 1.5 0 19.5
12 2.5 0 30 3.3 0 42.9 0 1.5 21
13 2.5 2.5 35 3.3 0 46.2 0 0 21
14 0 0 35 0 3.3 49.5 0 1.5 22.5
15 2.5 2.5 40 3.3 3.3 56.1 1.5 0 24
16 0 2.5 42.5 0 0 56.1 1.5 0 25.5
17 2.5 0 45 3.3 3.3 62.7 1.5 0 27
18 2.5 0 47.5 3.3 0 66 0 1.5 28.5
19 2.5 0 50 3.3 0 69.3 0 1.5 30
20 2.5 0 52.5 0 6.6 75.9 0 1.5 31.5
21 2.5 0 55 3.3 0 79.2 0 0 31.5
22 2.5 0 57.5 0 0 79.2 1.5 0 33
23 2.5 0 60 3.3 0 82.5 1.5 0 34.5
24 2.5 2.5 65 3.3 3.3 89.1 1.5 0 36
25 0 2.5 67.5 0 3.3 92.4 1.5 0 37.5
26 2.5 0 70 0 6.6 99 1.5 1.5 40.5
27 2.5 2.5 75 0 0 99 0 1.5 42
28 0 0 75 0 3.3 102.3 0 1.5 43.5
29 0 2.5 77.5 0 3.3 105.6 0 0 43.5
30 0 0 77.5 3.3 0 108.9 3 1.5 48

Note :
~ Tgl. 20 Nop 2017 PM Stop pkl. 14:33 – 17:10 (Ganti Rope Dryer)
~ Tgl. 21 Nop 2017 PM Stop pkl. 09:42 – 16:15 (Ganti Kanvas 5D)
~ Tgl. 27-28 Nop 2017 PM Stop
~ Tgl. 27 Nop 2017 Boiler #1 Stop
LAPORAN PEMAKAIAN CHEMICAL BOILER

BULAN : DESEMBER 2017

CHEMICAL
PHOSPHATE N – 1800 ELLIMIN-OX
TGL
Target = 87 Kg/ Bln Target = 174 Kg/ Bln Target = 57 Kg/ Bln
SHIFT I SHIFT II JUMLAH SHIFT I SHIFT II JUMLAH SHIFT I SHIFT II JUMLAH
01 2.5 0 2.5 0 0 0 0 1.5 1.5
02 2.5 0 5 3.3 3.3 6.6 0 1.5 3
03 0 2.5 7.5 0 3.3 9.9 1.5 0 4.5
04 0 2.5 10 0 3.3 13.2 1.5 1.5 7.5
05 2.5 0 12.5 3.3 3.3 19.8 0 3 10.5
06 0 2.5 15 0 3.3 23.1 0 1.5 12
07 0 0 15 0 3.3 26.4 0 1.5 13.5
08 2.5 2.5 20 0 6.6 33 0 1.5 15
09 2.5 2.5 25 0 0 33 0 1.5 16.5
10 2.5 0 27.5 3.3 0 36.3 1.5 0 18
11 0 2.5 30 3.3 3.3 42.9 1.5 0 19.5
12 2.5 0 32.5 3.3 0 46.2 1.5 3 24
13 2.5 2.5 37.5 3.3 0 49.5 0 1.5 25.5
14 2.5 0 40 0 6.6 56.1 0 1.5 27
15 2.5 0 42.5 0 3.3 59.4 0 3 30
16 2.5 0 45 3.3 0 62.7 1.5 0 31.5
17 2.5 0 47.5 6.6 0 69.3 1.5 0 33
18 2.5 2.5 52.5 0 3.3 72.6 1.5 1.5 36
19 2.5 0 55 0 6.6 79.2 1.5 1.5 39
20 2.5 2.5 60 0 0 79.2 0 0 39
21 0 2.5 62.5 3.3 0 82.5 1.5 0 40.5
22 2.5 0 65 3.3 3.3 89.1 1.5 1.5 43.5
23 2.5 2.5 70 0 0 89.1 0 1.5 45
24 2.5 0 72.5 3.3 0 92.4 1.5 1.5 48
25 2.5 2.5 77.5 3.3 3.3 99 0 1.5 49.5
26 2.5 0 80 3.3 0 102.3 1.5 1.5 52.5
27 2.5 0 82.5 3.3 0 105.6 0 0 52.5
28 2.5 0 85 0 0 105.6 1.5 0 54
29 2.5 0 87.5 6.6 0 112.2 1.5 0 55.5
30 2.5 2.5 92.5 3.3 0 115.5 1.5 1.5 58.5
31 0 2.5 95 0 3.3 118.8 0 1.5 60
Note :
LAPORAN PEMAKAIAN CHEMICAL BOILER

BULAN : JANUARI 2018

CHEMICAL
PHOSPHATE N – 1800 ELLIMIN-OX
TGL
Target = 87 Kg/ Bln Target = 174 Kg/ Bln Target = 57 Kg/ Bln
SHIFT I SHIFT II JUMLAH SHIFT I SHIFT II JUMLAH SHIFT I SHIFT II JUMLAH
01 2.5 0 2.5 0 0 0 0 1.5 1.5
02 5 0 7.5 0 6.6 6.6 0 3 4.5
03 2.5 0 10 0 0 6.6 0 0 4.5
04 2.5 0 12.5 3.3 3.3 13.2 1.5 0 6
05 2.5 2.5 17.5 3.3 0 16.5 0 1.5 7.5
06 2.5 0 20 3.3 0 19.8 1.5 0 9
07 0 2.5 22.5 3.3 3.3 26.4 1.5 0 10.5
08 2.5 0 25 0 3.3 29.7 1.5 0 12
09 2.5 0 27.5 0 3.3 33 1.5 1.5 15
10 2.5 0 30 0 0 33 1.5 0 16.5
11 2.5 0 32.5 3.3 0 36.3 0 1.5 18
12 2.5 0 35 0 0 36.3 0 1.5 19.5
13 2.5 2.5 40 3.3 0 39.6 1.5 1.5 22.5
14 0 0 40 3.3 0 42.9 0 0 22.5
15 2.5 0 42.5 3.3 0 46.2 1.5 0 24
16 2.5 2.5 47.5 3.3 0 49.5 1.5 0 25.5
17 0 2.5 50 3.3 3.3 56.1 1.5 1.5 28.5
18 0 2.5 52.5 0 3.3 59.4 0 1.5 30
19 2.5 0 55 0 0 59.4 1.5 0 31.5
20 2.5 2.5 60 0 3.3 62.7 1.5 0 33
21 0 2.5 62.5 3.3 0 66 1.5 1.5 36
22 2.5 0 65 0 3.3 69.3 0 1.5 37.5
23 2.5 0 67.5 0 0 69.3 0 0 37.5
24 2.5 0 70 3.3 0 72.6 1.5 0 39
25 2.5 2.5 75 3.3 3.3 79.2 1.5 1.5 42
26 0 2.5 77.5 0 3.3 82.5 1.5 0 43.5
27 0 2.5 80 0 0 82.5 0 1.5 45
28 2.5 0 82.5 3.3 3.3 89.1 0 1.5 46.5
29 2.5 0 85 0 3.3 92.4 0 3 49.5
30 0 0 85 0 3.3 95.7 0 1.5 51
31 2.5 0 87.5 0 3.3 99 0 0 51
Note :
~ Tgl. 03 Boiler #1 Stop Pkl. 02:39 – 13:40
~ Tgl. 08 PM Stop Pkl. 07:06 – 06:10
~ Tgl. 08 Boiler #2 Stop Pkl. 07:25 – 03:29
~ Tgl. 15 PM Stop Pkl. 21:59 – 04:55
~ Tgl. 16 PM Stop Pkl. 03:39 – 04:06
~ Tgl. 16 PM Stop Pkl. 06:30 – 18:08
~ Tgl. 18 SP Stop Pkl. 09:37 – 10:16
LAPORAN PEMAKAIAN CHEMICAL BOILER

BULAN : FEBRUARI 2018

CHEMICAL
PHOSPHATE N – 1800 ELLIMIN-OX
TGL
Target = 87 Kg/ Bln Target = 174 Kg/ Bln Target = 57 Kg/ Bln
SHIFT I SHIFT II JUMLAH SHIFT I SHIFT II JUMLAH SHIFT I SHIFT II JUMLAH
01 2.5 2.5 5 3.3 0 3.3 1.5 0 1.5
02 0 0 5 3.3 0 6.6 1.5 0 3
03 0 0 5 6.6 0 13.2 1.5 0 4.5
04 0 2.5 7.5 0 3.3 16.5 0 0 4.5
05 2.5 0 10 0 3.3 19.8 1.5 0 6
06 2.5 2.5 15 0 6.6 26.4 0 3 9
07 2.5 0 17.5 0 3.3 29.7 0 1.5 10.5
08 2.5 0 20 0 6.6 36.3 0 1.5 12
09 2.5 2.5 25 0 3.3 39.6 1.5 0 13.5
10 0 2.5 27.5 3.3 0 42.9 1.5 0 15
11 2.5 2.5 32.5 3.3 3.3 49.5 0 0 15
12 0 2.5 35 3.3 0 52.8 0 0 15
13 2.5 0 37.5 3.3 0 56.1 1.5 0 16.5
14 2.5 2.5 42.5 3.3 0 59.4 1.5 0 18
15 2.5 2.5 47.5 0 6.6 66 0 3 21
16 2.5 0 50 0 3.3 69.3 0 1.5 22.5
17 2.5 2.5 55 0 3.3 72.6 0 1.5 24
18 2.5 0 57.5 6.6 0 79.2 0 3 27
19 2.5 2.5 62.5 3.3 0 82.5 0 1.5 28.5
20 0 2.5 65 3.3 0 85.8 0 0 28.5
21 0 2.5 67.5 3.3 3.3 92.4 1.5 0 30
22 2.5 0 70 0 3.3 95.7 1.5 0 31.5
23 2.5 2.5 75 0 3.3 99 0 1.5 33
24 2.5 2.5 80 3.3 3.3 105.6 1.5 1.5 36
25 2.5 0 82.5 0 3.3 108.9 0 0 36
26 0 2.5 85 0 3.3 112.2 0 1.5 37.5
27 2.5 0 87.5 6.6 0 118.8 0 1.5 39
28 2.5 2.5 92.5 3.3 0 122.1 1.5 0 40.5

Note :
LAPORAN PEMAKAIAN CHEMICAL BOILER

BULAN : MARET 2018

CHEMICAL
PHOSPHATE N – 1800 ELLIMIN-OX
TGL
Target = 87 Kg/ Bln Target = 174 Kg/ Bln Target = 57 Kg/ Bln
SHIFT I SHIFT II JUMLAH SHIFT I SHIFT II JUMLAH SHIFT I SHIFT II JUMLAH
01 0 2.5 2.5 0 6.6 6.6 1.5 0 1.5
02 2.5 0 5 0 3.3 9.9 0 1.5 3
03 2.5 2.5 10 0 0 9.9 0 0 3
04 0 2.5 12.5 3.3 3.3 16.5 0 1.5 4.5
05 2.5 0 15 3.3 0 19.8 1.5 0 6
06 2.5 0 17.5 3.3 0 23.1 1.5 0 7.5
07 2.5 2.5 22.5 3.3 0 26.4 0 1.5 9
08 0 0 22.5 3.3 6.6 36.3 0 1.5 10.5
09 2.5 0 25 0 0 36.3 0 1.5 12
10 2.5 2.5 30 3.3 3.3 42.9 0 1.5 13.5
11 0 2.5 32.5 3.3 3.3 49.5 0 1.5 15
12 0 2.5 35 0 3.3 52.8 0 0 15
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
Note :