Podium-1 Podium-2
outer inner outer inner
13.785 2.91 13.785 2.91
4.35 2.77 4.35 2.77
5.7 2.95 5.7 2.95
4.35 0.56 4.35 0.56
5 2.9 5 2.9
7.21 1.05 7.21 1.05
7.6 1.75 7.6 1.75
0.6 2.25 0.6 2.25
4.05 1.75 4.05 1.75
0.6 2.25 0.6 2.25
2.11 1.475 2.11 1.475
10.33 2.65 10.33 2.65
4.35 2.1 4.35 2.1
5.7 1.825 5.7 1.825
4.35 2.865 4.35 2.865
13.785 1.05 13.785 1.05
2.9 2.9
0.56 0.56
2.95 2.95
2.77 2.77
6.26 6.26
6.26 6.26
2.77 2.77
1.05 1.05
3.05 3.05
2.865 2.865
1.7
1.825
2.9
1.2
0
Landscape Podium-1
outer inner outer
48.44 3.1 7.365
51.53 2.97 4.35
4.45 3.05 3.07
2.05 2.55
1.475 7.365
2.15 4.35
5.7 5.8
4.5 4.3
5.85 6.51
4.5 3.5
5.7
2.15
1.475
2.05
3.05
2.97
6.26
2.2
0.675
3.1
2.97
3.05
2.05
1.475
2.15
5.7
4.5
5.85
4.5
5.7
2.15
1.475
2.05
3.05
2.97
6.26
2.2
0.6
0.675
104.42 124.35 49.16
Parapit Wall shuttering & Concrete
Reparing,Granding,Handover balance.
Sr.No. Location Nos Area(builtup) Rate Amount
1 intermidate 1 2044.4 13 26577.2
2 Podium-1 1 16683.7 13 216888.1
3 Podium-2 1 16683.7 13 216888.1
4 Landscape 1 16683.7 13 216888.1
5 level -01 1 7066.13 13 91859.69
769101.2
tors
Amount
269277
78315
Amount
20195.78
5873.625
373661.4