You are on page 1of 2

Project Week list of goals Notes for week

Make students familiar with rules and procedures


1
Introductions Introduce self First week/ Open House
08/11-08/13
Ice breakers
PWP on pinch pots Students
2 expiriment with playdough Asmt#1
Intro to Pinch Pots no school on monday
08/16-08/20 ten pinch pots that follow a theme begin
sketches

3 Finish sketches
Themed pinch pots ED on Monday No school friday
8/23-8/27 Begin sculpting with clay

4
Themed pinch pots sculpt to lether hard phase meeting on monday
8/30-9/4

5 Turn into bone dry


Themed pinch pots
9/6-9/10 load into kiln by friday evening

Into to fabrics/sewing/glue
VTS Heirmonyous Bosch
6
Stuffed Project SWBAT create a stuffed animal based on a heirmonyous
9/13-9/17
bosch painting
Ask Students to pick creature
SWBAT come up with plan for assembling creature (glue,
7 sowing, staples)
Stuffed project
9/20-9/24 Complete Sketch
Begin assembling

reveiw of glazing
8
Stuffed project/ Glazing glaze pots monday ed on friday
9/27-10/1
continue assembling

Finish assembly tuesday


9 no school friday
Stuffed project Take photos of pots and animals
10/4-10/8 Parent teacher conference
midterm critique thursday

Intro to paper sculpture


10 Create a sculpture using pages from a book
Book Sculpture assembly scheduale
10/11-10/15 Sculpture bust reflect the story
finish sketches

11 Begin sculpture
Book Sculpture
10/18-10/22 Get to mid range by friday

12 Take process photos


Book sculpture ED friday
10/25- 10/29 finish by friday

Students will choose 2-d artwork to turn into sculpture


Final sculpture 13 Sculpture must hang on wall
Bring artwork to life 11/1 - 11/5 use at least one method learned in class
detailed sketches by friday

14 Bring in appropriate materials Monday and get started


2-d to life
11/8-11/12 In progress critique friday
15
2-d to life Reach 1/2 point by Wednesday
11/15-11/19

16
2-d to life In progress critique/ Studio clean up no school tues-frid
11/22

17 Finish by thursday
2-d to life sub thurs/frid Send out gallery notes to parents
11/29-12/3 write artist statememnt friday

Discuss importance of detail


18
Touch Up/ Prep for Gallery Detailed touch ups on works
12/6-12/10
Begin writing artist statement for each work on thursday

19 Hang up statememnts and Gallery


Gallery/ Final week gallery thursday and friday night
12/13-12/17 Gallery on thursday/friday

You might also like