MODULE 5.2 RAÑOLA, ANDREY MARY C.

ACTIVITY
LINEAR PROGRAMMING MMW SECTION: 04015 - 17:00-18:30 TTH
APPLICATIONS
1) THE GEM MAKER OF JEWELRY MAKES TWO BRACELET
DESIGNS, HEART DESIGN AND FLOWER DESIGN.....
Product
Quantity Gold Platinum Profit

Heart (x) 3 4.5 2,500

Flower (y) 2.5 3 3,400

3x +4.5y ≤ 28 x=9.33, y=6.22 4.5x +3y ≤ 20 x=8, y=6.67


3x +2.5y = 28 X-Intercept (9.33, 0) 4.5x +3y = 20 X-Intercept (8, 0)

3x +2.5y = 28 Y-Intercept (0, 6.22) 4.5x +3y = 20 Y-Intercept (0, 6.67)


MODULE 5.2 RAÑOLA, ANDREY MARY C.
ACTIVITY
LINEAR PROGRAMMING MMW SECTION: 04015 - 17:00-18:30 TTH
APPLICATIONS
1) THE GEM MAKER OF JEWELRY MAKES TWO BRACELET
DESIGNS, HEART DESIGN AND FLOWER DESIGN.....
(0,6.67) The store has 28 ounces of gold and 20 ounces
of platinum.
(0,6.22) Verticles of the Maximum profit:
feasible region 2500x +3400y = z

POINT OF (5, 4) 12,500 + 13,600 = 26,100


INTERSECTION

(2.67, 4.44) (2, 2) 5,000 + 6,800 = 11,800

(2, 4) 5,000 + 13,600 = 18,600

2500x +3400y = z
2500(5) + 3400(4) = z
12,500 + 13,600 = 26,100 Maximum profit
0 (8,0) (9.33,0)
MODULE 5.2 RAÑOLA, ANDREY MARY C.
ACTIVITY
LINEAR PROGRAMMING MMW SECTION: 04015 - 17:00-18:30 TTH
APPLICATIONS
2) TWO MACHINES, A AND B PRODUCE ITEMS AT THE RATE
OF 50 PER HOUR AND 40 PER HOUR, RESPECTIVELY.....
A B Units to be
produced
Units per 50 40 1,000
hour

Substitute:
1,000 = 50A + 40B A + B = 24
A = 24 - B
1,000 = 50(24 - B) + 40B A + 20 = 24
1,000 = 1,200 - 50B + 40B A = 24
-200 = -10B
B = 20

"A" produces for four hours, while


"B" produces for twenty hours
MODULE 5.2 RAÑOLA, ANDREY MARY C.
ACTIVITY
LINEAR PROGRAMMING MMW SECTION: 04015 - 17:00-18:30 TTH
APPLICATIONS
2) TWO MACHINES, A AND B PRODUCE ITEMS AT THE RATE
OF 50 PER HOUR AND 40 PER HOUR, RESPECTIVELY.....

Verticles of the
feasible region Maximum : 1,000= z
(0,25)
(0,24) POINT OF
INTERSECTION (5, 4) 250, 160
(4,20)
20
(10, 22) 500, 880
15
(20,24) 1000, 960

10

0 5 10 15 (20,0)
(24,0)