You are on page 1of 5

LAPORAN PROGRESS PEKERJAAN

Proyek : Green Office Park No.1 BSD


No. Dokumen : 004/LPP-PRI/GOP-1/FCD/VIII/2018
Pekerjaan : Façade Second Skin
No. SPK : SAP 4700006949
Prestasi Tanggal : 4 Juli 2018 - 3 Agustus 2018
Bulan ke- :4
Durasi Kontrak : 6 (enam) bulan : 25 Januari - 25 Juli 2018

TOTAL
Bobot Supply Installation
Ref Description Unit Quantity

Rincian Rp. Rp.

ELEMENT B - STRUCTURAL WORKS


"Rangka Baja Dudukan Façade" / Line Profile
Supply, delivery, fabrication, erection and
installation of steel works; grade ST-37;
including welding; all in accordance with
drawings and specification to the approval
of the Engineer.
TOTAL
TOTAL SUB TOTAL TOTAL Sebelumnya
Bobot
Volume Progress
Rp. RINCIAN MOS PSG TOT MOS PSG TOT
45% 55% 45% 55%
Progress Kemajuan Pekerjaan
ya Saat ini
Bobot Volume Progress Bobot
MOS PSG TOT MOS PSG TOT MOS PSG TOT MOS
45% 55% 45% 55% 45% 55% 45%
an
s/d Saat ini
Bobot Volume Progress Bobot
PSG TOT MOS PSG TOT MOS PSG TOT MOS PSG
55% 45% 55% 45% 55%
Bobot
TOT