Project Team:
Project Sponsor: Select projects; Attend bi-weekly LSS
Problem Statement: meeting to coach; Coach project leader in a regular basis.
Signature: Robbie Xu
T case Molding average OEE in May-2016 is 56% which had affected Project Leader: Define team and plan; Have weekly meeting
OTD and TPT. with team to follow up; Attend bi-weekly LSS meeting;
Complete training and certification.
Signature: Sophie Teng, Otter Liu, Darren Teng,
MBB/BB: Provide training and coaching to project leader;
Coordinate LSS meetings.
Goal Statement: Signature: Luis A Bocanegra , Belinda Wei , Oracle Wang
Project Member: Define the plan with project leader; Collect
• Improve Molding OEE to 62%. data; Attend the problem solving meetings; Implement the
identified solutions.
Signature: Leo Huang, Reiko Wang, Steven Zheng, Henry Hao,
James Fei
Problem:
Project Goal:
• T case Molding average OEE in
May-2016 is 56% • Improve Molding OEE to 62%.
• high WIP
Step2- Process Analysis
Molding Process Chart
DMAIC
Input Output
Supplier Customer
Process
Epoxy leadframe
Micro stamping Assembly LF Molded strip DPD
MFG team
Output
PE team
Degate
Product Cull
Step 3 - Define
Team and Milestone
Team member
Step 3 - Define
Team and Milestone
Milestone
We collect downtime data for machine 8#, 16#, 21# from 1-Jun to 16-Jun,
and we choose the top 4 as project scope.
1007: 料未跑到位
1400: 树脂供料报警
0420: 引脚框缺料
1813: 出料抓料异常
Step 4 - Select the CTQ
characteristic Percentage
DMAIC