Project Overview: In alignment with the company’s strategic goals, the Logistics Executive team has jointly set the
objective to reduce internal operating costs by 10%. This has translated to a 3.6% reduction of
operating costs in the Midwest Logistics Region. The Midwest Logistics Region’s Lean Six Sigma team has examined
multiple projects that may impact the breakthrough goal and has identified optimizing trailer utilization as a high
priority.
Problem Statement: The Midwest Logistics Region needs to reduce operating costs by 3.6% ($324 million).
Improving trailer utilization has been identified as the quickest way to reduce costs within their direct
control. The Lean Six Sigma team needs to analyze the current state of trailer utilization and then suggest improvements
based on an optimized process, within 4-6 months.
If the Midwest Logistics Region fails to show an opportunity to reduce operating costs as directed by the company’s
strategic plans within 4-6 months, the region would have to reduce operating costs by other means, such as labor
cutbacks, procurement freezes, and contract renegotiations. By staying in the current state the Midwest Logistics Region
would have to choose unfavorable cost cutting methods which typically impact the productivity of the operation and may
not meet the $324 million goal. If productivity is lost, shipments may not make it to the market on-time thus reducing
the total sales of the company. The final impact would be a devaluation of Wal-Mart's stock due to its inability to meet
the 10% profit increase projection.
What is important to these customers – CTS: Up-to-date trailer status, optimized trailer dispatch plan,
open communication of critical or jeopardy events, realistic process time estimates
Module 1 - Define Phase 9
Scope Statement : The project is limited to the Midwest region which Anita Baker and Joe Thompson are
responsible. The Lean Six Sigma team will examine and recommend changes to the major process steps for the use of a
trailer: dispatch, load, transport, dispatch update, and unload. The investigation is limited to the two methods of trailer
use: live load/unload and drop’n hook. These methods of use may occur at a vendor, distribution center, or store.
Projected Financial Benefit (s): Based on an operating budget of $9 billion, this project will attempt to avoid
costs connected with trailer use in the Midwest region. The avoidance target is $324 million.
5
23/09/2019
Tools
Tools usually used in Define phase:
1. SIPOC
2. Pareto
3. Cost of Quality
4. Severity-Urgency Matrix
5. Performance – Importance Matrix
Tools 1: SIPOC
• A process map that includes Suppliers,
Inputs, Process, Outputs and Customers.
• Quality of the output is improved by
analyzing input and process variables.
• SIPOC is an effective communication tool
ensuring that the team members are all
viewing the process in the same way.
6
23/09/2019
SIPOC Steps
a. Draw up a rough diagram of the process to be
optimized in five to seven process steps.
b. Place the single process steps in their correct
sequence – use a sentence with a noun and a
verb.
c. Identify the key inputs (what is put into the
process), suppliers (who delivers the input), and
outputs (the important results which the process
delivers).
d. Describe the key customers as receivers of the
essential output. This step forms the basis for the
next tool in the Define Phase.
SIPOC
7
23/09/2019
SIPOC
EXERCISE #1
• Create a SIPOC diagram for the key business
process of Universitas Prasetiya Mulya!
8
23/09/2019
Pareto steps
a. Count your data (frequency)
b. Sort them out from the largest point to
smallest point
c. Make an accumulation of relative
percentage
others 84 6% 93.5%
timer 53 3% 97.0%
1.526
9
23/09/2019
Pareto Diagram
Frequency cumulative (%)
100
1400
1200 80
1000
60
800
600 40
400
20
200
0 -
rs
l
or
rs
rs
er
s
rs
ro
er
tim
le
to
do
ne
he
nt
rn
ol
la
co
ur
ot
en
r
bu
gu
tb
er
er
ov
re
ar
on
aw
rn
re
bu
fr
dr
10
23/09/2019
– Appraisal cost
Level of Quality
• Cost of Poor Quality (CPQ)
– Internal failure cost Expert estimate 60-90% of total Quality
– External failure cost cost are internal and external failure cost!
21
External Failure
Internal Failure
Prevention
Appraisal
Level of Quality
Appraisal cost
11
23/09/2019
Tools 5:
Severity-Urgency Analysis
Clustering your problem into 4 quadrant : level of severity
(what will affect the customer) and level of urgency
Severity – affect to customer
Low High
Low Priority 3
12
23/09/2019
Severity-Urgency Analysis
EXERCISE #2
As a student, draw your own Severity-Urgency
matrix!
Tools 6:
Performance-Importance Analysis
Clustering your problem into 4 quadrant : level of performance
and level of importance
Low High
Performance – internal company
13
23/09/2019
EXERCISE #3
Our campus need to upgrade its
performance, which one you choose?
Pick the
• Survey, tools • Scope
• Focus Group • Goal
• Field Investigation • Quantitatif • Timeline of project
• etc • COQ, Pareto
• Qualitatif
• SIPOC, Severity,
Importance
Identify Project
CTQ Charter
14
23/09/2019
Measurement
• the act of quantifying the performance
dimensions of products, services,
processes, and other business activities
• Measures and indicators - numerical
information that results from measurement
15
23/09/2019
16
23/09/2019
Measurable=Usually
quantifiable criteria, to help team stay on track
answering the HOW many?
Relevant =Usually
important and matters, align with other goals
answering Is it the right time, people?
Time-bound=prevent
deadline, giving team sense of urgency to
goals overtaken by daily routine
Goal Example
I want to write a business book
Specific: I will write a book on social media that is a minimum of 150 pages.
Measurable: I will write one chapter per month, or 3-5 pages per week.
Attainable: I will work on the manuscript first, and once that is completed, I will
begin to search for a publisher or explore self-publishing.
17
23/09/2019
Good measures…
Acquire 3 new supplier in the next 3 months, by
contacting 2 potential supplier each week.
By January 2016 will start working with the new supplier.
PROCESS
CAPABILITY
INDEX (Cpk)
18
23/09/2019
USL
UCL
Mean
LCL
LSL
19
23/09/2019
Current experience
EXERCISE #4
1. Pelanggan sebuah produk sudah memiliki
persyaratan ketebalan bahan antara 32-36 gram.
Jika tidak memenuhi persyaratan tersebut, maka
produk akan ditolak. Hasil pengukuran dari 24
sampel bahan yang diambil menunjukkan rata-rata
ketebalan bahan 33.9 gram dengan standard
deviasi 3.48 gram. Apakah bisnis proses
perusahaan sudah kelas dunia? Jelaskan!