4 1/2"
7 7 2" BOLT KIT, QTY 4 X 0.625 DIA X 3.5L , 25LB-FT
/1 6"
'- 19
2
3'-0 1/2"
5 1/8"
1. MATERIAL BOM INFORMATION IS FOR REFERENCE ONLY, MATERIAL SELECTION TO
BE DETERMINED PER THE CONTRACT DOCUMENTS. BOM QUANTITIES ARE FOR
INFORMATION ONLY, ACTUAL QUANTITIES REQUIRED TO BE VERIFIED BY
INSTALLATION CONTRACTOR AGAINST ACTUAL DESIGN
2. INSTALLATION CONTRACTOR RESPONSIBLE FOR HANGER TYPE AND LOCATION BASED
UPON CONTRACT DOCUMENTS
3. INSTALLATION CONTRACTOR RESPONSIBLE FOR VERIFICATION AGAINST ALL
CONTRACT DOCUMENTS TO ENSURE COMPLIANCE WITH ALL DRAWINGS,
SPECIFICATIONS, AND OTHER CONTRACTUAL ITEMS
4. INSTALLATION CONTRACTOR RESPONSIBLE FOR FIELD VERIFICATION BEFORE
1'-
7 7/1 FABRICATION AND INSTALLATION
6" 5. ALL RACK MODELUE REFERENCE DIMENSIONS ARE FROM THE CENTERLINE OF THE
FARTHEST SOUTHWEST VERTICAL TUBE STEEL OF THE MODULE
6. ALL RACK MODULE ELEVATIONS ARE FROM THE TOP OF THE MOUNTING PLATE OF
THE FARTHEST SOUTHWEST VERTICAL TUBE STEEL OF THE MODULE
7. ALL OFF-RACK REFERENCE DIMENSIONS ARE FROM THE CENTERLINE OF THE
CLOSEST COLUMN INTERSECTION
8. ALL OFF-RACK ISO ELEVATIONS ARE FROM THE 48” BENCHMARK ON THE
ASSOCIATED FLOOR.
9"
"
1/2
1'-0
4 1/2"
1. MATERIAL BOM INFORMATION IS FOR REFERENCE ONLY, MATERIAL SELECTION TO
BE DETERMINED PER THE CONTRACT DOCUMENTS. BOM QUANTITIES ARE FOR
INFORMATION ONLY, ACTUAL QUANTITIES REQUIRED TO BE VERIFIED BY
INSTALLATION CONTRACTOR AGAINST ACTUAL DESIGN
2. INSTALLATION CONTRACTOR RESPONSIBLE FOR HANGER TYPE AND LOCATION BASED
UPON CONTRACT DOCUMENTS
2'-3 5/8" 3. INSTALLATION CONTRACTOR RESPONSIBLE FOR VERIFICATION AGAINST ALL
CONTRACT DOCUMENTS TO ENSURE COMPLIANCE WITH ALL DRAWINGS,
SPECIFICATIONS, AND OTHER CONTRACTUAL ITEMS
4. INSTALLATION CONTRACTOR RESPONSIBLE FOR FIELD VERIFICATION BEFORE
FABRICATION AND INSTALLATION
5. ALL RACK MODELUE REFERENCE DIMENSIONS ARE FROM THE CENTERLINE OF THE
FARTHEST SOUTHWEST VERTICAL TUBE STEEL OF THE MODULE
6. ALL RACK MODULE ELEVATIONS ARE FROM THE TOP OF THE MOUNTING PLATE OF
THE FARTHEST SOUTHWEST VERTICAL TUBE STEEL OF THE MODULE
7. ALL OFF-RACK REFERENCE DIMENSIONS ARE FROM THE CENTERLINE OF THE
CLOSEST COLUMN INTERSECTION
8. ALL OFF-RACK ISO ELEVATIONS ARE FROM THE 48” BENCHMARK ON THE
ASSOCIATED FLOOR.
5"
6 "
1 3/1
1'-
2'-4 7/8"
1. MATERIAL BOM INFORMATION IS FOR REFERENCE ONLY, MATERIAL SELECTION TO
BE DETERMINED PER THE CONTRACT DOCUMENTS. BOM QUANTITIES ARE FOR
INFORMATION ONLY, ACTUAL QUANTITIES REQUIRED TO BE VERIFIED BY
INSTALLATION CONTRACTOR AGAINST ACTUAL DESIGN
2. INSTALLATION CONTRACTOR RESPONSIBLE FOR HANGER TYPE AND LOCATION BASED
UPON CONTRACT DOCUMENTS
3. INSTALLATION CONTRACTOR RESPONSIBLE FOR VERIFICATION AGAINST ALL
2'- CONTRACT DOCUMENTS TO ENSURE COMPLIANCE WITH ALL DRAWINGS,
11 SPECIFICATIONS, AND OTHER CONTRACTUAL ITEMS
5/8 4. INSTALLATION CONTRACTOR RESPONSIBLE FOR FIELD VERIFICATION BEFORE
"
FABRICATION AND INSTALLATION
9 1/2"
5. ALL RACK MODELUE REFERENCE DIMENSIONS ARE FROM THE CENTERLINE OF THE
FARTHEST SOUTHWEST VERTICAL TUBE STEEL OF THE MODULE
6. ALL RACK MODULE ELEVATIONS ARE FROM THE TOP OF THE MOUNTING PLATE OF
THE FARTHEST SOUTHWEST VERTICAL TUBE STEEL OF THE MODULE
7. ALL OFF-RACK REFERENCE DIMENSIONS ARE FROM THE CENTERLINE OF THE
8"
CLOSEST COLUMN INTERSECTION
8. ALL OFF-RACK ISO ELEVATIONS ARE FROM THE 48” BENCHMARK ON THE
ASSOCIATED FLOOR.
9"
9"
4 1/2"
2'-3"
1. MATERIAL BOM INFORMATION IS FOR REFERENCE ONLY, MATERIAL SELECTION TO
BE DETERMINED PER THE CONTRACT DOCUMENTS. BOM QUANTITIES ARE FOR
INFORMATION ONLY, ACTUAL QUANTITIES REQUIRED TO BE VERIFIED BY
INSTALLATION CONTRACTOR AGAINST ACTUAL DESIGN
2. INSTALLATION CONTRACTOR RESPONSIBLE FOR HANGER TYPE AND LOCATION BASED
UPON CONTRACT DOCUMENTS
3. INSTALLATION CONTRACTOR RESPONSIBLE FOR VERIFICATION AGAINST ALL
CONTRACT DOCUMENTS TO ENSURE COMPLIANCE WITH ALL DRAWINGS,
SPECIFICATIONS, AND OTHER CONTRACTUAL ITEMS
4. INSTALLATION CONTRACTOR RESPONSIBLE FOR FIELD VERIFICATION BEFORE
FABRICATION AND INSTALLATION
5. ALL RACK MODELUE REFERENCE DIMENSIONS ARE FROM THE CENTERLINE OF THE
5 1/8"
4 1/2"
2'-7 1/2"
5. ALL RACK MODELUE REFERENCE DIMENSIONS ARE FROM THE CENTERLINE OF THE
FARTHEST SOUTHWEST VERTICAL TUBE STEEL OF THE MODULE
6. ALL RACK MODULE ELEVATIONS ARE FROM THE TOP OF THE MOUNTING PLATE OF
THE FARTHEST SOUTHWEST VERTICAL TUBE STEEL OF THE MODULE
7. ALL OFF-RACK REFERENCE DIMENSIONS ARE FROM THE CENTERLINE OF THE
CLOSEST COLUMN INTERSECTION
8. ALL OFF-RACK ISO ELEVATIONS ARE FROM THE 48” BENCHMARK ON THE
ASSOCIATED FLOOR.
4
1/
2"
1'-
95
/16
"
41
/2"
4 1/2"
1. MATERIAL BOM INFORMATION IS FOR REFERENCE ONLY, MATERIAL SELECTION TO
BE DETERMINED PER THE CONTRACT DOCUMENTS. BOM QUANTITIES ARE FOR
INFORMATION ONLY, ACTUAL QUANTITIES REQUIRED TO BE VERIFIED BY
INSTALLATION CONTRACTOR AGAINST ACTUAL DESIGN
2. INSTALLATION CONTRACTOR RESPONSIBLE FOR HANGER TYPE AND LOCATION BASED
UPON CONTRACT DOCUMENTS
3. INSTALLATION CONTRACTOR RESPONSIBLE FOR VERIFICATION AGAINST ALL
CONTRACT DOCUMENTS TO ENSURE COMPLIANCE WITH ALL DRAWINGS,
2'-7 1/2"
SPECIFICATIONS, AND OTHER CONTRACTUAL ITEMS
4. INSTALLATION CONTRACTOR RESPONSIBLE FOR FIELD VERIFICATION BEFORE
FABRICATION AND INSTALLATION
5. ALL RACK MODELUE REFERENCE DIMENSIONS ARE FROM THE CENTERLINE OF THE
FARTHEST SOUTHWEST VERTICAL TUBE STEEL OF THE MODULE
6. ALL RACK MODULE ELEVATIONS ARE FROM THE TOP OF THE MOUNTING PLATE OF
THE FARTHEST SOUTHWEST VERTICAL TUBE STEEL OF THE MODULE
7. ALL OFF-RACK REFERENCE DIMENSIONS ARE FROM THE CENTERLINE OF THE
CLOSEST COLUMN INTERSECTION
8. ALL OFF-RACK ISO ELEVATIONS ARE FROM THE 48” BENCHMARK ON THE
ASSOCIATED FLOOR.
5 1/8"
8"
H
°
45
77 6"
/16 /1
" 77
2'-9 7/8"
1. MATERIAL BOM INFORMATION IS FOR REFERENCE ONLY, MATERIAL SELECTION TO
BE DETERMINED PER THE CONTRACT DOCUMENTS. BOM QUANTITIES ARE FOR
1'- INFORMATION ONLY, ACTUAL QUANTITIES REQUIRED TO BE VERIFIED BY
77 INSTALLATION CONTRACTOR AGAINST ACTUAL DESIGN
/8"
2. INSTALLATION CONTRACTOR RESPONSIBLE FOR HANGER TYPE AND LOCATION BASED
UPON CONTRACT DOCUMENTS
3. INSTALLATION CONTRACTOR RESPONSIBLE FOR VERIFICATION AGAINST ALL
CONTRACT DOCUMENTS TO ENSURE COMPLIANCE WITH ALL DRAWINGS,
SPECIFICATIONS, AND OTHER CONTRACTUAL ITEMS
4. INSTALLATION CONTRACTOR RESPONSIBLE FOR FIELD VERIFICATION BEFORE
FABRICATION AND INSTALLATION
5. ALL RACK MODELUE REFERENCE DIMENSIONS ARE FROM THE CENTERLINE OF THE
FARTHEST SOUTHWEST VERTICAL TUBE STEEL OF THE MODULE
6. ALL RACK MODULE ELEVATIONS ARE FROM THE TOP OF THE MOUNTING PLATE OF
THE FARTHEST SOUTHWEST VERTICAL TUBE STEEL OF THE MODULE
7. ALL OFF-RACK REFERENCE DIMENSIONS ARE FROM THE CENTERLINE OF THE
5"
CLOSEST COLUMN INTERSECTION
8. ALL OFF-RACK ISO ELEVATIONS ARE FROM THE 48” BENCHMARK ON THE
ASSOCIATED FLOOR.
2 KJW 02.03.20 VALVE RELOCATED NO CHANGE TO BOM PER RFI
1 EDV 04.18.19 CONSTRUCTION ISSUE
0 MC 12.20.18 ISSUED FOR CONSTRUCTION
REV BY DATE DESCRIPTION
REF. P&ID LINE NUMBER INSULATION SPEC DETAILED BY/DATE FIELD SLOPE CHECK WEIGHT PROJECT NAME PROJECT NUMBER
KD-14-03-B 14-3.1705 NI EDV 04.18.19 8lbs PHARMACHEM - PROJECT SUNRISE 623010634
REF. ORTHO LINE SIZE INSULATION THICKNESS EXTRACTED BY/DATE CM/OWNER SLOPE ACCPT. LINEAR FOOTAGE DRAWING NO.
N/A 2.00 0.00 JBF 04.18.19 5 2.00-CIP-14-3.1705-L25-NI-0.00-001
FLOOR SYSTEM SPECIAL APP'D BY LEAD/DATE Q.C. VERIFIED SHOP JOINTS REV.
KJW/02.04.20
THE PROCESS PEOPLE *2.00-CIP-14-3.1705-L25-NI-0.00-001*
3 CIP WP-L3C3 0
www.kinetics.net
AREA
1
PIPE SPEC
L25
ISO MTO I.F.C. BY SUPER/DATE Q.C. SLOPE VERIFIED FIELD JOINTS
0
2
BILL OF MATERIALS
N ID QTY SIZE DESCRIPTION
1 1'-8 5/8" 2" PIPE, CS F1545 150LB PTFE, FXF
4 1/2"
3 2 2" ELBOW 90 , CS F1545 150LB PTFE, FXF
10
13/ /8"
16" 43
2'-3 5/8"
1. MATERIAL BOM INFORMATION IS FOR REFERENCE ONLY, MATERIAL SELECTION TO
5"
BE DETERMINED PER THE CONTRACT DOCUMENTS. BOM QUANTITIES ARE FOR
INFORMATION ONLY, ACTUAL QUANTITIES REQUIRED TO BE VERIFIED BY
INSTALLATION CONTRACTOR AGAINST ACTUAL DESIGN
2. INSTALLATION CONTRACTOR RESPONSIBLE FOR HANGER TYPE AND LOCATION BASED
UPON CONTRACT DOCUMENTS
3. INSTALLATION CONTRACTOR RESPONSIBLE FOR VERIFICATION AGAINST ALL
CONTRACT DOCUMENTS TO ENSURE COMPLIANCE WITH ALL DRAWINGS,
SPECIFICATIONS, AND OTHER CONTRACTUAL ITEMS
4. INSTALLATION CONTRACTOR RESPONSIBLE FOR FIELD VERIFICATION BEFORE
FABRICATION AND INSTALLATION
5. ALL RACK MODELUE REFERENCE DIMENSIONS ARE FROM THE CENTERLINE OF THE
FARTHEST SOUTHWEST VERTICAL TUBE STEEL OF THE MODULE
6. ALL RACK MODULE ELEVATIONS ARE FROM THE TOP OF THE MOUNTING PLATE OF
THE FARTHEST SOUTHWEST VERTICAL TUBE STEEL OF THE MODULE
7. ALL OFF-RACK REFERENCE DIMENSIONS ARE FROM THE CENTERLINE OF THE
CLOSEST COLUMN INTERSECTION
8. ALL OFF-RACK ISO ELEVATIONS ARE FROM THE 48” BENCHMARK ON THE
ASSOCIATED FLOOR.
9"
3 2 2" ELBOW 90 , CS F1545 150LB PTFE, FXF
11° H
4 1 2"X1 1/2" REDUCER CON, CS F1545 150LB PTFE, FXF
3
15
/1
6"
9"
4 1/2"
2'-9 13/16"
4 1/2"
5 1 2"X1 1/2" REDUCER CON, CS F1545 150LB PTFE, FXF
2'-9 3/4"
1. MATERIAL BOM INFORMATION IS FOR REFERENCE ONLY, MATERIAL SELECTION TO
BE DETERMINED PER THE CONTRACT DOCUMENTS. BOM QUANTITIES ARE FOR
INFORMATION ONLY, ACTUAL QUANTITIES REQUIRED TO BE VERIFIED BY
INSTALLATION CONTRACTOR AGAINST ACTUAL DESIGN
1'
5 1/8"
0
5/
1'-1 1/8"
8"
1. MATERIAL BOM INFORMATION IS FOR REFERENCE ONLY, MATERIAL SELECTION TO
BE DETERMINED PER THE CONTRACT DOCUMENTS. BOM QUANTITIES ARE FOR
INFORMATION ONLY, ACTUAL QUANTITIES REQUIRED TO BE VERIFIED BY
INSTALLATION CONTRACTOR AGAINST ACTUAL DESIGN
1'-9" 2. INSTALLATION CONTRACTOR RESPONSIBLE FOR HANGER TYPE AND LOCATION BASED
UPON CONTRACT DOCUMENTS
3. INSTALLATION CONTRACTOR RESPONSIBLE FOR VERIFICATION AGAINST ALL
CONTRACT DOCUMENTS TO ENSURE COMPLIANCE WITH ALL DRAWINGS,
SPECIFICATIONS, AND OTHER CONTRACTUAL ITEMS
4. INSTALLATION CONTRACTOR RESPONSIBLE FOR FIELD VERIFICATION BEFORE
FABRICATION AND INSTALLATION
5. ALL RACK MODELUE REFERENCE DIMENSIONS ARE FROM THE CENTERLINE OF THE
FARTHEST SOUTHWEST VERTICAL TUBE STEEL OF THE MODULE
6. ALL RACK MODULE ELEVATIONS ARE FROM THE TOP OF THE MOUNTING PLATE OF
5"
8"
4 4 2" ELBOW 90 , CS F1545 150LB PTFE, FXF
8"
7 9 2" BOLT KIT, QTY 4 X 0.625 DIA X 3.5L , 25LB-FT
9"
8 1 2" VALVE BALL, CS F1545 150LB, 200 CHEMTITE,FXF
2'-
11
7/8
1'-1 3/16" "
" 2'- 5 1'-9 3/16" 2" PIPE, CS F1545 150LB PTFE, FXF
1 1/2 33
1' - /16 6 5 1/16" 2" PIPE, CS F1545 150LB PTFE, FXF
" 31 7 2 2" ELBOW 45, CS F1545 150LB PTFE, FXF
/2"
8 1 2" ELBOW 90 , CS F1545 150LB PTFE, FXF
H
5° 1
7 14 "
9 2"X1" REDUCER CON, CS F1545 150LB PTFE, FXF
/8" /8
71 10 1 2" TEE, CS F1545 150LB PTFE, FXFXF
1'-3"
4 1/2"
3 1/2"
8"
5 2 2" ELBOW 90 , CS F1545 150LB PTFE, FXF
5/
-1
6 1 2"X1" REDUCER CON, CS F1545 150LB PTFE, FXF
2'
7 1 1" BOLT KIT, QTY 4 X 0.5 DIA X 2.75L , 10LB-FT
2'-
117
/16
"
8"
1. MATERIAL BOM INFORMATION IS FOR REFERENCE ONLY, MATERIAL SELECTION TO
BE DETERMINED PER THE CONTRACT DOCUMENTS. BOM QUANTITIES ARE FOR
INFORMATION ONLY, ACTUAL QUANTITIES REQUIRED TO BE VERIFIED BY
INSTALLATION CONTRACTOR AGAINST ACTUAL DESIGN
2. INSTALLATION CONTRACTOR RESPONSIBLE FOR HANGER TYPE AND LOCATION BASED
UPON CONTRACT DOCUMENTS
3. INSTALLATION CONTRACTOR RESPONSIBLE FOR VERIFICATION AGAINST ALL
CONTRACT DOCUMENTS TO ENSURE COMPLIANCE WITH ALL DRAWINGS,
1'-7 3/8"
SPECIFICATIONS, AND OTHER CONTRACTUAL ITEMS
4. INSTALLATION CONTRACTOR RESPONSIBLE FOR FIELD VERIFICATION BEFORE
FABRICATION AND INSTALLATION
5. ALL RACK MODELUE REFERENCE DIMENSIONS ARE FROM THE CENTERLINE OF THE
FARTHEST SOUTHWEST VERTICAL TUBE STEEL OF THE MODULE
6. ALL RACK MODULE ELEVATIONS ARE FROM THE TOP OF THE MOUNTING PLATE OF
THE FARTHEST SOUTHWEST VERTICAL TUBE STEEL OF THE MODULE
7. ALL OFF-RACK REFERENCE DIMENSIONS ARE FROM THE CENTERLINE OF THE
CLOSEST COLUMN INTERSECTION
8. ALL OFF-RACK ISO ELEVATIONS ARE FROM THE 48” BENCHMARK ON THE
ASSOCIATED FLOOR.
5"
9"
9 1 2" TEE, CS F1545 150LB PTFE, FXFXF
"
1/8
1'-9
8"
1. MATERIAL BOM INFORMATION IS FOR REFERENCE ONLY, MATERIAL SELECTION TO
BE DETERMINED PER THE CONTRACT DOCUMENTS. BOM QUANTITIES ARE FOR
INFORMATION ONLY, ACTUAL QUANTITIES REQUIRED TO BE VERIFIED BY
INSTALLATION CONTRACTOR AGAINST ACTUAL DESIGN
2'-6 11/16"
2. INSTALLATION CONTRACTOR RESPONSIBLE FOR HANGER TYPE AND LOCATION BASED
UPON CONTRACT DOCUMENTS
3. INSTALLATION CONTRACTOR RESPONSIBLE FOR VERIFICATION AGAINST ALL
CONTRACT DOCUMENTS TO ENSURE COMPLIANCE WITH ALL DRAWINGS,
SPECIFICATIONS, AND OTHER CONTRACTUAL ITEMS
4. INSTALLATION CONTRACTOR RESPONSIBLE FOR FIELD VERIFICATION BEFORE
FABRICATION AND INSTALLATION
5. ALL RACK MODELUE REFERENCE DIMENSIONS ARE FROM THE CENTERLINE OF THE
FARTHEST SOUTHWEST VERTICAL TUBE STEEL OF THE MODULE
6. ALL RACK MODULE ELEVATIONS ARE FROM THE TOP OF THE MOUNTING PLATE OF
THE FARTHEST SOUTHWEST VERTICAL TUBE STEEL OF THE MODULE
7. ALL OFF-RACK REFERENCE DIMENSIONS ARE FROM THE CENTERLINE OF THE
CLOSEST COLUMN INTERSECTION
8. ALL OFF-RACK ISO ELEVATIONS ARE FROM THE 48” BENCHMARK ON THE
ASSOCIATED FLOOR.
2 JFF 01.31.20 VALVE RELOCATED NO CHANGE TO BOM PER RFI
5"
8"
1'
-3
3/
4"
1'-9 9/16"
8"
5 2 2" ELBOW 90 , CS F1545 150LB PTFE, FXF
8"
7 1 1" BOLT KIT, QTY 4 X 0.5 DIA X 2.75L , 10LB-FT
1'
-2
1/
16
"
1. MATERIAL BOM INFORMATION IS FOR REFERENCE ONLY, MATERIAL SELECTION TO
2'-1 7/8"
BE DETERMINED PER THE CONTRACT DOCUMENTS. BOM QUANTITIES ARE FOR
INFORMATION ONLY, ACTUAL QUANTITIES REQUIRED TO BE VERIFIED BY
INSTALLATION CONTRACTOR AGAINST ACTUAL DESIGN
2. INSTALLATION CONTRACTOR RESPONSIBLE FOR HANGER TYPE AND LOCATION BASED
UPON CONTRACT DOCUMENTS
3. INSTALLATION CONTRACTOR RESPONSIBLE FOR VERIFICATION AGAINST ALL
CONTRACT DOCUMENTS TO ENSURE COMPLIANCE WITH ALL DRAWINGS,
SPECIFICATIONS, AND OTHER CONTRACTUAL ITEMS
4. INSTALLATION CONTRACTOR RESPONSIBLE FOR FIELD VERIFICATION BEFORE
FABRICATION AND INSTALLATION
5. ALL RACK MODELUE REFERENCE DIMENSIONS ARE FROM THE CENTERLINE OF THE
FARTHEST SOUTHWEST VERTICAL TUBE STEEL OF THE MODULE
5"
6. ALL RACK MODULE ELEVATIONS ARE FROM THE TOP OF THE MOUNTING PLATE OF
THE FARTHEST SOUTHWEST VERTICAL TUBE STEEL OF THE MODULE
7. ALL OFF-RACK REFERENCE DIMENSIONS ARE FROM THE CENTERLINE OF THE
CLOSEST COLUMN INTERSECTION
8. ALL OFF-RACK ISO ELEVATIONS ARE FROM THE 48” BENCHMARK ON THE
ASSOCIATED FLOOR.
2 JFF 01.31.20 VALVE RELOCATED NO CHANGE TO BOM PER RFI
1 MLC 04.17.19 CONSTRUCTION ISSUE
0 JFF 12.20.18 ISSUED FOR CONSTRUCTION
REV BY DATE DESCRIPTION
REF. P&ID LINE NUMBER INSULATION SPEC DETAILED BY/DATE FIELD SLOPE CHECK WEIGHT PROJECT NAME PROJECT NUMBER
05-H-50-4203-03 14-3.1721 NI JFF 01.31.20 8lbs PHARMACHEM - PROJECT SUNRISE 623010634
REF. ORTHO LINE SIZE INSULATION THICKNESS EXTRACTED BY/DATE CM/OWNER SLOPE ACCPT. LINEAR FOOTAGE DRAWING NO.
N/A 2.00 0.00 KJW 01.31.20 3 2.00-CIP-14-3.1721-L25-NI-0.00-001
FLOOR SYSTEM SPECIAL APP'D BY LEAD/DATE Q.C. VERIFIED SHOP JOINTS REV.
KJW/01.31.20
THE PROCESS PEOPLE *2.00-CIP-14-3.1721-L25-NI-0.00-001*
WP CIP 0
www.kinetics.net
AREA
L3C3
PIPE SPEC
L25
ISO MTO I.F.C. BY SUPER/DATE Q.C. SLOPE VERIFIED FIELD JOINTS
0
2
BILL OF MATERIALS
N ID QTY SIZE DESCRIPTION
1 3'-0 7/16" 2" PIPE, CS F1545 150LB PTFE, FXF
31
/2"
/4"
93
1'-
2'-
91
/2"
3'-11 3/4"
1. MATERIAL BOM INFORMATION IS FOR REFERENCE ONLY, MATERIAL SELECTION TO
BE DETERMINED PER THE CONTRACT DOCUMENTS. BOM QUANTITIES ARE FOR
INFORMATION ONLY, ACTUAL QUANTITIES REQUIRED TO BE VERIFIED BY
INSTALLATION CONTRACTOR AGAINST ACTUAL DESIGN
2. INSTALLATION CONTRACTOR RESPONSIBLE FOR HANGER TYPE AND LOCATION BASED
UPON CONTRACT DOCUMENTS
3. INSTALLATION CONTRACTOR RESPONSIBLE FOR VERIFICATION AGAINST ALL
CONTRACT DOCUMENTS TO ENSURE COMPLIANCE WITH ALL DRAWINGS,
SPECIFICATIONS, AND OTHER CONTRACTUAL ITEMS
4. INSTALLATION CONTRACTOR RESPONSIBLE FOR FIELD VERIFICATION BEFORE
FABRICATION AND INSTALLATION
5. ALL RACK MODELUE REFERENCE DIMENSIONS ARE FROM THE CENTERLINE OF THE
FARTHEST SOUTHWEST VERTICAL TUBE STEEL OF THE MODULE
6. ALL RACK MODULE ELEVATIONS ARE FROM THE TOP OF THE MOUNTING PLATE OF
THE FARTHEST SOUTHWEST VERTICAL TUBE STEEL OF THE MODULE
5 1/8"
7. ALL OFF-RACK REFERENCE DIMENSIONS ARE FROM THE CENTERLINE OF THE
CLOSEST COLUMN INTERSECTION
8. ALL OFF-RACK ISO ELEVATIONS ARE FROM THE 48” BENCHMARK ON THE
ASSOCIATED FLOOR.
2'-6 1/4"
1. MATERIAL BOM INFORMATION IS FOR REFERENCE ONLY, MATERIAL SELECTION TO
BE DETERMINED PER THE CONTRACT DOCUMENTS. BOM QUANTITIES ARE FOR
INFORMATION ONLY, ACTUAL QUANTITIES REQUIRED TO BE VERIFIED BY
INSTALLATION CONTRACTOR AGAINST ACTUAL DESIGN
2. INSTALLATION CONTRACTOR RESPONSIBLE FOR HANGER TYPE AND LOCATION BASED
UPON CONTRACT DOCUMENTS
3. INSTALLATION CONTRACTOR RESPONSIBLE FOR VERIFICATION AGAINST ALL
CONTRACT DOCUMENTS TO ENSURE COMPLIANCE WITH ALL DRAWINGS,
SPECIFICATIONS, AND OTHER CONTRACTUAL ITEMS
4. INSTALLATION CONTRACTOR RESPONSIBLE FOR FIELD VERIFICATION BEFORE
8"
33° FABRICATION AND INSTALLATION
5. ALL RACK MODELUE REFERENCE DIMENSIONS ARE FROM THE CENTERLINE OF THE
H
FARTHEST SOUTHWEST VERTICAL TUBE STEEL OF THE MODULE
6. ALL RACK MODULE ELEVATIONS ARE FROM THE TOP OF THE MOUNTING PLATE OF
THE FARTHEST SOUTHWEST VERTICAL TUBE STEEL OF THE MODULE
7. ALL OFF-RACK REFERENCE DIMENSIONS ARE FROM THE CENTERLINE OF THE
9 5/8"
"
7 7/8 CLOSEST COLUMN INTERSECTION
1'-
77 1'- 8. ALL OFF-RACK ISO ELEVATIONS ARE FROM THE 48” BENCHMARK ON THE
ASSOCIATED FLOOR.
/8"
1 JFF 01.31.20 RELOCATED VALVE NO CHANGE TO BOM PER RFI
0 EDV 03.25.19 ISSUED FOR CONSTRUCTION
REV BY DATE DESCRIPTION
REF. P&ID LINE NUMBER INSULATION SPEC DETAILED BY/DATE FIELD SLOPE CHECK WEIGHT PROJECT NAME PROJECT NUMBER
KD-14-06-A 14-6.1703 NI EDV 03.25.19 11lbs PHARMACHEM - PROJECT SUNRISE 623010634
REF. ORTHO LINE SIZE INSULATION THICKNESS EXTRACTED BY/DATE CM/OWNER SLOPE ACCPT. LINEAR FOOTAGE DRAWING NO.
N/A 2.00 0.00 DLK 03.24.19 6 2.00-CIP-14-6.1703-L25-NI-0.00-001
FLOOR SYSTEM SPECIAL APP'D BY LEAD/DATE Q.C. VERIFIED SHOP JOINTS REV.
KJW/01.31.20
THE PROCESS PEOPLE *2.00-CIP-14-6.1703-L25-NI-0.00-001*
3 CIP WP-L3C6 0
www.kinetics.net
AREA
3
PIPE SPEC
L25
ISO MTO I.F.C. BY SUPER/DATE Q.C. SLOPE VERIFIED FIELD JOINTS
0
1
BILL OF MATERIALS
N NORTH ARROW ROTATED FOR CLARITY ID QTY SIZE DESCRIPTION
1 2'-9 5/16" 2" PIPE, CS F1545 150LB PTFE, FXF
10 5/16"
45° V
"
16
5/
10
1. MATERIAL BOM INFORMATION IS FOR REFERENCE ONLY, MATERIAL SELECTION TO
9"
6"
INFORMATION ONLY, ACTUAL QUANTITIES REQUIRED TO BE VERIFIED BY
INSTALLATION CONTRACTOR AGAINST ACTUAL DESIGN
2. INSTALLATION CONTRACTOR RESPONSIBLE FOR HANGER TYPE AND LOCATION BASED
UPON CONTRACT DOCUMENTS
3. INSTALLATION CONTRACTOR RESPONSIBLE FOR VERIFICATION AGAINST ALL
1'-10 1/16"
CONTRACT DOCUMENTS TO ENSURE COMPLIANCE WITH ALL DRAWINGS,
SPECIFICATIONS, AND OTHER CONTRACTUAL ITEMS
4. INSTALLATION CONTRACTOR RESPONSIBLE FOR FIELD VERIFICATION BEFORE
FABRICATION AND INSTALLATION
5. ALL RACK MODELUE REFERENCE DIMENSIONS ARE FROM THE CENTERLINE OF THE
FARTHEST SOUTHWEST VERTICAL TUBE STEEL OF THE MODULE
6. ALL RACK MODULE ELEVATIONS ARE FROM THE TOP OF THE MOUNTING PLATE OF
THE FARTHEST SOUTHWEST VERTICAL TUBE STEEL OF THE MODULE
7. ALL OFF-RACK REFERENCE DIMENSIONS ARE FROM THE CENTERLINE OF THE
CLOSEST COLUMN INTERSECTION
8. ALL OFF-RACK ISO ELEVATIONS ARE FROM THE 48” BENCHMARK ON THE
ASSOCIATED FLOOR.
9"
8 1 1" BOLT KIT, QTY 4 X 0.5 DIA X 2.75L , 10LB-FT
8°
H
"
3/16
0
1'-
8"
3'
-1
1
8 7 2" BOLT KIT, QTY 4 X 0.625 DIA X 3.5L , 25LB-FT
1/
4"
9 1 2" VALVE BALL, CS F1545 150LB, 200 CHEMTITE,FXF
8"
1. MATERIAL BOM INFORMATION IS FOR REFERENCE ONLY, MATERIAL SELECTION TO
BE DETERMINED PER THE CONTRACT DOCUMENTS. BOM QUANTITIES ARE FOR
2'-10 1/2"
INFORMATION ONLY, ACTUAL QUANTITIES REQUIRED TO BE VERIFIED BY
INSTALLATION CONTRACTOR AGAINST ACTUAL DESIGN
2. INSTALLATION CONTRACTOR RESPONSIBLE FOR HANGER TYPE AND LOCATION BASED
UPON CONTRACT DOCUMENTS
3. INSTALLATION CONTRACTOR RESPONSIBLE FOR VERIFICATION AGAINST ALL
CONTRACT DOCUMENTS TO ENSURE COMPLIANCE WITH ALL DRAWINGS,
SPECIFICATIONS, AND OTHER CONTRACTUAL ITEMS
4. INSTALLATION CONTRACTOR RESPONSIBLE FOR FIELD VERIFICATION BEFORE
FABRICATION AND INSTALLATION
5. ALL RACK MODELUE REFERENCE DIMENSIONS ARE FROM THE CENTERLINE OF THE
FARTHEST SOUTHWEST VERTICAL TUBE STEEL OF THE MODULE
5"
6. ALL RACK MODULE ELEVATIONS ARE FROM THE TOP OF THE MOUNTING PLATE OF
THE FARTHEST SOUTHWEST VERTICAL TUBE STEEL OF THE MODULE
7. ALL OFF-RACK REFERENCE DIMENSIONS ARE FROM THE CENTERLINE OF THE
CLOSEST COLUMN INTERSECTION
8. ALL OFF-RACK ISO ELEVATIONS ARE FROM THE 48” BENCHMARK ON THE
ASSOCIATED FLOOR.