PIPES
3 Tube (MTR) 1" 3
4 Tube (MTR) 1.5" 13
5 Tube (MTR) 2" 85
1 45° Long Elbow 1.5" 12
2 45° Long Elbow 2" 97
3 45° Short Elbow 1" 5
4 1" 5
FITTINGS
90° Short Elbow
5 Reducer 1.5"x1" 5
6 Reducer 2"x1.5" 5
VALVES
1 KF Bore Flange 1" 5
2 KF Bore Flange 1.5" 50
FLANGES
3 KF Bore Flange 2" 99
GASKETS
2 Karlez O-Ring NW40 1.5" 30
3 Karlez O-Ring NW50 2" 52
BOLTS&NUTS
1 Test port, MVCR with end plug 0.25" 10
2 Test port, MVCR with end plug 0.5" 5
3 Clamp Toggle 1" 5
4 Clamp Toggle 1.5" 30
5 Clamp Toggle 2" 52
6 Reducing Bellow, 10" Long. 2"x1.5" 5
7 Installation of vendor spool (310mm) 1.5" 10
8 Pressure Test - 5
MISCELLANEOUS
LEAD Management Engineering & Construction Pte Ltd
16, International Business Park, #03-00, Singapore 609929
Tel: (65) 6366 2535 Fax: (65) 6366 2510