SEASHORE GALVANIZING FACTORY

GALVANIZING REPORT
PROJECT TITLE.- EPIC FOR DOMESTIC SUPPLY OF BUTANE FROM NGL COMPLEX TO QP REFINERY-MESAIEED, PHASE-1
CONTRACT NO. MAIN CODE- GC17100400 PROCEDURE NO.- 4012-MGEN-5-05-0033 RFI NO.- 4012-5-RFI-0012 REPORT NO.- FERNAS-STR-001
PROJECT NO.- 4012 Rev1 ITP NO.- 4012-MGEN-5-25-0014 DRAWING NO.- 4012-MGEN-1-66-0001 DATE- 27/11/2018

S. NO. QTY ITEM BLASTING PICKLING RINSING FLUXING DRYING GALVANIZING COATING COOLING REMARKS

1. Surface 1. Removal of 1. Smoothness


1. Surface 1.Thickness
Inspection cleaniness 1. Check Moisture content 2. Bare spot
cleaniness 2.UOM microns Warpage Adhesion
Parameters 2. Removal of Surface 2. Presence of 3. Dross carry over
3.85 microns
Paint marking Flux coating 4. Lumps

VISUAL ASTM A VISUAL ASTM VISUAL VISUAL VISUAL VISUAL ASTM A ASTM A 123
123 & A 385 A 123 123 TABLE 1
ACCEPTED
1 650 No's LIFTING HOOKS ACCEPTED ACCEPTED ACCEPTED ACCEPTED ACCEPTED 121 Microns N/A PASSED
Sa2.5
(750MM)

INSPECTED BY SGF FERNAS TPI QC QP

NAME

SIGN

DATE

SGF.FO.14 ASTM A 123