Professional Documents
Culture Documents
- (minus) white
example: =P+SP_1101-12F1
NAMEPLATES
External powered
Brown Relay contacts, solenoids and all instrument switches are shown
in the following status :
EEx SIGNALS (IF APPLICABLE) A Relay contacts, solenoids and monitor switches are shown in de-energized state
X3 230VAC EXTERNAL POWER SOURCE X13 ANALOGUE SIGNALS (4-20mA / 1-5V ESO)
X7 BRAKE CONTACTS X17 DIFFERENT SIGNALS (NOT 230V) IN ONE CONNECTION CABLE TO FIELD INSTRUMENT
X9 24VAC
CLIENT : AF SUGAR
JAKARTA , INDONESIA
COMMISSIONING :
Global Water Engineering CLIENT: AF SUGAR MAIN CONTROL PANEL = MCP + INFO
Autobaan 22.01.01 DRAWN 13/10/2015 RL
BE-8210 Loppem FRONT PAGE CHECKED
+32 50 54 64 44 PROJECT: WASTEWATER TREATMENT PLANT APPROVED
+32 50 54 64 46 DATE NAME SIGN
This document is the property of GLOBAL WATER ENGINEERING (GWE) NV Belgium. It shall not be copied,
http://www.globalwe.com PROJECT No.: 34124 transmitted or communicated to thirdparties without the explicit agreement of GWE. International conven- REV DATE DESCRIPTION BY CHK PAGE:000 NEXT: 010 LAST: 040
tions of Berne (1886) - Paris (1896) - Berlin (1908) - Berne (1914) - Rome (1928) - Brussels (1948)
0 1 2 3 4 5 6 7 8 9
Table of content
Plant Location Page Page designation Created Modified Revisions Remarks
Global Water Engineering CLIENT: AF SUGAR MAIN CONTROL PANEL = MCP + INFO
Autobaan 22.01.01 DRAWN 13/10/2015 RL
BE-8210 Loppem TABLE OF CONTENT CHECKED
+32 50 54 64 44 PROJECT: WASTEWATER TREATMENT PLANT APPROVED
+32 50 54 64 46 DATE NAME SIGN
This document is the property of GLOBAL WATER ENGINEERING (GWE) NV Belgium. It shall not be copied,
http://www.globalwe.com PROJECT No.: 34124 transmitted or communicated to thirdparties without the explicit agreement of GWE. International conven- REV DATE DESCRIPTION BY CHK PAGE:010 NEXT: 011 LAST: 040
tions of Berne (1886) - Paris (1896) - Berlin (1908) - Berne (1914) - Rome (1928) - Brussels (1948)
0 1 2 3 4 5 6 7 8 9
Table of content
Plant Location Page Page designation Created Modified Revisions Remarks
Global Water Engineering CLIENT: AF SUGAR MAIN CONTROL PANEL = MCP + INFO
Autobaan 22.01.01 DRAWN 13/10/2015 RL
BE-8210 Loppem TABLE OF CONTENT CHECKED
+32 50 54 64 44 PROJECT: WASTEWATER TREATMENT PLANT APPROVED
+32 50 54 64 46 DATE NAME SIGN
This document is the property of GLOBAL WATER ENGINEERING (GWE) NV Belgium. It shall not be copied,
http://www.globalwe.com PROJECT No.: 34124 transmitted or communicated to thirdparties without the explicit agreement of GWE. International conven- REV DATE DESCRIPTION BY CHK PAGE:011 NEXT: 012 LAST: 040
tions of Berne (1886) - Paris (1896) - Berlin (1908) - Berne (1914) - Rome (1928) - Brussels (1948)
0 1 2 3 4 5 6 7 8 9
Table of content
Plant Location Page Page designation Created Modified Revisions Remarks
Global Water Engineering CLIENT: AF SUGAR MAIN CONTROL PANEL = MCP + INFO
Autobaan 22.01.01 DRAWN 13/10/2015 RL
BE-8210 Loppem TABLE OF CONTENT CHECKED
+32 50 54 64 44 PROJECT: WASTEWATER TREATMENT PLANT APPROVED
+32 50 54 64 46 DATE NAME SIGN
This document is the property of GLOBAL WATER ENGINEERING (GWE) NV Belgium. It shall not be copied,
http://www.globalwe.com PROJECT No.: 34124 transmitted or communicated to thirdparties without the explicit agreement of GWE. International conven- REV DATE DESCRIPTION BY CHK PAGE:012 NEXT: 030 LAST: 040
tions of Berne (1886) - Paris (1896) - Berlin (1908) - Berne (1914) - Rome (1928) - Brussels (1948)
0 1 2 3 4 5 6 7 8 9
Revision overview
Revision Date Revision description Pages
Global Water Engineering CLIENT: AF SUGAR MAIN CONTROL PANEL = MCP + INFO
Autobaan 22.01.01 DRAWN 13/10/2015 RL
BE-8210 Loppem MODIFICATIONS CHECKED
+32 50 54 64 44 PROJECT: WASTEWATER TREATMENT PLANT APPROVED
+32 50 54 64 46 DATE NAME SIGN
This document is the property of GLOBAL WATER ENGINEERING (GWE) NV Belgium. It shall not be copied,
http://www.globalwe.com PROJECT No.: 34124 transmitted or communicated to thirdparties without the explicit agreement of GWE. International conven- REV DATE DESCRIPTION BY CHK PAGE:030 NEXT: 040 LAST: 040
tions of Berne (1886) - Paris (1896) - Berlin (1908) - Berne (1914) - Rome (1928) - Brussels (1948)
0 1 2 3 4 5 6 7 8 9
SYSTEM SPECIFICATIONS
PANEL +PNL1
MANUFACTURER: VANSANT
Global Water Engineering CLIENT: AF SUGAR MAIN CONTROL PANEL = MCP + INFO
Autobaan 22.01.01 DRAWN 13/10/2015 RL
BE-8210 Loppem SYSTEM SPECIFICATIONS CHECKED
+32 50 54 64 44 PROJECT: WASTEWATER TREATMENT PLANT APPROVED
PANEL +PNL1
+32 50 54 64 46 DATE NAME SIGN
This document is the property of GLOBAL WATER ENGINEERING (GWE) NV Belgium. It shall not be copied,
http://www.globalwe.com PROJECT No.: 34124 transmitted or communicated to thirdparties without the explicit agreement of GWE. International conven- REV DATE DESCRIPTION BY CHK PAGE:040 NEXT: +PNL1/000 LAST: 040
tions of Berne (1886) - Paris (1896) - Berlin (1908) - Berne (1914) - Rome (1928) - Brussels (1948)
0 1 2 3 4 5 6 7 8 9
-L1 / 015.0
-L2 / 015.0
-L3 / 015.0
-N / 015.0
-000Q1
1 3 5 7
-000F1
1 3
-0L1 / 020.0
-0N / 020.0 1
250-630A 32A 2 4
I> I> I>
2 4 6 8
-PE:000.1 -PE:000.2
-X1 1 2 PE
=LVDB =LPDB
L1 L2 L3 N PE L N PE
LVDB
1 : SHORT CIRCUIT PROOF WIRES (THICK INSULATION) TO BE USED
Global Water Engineering CLIENT: AF SUGAR MAIN CONTROL PANEL = MCP + PNL1
Autobaan 22.01.01 DRAWN 13/10/2015 RL
BE-8210 Loppem INCOMING CHECKED
+32 50 54 64 44 PROJECT: WASTEWATER TREATMENT PLANT APPROVED
POWER SUPPLY
+32 50 54 64 46 DATE NAME SIGN
This document is the property of GLOBAL WATER ENGINEERING (GWE) NV Belgium. It shall not be copied,
http://www.globalwe.com PROJECT No.: 34124 transmitted or communicated to thirdparties without the explicit agreement of GWE. International conven- REV DATE DESCRIPTION BY CHK PAGE:000 NEXT: 015 LAST: 1050
tions of Berne (1886) - Paris (1896) - Berlin (1908) - Berne (1914) - Rome (1928) - Brussels (1948)
0 1 2 3 4 5 6 7 8 9
1 3 1 3 1 3 5
2 4 2 4 2 4 6
L N PE L N PE L1 L2 L3 PE
-015X1 -015X2 -015X3
Global Water Engineering CLIENT: AF SUGAR MAIN CONTROL PANEL = MCP + PNL1
Autobaan 22.01.01 DRAWN 13/10/2015 RL
BE-8210 Loppem FEEDER TO CHECKED
+32 50 54 64 44 PROJECT: WASTEWATER TREATMENT PLANT APPROVED
POWER OUTLETS
+32 50 54 64 46 DATE NAME SIGN
This document is the property of GLOBAL WATER ENGINEERING (GWE) NV Belgium. It shall not be copied,
http://www.globalwe.com PROJECT No.: 34124 transmitted or communicated to thirdparties without the explicit agreement of GWE. International conven- REV DATE DESCRIPTION BY CHK PAGE:015 NEXT: 020 LAST: 1050
tions of Berne (1886) - Paris (1896) - Berlin (1908) - Berne (1914) - Rome (1928) - Brussels (1948)
0 1 2 3 4 5 6 7 8 9
000.9 / -0L1
000.9 / -0N
1 3 1 3 1 3
-020F1 -020F2 -020F3
6A 2 4 6A 2 4 6A 2 4
-XLIGHTING 1 PE 2
L PE N L PE N L PE N
L PE N L PE N
-020H1 -020H2 -020H3
-020X1 -020X2
MAX 6A
PROGRAM DEVICES MAX 6A
CAUTION : THESE CIRCUITS REMAIN POWERED WHEN MAIN SWITCH IS TURNED OFF ONLY !!!
Global Water Engineering CLIENT: AF SUGAR MAIN CONTROL PANEL = MCP + PNL1
Autobaan 22.01.01 DRAWN 13/10/2015 RL
BE-8210 Loppem PANEL LIGHTS CHECKED
+32 50 54 64 44 PROJECT: WASTEWATER TREATMENT PLANT APPROVED
+32 50 54 64 46 DATE NAME SIGN
This document is the property of GLOBAL WATER ENGINEERING (GWE) NV Belgium. It shall not be copied,
http://www.globalwe.com PROJECT No.: 34124 transmitted or communicated to thirdparties without the explicit agreement of GWE. International conven- REV DATE DESCRIPTION BY CHK PAGE:020 NEXT: 021 LAST: 1050
tions of Berne (1886) - Paris (1896) - Berlin (1908) - Berne (1914) - Rome (1928) - Brussels (1948)
0 1 2 3 4 5 6 7 8 9
FAN IN PANEL
PANEL COOLING FANS
OFF
1 3 14 24 24 1
-021F1 -021F1 -021F3
6A 2 4 11 21 /021.1 21 0,5A 2
/021.6 /021.6
1 3 14
-021K1 -021F1
/021.6 2 4 /021.1 11
1
-021S1 0
35°C 2
-XVENTILATION 1 2 PE
36
E015.4
/1002.5
A1 A1
-1000U05
DI
-021K1 -021K2
A2 A2
1 2 /021.0 1 2 /039.1
3 4 /021.1
L N L N L N L N L N
-021M1
M -021M2
M -021M3
M -021M4
M -021M5
M
700m3/h 1~ 700m3/h 1~ 700m3/h 1~ 700m3/h 1~ 700m3/h 1~
PE PE PE PE PE
Global Water Engineering CLIENT: AF SUGAR MAIN CONTROL PANEL = MCP + PNL1
Autobaan 22.01.01 DRAWN 13/10/2015 RL
BE-8210 Loppem PANEL COOLING CHECKED
+32 50 54 64 44 PROJECT: WASTEWATER TREATMENT PLANT APPROVED
+32 50 54 64 46 DATE NAME SIGN
This document is the property of GLOBAL WATER ENGINEERING (GWE) NV Belgium. It shall not be copied,
http://www.globalwe.com PROJECT No.: 34124 transmitted or communicated to thirdparties without the explicit agreement of GWE. International conven- REV DATE DESCRIPTION BY CHK PAGE:021 NEXT: 030 LAST: 1050
tions of Berne (1886) - Paris (1896) - Berlin (1908) - Berne (1914) - Rome (1928) - Brussels (1948)
0 1 2 3 4 5 6 7 8 9
400 0
-030U2
/030.7
-030T1 L1 L2 L3 11
400/230V
1600VA 230 0
SE
1 3 RM17 UB310
-030F1 -PE:030.1
25A 2 4 12 14
-030U1
5 1 3
L(+) N(-) PE
PLUGTRAB
2 L(+)
6
N(-)
2
PE
4
1 -PE:030.2
-030F2
6A 2
1 37
032.0 / -230VL00
130.4 / -230VN00
E015.5
-PE:030.3 /1002.5
A1 A1
-1000U05
-030K1 -030K2 DI
A2 A2
038.8 / -0V20 -0V20 / 750.0
A1 A2 1 2 /032.8
3 4 /032.8
03 04 /030.9
5 6 /032.9
13 14
13 14
23 24
21 22
33 34
43 44
1 : COMMON OF CONTROL TRANSFORMER HAS TO BE CONNECTED TO EARTH 57 58 /030.8
-PE:031.1
-X3 1 2 PE
-P/UPS.1 1 2 GNYE
LiYY-JZ
3G2,5 mm²
-X2 1
-031U1 -I/UPS 1
INPUT LiYY-JZ
L N PE
4G1 mm²
~ RECTIFIER BATTERY
= -031U1
COM.2 COM.6
BYPASS
= BOOSTER UPS
= 230 0 APC9613
CONNECTION
BOARD
= BATTERY
CHARGER -031T1
= 230/230V
2500VA
N.O.2 N.O.6
230 0
~ INVERTOR
=
OUTPUT
L N PE
1 -I/UPS
2 3
-PE:031.2
38 39
E015.6 E015.7
/1002.5 /1002.5
-1000U05 -1000U05
DI DI
230VAC 230VAC
DISTRIBUTION DISTRIBUTION
UPS
1 1 3 1 3
-032F01 -032F21 -032F24
2A 2 4A 2 4 10A 2 4
1 3 5
-030K2
/030.8 2 4 6
1
130.4 / -230VL01
1000.0 / -230VL21
1000.0 / -230VN21
680.0 / -230VL24
680.0 / -230VN24
230VAC MOTOR STARTERS
24VDC 24VDC
POWER SUPPLY POWER SUPPLY
UPS
1 3 5 1 3
-038F1 -038F2
25A gG 2 4 6 25A gG 2 4
-PE:038.2 -PE:038.5
-038U1 -038U2
5 7 9 1 3 5 1 3
L1 L2 L3 N PE L(+) N(-) PE
PLUGTRAB PLUGTRAB
2 L1
6
L2
8 10
L3 N
2
PE
4
2 L(+)
6
N(-)
2
PE
4
-PE:038.3 -PE:038.6
1 3 5 1 3 5
-038Q1 -038Q2
1-1,6A 1-1,6A
I> I> I> I> I> I>
2 4 6 2 4 6
L1 L2 L3 L N
-038G1 3 -038G2
24V/10A 24V/10A
V- V+ V- V+
1 1
-PE:038.1 -PE:038.4
040.0 / -0V00
039.0 / -24V00
030.7 / -0V20
030.7 / -24V20
3
1 : COMMON OF POWER SUPPLY HAS TO BE CONNECTED TO EARTH
2 : TO BE CONNECTED ACCORDING TO PHOENIX CONTACT GUIDELINES SEE OEM MANUAL
3 : CAUTION POWERED BY UPS EVEN WHEN MAIN POWER SWITCH IS OFF
Global Water Engineering CLIENT: AF SUGAR MAIN CONTROL PANEL = MCP + PNL1
Autobaan 22.01.01 DRAWN 13/10/2015 RL
BE-8210 Loppem 24VDC CHECKED
+32 50 54 64 44 PROJECT: WASTEWATER TREATMENT PLANT APPROVED
POWER SUPPLY
+32 50 54 64 46 DATE NAME SIGN
This document is the property of GLOBAL WATER ENGINEERING (GWE) NV Belgium. It shall not be copied,
http://www.globalwe.com PROJECT No.: 34124 transmitted or communicated to thirdparties without the explicit agreement of GWE. International conven- REV DATE DESCRIPTION BY CHK PAGE:038 NEXT: 039 LAST: 1050
tions of Berne (1886) - Paris (1896) - Berlin (1908) - Berne (1914) - Rome (1928) - Brussels (1948)
0 1 2 3 4 5 6 7 8 9
24VDC 24VDC
DISTRIBUTION DISTRIBUTION
UPS
1 1 1 1 1 1 1
-039F01 -039F02 -039F03 -039F04 -039F21 -039F22 -039F24
4A 2 4A 2 2A 2 2A 2 2A 2 2A 2 6A 2
1
-021K2
/021.7 2
130.2 / -24V01
1000.2 / -24V02
290.8 / -24V03
760.0 / -24V04
021.0 / -24V21
1000.2 / -24V22
680.0 / -24V24
24VDC MOTOR STARTERS
GENERAL RESET
DO
-1000U07
/1003.5
A026.7
29
A1
-040K1
A2
038.0 / -0V00 -0V00 / 060.4
03 04
13 14 /290.3
23 24 /290.9
33 34 /320.3
43 44 /321.3
53 54
63 64
73 74
83 84
Global Water Engineering CLIENT: AF SUGAR MAIN CONTROL PANEL = MCP + PNL1
Autobaan 22.01.01 DRAWN 13/10/2015 RL
BE-8210 Loppem GENERAL RESET CHECKED
+32 50 54 64 44 PROJECT: WASTEWATER TREATMENT PLANT APPROVED
+32 50 54 64 46 DATE NAME SIGN
This document is the property of GLOBAL WATER ENGINEERING (GWE) NV Belgium. It shall not be copied,
http://www.globalwe.com PROJECT No.: 34124 transmitted or communicated to thirdparties without the explicit agreement of GWE. International conven- REV DATE DESCRIPTION BY CHK PAGE:040 NEXT: 060 LAST: 1050
tions of Berne (1886) - Paris (1896) - Berlin (1908) - Berne (1914) - Rome (1928) - Brussels (1948)
0 1 2 3 4 5 6 7 8 9
-X2 4
-S/LPES_A401A 1
1 3 5 LiYY-JZ
3G1 mm²
-060K1 11
/060.4 2 4 6
-ESA401A 2 3
12 E000.0 E000.1
2 /1001.0 /1001.0
-S/LPES_A401A
-1000U02 -1000U02
-X2 5
DI DI
-PE:060.1
-X0.5 4 5 6 PE
-P/A401A 1 2 3 GNYE
LiYY-JZ
4G2,5 mm²
A1
-060K1
A2
040.9 / -0V00 -0V00 / 061.4
1 2 /060.0
3 4 /060.1
U V W 5 6 /060.1
13 14 /060.5
=FIELD+ M
-A401A 3~
P:0,37kW
In:0,77A PE
Global Water Engineering CLIENT: AF SUGAR MAIN CONTROL PANEL = MCP + PNL1
Autobaan 22.01.01 DRAWN 13/10/2015 RL
BE-8210 Loppem A401A CHECKED
+32 50 54 64 44 PROJECT: WASTEWATER TREATMENT PLANT APPROVED
AGITATOR A COAGULATION TANK
+32 50 54 64 46 DATE NAME SIGN
This document is the property of GLOBAL WATER ENGINEERING (GWE) NV Belgium. It shall not be copied,
http://www.globalwe.com PROJECT No.: 34124 transmitted or communicated to thirdparties without the explicit agreement of GWE. International conven- REV DATE DESCRIPTION BY CHK PAGE:060 NEXT: 061 LAST: 1050
tions of Berne (1886) - Paris (1896) - Berlin (1908) - Berne (1914) - Rome (1928) - Brussels (1948)
0 1 2 3 4 5 6 7 8 9
-X2 6
-S/LPES_A401B 1
1 3 5 LiYY-JZ
3G1 mm²
-061K1 11
/061.4 2 4 6
-ESA401B 4 5
12 E000.2 E000.3
2 /1001.0 /1001.0
-S/LPES_A401B
-1000U02 -1000U02
-X2 7
DI DI
-PE:061.1
-X0.5 7 8 9 PE
-P/A401B 1 2 3 GNYE
LiYY-JZ
4G2,5 mm²
A1
-061K1
A2
060.9 / -0V00 -0V00 / 062.4
1 2 /061.0
3 4 /061.1
U V W 5 6 /061.1
13 14 /061.5
=FIELD+ M
-A401B 3~
P:0,37kW
In:0,77A PE
Global Water Engineering CLIENT: AF SUGAR MAIN CONTROL PANEL = MCP + PNL1
Autobaan 22.01.01 DRAWN 13/10/2015 RL
BE-8210 Loppem A401B CHECKED
+32 50 54 64 44 PROJECT: WASTEWATER TREATMENT PLANT APPROVED
AGITATOR B COAGULATION TANK
+32 50 54 64 46 DATE NAME SIGN
This document is the property of GLOBAL WATER ENGINEERING (GWE) NV Belgium. It shall not be copied,
http://www.globalwe.com PROJECT No.: 34124 transmitted or communicated to thirdparties without the explicit agreement of GWE. International conven- REV DATE DESCRIPTION BY CHK PAGE:061 NEXT: 062 LAST: 1050
tions of Berne (1886) - Paris (1896) - Berlin (1908) - Berne (1914) - Rome (1928) - Brussels (1948)
0 1 2 3 4 5 6 7 8 9
-X2 8
-S/LPES_A402 1
1 3 5 LiYY-JZ
3G1 mm²
-062K1 11
/062.4 2 4 6
-ESA402 6 7
12 E000.4 E000.5
2 /1001.0 /1001.0
-S/LPES_A402
-1000U02 -1000U02
-X2 9
DI DI
-PE:062.1
-X0.5 10 11 12 PE
-P/A402 1 2 3 GNYE
LiYY-JZ
4G2,5 mm²
A1
-062K1
A2
061.9 / -0V00 -0V00 / 120.8
1 2 /062.0
3 4 /062.1
U V W 5 6 /062.1
13 14 /062.5
=FIELD+ M
-A402 3~
P:0,37kW
In:0,77A PE
Global Water Engineering CLIENT: AF SUGAR MAIN CONTROL PANEL = MCP + PNL1
Autobaan 22.01.01 DRAWN 13/10/2015 RL
BE-8210 Loppem A402 CHECKED
+32 50 54 64 44 PROJECT: WASTEWATER TREATMENT PLANT APPROVED
AGITATOR FLOCCULATION TANK
+32 50 54 64 46 DATE NAME SIGN
This document is the property of GLOBAL WATER ENGINEERING (GWE) NV Belgium. It shall not be copied,
http://www.globalwe.com PROJECT No.: 34124 transmitted or communicated to thirdparties without the explicit agreement of GWE. International conven- REV DATE DESCRIPTION BY CHK PAGE:062 NEXT: 120 LAST: 1050
tions of Berne (1886) - Paris (1896) - Berlin (1908) - Berne (1914) - Rome (1928) - Brussels (1948)
0 1 2 3 4 5 6 7 8 9
D103 D103 D103 D103 D103 D103 D103 D103 D103 D103 D103 D103
MULTISTAGE EVAPORATOR SYSTEM
-PE:120.2 -PE:120.5
-PE:120.1
2 3 4 5 GNYE -I/D103.1 1 2 3 4 SH
-S/D103.2 LiYCY-JZ
5G1 mm²
-X2 11 12 13 14 PE -X13 1 2 3 4 PE
-PE:120.3 -PE:120.4
HOLD
1 9
5 9 /120.4
=FIELD 4 12
8 12
+D103 L1 L2 L3 PE
D103
Global Water Engineering CLIENT: AF SUGAR MAIN CONTROL PANEL = MCP + PNL1
Autobaan 22.01.01 DRAWN 13/10/2015 RL
BE-8210 Loppem D103 CHECKED
+32 50 54 64 44 PROJECT: WASTEWATER TREATMENT PLANT APPROVED
MULTISTAGE EVAPORATOR SYSTEM
+32 50 54 64 46 DATE NAME SIGN
This document is the property of GLOBAL WATER ENGINEERING (GWE) NV Belgium. It shall not be copied,
http://www.globalwe.com PROJECT No.: 34124 transmitted or communicated to thirdparties without the explicit agreement of GWE. International conven- REV DATE DESCRIPTION BY CHK PAGE:120 NEXT: 130 LAST: 1050
tions of Berne (1886) - Paris (1896) - Berlin (1908) - Berne (1914) - Rome (1928) - Brussels (1948)
0 1 2 3 4 5 6 7 8 9
120.1 / -L1 -L1 / 170.0 039.0 / -24V01 -24V01 / 170.2 032.0 / -230VL01 -230VL01 /
120.1 / -L2 -L2 / 170.0 120.9 / -24V21 -24V21 / 170.2
120.1 / -L3 -L3 / 170.0 DO DO
-1000U06 -1000U06
10 mm² 5
VOBst /1003.0 /1003.0
-130K2 A020.4 A020.5
1 3 5 13 21 /130.7 9
6 7
-130Q1
37-50A 14 22 13 21 13
I> I> I> /130.4 /130.5 -130Q1 -130K1
2 4 6 /130.1 14 /130.1 22 /130.4 14
1 3 5
-130K1
/130.4 2 4 6
16 17
E001.4 E001.5
5
/1001.0 /1001.0
-130K3 -1000U02 -1000U02
/130.8 9
-PE:130.1 DI DI
I/O
(DO)
-130U1
1/L1 3/L2 5/L3 PE A1 N1 N2 13 23
+ START STOP
FAULT
RUN
SOFT STARTER DANFOSS
MCD202022T4CV1 -
2/T1 4/T2 6T3 PE A2 14 24
(175G5223)
-X0.2 1 2 3 PE
-P/E103 1 2 3 GNYE
LiYY-JZ
14 15
4G16 mm²
E001.2 E001.3
/1001.0 /1001.0
A1 14 14
-1000U02 -1000U02
DI DI
-130K1 -130K2 -130K3
A2 13 13
120.9 / -0V00 -0V00 / 130.7 030.1 / -230VN00 -230VN00 / 130.2 / -0V00 -0V00 / 170.2
1 2 /130.0 1 9 1 9
3 4 /130.1 5 9 /130.45 9 /130.3
U V W 5 6 /130.1 4 12 4 12
13 14 /130.5 8 12 8 12
=FIELD+ M 21 22
-E103 3~
P:22kW
In:39A PE
Global Water Engineering CLIENT: AF SUGAR MAIN CONTROL PANEL = MCP + PNL1
Autobaan 22.01.01 DRAWN 13/10/2015 RL
BE-8210 Loppem E103 CHECKED
+32 50 54 64 44 PROJECT: WASTEWATER TREATMENT PLANT APPROVED
COOLING TOWER
+32 50 54 64 46 DATE NAME SIGN
This document is the property of GLOBAL WATER ENGINEERING (GWE) NV Belgium. It shall not be copied,
http://www.globalwe.com PROJECT No.: 34124 transmitted or communicated to thirdparties without the explicit agreement of GWE. International conven- REV DATE DESCRIPTION BY CHK PAGE:130 NEXT: 170 LAST: 1050
tions of Berne (1886) - Paris (1896) - Berlin (1908) - Berne (1914) - Rome (1928) - Brussels (1948)
0 1 2 3 4 5 6 7 8 9
-X2 15
-S/LPES_I201A 1
1 3 5 LiYY-JZ
3G1,5 mm²
-170K1 11
/170.4 2 4 6
-ESI201A 22 23
12 E002.0 E002.1
5
2 /1001.0 /1001.0
-170K3 -S/LPES_I201A
-1000U02 -1000U02
-PE:170.1
/170.7 9 -X2 16
DI DI
I/O
(DO)
-170U1
1/L1 3/L2 5/L3 PE A1 N1 N2 13 23
+ START STOP
FAULT
RUN
SOFT STARTER DANFOSS
MCD202015T4CV1 -
2/T1 4/T2 6T3 PE A2 14 24
(175G5221)
-X0.3 1 2 3 PE
-P/I201A 1 2 3 GNYE
LiYY-JZ
18 19
4G10 mm²
E001.6 E001.7
/1001.0 /1001.0
A1 14
-1000U02 -1000U02
DI DI
-170K1 -170K3
A2 13
130.9 / -0V00 -0V00 / 171.2
1 2 /170.0 1 9
3 4 /170.1 5 9 /170.3
U V W 5 6 /170.1 4 12
13 14 /170.5 8 12
=FIELD+ M 21 22
-I201A 3~
P:15kW
In:28,7A PE
Global Water Engineering CLIENT: AF SUGAR MAIN CONTROL PANEL = MCP + PNL1
Autobaan 22.01.01 DRAWN 13/10/2015 RL
BE-8210 Loppem I201A CHECKED
+32 50 54 64 44 PROJECT: WASTEWATER TREATMENT PLANT APPROVED
SURFACE AERATOR A
+32 50 54 64 46 DATE NAME SIGN
This document is the property of GLOBAL WATER ENGINEERING (GWE) NV Belgium. It shall not be copied,
http://www.globalwe.com PROJECT No.: 34124 transmitted or communicated to thirdparties without the explicit agreement of GWE. International conven- REV DATE DESCRIPTION BY CHK PAGE:170 NEXT: 171 LAST: 1050
tions of Berne (1886) - Paris (1896) - Berlin (1908) - Berne (1914) - Rome (1928) - Brussels (1948)
0 1 2 3 4 5 6 7 8 9
-X2 17
-S/LPES_I201B 1
1 3 5 LiYY-JZ
3G1,5 mm²
-171K1 11
/171.4 2 4 6
-ESI201B 26 27
12 E002.4 E002.5
5
2 /1001.0 /1001.0
-171K3 -S/LPES_I201B
-1000U02 -1000U02
-PE:171.1
/171.7 9 -X2 18
DI DI
I/O
(DO)
-171U1
1/L1 3/L2 5/L3 PE A1 N1 N2 13 23
+ START STOP
FAULT
RUN
SOFT STARTER DANFOSS
MCD202015T4CV1 -
2/T1 4/T2 6T3 PE A2 14 24
(175G5221)
-X0.3 4 5 6 PE
-P/I201B 1 2 3 GNYE
LiYY-JZ
24 25
4G10 mm²
E002.2 E002.3
/1001.0 /1001.0
A1 14
-1000U02 -1000U02
DI DI
-171K1 -171K3
A2 13
170.9 / -0V00 -0V00 / 180.4
1 2 /171.0 1 9
3 4 /171.1 5 9 /171.3
U V W 5 6 /171.1 4 12
13 14 /171.5 8 12
=FIELD+ M 21 22
-I201B 3~
P:15kW
In:28,7A PE
Global Water Engineering CLIENT: AF SUGAR MAIN CONTROL PANEL = MCP + PNL1
Autobaan 22.01.01 DRAWN 13/10/2015 RL
BE-8210 Loppem I201B CHECKED
+32 50 54 64 44 PROJECT: WASTEWATER TREATMENT PLANT APPROVED
SURFACE AERATOR B
+32 50 54 64 46 DATE NAME SIGN
This document is the property of GLOBAL WATER ENGINEERING (GWE) NV Belgium. It shall not be copied,
http://www.globalwe.com PROJECT No.: 34124 transmitted or communicated to thirdparties without the explicit agreement of GWE. International conven- REV DATE DESCRIPTION BY CHK PAGE:171 NEXT: 180 LAST: 1050
tions of Berne (1886) - Paris (1896) - Berlin (1908) - Berne (1914) - Rome (1928) - Brussels (1948)
0 1 2 3 4 5 6 7 8 9
1 3 5
-180K1
/180.4 2 4 6
28 29
E002.6 E002.7
/1001.0 /1001.0
-1000U02 -1000U02
DI DI
-PE:180.1
-X0.5 13 14 15 PE
-P/M401 1 2 3 GNYE
LiYY-JZ
4G2,5 mm²
A1
-180K1
A2
171.9 / -0V00 -0V00 / 200.4
1 2 /180.0
3 4 /180.1
U V W 5 6 /180.1
13 14 /180.5
=FIELD+ M
-M401 3~
P:0,37kW
In:0,77A PE
Global Water Engineering CLIENT: AF SUGAR MAIN CONTROL PANEL = MCP + PNL1
Autobaan 22.01.01 DRAWN 13/10/2015 RL
BE-8210 Loppem M401 CHECKED
+32 50 54 64 44 PROJECT: WASTEWATER TREATMENT PLANT APPROVED
POLYELECTROLITE PREPARATION UNIT
+32 50 54 64 46 DATE NAME SIGN
This document is the property of GLOBAL WATER ENGINEERING (GWE) NV Belgium. It shall not be copied,
http://www.globalwe.com PROJECT No.: 34124 transmitted or communicated to thirdparties without the explicit agreement of GWE. International conven- REV DATE DESCRIPTION BY CHK PAGE:180 NEXT: 200 LAST: 1050
tions of Berne (1886) - Paris (1896) - Berlin (1908) - Berne (1914) - Rome (1928) - Brussels (1948)
0 1 2 3 4 5 6 7 8 9
1 3 5
-200K1
/200.4 2 4 6
32 33
E003.0 E003.1
/1001.0 /1001.0
-1000U02 -1000U02
DI DI
-PE:200.1
-X0.5 16 17 18 PE
-P/P100 1 2 3 GNYE
LiYY-JZ
4G2,5 mm²
A1
-200K1
A2
180.9 / -0V00 -0V00 / 270.4
1 2 /200.0
3 4 /200.1
U V W 5 6 /200.1
13 14 /200.5
=FIELD+ M
-P100 3~
P:1,1kW
In:2,1A PE
Global Water Engineering CLIENT: AF SUGAR MAIN CONTROL PANEL = MCP + PNL1
Autobaan 22.01.01 DRAWN 13/10/2015 RL
BE-8210 Loppem P100 CHECKED
+32 50 54 64 44 PROJECT: WASTEWATER TREATMENT PLANT APPROVED
ACID PUMP
+32 50 54 64 46 DATE NAME SIGN
This document is the property of GLOBAL WATER ENGINEERING (GWE) NV Belgium. It shall not be copied,
http://www.globalwe.com PROJECT No.: 34124 transmitted or communicated to thirdparties without the explicit agreement of GWE. International conven- REV DATE DESCRIPTION BY CHK PAGE:200 NEXT: 270 LAST: 1050
tions of Berne (1886) - Paris (1896) - Berlin (1908) - Berne (1914) - Rome (1928) - Brussels (1948)
0 1 2 3 4 5 6 7 8 9
1 3 5
-270K1
/270.4 2 4 6
34 35
E003.2 E003.3
/1001.0 /1001.0
-1000U02 -1000U02
DI DI
-PE:270.1
-X0.5 19 20 21 PE
-P/P107 1 2 3 GNYE
LiYY-JZ
4G4 mm²
A1
-270K1
A2
200.9 / -0V00 -0V00 / 280.4
1 2 /270.0
3 4 /270.1
U V W 5 6 /270.1
13 14 /270.5
=FIELD+ M 21 22
-P107 3~
P:2,2kW
In:4A PE
Global Water Engineering CLIENT: AF SUGAR MAIN CONTROL PANEL = MCP + PNL1
Autobaan 22.01.01 DRAWN 13/10/2015 RL
BE-8210 Loppem P107 CHECKED
+32 50 54 64 44 PROJECT: WASTEWATER TREATMENT PLANT APPROVED
BY-PASS PUMP
+32 50 54 64 46 DATE NAME SIGN
This document is the property of GLOBAL WATER ENGINEERING (GWE) NV Belgium. It shall not be copied,
http://www.globalwe.com PROJECT No.: 34124 transmitted or communicated to thirdparties without the explicit agreement of GWE. International conven- REV DATE DESCRIPTION BY CHK PAGE:270 NEXT: 280 LAST: 1050
tions of Berne (1886) - Paris (1896) - Berlin (1908) - Berne (1914) - Rome (1928) - Brussels (1948)
0 1 2 3 4 5 6 7 8 9
1 3 5
-280K1
/280.4 2 4 6
36 37
E003.4 E003.5
/1001.0 /1001.0
-1000U02 -1000U02
DI DI
-PE:280.1
-X0.5 22 23 24 PE
-P/P108 1 2 3 GNYE
LiYY-JZ
4G2,5 mm²
A1
-280K1
A2
270.9 / -0V00 -0V00 / 290.4
1 2 /280.0
3 4 /280.1
U V W 5 6 /280.1
13 14 /280.5
=FIELD+ M 21 22
-P108 3~
P:2,2kW
In:4,8A PE
Global Water Engineering CLIENT: AF SUGAR MAIN CONTROL PANEL = MCP + PNL1
Autobaan 22.01.01 DRAWN 13/10/2015 RL
BE-8210 Loppem P108 CHECKED
+32 50 54 64 44 PROJECT: WASTEWATER TREATMENT PLANT APPROVED
HEAT EXCHANGER FEED PUMP
+32 50 54 64 46 DATE NAME SIGN
This document is the property of GLOBAL WATER ENGINEERING (GWE) NV Belgium. It shall not be copied,
http://www.globalwe.com PROJECT No.: 34124 transmitted or communicated to thirdparties without the explicit agreement of GWE. International conven- REV DATE DESCRIPTION BY CHK PAGE:280 NEXT: 290 LAST: 1050
tions of Berne (1886) - Paris (1896) - Berlin (1908) - Berne (1914) - Rome (1928) - Brussels (1948)
0 1 2 3 4 5 6 7 8 9
AO
1 3 5
-1000U15
-290K1
/290.4 /1006.0
2 4 6
PAW326 2 3
15 18 E004.0 E004.1
QI3 MANA
/1001.5 /1001.5
5 13 23
-1000U03 -1000U03
-PE:290.1 -290K3 -040K1 DI DI
-040K1
/290.7 9 /040.0 14 /040.0 24
I/O RESET RESET
(DO)
-290U1 -290U2
/290.4
91 92 93 95 53 55 12 18 19 27 33 1 4 B1 97 95 Y1 Y2
L1 L2 L3 PE 4-20mA COM +24V START REV. COAST RESET
STOP INVERSE
TELEMECANIQUE
LT3 SM00ED
FREQUENCY DRIVE DANFOSS FAULT RUN
U V W PE FC-302P11KT5
96 97 98 99 2 3 5 6 A2 98 96 T1 T2
(131B9826)
-PTC_P109/1 / 290.9
1 -PTC_P109/2 / 290.9
-X15 1 2
-PTC_P109/1
-PTC_P109/2
290.2 /
290.2 /
95
-P/P109 BK BN GY GNYE-I/P109 1 2
FRECO-EMC LiYY-JZ -290U2
38 39 4
4G6 mm² 3G1 mm² /290.8 96
E003.6 E003.7 E004.2
/1001.0 /1001.0 /1001.5
A1 14
-1000U02 -1000U02 -1000U03
DI DI
-290K1 -290K3 DI
A2 13
280.9 / -0V00 -0V00 / 300.4
1 2 /290.0 1 9
3 4 /290.1 5 9 /290.2
U V W 5 6 /290.1 4 12
13 14 /290.5 8 12
=FIELD+ M θ
21 22
-P109 3~
P:11kW
In:22,8A PE
1 3 5
-300K1
/300.4 2 4 6
5 6
E004.3 E004.4
/1001.5 /1001.5
-1000U03 -1000U03
DI DI
-PE:300.1
-X0.5 25 26 27 PE
-P/P110 1 2 3 GNYE
LiYY-JZ
4G2,5 mm²
A1
-300K1
A2
290.9 / -0V00 -0V00 / 310.4
1 2 /300.0
3 4 /300.1
U V W 5 6 /300.1
13 14 /300.5
=FIELD+ M 21 22
-P110 3~
P:3kW
In:6,2A PE
Global Water Engineering CLIENT: AF SUGAR MAIN CONTROL PANEL = MCP + PNL1
Autobaan 22.01.01 DRAWN 13/10/2015 RL
BE-8210 Loppem P110 CHECKED
+32 50 54 64 44 PROJECT: WASTEWATER TREATMENT PLANT APPROVED
COOLING WATER RECIRCULATION PUMP 1
+32 50 54 64 46 DATE NAME SIGN
This document is the property of GLOBAL WATER ENGINEERING (GWE) NV Belgium. It shall not be copied,
http://www.globalwe.com PROJECT No.: 34124 transmitted or communicated to thirdparties without the explicit agreement of GWE. International conven- REV DATE DESCRIPTION BY CHK PAGE:300 NEXT: 310 LAST: 1050
tions of Berne (1886) - Paris (1896) - Berlin (1908) - Berne (1914) - Rome (1928) - Brussels (1948)
0 1 2 3 4 5 6 7 8 9
1 3 5
-310K1
/310.4 2 4 6
7 8
E004.5 E004.6
/1001.5 /1001.5
-1000U03 -1000U03
DI DI
-PE:310.1
-X0.4 1 2 3 PE
-P/P111 1 2 3 GNYE
LiYY-JZ
4G6 mm²
A1
-310K1
A2
300.9 / -0V00 -0V00 / 320.4
1 2 /310.0
3 4 /310.1
U V W 5 6 /310.1
13 14 /310.5
=FIELD+ M 21 22
-P111 3~
P:11kW
In:22,8A PE
Global Water Engineering CLIENT: AF SUGAR MAIN CONTROL PANEL = MCP + PNL1
Autobaan 22.01.01 DRAWN 13/10/2015 RL
BE-8210 Loppem P111 CHECKED
+32 50 54 64 44 PROJECT: WASTEWATER TREATMENT PLANT APPROVED
COOLING WATER RECIRCULATION PUMP 2
+32 50 54 64 46 DATE NAME SIGN
This document is the property of GLOBAL WATER ENGINEERING (GWE) NV Belgium. It shall not be copied,
http://www.globalwe.com PROJECT No.: 34124 transmitted or communicated to thirdparties without the explicit agreement of GWE. International conven- REV DATE DESCRIPTION BY CHK PAGE:310 NEXT: 320 LAST: 1050
tions of Berne (1886) - Paris (1896) - Berlin (1908) - Berne (1914) - Rome (1928) - Brussels (1948)
0 1 2 3 4 5 6 7 8 9
AO
1 3 5
-1000U15
-320K1
/320.4 /1006.0
2 4 6
PAW328 13 14
23 26 E005.1 E005.2
QI4 MANA
/1001.5 /1001.5
5 33
-1000U03 -1000U03
-PE:320.1 -320K3 -040K1 DI DI
/320.7 9 /040.0 34
I/O RESET
(DO)
-320U1
91 92 93 95 53 55 12 18 19 27 33 1 4
L1 L2 L3 PE 4-20mA COM +24V START REV. COAST RESET
STOP INVERSE
U V W PE FC-302PK37T5
96 97 98 99 2 3 5 6
(131B0033)
8
-P/P112A BK BN GY GNYE
FRECO-EMC -320K3
9 12
4G2,5 mm² /320.7 12
E004.7 E005.0
/1001.5 /1001.5
A1 A1 Y1 14
-1000U03 -1000U03
DI DI
-320K1 -320K2 -320K3
A2 A2 13
310.9 / -0V00 -0V00 / 320.1.4
1 2 /320.0 18 15 /320.1.4 1 9
3 4 /320.1 5 9 /320.2
U V W 16 15 4 12
5 6 /320.1
13 14 /320.5 8 12 /320.5
=FIELD+ M
-P112A 3~
P:0,18kW
In:0,41A PE
2,5 mm² 18
VOBst -320K2
1 3 5 /320.5 15
-320.1F1
0,5A 22 24 13
2 4 6
-320.1U1 -320.1K1
/320.1.8 21 /320.1.4 14
-E3 / 320.1.9
-M / 320.1.9
-E3 / 320.1.1
1 3 5
-320.1K1
/320.1.4 2 4 6
15
E005.3
/1001.5
-1000U03
DI
-320.1U1
/320.1.4
A1 11 21 E3
SET 0,06A
TELEMECANIQUE
RM35 JA31MW
A2 12 14 22 24 M
-PE:320.1.1
-X0.5 28 29 30 PE
320.1.1 / -M
-P/P112A.1 1 2 3 GNYE
LiYY-JZ
16
4G2,5 mm²
E005.4
/1001.5
A1
-1000U03
-320.1K1 DI
A2
320.9 / -0V00 -0V00 / 321.4
1 2 /320.1.0
3 4 /320.1.1
U V W 5 6 /320.1.1
13 14 /320.1.5
=FIELD+ M
-P112A.1 3~
P:0,03kW
In:0,06A PE
Global Water Engineering CLIENT: AF SUGAR MAIN CONTROL PANEL = MCP + PNL1
Autobaan 22.01.01 DRAWN 13/10/2015 RL
BE-8210 Loppem P112A.1 CHECKED
+32 50 54 64 44 PROJECT: WASTEWATER TREATMENT PLANT APPROVED
MOTOR COOLING FAN
+32 50 54 64 46 DATE NAME SIGN
This document is the property of GLOBAL WATER ENGINEERING (GWE) NV Belgium. It shall not be copied,
http://www.globalwe.com PROJECT No.: 34124 transmitted or communicated to thirdparties without the explicit agreement of GWE. International conven- REV DATE DESCRIPTION BY CHK PAGE:320.1NEXT: 321 LAST: 1050
tions of Berne (1886) - Paris (1896) - Berlin (1908) - Berne (1914) - Rome (1928) - Brussels (1948)
0 1 2 3 4 5 6 7 8 9
AO
1 3 5
-1000U15
-321K1
/321.4 /1006.0
2 4 6
PAW330 19 22
27 30 E005.7 E006.0
QI5 MANA
/1001.5 /1001.5
5 43
-1000U03 -1000U03
-PE:321.1 -321K3 -040K1 DI DI
/321.7 9 /040.0 44
I/O RESET
(DO)
-321U1
91 92 93 95 53 55 12 18 19 27 33 1 4
L1 L2 L3 PE 4-20mA COM +24V START REV. COAST RESET
STOP INVERSE
U V W PE FC-302PK37T5
96 97 98 99 2 3 5 6
(131B0033)
8
-P/P112B BK BN GY GNYE
FRECO-EMC -321K3
17 18
4G2,5 mm² /321.7 12
E005.5 E005.6
/1001.5 /1001.5
A1 A1 Y1 14
-1000U03 -1000U03
DI DI
-321K1 -321K2 -321K3
A2 A2 13
320.1.9 / -0V00 -0V00 / 321.1.4
1 2 /321.0 18 15 /321.1.4 1 9
3 4 /321.1 5 9 /321.2
U V W 16 15 4 12
5 6 /321.1
13 14 /321.5 8 12 /321.5
=FIELD+ M
-P112B 3~
P:0,18kW
In:0,41A PE
2,5 mm² 18
VOBst -321K2
1 3 5 /321.5 15
-321.1F1
0,5A 22 24 13
2 4 6
-321.1U1 -321.1K1
/321.1.8 21 /321.1.4 14
-E3 / 321.1.9
-M / 321.1.9
-E3 / 321.1.1
1 3 5
-321.1K1
/321.1.4 2 4 6
23
E006.1
/1001.5
-1000U03
DI
-321.1U1
/321.1.4
A1 11 21 E3
SET 0,06A
TELEMECANIQUE
RM35 JA31MW
A2 12 14 22 24 M
-PE:321.1.1
-X0.5 31 32 33 PE
321.1.1 / -M
-P/P112B.1 1 2 3 GNYE
LiYY-JZ
24
4G2,5 mm²
E006.2
/1001.5
A1
-1000U03
-321.1K1 DI
A2
321.9 / -0V00 -0V00 / 370.4
1 2 /321.1.0
3 4 /321.1.1
U V W 5 6 /321.1.1
13 14 /321.1.5
=FIELD+ M
-P112B.1 3~
P:0,03kW
In:0,06A PE
Global Water Engineering CLIENT: AF SUGAR MAIN CONTROL PANEL = MCP + PNL1
Autobaan 22.01.01 DRAWN 13/10/2015 RL
BE-8210 Loppem P112B.1 CHECKED
+32 50 54 64 44 PROJECT: WASTEWATER TREATMENT PLANT APPROVED
MOTOR COOLING FAN
+32 50 54 64 46 DATE NAME SIGN
This document is the property of GLOBAL WATER ENGINEERING (GWE) NV Belgium. It shall not be copied,
http://www.globalwe.com PROJECT No.: 34124 transmitted or communicated to thirdparties without the explicit agreement of GWE. International conven- REV DATE DESCRIPTION BY CHK PAGE:321.1NEXT: 370 LAST: 1050
tions of Berne (1886) - Paris (1896) - Berlin (1908) - Berne (1914) - Rome (1928) - Brussels (1948)
0 1 2 3 4 5 6 7 8 9
1 3 5
-370K1
/370.4 2 4 6
25 26
E006.3 E006.4
/1001.5 /1001.5
-1000U03 -1000U03
DI DI
-PE:370.1
-X0.5 34 35 36 PE
-P/P117 1 2 3 GNYE
LiYY-JZ
4G4 mm²
A1
-370K1
A2
321.1.9 / -0V00 -0V00 / 380.4
1 2 /370.0
3 4 /370.1
U V W 5 6 /370.1
13 14 /370.5
=FIELD+ M 21 22
-P117 3~
P:7,5kW
In:13,3A PE
Global Water Engineering CLIENT: AF SUGAR MAIN CONTROL PANEL = MCP + PNL1
Autobaan 22.01.01 DRAWN 13/10/2015 RL
BE-8210 Loppem P117 CHECKED
+32 50 54 64 44 PROJECT: WASTEWATER TREATMENT PLANT APPROVED
B104 MIXING PUMP
+32 50 54 64 46 DATE NAME SIGN
This document is the property of GLOBAL WATER ENGINEERING (GWE) NV Belgium. It shall not be copied,
http://www.globalwe.com PROJECT No.: 34124 transmitted or communicated to thirdparties without the explicit agreement of GWE. International conven- REV DATE DESCRIPTION BY CHK PAGE:370 NEXT: 380 LAST: 1050
tions of Berne (1886) - Paris (1896) - Berlin (1908) - Berne (1914) - Rome (1928) - Brussels (1948)
0 1 2 3 4 5 6 7 8 9
1 3 5
-380K1
/380.4 2 4 6
27 28
E006.5 E006.6
/1001.5 /1001.5
-1000U03 -1000U03
DI DI
-PE:380.1
-X0.5 37 38 39 PE
-P/P118 1 2 3 GNYE
LiYY-JZ
4G4 mm²
A1
-380K1
A2
370.9 / -0V00 -0V00 / 450.4
1 2 /380.0
3 4 /380.1
U V W 5 6 /380.1
13 14 /380.5
=FIELD+ M 21 22
-P118 3~
P:7,5kW
In:13,3A PE
Global Water Engineering CLIENT: AF SUGAR MAIN CONTROL PANEL = MCP + PNL1
Autobaan 22.01.01 DRAWN 13/10/2015 RL
BE-8210 Loppem P118 CHECKED
+32 50 54 64 44 PROJECT: WASTEWATER TREATMENT PLANT APPROVED
B101 MIXING PUMP
+32 50 54 64 46 DATE NAME SIGN
This document is the property of GLOBAL WATER ENGINEERING (GWE) NV Belgium. It shall not be copied,
http://www.globalwe.com PROJECT No.: 34124 transmitted or communicated to thirdparties without the explicit agreement of GWE. International conven- REV DATE DESCRIPTION BY CHK PAGE:380 NEXT: 450 LAST: 1050
tions of Berne (1886) - Paris (1896) - Berlin (1908) - Berne (1914) - Rome (1928) - Brussels (1948)
0 1 2 3 4 5 6 7 8 9
1 3 5
-450K1
/450.4 2 4 6
29 32
E006.7 E007.0
/1001.5 /1001.5
-1000U03 -1000U03
DI DI
-PE:450.1
-X0.5 40 41 42 PE
5
-P/P200 1 2 3 GNYE
LiYY-JZ -940K1
4G2,5 mm² /940.1 9
A1
-450K1
A2
380.9 / -0V00 -0V00 / 460.4
1 2 /450.0
3 4 /450.1
U V W 5 6 /450.1
13 14 /450.5
=FIELD+ M
-P200 3~
P:1,5kW
In:2,8A PE
Global Water Engineering CLIENT: AF SUGAR MAIN CONTROL PANEL = MCP + PNL1
Autobaan 22.01.01 DRAWN 13/10/2015 RL
BE-8210 Loppem P200 CHECKED
+32 50 54 64 44 PROJECT: WASTEWATER TREATMENT PLANT APPROVED
AEROBIC SLUDGE PUMP
+32 50 54 64 46 DATE NAME SIGN
This document is the property of GLOBAL WATER ENGINEERING (GWE) NV Belgium. It shall not be copied,
http://www.globalwe.com PROJECT No.: 34124 transmitted or communicated to thirdparties without the explicit agreement of GWE. International conven- REV DATE DESCRIPTION BY CHK PAGE:450 NEXT: 460 LAST: 1050
tions of Berne (1886) - Paris (1896) - Berlin (1908) - Berne (1914) - Rome (1928) - Brussels (1948)
0 1 2 3 4 5 6 7 8 9
1 3 5
-460K1
/460.4 2 4 6
33 34
E007.1 E007.2
/1001.5 /1001.5
-1000U03 -1000U03
DI DI
-PE:460.1
-X0.5 43 44 45 PE
5
-P/P201 1 2 3 GNYE
LiYY-JZ -940K2
4G2,5 mm² /940.3 9
A1
-460K1
A2
450.9 / -0V00 -0V00 / 560.4
1 2 /460.0
3 4 /460.1
U V W 5 6 /460.1
13 14 /460.5
=FIELD+ M 21 22
-P201 3~
P:3kW
In:5,9A PE
Global Water Engineering CLIENT: AF SUGAR MAIN CONTROL PANEL = MCP + PNL1
Autobaan 22.01.01 DRAWN 13/10/2015 RL
BE-8210 Loppem P201 CHECKED
+32 50 54 64 44 PROJECT: WASTEWATER TREATMENT PLANT APPROVED
TERTIARY TREATMENT FEED PUMP
+32 50 54 64 46 DATE NAME SIGN
This document is the property of GLOBAL WATER ENGINEERING (GWE) NV Belgium. It shall not be copied,
http://www.globalwe.com PROJECT No.: 34124 transmitted or communicated to thirdparties without the explicit agreement of GWE. International conven- REV DATE DESCRIPTION BY CHK PAGE:460 NEXT: 560 LAST: 1050
tions of Berne (1886) - Paris (1896) - Berlin (1908) - Berne (1914) - Rome (1928) - Brussels (1948)
0 1 2 3 4 5 6 7 8 9
1 3 5
-560K1
/560.4 2 4 6
35 36
E007.3 E007.4
/1001.5 /1001.5
-1000U03 -1000U03
DI DI
-PE:560.1
-X0.5 46 47 48 PE
5
-P/P400 1 2 3 GNYE
LiYY-JZ -940K3
4G2,5 mm² /940.7 9
A1
-560K1
A2
460.9 / -0V00 -0V00 / 561.4
1 2 /560.0
3 4 /560.1
U V W 5 6 /560.1
13 14 /560.5
=FIELD+ M
-P400 3~
P:0,75kW
In:1,5A PE
Global Water Engineering CLIENT: AF SUGAR MAIN CONTROL PANEL = MCP + PNL1
Autobaan 22.01.01 DRAWN 13/10/2015 RL
BE-8210 Loppem P400 CHECKED
+32 50 54 64 44 PROJECT: WASTEWATER TREATMENT PLANT APPROVED
TERTIARY SLUDGE PUMP
+32 50 54 64 46 DATE NAME SIGN
This document is the property of GLOBAL WATER ENGINEERING (GWE) NV Belgium. It shall not be copied,
http://www.globalwe.com PROJECT No.: 34124 transmitted or communicated to thirdparties without the explicit agreement of GWE. International conven- REV DATE DESCRIPTION BY CHK PAGE:560 NEXT: 561 LAST: 1050
tions of Berne (1886) - Paris (1896) - Berlin (1908) - Berne (1914) - Rome (1928) - Brussels (1948)
0 1 2 3 4 5 6 7 8 9
1 3 5
-561K1
/561.4 2 4 6
37 38
E007.5 E007.6
/1001.5 /1001.5
-1000U03 -1000U03
DI DI
-PE:561.1
-X0.5 49 50 51 PE
-P/P401 1 2 3 GNYE
LiYY-JZ
4G4 mm²
A1
-561K1
A2
560.9 / -0V00 -0V00 / 562.4
1 2 /561.0
3 4 /561.1
U V W 5 6 /561.1
13 14 /561.5
=FIELD+ M 21 22
-P401 3~
P:7,5kW
In:14,6A PE
Global Water Engineering CLIENT: AF SUGAR MAIN CONTROL PANEL = MCP + PNL1
Autobaan 22.01.01 DRAWN 13/10/2015 RL
BE-8210 Loppem P401 CHECKED
+32 50 54 64 44 PROJECT: WASTEWATER TREATMENT PLANT APPROVED
SAND FILTERS FEED PUMP
+32 50 54 64 46 DATE NAME SIGN
This document is the property of GLOBAL WATER ENGINEERING (GWE) NV Belgium. It shall not be copied,
http://www.globalwe.com PROJECT No.: 34124 transmitted or communicated to thirdparties without the explicit agreement of GWE. International conven- REV DATE DESCRIPTION BY CHK PAGE:561 NEXT: 562 LAST: 1050
tions of Berne (1886) - Paris (1896) - Berlin (1908) - Berne (1914) - Rome (1928) - Brussels (1948)
0 1 2 3 4 5 6 7 8 9
1 3 5
-562K1
/562.4 2 4 6
39 2
E007.7 E008.0
/1001.5 /1002.0
-1000U03 -1000U04
DI DI
-PE:562.1
-X0.5 52 53 54 PE
-P/P402 1 2 3 GNYE
LiYY-JZ
4G2,5 mm²
A1
-562K1
A2
561.9 / -0V00 -0V00 / 563.4
1 2 /562.0
3 4 /562.1
U V W 5 6 /562.1
13 14 /562.5
=FIELD+ M
-P402 3~
P:0,37kW
In:0,77A PE
Global Water Engineering CLIENT: AF SUGAR MAIN CONTROL PANEL = MCP + PNL1
Autobaan 22.01.01 DRAWN 13/10/2015 RL
BE-8210 Loppem P402 CHECKED
+32 50 54 64 44 PROJECT: WASTEWATER TREATMENT PLANT APPROVED
POLYMER DOSING PUMP
+32 50 54 64 46 DATE NAME SIGN
This document is the property of GLOBAL WATER ENGINEERING (GWE) NV Belgium. It shall not be copied,
http://www.globalwe.com PROJECT No.: 34124 transmitted or communicated to thirdparties without the explicit agreement of GWE. International conven- REV DATE DESCRIPTION BY CHK PAGE:562 NEXT: 563 LAST: 1050
tions of Berne (1886) - Paris (1896) - Berlin (1908) - Berne (1914) - Rome (1928) - Brussels (1948)
0 1 2 3 4 5 6 7 8 9
1 3 5
-563K1
/563.4 2 4 6
3 4
E008.1 E008.2
/1002.0 /1002.0
-1000U04 -1000U04
DI DI
-PE:563.1
-X0.5 55 56 57 PE
-P/P403 1 2 3 GNYE
LiYY-JZ
4G2,5 mm²
A1
-563K1
A2
562.9 / -0V00 -0V00 / 564.4
1 2 /563.0
3 4 /563.1
U V W 5 6 /563.1
13 14 /563.5
=FIELD+ M
-P403 3~
P:0,25kW
In:0,55A PE
Global Water Engineering CLIENT: AF SUGAR MAIN CONTROL PANEL = MCP + PNL1
Autobaan 22.01.01 DRAWN 13/10/2015 RL
BE-8210 Loppem P403 CHECKED
+32 50 54 64 44 PROJECT: WASTEWATER TREATMENT PLANT APPROVED
FeCl3 DOSING PUMP
+32 50 54 64 46 DATE NAME SIGN
This document is the property of GLOBAL WATER ENGINEERING (GWE) NV Belgium. It shall not be copied,
http://www.globalwe.com PROJECT No.: 34124 transmitted or communicated to thirdparties without the explicit agreement of GWE. International conven- REV DATE DESCRIPTION BY CHK PAGE:563 NEXT: 564 LAST: 1050
tions of Berne (1886) - Paris (1896) - Berlin (1908) - Berne (1914) - Rome (1928) - Brussels (1948)
0 1 2 3 4 5 6 7 8 9
1 3 5
-564K1
/564.4 2 4 6
5 6
E008.3 E008.4
/1002.0 /1002.0
-1000U04 -1000U04
DI DI
-PE:564.1
-X0.5 58 59 60 PE
-P/P406A 1 2 3 GNYE
LiYY-JZ
4G4 mm²
A1
-564K1
A2
563.9 / -0V00 -0V00 / 565.4
1 2 /564.0
3 4 /564.1
U V W 5 6 /564.1
13 14 /564.5
=FIELD+ M 21 22
-P406A 3~
P:7,5kW
In:13,3A PE
Global Water Engineering CLIENT: AF SUGAR MAIN CONTROL PANEL = MCP + PNL1
Autobaan 22.01.01 DRAWN 13/10/2015 RL
BE-8210 Loppem P406A CHECKED
+32 50 54 64 44 PROJECT: WASTEWATER TREATMENT PLANT APPROVED
SAND FILTER BACKFLUSH PUMP 1
+32 50 54 64 46 DATE NAME SIGN
This document is the property of GLOBAL WATER ENGINEERING (GWE) NV Belgium. It shall not be copied,
http://www.globalwe.com PROJECT No.: 34124 transmitted or communicated to thirdparties without the explicit agreement of GWE. International conven- REV DATE DESCRIPTION BY CHK PAGE:564 NEXT: 565 LAST: 1050
tions of Berne (1886) - Paris (1896) - Berlin (1908) - Berne (1914) - Rome (1928) - Brussels (1948)
0 1 2 3 4 5 6 7 8 9
1 3 5
-565K1
/565.4 2 4 6
7 8
E008.5 E008.6
/1002.0 /1002.0
-1000U04 -1000U04
DI DI
-PE:565.1
-X0.5 61 62 63 PE
-P/P406B 1 2 3 GNYE
LiYY-JZ
4G4 mm²
A1
-565K1
A2
564.9 / -0V00 -0V00 / 680.0
1 2 /565.0
3 4 /565.1
U V W 5 6 /565.1
13 14 /565.5
=FIELD+ M 21 22
-P406B 3~
P:7,5kW
In:13,3A PE
Global Water Engineering CLIENT: AF SUGAR MAIN CONTROL PANEL = MCP + PNL1
Autobaan 22.01.01 DRAWN 13/10/2015 RL
BE-8210 Loppem P406B CHECKED
+32 50 54 64 44 PROJECT: WASTEWATER TREATMENT PLANT APPROVED
SAND FILTER BACKFLUSH PUMP 2
+32 50 54 64 46 DATE NAME SIGN
This document is the property of GLOBAL WATER ENGINEERING (GWE) NV Belgium. It shall not be copied,
http://www.globalwe.com PROJECT No.: 34124 transmitted or communicated to thirdparties without the explicit agreement of GWE. International conven- REV DATE DESCRIPTION BY CHK PAGE:565 NEXT: 680 LAST: 1050
tions of Berne (1886) - Paris (1896) - Berlin (1908) - Berne (1914) - Rome (1928) - Brussels (1948)
0 1 2 3 4 5 6 7 8 9
ACV107 ACV107
ON/OFF VALVE OPEN/CLOSE
S100 DISCHARGE
9 9
-680K1
/680.3 1 5
=FIELD+
-ACV107 4 3 8 7 5 6
CL OP
CLOSE (NO)
OPEN (NO)
REMOTE CONTROL
RCEL-009
PE 5 6
GNYE 2 3
-S/ACV107.1 -S/ACV107.2
-X1 PE -X2 26 27
-PE:680.1
9 12
E008.7 E009.0
/1002.0 /1002.0
14
-1000U04 -1000U04
DI DI
-680K1
13
565.9 / -0V00 -0V00 / 760.0
1 9 /680.2
5 9 /680.2
4 12
8 12
Global Water Engineering CLIENT: AF SUGAR MAIN CONTROL PANEL = MCP + PNL1
Autobaan 22.01.01 DRAWN 13/10/2015 RL
BE-8210 Loppem ACV107 CHECKED
+32 50 54 64 44 PROJECT: WASTEWATER TREATMENT PLANT APPROVED
ON/OFF VALVE
+32 50 54 64 46 DATE NAME SIGN
This document is the property of GLOBAL WATER ENGINEERING (GWE) NV Belgium. It shall not be copied,
http://www.globalwe.com PROJECT No.: 34124 transmitted or communicated to thirdparties without the explicit agreement of GWE. International conven- REV DATE DESCRIPTION BY CHK PAGE:680 NEXT: 750 LAST: 1050
tions of Berne (1886) - Paris (1896) - Berlin (1908) - Berne (1914) - Rome (1928) - Brussels (1948)
0 1 2 3 4 5 6 7 8 9
L- + - L- + - L- + -
2 PE 25- 26+ 27- PE 2 PE 25- 26+ 27- PE 2 PE 25- 26+ 27- PE
Global Water Engineering CLIENT: AF SUGAR MAIN CONTROL PANEL = MCP + PNL1
Autobaan 22.01.01 DRAWN 13/10/2015 RL
BE-8210 Loppem FT107+FT109+FT201 CHECKED
+32 50 54 64 44 PROJECT: WASTEWATER TREATMENT PLANT APPROVED
FLOW TRANSMITTER
+32 50 54 64 46 DATE NAME SIGN
This document is the property of GLOBAL WATER ENGINEERING (GWE) NV Belgium. It shall not be copied,
http://www.globalwe.com PROJECT No.: 34124 transmitted or communicated to thirdparties without the explicit agreement of GWE. International conven- REV DATE DESCRIPTION BY CHK PAGE:750 NEXT: 751 LAST: 1050
tions of Berne (1886) - Paris (1896) - Berlin (1908) - Berne (1914) - Rome (1928) - Brussels (1948)
0 1 2 3 4 5 6 7 8 9
FT404
FLOW TRANSMITTER
FC EFFLUENT TO DISCHARGE
=FIELD+
-fT404
-X2 40
-S/FT404 1
LiYY-JZ
3G1,5 mm²
=FIELD+
-FT404 1 9 11 10
L+ YE RD BK
2 GNYE -I/FT404 1 2 SH
-S/FT404 LiYCY-JZ
3G1 mm²
-X2 41 PE -X13 17 18 PE
-PE:750.5 -PE:750.6
MI5+ M5-
14 15
PEW266
/1004.0
-1000U12
AI
750.9 / -0V20 -0V20 / 790.0
Global Water Engineering CLIENT: AF SUGAR MAIN CONTROL PANEL = MCP + PNL1
Autobaan 22.01.01 DRAWN 13/10/2015 RL
BE-8210 Loppem FT404 CHECKED
+32 50 54 64 44 PROJECT: WASTEWATER TREATMENT PLANT APPROVED
FLOW TRANSMITTER
+32 50 54 64 46 DATE NAME SIGN
This document is the property of GLOBAL WATER ENGINEERING (GWE) NV Belgium. It shall not be copied,
http://www.globalwe.com PROJECT No.: 34124 transmitted or communicated to thirdparties without the explicit agreement of GWE. International conven- REV DATE DESCRIPTION BY CHK PAGE:751 NEXT: 760 LAST: 1050
tions of Berne (1886) - Paris (1896) - Berlin (1908) - Berne (1914) - Rome (1928) - Brussels (1948)
0 1 2 3 4 5 6 7 8 9
9 9
-760K2
/760.8 1 5
=FIELD+
-KCV201 4 3 8 7 5 6
CL OP
CLOSE (NO)
OPEN (NO)
REMOTE CONTROL
RCEL-009
PE 5 6
GNYE 2 3
-S/KCV201.1 -S/KCV201.2
-PE:760.2
-X2 42 PE
-S/KCV103 1 GNYE
LiYY-JZ
3G2,5 mm²
X1
-KCV103 16 17
X2 E009.4 E009.5
/1002.0 /1002.0
14 14
2 -1000U04 -1000U04
-S/KCV103 -760K1 DI DI
-760K2
-X2 43 13 13
680.9 / -0V00 -0V00 / 940.0
1 9 1 9 /760.7
5 9 /760.0 5 9 /760.7
4 12 4 12
8 12 8 12
Global Water Engineering CLIENT: AF SUGAR MAIN CONTROL PANEL = MCP + PNL1
Autobaan 22.01.01 DRAWN 13/10/2015 RL
BE-8210 Loppem KCV103+KCV201 CHECKED
+32 50 54 64 44 PROJECT: WASTEWATER TREATMENT PLANT APPROVED
ON/OFF VALVE
+32 50 54 64 46 DATE NAME SIGN
This document is the property of GLOBAL WATER ENGINEERING (GWE) NV Belgium. It shall not be copied,
http://www.globalwe.com PROJECT No.: 34124 transmitted or communicated to thirdparties without the explicit agreement of GWE. International conven- REV DATE DESCRIPTION BY CHK PAGE:760 NEXT: 780 LAST: 1050
tions of Berne (1886) - Paris (1896) - Berlin (1908) - Berne (1914) - Rome (1928) - Brussels (1948)
0 1 2 3 4 5 6 7 8 9
2 4 6 2 4 6 2 4
-I/LS101 -I/LS104 -I/LS107
18 19 22 23 24 25 26 27
E009.6 E009.7 E010.0 E010.1 E010.2 E010.3 E010.4 E010.5
/1002.0 /1002.0 /1002.0 /1002.0 /1002.0 /1002.0 /1002.0 /1002.0
-1000U04 -1000U04 -1000U04 -1000U04 -1000U04 -1000U04 -1000U04 -1000U04
DI DI DI DI DI DI DI DI
Global Water Engineering CLIENT: AF SUGAR MAIN CONTROL PANEL = MCP + PNL1
Autobaan 22.01.01 DRAWN 13/10/2015 RL
BE-8210 Loppem LS101+LS104+LS107 CHECKED
+32 50 54 64 44 PROJECT: WASTEWATER TREATMENT PLANT APPROVED
LEVEL SWITCH
+32 50 54 64 46 DATE NAME SIGN
This document is the property of GLOBAL WATER ENGINEERING (GWE) NV Belgium. It shall not be copied,
http://www.globalwe.com PROJECT No.: 34124 transmitted or communicated to thirdparties without the explicit agreement of GWE. International conven- REV DATE DESCRIPTION BY CHK PAGE:780 NEXT: 781 LAST: 1050
tions of Berne (1886) - Paris (1896) - Berlin (1908) - Berne (1914) - Rome (1928) - Brussels (1948)
0 1 2 3 4 5 6 7 8 9
2 4 6 2 4 6 2 4
-I/LS109 -I/LS202 -I/LS205
28 29 32 33 34 35 36 37
E010.6 E010.7 E011.0 E011.1 E011.2 E011.3 E011.4 E011.5
/1002.0 /1002.0 /1002.0 /1002.0 /1002.0 /1002.0 /1002.0 /1002.0
-1000U04 -1000U04 -1000U04 -1000U04 -1000U04 -1000U04 -1000U04 -1000U04
DI DI DI DI DI DI DI DI
Global Water Engineering CLIENT: AF SUGAR MAIN CONTROL PANEL = MCP + PNL1
Autobaan 22.01.01 DRAWN 13/10/2015 RL
BE-8210 Loppem LS109+LS202+LS205 CHECKED
+32 50 54 64 44 PROJECT: WASTEWATER TREATMENT PLANT APPROVED
LEVEL SWITCH
+32 50 54 64 46 DATE NAME SIGN
This document is the property of GLOBAL WATER ENGINEERING (GWE) NV Belgium. It shall not be copied,
http://www.globalwe.com PROJECT No.: 34124 transmitted or communicated to thirdparties without the explicit agreement of GWE. International conven- REV DATE DESCRIPTION BY CHK PAGE:781 NEXT: 782 LAST: 1050
tions of Berne (1886) - Paris (1896) - Berlin (1908) - Berne (1914) - Rome (1928) - Brussels (1948)
0 1 2 3 4 5 6 7 8 9
-X2 79 81 83 -X2 85 87
-I/LS401 1 3 5 -I/LS403 1 3
LiYY-JZ LiYY-JZ
7G1 mm² 5G1 mm²
2 4 6 2 4
-I/LS401 -I/LS403
-X2 80 82 84 -X2 86 88
38 39 2 3 4
E011.6 E011.7 E012.0 E012.1 E012.2
/1002.0 /1002.0 /1002.5 /1002.5 /1002.5
-1000U04 -1000U04 -1000U05 -1000U05 -1000U05
DI DI DI DI DI
Global Water Engineering CLIENT: AF SUGAR MAIN CONTROL PANEL = MCP + PNL1
Autobaan 22.01.01 DRAWN 13/10/2015 RL
BE-8210 Loppem LS401+LS403 CHECKED
+32 50 54 64 44 PROJECT: WASTEWATER TREATMENT PLANT APPROVED
LEVEL SWITCH
+32 50 54 64 46 DATE NAME SIGN
This document is the property of GLOBAL WATER ENGINEERING (GWE) NV Belgium. It shall not be copied,
http://www.globalwe.com PROJECT No.: 34124 transmitted or communicated to thirdparties without the explicit agreement of GWE. International conven- REV DATE DESCRIPTION BY CHK PAGE:782 NEXT: 790 LAST: 1050
tions of Berne (1886) - Paris (1896) - Berlin (1908) - Berne (1914) - Rome (1928) - Brussels (1948)
0 1 2 3 4 5 6 7 8 9
LT108 LT201
LEVEL TRANSMITTER LEVEL TRANSMITTER
LC F101 LC D201
-X13 19 -X13 21
-I/LT108 1 -I/LT201 1
LiYCY-JZ LiYCY-JZ
3G1 mm² 3G1 mm²
=FIELD+ =FIELD+
-LT108 + -LT201 + ENDRESS & HAUSER
WATERPILOT
ENDRESS & HAUSER FMX21
JUNCTION
CERABAR
BOX
M PMC51 CABLE TO JB CONNECTION :
- RD WIRE TO +
- PE - PE - BK WIRE TO -
- SCR TO PE
2 GNYE SH 2 GNYE SH
-I/LT108 -I/LT201
-X13 20 PE PE -X13 22 PE PE
-PE:790.1 -PE:790.2
Global Water Engineering CLIENT: AF SUGAR MAIN CONTROL PANEL = MCP + PNL1
Autobaan 22.01.01 DRAWN 13/10/2015 RL
BE-8210 Loppem LT108+LT201 CHECKED
+32 50 54 64 44 PROJECT: WASTEWATER TREATMENT PLANT APPROVED
LEVEL TRANSMITTER
+32 50 54 64 46 DATE NAME SIGN
This document is the property of GLOBAL WATER ENGINEERING (GWE) NV Belgium. It shall not be copied,
http://www.globalwe.com PROJECT No.: 34124 transmitted or communicated to thirdparties without the explicit agreement of GWE. International conven- REV DATE DESCRIPTION BY CHK PAGE:790 NEXT: 830 LAST: 1050
tions of Berne (1886) - Paris (1896) - Berlin (1908) - Berne (1914) - Rome (1928) - Brussels (1948)
0 1 2 3 4 5 6 7 8 9
OIT201
O CONTROL
DO CONTROL IN D201
W COS61D
-X2 89
-S/OIT201 1
WH
GN
BN
LiYY-JZ YE
3G1,5 mm²
=FIELD+
-OIT201 + 187 188 197 198 PE ENDRESS & HAUSER
+ - A B LIQUILINE
SENSOR
CM442
OUTPUT 1 OUTPUT 2
+ - + -
- PE 31 32 31 32
1
2 GNYE -I/OIT201 1 2 SH
-S/OIT201 LiYCY-JZ
3G1 mm²
-X2 90 PE -X13 23 24 PE
-PE:830.1 -PE:830.2
MI0+ M0-
2 3
PEW272
/1004.5
-1000U13
AI
790.9 / -0V20 -0V20 / 870.0
PHIT100/TT100
PH+TT TRANSMITTER
PH+TEMP. CONTROL
OUTLET B101
830.9 / -24V24 -24V24 / 871.0
CPS91D
-X2 93
-S/PHIT100 1
WH
GN
BN
YE
LiYY-JZ
3G1,5 mm²
=FIELD+
-PHIT100 + ENDRESS & HAUSER
LIQUILINE
CM442
OUTPUT 1 OUTPUT 2
+ - + -
- PE 31 32 31 32
1
2 GNYE -I/PHIT100 1 2 3 4 SH
-S/PHIT100 LiYCY-JZ
5G1 mm²
-X2 94 PE -X13 29 30 31 32 PE
-PE:870.1 -PE:870.2
PHIT105/TT105
PH+TT TRANSMITTER
PH+TEMP. CONTROL
OUTLET S100
870.9 / -24V24 -24V24 / 872.0
CPS91D
-X2 91
-S/PHIT105 1
WH
GN
BN
YE
LiYY-JZ
3G1,5 mm²
=FIELD+
-PHIT105 + ENDRESS & HAUSER
LIQUILINE
CM442
OUTPUT 1 OUTPUT 2
+ - + -
- PE 31 32 31 32
1
2 GNYE -I/PHIT105 1 2 3 4 SH
-S/PHIT105 LiYCY-JZ
5G1 mm²
-X2 92 PE -X13 25 26 27 28 PE
-PE:871.1 -PE:871.2
PHIT201/TT201
PH+TT TRANSMITTER
PH+TEMP. CONTROL
INLET D201
871.9 / -24V24 -24V24 / 940.0
CPS91D
-X2 95
-S/PHIT201 1
WH
GN
BN
YE
LiYY-JZ
3G1,5 mm²
=FIELD+
-PHIT201 + ENDRESS & HAUSER
LIQUILINE
CM442
OUTPUT 1 OUTPUT 2
+ - + -
- PE 31 32 31 32
1
2 GNYE -I/PHIT201 1 2 3 4 SH
-S/PHIT201 LiYCY-JZ
5G1 mm²
-X2 96 PE -X13 33 34 35 36 PE
-PE:872.1 -PE:872.2
=FIELD+ 4 4 =FIELD+ 4
-JB_TS200 -940K1 -940K2 -JB_TS400 -940K3
/940.1 12 /940.3 12 /940.7 12
-I/TS200 1 2 3 SH -I/TS400 1 2 3 SH
LiYCY-JZ LiYCY-JZ
4G1,5 mm² 4G1,5 mm²
-X15 3 4 5 PE -X2 97 -X15 6 7 8 PE
-S/TS201 1
LiYY-JZ
-PE:940.1 -PE:941.2
3G1 mm²
NETZSCH NETZSCH
STP-2A STP-2A
7 3 1 7 3 1
2
-S/TS201
-X2 98
5 6 7
E012.3 E012.4 E012.5
/1002.5 /1002.5 /1002.5
14 14 14
-1000U05 -1000U05 -1000U05
-940K1 DI
-940K2 DI
-940K3 DI
13 13 13
760.9 / -0V00 -0V00 / 1000.2
1 9 1 9 1 9
5 9 /450.4 5 9 /460.4 5 9 /560.4
4 12 /940.2 4 12 /940.4 4 12 /940.8
8 12 8 12 8 12
Global Water Engineering CLIENT: AF SUGAR MAIN CONTROL PANEL = MCP + PNL1
Autobaan 22.01.01 DRAWN 13/10/2015 RL
BE-8210 Loppem TS200+TS201+TS400 CHECKED
+32 50 54 64 44 PROJECT: WASTEWATER TREATMENT PLANT APPROVED
TEMPERATURE SWITCH
+32 50 54 64 46 DATE NAME SIGN
This document is the property of GLOBAL WATER ENGINEERING (GWE) NV Belgium. It shall not be copied,
http://www.globalwe.com PROJECT No.: 34124 transmitted or communicated to thirdparties without the explicit agreement of GWE. International conven- REV DATE DESCRIPTION BY CHK PAGE:940 NEXT: 950 LAST: 1050
tions of Berne (1886) - Paris (1896) - Berlin (1908) - Berne (1914) - Rome (1928) - Brussels (1948)
0 1 2 3 4 5 6 7 8 9
TT108
TEMP. TRANSMITTER
TEMP. DISTILLATE TANK
-X13 37
-I/TT108 1
LiYCY-JZ
3G1 mm²
=FIELD+
-TT108 +
- PE
2 SH
-I/TT108
-X13 38 PE
-PE:950.1
MI7+ M7-
18 19
PEW286
/1004.5
-1000U13
AI
872.9 / -0V20 -0V20 / 1000.2
Global Water Engineering CLIENT: AF SUGAR MAIN CONTROL PANEL = MCP + PNL1
Autobaan 22.01.01 DRAWN 13/10/2015 RL
BE-8210 Loppem TT108 CHECKED
+32 50 54 64 44 PROJECT: WASTEWATER TREATMENT PLANT APPROVED
TEMPERATURE TRANSMITTER
+32 50 54 64 46 DATE NAME SIGN
This document is the property of GLOBAL WATER ENGINEERING (GWE) NV Belgium. It shall not be copied,
http://www.globalwe.com PROJECT No.: 34124 transmitted or communicated to thirdparties without the explicit agreement of GWE. International conven- REV DATE DESCRIPTION BY CHK PAGE:950 NEXT: 1000 LAST: 1050
tions of Berne (1886) - Paris (1896) - Berlin (1908) - Berne (1914) - Rome (1928) - Brussels (1948)
0 1 2 3 4 5 6 7 8 9
6ES7321-1BL00-0AA0
6ES7321-1BL00-0AA0
6ES7321-1BL00-0AA0
6ES7321-1BL00-0AA0
6ES7322-1BL00-0AA0
6ES7322-1BL00-0AA0
32xDO 24VDC/1A
32xDO 24VDC/1A
POWER SUPPLY CPU V1+
32xDI 24VDC
32xDI 24VDC
32xDI 24VDC
32xDI 24VDC
6ES7307-1KA02-0AA0 6ES7315-2EH14-0AB0
MOXA
5 PORT ETHERNET SWITCH
V1- PORT1 PORT2 PORT3 PORT4 PORT5
L1 N PE L+ M L+ M MPI/DP PN 1M 2M 1M 2M 1M 2M 1M 2M 1M 2M 3M 4M 1M 2M 3M 4M
20 40 20 40 20 40 20 40 10 20 30 40 10 20 30 40
-I/PB
PB CABLE 940.9 / -0V00
2x0,34 mm²
-0V00 / 1050.0
950.9 / -0V20 -0V20 / 1000.2
-PE:1000.1
1000.9 / -24V22 -24V22 /
-1000U11 -1000U12 -1000U13 -1000U14 -1000U15 -1000U16
1 1 1 1 1
SIEMENS L+ L+ L+ L+ L+
S7-300
6ES7332-5HF00-0AB0
6ES7332-5HF00-0AB0
6ES7331-7KF02-0AB0
6ES7331-7KF02-0AB0
6ES7331-7KF02-0AB0
IM 153-1
8xAO 12BIT
8xAO 12BIT
6ES7153-1AA03-0XB0
8xAI 12BIT
8xAI 12BIT
8xAI 12BIT
L+ M M PE X M M M M M
20 20 20 20 20
PB TO LPSD
-PE:1000.2
032.5 / -230VL21
032.6 / -230VN21
Global Water Engineering CLIENT: AF SUGAR MAIN CONTROL PANEL = MCP + PNL1
Autobaan 22.01.01 DRAWN 13/10/2015 RL
BE-8210 Loppem PLC OVERVIEW CHECKED
+32 50 54 64 44 PROJECT: WASTEWATER TREATMENT PLANT APPROVED
POWER SUPPLY
+32 50 54 64 46 DATE NAME SIGN
This document is the property of GLOBAL WATER ENGINEERING (GWE) NV Belgium. It shall not be copied,
http://www.globalwe.com PROJECT No.: 34124 transmitted or communicated to thirdparties without the explicit agreement of GWE. International conven- REV DATE DESCRIPTION BY CHK PAGE:1000 NEXT: 1001 LAST: 1050
tions of Berne (1886) - Paris (1896) - Berlin (1908) - Berne (1914) - Rome (1928) - Brussels (1948)
0 1 2 3 4 5 6 7 8 9
-1000U02 -1000U03
SIEMENS SM321 SIEMENS SM321
2 2
E000.0 /060.5 -060Q1:22 A401A FAULT E004.0 /290.5 -290Q1:22 P109 FAULT
3 3
E000.1 /060.5 -060K1:14 A401A ON E004.1 /290.5 -290K1:14 P109 ON
4 4
E000.2 /061.5 -061Q1:22 A401B FAULT E004.2 /290.9 -290U2:98 P109 THERMAL PROTECTION TS109
5 5
E000.3 /061.5 -061K1:14 A401B ON E004.3 /300.5 -300Q1:22 P110 FAULT
6 6
E000.4 /062.5 -062Q1:22 A402 FAULT E004.4 /300.5 -300K1:14 P110 ON
7 7
E000.5 /062.5 -062K1:14 A402 ON E004.5 /310.5 -310Q1:22 P111 FAULT
8 8
E000.6 /120.2 =FIELD+D103 D103 E004.6 /310.5 -310K1:14 P111 ON
9 9
E000.7 /120.2 =FIELD+D103 D103 E004.7 /320.3 -320U1:2 P112A VFD FAULT
12 12
E001.0 /120.3 =FIELD+D103 D103 E005.0 /320.3 -320U1:5 P112A VFD RUN
13 13
E001.1 /120.3 =FIELD+D103 D103 E005.1 /320.5 -320F1:11 P112A FAULT
14 14
E001.2 /130.3 -130U1:14 E103 SS RUN E005.2 /320.5 -320K1:14 P112A ON
15 15
E001.3 /130.3 -130U1:24 E103 SS RUN E005.3 /320.1.5-320.1K1:14 P112A.1 ON
16 16
E001.4 /130.5 -130Q1:22 E103 FAULT E005.4 /320.1.9-320.1U1:12 P112A.1 FAULT
17 17
E001.5 /130.5 -130K1:14 E103 ON E005.5 /321.3 -321U1:2 P112B VFD FAULT
18 18
E001.6 /170.3 -170U1:14 I201A SS RUN E005.6 /321.3 -321U1:5 P112B VFD RUN
19 19
E001.7 /170.3 -170U1:24 I201A SS RUN E005.7 /321.5 -321F1:11 P112B FAULT
1M 1M
20 20
/1000.2 /1000.2
22 22
E002.0 /170.5 -170Q1:22 I201A FAULT E006.0 /321.5 -321K1:14 P112B ON
23 23
E002.1 /170.5 -170K1:14 I201A ON E006.1 /321.1.5-321.1K1:14 P112B.1 ON
24 24
E002.2 /171.3 -171U1:14 I201B SS RUN E006.2 /321.1.9-321.1U1:12 P112B.1 FAULT
25 25
E002.3 /171.3 -171U1:24 I201B SS RUN E006.3 /370.5 -370Q1:22 P117 FAULT
26 26
E002.4 /171.5 -171Q1:22 I201B FAULT E006.4 /370.5 -370K1:14 P117 ON
27 27
E002.5 /171.5 -171K1:14 I201B ON E006.5 /380.5 -380Q1:22 P118 FAULT
28 28
E002.6 /180.5 -180Q1:22 M401 FAULT E006.6 /380.5 -380K1:14 P118 ON
29 29
E002.7 /180.5 -180K1:14 M401 ON E006.7 /450.5 -450Q1:22 P200 FAULT
32 32
E003.0 /200.5 -200Q1:22 P100 FAULT E007.0 /450.5 -450K1:14 P200 ON
33 33
E003.1 /200.5 -200K1:14 P100 ON E007.1 /460.5 -460Q1:22 P201 FAULT
34 34
E003.2 /270.5 -270Q1:22 P107 FAULT E007.2 /460.5 -460K1:14 P201 ON
35 35
E003.3 /270.5 -270K1:14 P107 ON E007.3 /560.5 -560Q1:22 P400 FAULT
36 36
E003.4 /280.5 -280Q1:22 P108 FAULT E007.4 /560.5 -560K1:14 P400 ON
37 37
E003.5 /280.5 -280K1:14 P108 ON E007.5 /561.5 -561Q1:22 P401 FAULT
38 38
E003.6 /290.3 -290U1:2 P109 VFD FAULT E007.6 /561.5 -561K1:14 P401 ON
39 39
E003.7 /290.3 -290U1:5 P109 VFD RUN E007.7 /562.5 -562Q1:22 P402 FAULT
2M 2M
40 40
6ES7321-1BL00-0AA0 /1000.2 6ES7321-1BL00-0AA0 /1000.3
32x DI 24VDC 32x DI 24VDC
Global Water Engineering CLIENT: AF SUGAR MAIN CONTROL PANEL = MCP + PNL1
Autobaan 22.01.01 DRAWN 13/10/2015 RL
BE-8210 Loppem PLC OVERVIEW CHECKED
+32 50 54 64 44 PROJECT: WASTEWATER TREATMENT PLANT APPROVED
DIGITAL INPUTS
+32 50 54 64 46 DATE NAME SIGN
This document is the property of GLOBAL WATER ENGINEERING (GWE) NV Belgium. It shall not be copied,
http://www.globalwe.com PROJECT No.: 34124 transmitted or communicated to thirdparties without the explicit agreement of GWE. International conven- REV DATE DESCRIPTION BY CHK PAGE:1001 NEXT: 1002 LAST: 1050
tions of Berne (1886) - Paris (1896) - Berlin (1908) - Berne (1914) - Rome (1928) - Brussels (1948)
0 1 2 3 4 5 6 7 8 9
-1000U04 -1000U05
SIEMENS SM321 SIEMENS SM321
2 2
E008.0 /562.5 -562K1:14 P402 ON E012.0 /782.2 =FIELD-LS401H LS401 LEVEL SWITCH LEVEL S400 H
3 3
E008.1 /563.5 -563Q1:22 P403 FAULT E012.1 /782.3 =FIELD-LS403LL LS403 LEVEL SWITCH LEVEL M401 LL
4 4
E008.2 /563.5 -563K1:14 P403 ON E012.2 /782.4 =FIELD-LS403L LS403 LEVEL SWITCH LEVEL M401 L
5 5
E008.3 /564.5 -564Q1:22 P406A FAULT E012.3 /940.2 -940K1:12 TS200 TEMP. SWITCH MOTOR TEMP. P200
6 6
E008.4 /564.5 -564K1:14 P406A ON E012.4 /940.4 -940K2:12 TS201 TEMP. SWITCH MOTOR TEMP. P201
7 7
E008.5 /565.5 -565Q1:22 P406B FAULT E012.5 /940.8 -940K3:12 TS400 TEMP. SWITCH MOTOR TEMP. P400
8 8
E008.6 /565.5 -565K1:14 P406B ON E012.6
9 9
E008.7 /680.1 =FIELD-ACV107:5 ACV107 ON/OFF VALVE S100 DISCHARGE E012.7
12 12
E009.0 /680.2 =FIELD-ACV107:6 ACV107 ON/OFF VALVE S100 DISCHARGE E013.0
13 13
E009.1 /750.1 =FIELD-FT107:25- FT107 FLOW TRANSMITTER FC TO S100 E013.1
14 14
E009.2 /750.4 =FIELD-FT109:25- FT109 FLOW TRANSMITTER FC TO D201 E013.2
15 15
E009.3 /750.7 =FIELD-FT201:25- FT201 FLOW TRANSMITTER FC TO B401 E013.3
16 16
E009.4 /760.6 =FIELD-KCV201:5 KCV201 ON/OFF VALVE OUTLET D201 E013.4
17 17
E009.5 /760.6 =FIELD-KCV201:6 KCV201 ON/OFF VALVE OUTLET D201 E013.5
18 18
E009.6 /780.0 =FIELD-LS101L LS101 LEVEL SWITCH LEVEL B101 L E013.6
19 19
E009.7 /780.1 =FIELD-LS101M LS101 LEVEL SWITCH LEVEL B101 M E013.7
1M 1M
20 20
/1000.3 /1000.3
22 22
E010.0 /780.2 =FIELD-LS101H LS101 LEVEL SWITCH LEVEL B101 H E014.0
23 23
E010.1 /780.3 =FIELD-LS104L LS104 LEVEL SWITCH LEVEL B104 L E014.1
24 24
E010.2 /780.4 =FIELD-LS104M LS104 LEVEL SWITCH LEVEL B104 M E014.2
25 25
E010.3 /780.5 =FIELD-LS104H LS104 LEVEL SWITCH LEVEL B104 H E014.3
26 26
E010.4 /780.6 =FIELD-LS107L LS107 LEVEL SWITCH LEVEL B107 L E014.4
27 27
E010.5 /780.7 =FIELD-LS107H LS107 LEVEL SWITCH LEVEL B107 H E014.5
28 28
E010.6 /781.0 =FIELD-LS109L LS109 LEVEL SWITCH LEVEL B108 L E014.6
29 29
E010.7 /781.1 =FIELD-LS109M LS109 LEVEL SWITCH LEVEL B108 M E014.7
32 32
E011.0 /781.2 =FIELD-LS109H LS109 LEVEL SWITCH LEVEL B108 H E015.0
33 33
E011.1 /781.3 =FIELD-LS202L LS202 LEVEL SWITCH LEVEL B201 L E015.1
34 34
E011.2 /781.4 =FIELD-LS202M LS202 LEVEL SWITCH LEVEL B201 M E015.2
35 35
E011.3 /781.5 =FIELD-LS202H LS202 LEVEL SWITCH LEVEL B201 H E015.3
36 36
E011.4 /781.6 =FIELD-LS205LL LS205 LEVEL SWITCH LEVEL F202 LL E015.4 /021.6 -021F1:21 PANEL COOLING FANS OFF
37 37
E011.5 /781.7 =FIELD-LS205L LS205 LEVEL SWITCH LEVEL F202 L E015.5 /030.9 -030K1:04 MAIN POWER SUPPLY OK
38 38
E011.6 /782.0 =FIELD-LS401L LS401 LEVEL SWITCH LEVEL S400 L E015.6 /031.9 -031U1:N.O.2 UPS LOW BAT
39 39
E011.7 /782.1 =FIELD-LS401M LS401 LEVEL SWITCH LEVEL S400 M E015.7 /031.9 -031U1:N.O.6 UPS FAULT
2M 2M
40 40
6ES7321-1BL00-0AA0 /1000.3 6ES7321-1BL00-0AA0 /1000.3
32x DI 24VDC 32x DI 24VDC
Global Water Engineering CLIENT: AF SUGAR MAIN CONTROL PANEL = MCP + PNL1
Autobaan 22.01.01 DRAWN 13/10/2015 RL
BE-8210 Loppem PLC OVERVIEW CHECKED
+32 50 54 64 44 PROJECT: WASTEWATER TREATMENT PLANT APPROVED
DIGITAL INPUTS
+32 50 54 64 46 DATE NAME SIGN
This document is the property of GLOBAL WATER ENGINEERING (GWE) NV Belgium. It shall not be copied,
http://www.globalwe.com PROJECT No.: 34124 transmitted or communicated to thirdparties without the explicit agreement of GWE. International conven- REV DATE DESCRIPTION BY CHK PAGE:1002 NEXT: 1003 LAST: 1050
tions of Berne (1886) - Paris (1896) - Berlin (1908) - Berne (1914) - Rome (1928) - Brussels (1948)
0 1 2 3 4 5 6 7 8 9
-1000U06 -1000U07
SIEMENS SM322 SIEMENS SM322
1L+ 1 1L+ 1
/1000.4 /1000.5
2 2
A020.0 /060.4 -060K1:A1 A401A START A024.0 /680.3 -680K1:14 ACV107 OPEN/CLOSE
3 3
A020.1 /061.4 -061K1:A1 A401B START A024.1 /760.1 -760K1:14 KCV103 ON/OFF
4 4
A020.2 /062.4 -062K1:A1 A402 START A024.2 /760.8 -760K2:14 KCV201 OPEN/CLOSE
5 5
A020.3 /120.9 -120K1:14 D103 A024.3
6 6
A020.4 /130.7 -130K2:14 E103 START A024.4
7 7
A020.5 /130.8 -130K3:14 E103 SS START A024.5
8 8
A020.6 /170.4 -170K1:A1 I201A START A024.6
9 9
A020.7 /170.7 -170K3:14 I201A SS START A024.7
1M 10 1M 10
/1000.4 /1000.5
2L+ 11 2L+ 11
/1000.4 /1000.5
12 12
A021.0 /171.4 -171K1:A1 I201B START A025.0
13 13
A021.1 /171.7 -171K3:14 I201B SS START A025.1
14 14
A021.2 /180.4 -180K1:A1 M401 START A025.2
15 15
A021.3 /200.4 -200K1:A1 P100 START A025.3
16 16
A021.4 /270.4 -270K1:A1 P107 START A025.4
17 17
A021.5 /280.4 -280K1:A1 P108 START A025.5
18 18
A021.6 /290.4 -290K1:A1 P109 START A025.6
19 19
A021.7 /290.7 -290K3:14 P109 VFD START A025.7
2M 20 2M 20
/1000.4 /1000.5
3L+ 21 3L+ 21
/1000.4 /1000.5
22 22
A022.0 /300.4 -300K1:A1 P110 START A026.0
23 23
A022.1 /310.4 -310K1:A1 P111 START A026.1
24 24
A022.2 /320.4 -320K1:A1 P112A START A026.2
25 25
A022.3 /320.7 -320K3:14 P112A VFD START A026.3
26 26
A022.4 /321.4 -321K1:A1 P112B START A026.4
27 27
A022.5 /321.7 -321K3:14 P112B VFD START A026.5
28 28
A022.6 /370.4 -370K1:A1 P117 START A026.6
29 29
A022.7 /380.4 -380K1:A1 P118 START A026.7 /040.0 -040K1:A1 GENERAL RESET
3M 30 3M 30
/1000.4 /1000.5
4L+ 31 4L+ 31
/1000.4 /1000.5
32 32
A023.0 /450.4 -450K1:A1 P200 START A027.0 /1050.0 -1050K1:14 DO SPARE 01
33 33
A023.1 /460.4 -460K1:A1 P201 START A027.1 /1050.1 -1050K2:14 DO SPARE 02
34 34
A023.2 /560.4 -560K1:A1 P400 START A027.2 /1050.2 -1050K3:14 DO SPARE 03
35 35
A023.3 /561.4 -561K1:A1 P401 START A027.3 /1050.2 -1050K4:14 DO SPARE 04
36 36
A023.4 /562.4 -562K1:A1 P402 START A027.4 /1050.3 -1050K5:14 DO SPARE 05
37 37
A023.5 /563.4 -563K1:A1 P403 START A027.5 /1050.3 -1050K6:14 DO SPARE 06
38 38
A023.6 /564.4 -564K1:A1 P406A START A027.6 /1050.4 -1050K7:14 DO SPARE 07
39 39
A023.7 /565.4 -565K1:A1 P406B START A027.7 /1050.4 -1050K8:14 DO SPARE 08
4M 40 4M 40
/1000.4 /1000.5
6ES7322-1BL00-0AA0 6ES7322-1BL00-0AA0
32x DO 24VDC 32x DO 24VDC
Global Water Engineering CLIENT: AF SUGAR MAIN CONTROL PANEL = MCP + PNL1
Autobaan 22.01.01 DRAWN 13/10/2015 RL
BE-8210 Loppem PLC OVERVIEW CHECKED
+32 50 54 64 44 PROJECT: WASTEWATER TREATMENT PLANT APPROVED
DIGITAL OUTPUTS
+32 50 54 64 46 DATE NAME SIGN
This document is the property of GLOBAL WATER ENGINEERING (GWE) NV Belgium. It shall not be copied,
http://www.globalwe.com PROJECT No.: 34124 transmitted or communicated to thirdparties without the explicit agreement of GWE. International conven- REV DATE DESCRIPTION BY CHK PAGE:1003 NEXT: 1004 LAST: 1050
tions of Berne (1886) - Paris (1896) - Berlin (1908) - Berne (1914) - Rome (1928) - Brussels (1948)
0 1 2 3 4 5 6 7 8 9
-1000U12 -1000U13
SIEMENS SM331 SIEMENS SM331
L+ 1 L+ 1
/1000.2 /1000.3
M0+ 2 M0+ 2
/120.5 =FIELD+D103 D103 /830.5 =FIELD-OIT201:31 OIT201 O CONTROL DO CONTROL IN D201
CH0 PEW256 M0- 3 CH0 PEW272 M0- 3
/120.6 =FIELD+D103 D103 /830.5 =FIELD-OIT201:32 OIT201 O CONTROL DO CONTROL IN D201
M1+ 4 M1+ 4
/120.6 =FIELD+D103 D103 /870.5 =FIELD-PHIT100:31 PHIT100/TT100 PH+TT TRANSMITTER PH+TEMP. CONTROL OUTLET B101
CH1 PEW258 M1- 5 CH1 PEW274 M1- 5
/120.6 =FIELD+D103 D103 /870.5 =FIELD-PHIT100:32 PHIT100/TT100 PH+TT TRANSMITTER PH+TEMP. CONTROL OUTLET B101
M2+ 6 M2+ 6
/750.2 =FIELD-FT107:26+ FT107 FLOW TRANSMITTER FC TO S100 /870.5 =FIELD-PHIT100:31 PHIT100/TT100 PH+TT TRANSMITTER PH+TEMP. CONTROL OUTLET B101
CH2 PEW260 M2- 7 CH2 PEW276 M2- 7
/750.2 =FIELD-FT107:27- FT107 FLOW TRANSMITTER FC TO S100 /870.5 =FIELD-PHIT100:32 PHIT100/TT100 PH+TT TRANSMITTER PH+TEMP. CONTROL OUTLET B101
M3+ 8 M3+ 8
/750.5 =FIELD-FT109:26+ FT109 FLOW TRANSMITTER FC TO D201 /871.5 =FIELD-PHIT105:31 PHIT105/TT105 PH+TT TRANSMITTER PH+TEMP. CONTROL OUTLET S100
CH3 PEW262 M3- 9 CH3 PEW278 M3- 9
/750.5 =FIELD-FT109:27- FT109 FLOW TRANSMITTER FC TO D201 /871.5 =FIELD-PHIT105:32 PHIT105/TT105 PH+TT TRANSMITTER PH+TEMP. CONTROL OUTLET S100
COMP+ 10 COMP+ 10
COMP MANA 11 COMP MANA 11
M4+ 12 M4+ 12
/750.8 =FIELD-FT201:26+ FT201 FLOW TRANSMITTER FC TO B401 /871.5 =FIELD-PHIT105:31 PHIT105/TT105 PH+TT TRANSMITTER PH+TEMP. CONTROL OUTLET S100
CH4 PEW264 M4- 13 CH4 PEW280 M4- 13
/750.8 =FIELD-FT201:27- FT201 FLOW TRANSMITTER FC TO B401 /871.5 =FIELD-PHIT105:32 PHIT105/TT105 PH+TT TRANSMITTER PH+TEMP. CONTROL OUTLET S100
M5+ 14 M5+ 14
/751.2 =FIELD-FT404:5 FT404 FLOW TRANSMITTER FC EFFLUENT TO DISCHARGE /872.5 =FIELD-PHIT201:31 PHIT201/TT201 PH+TT TRANSMITTER PH+TEMP. CONTROL INLET D201
CH5 PEW266 M5- 15 CH5 PEW282 M5- 15
/751.2 =FIELD-FT404:4 FT404 FLOW TRANSMITTER FC EFFLUENT TO DISCHARGE /872.5 =FIELD-PHIT201:32 PHIT201/TT201 PH+TT TRANSMITTER PH+TEMP. CONTROL INLET D201
M6+ 16 M6+ 16
/790.0 =FIELD-LT108:- LT100 LEVEL TRANSMITTER LC B100 /872.5 =FIELD-PHIT201:31 PHIT201/TT201 PH+TT TRANSMITTER PH+TEMP. CONTROL INLET D201
CH6 PEW268 M6- 17 CH6 PEW284 M6- 17
/790.1 =FIELD-FT404:2 LT100 LEVEL TRANSMITTER LC B100 /872.5 =FIELD-PHIT201:32 PHIT201/TT201 PH+TT TRANSMITTER PH+TEMP. CONTROL INLET D201
M7+ 18 M7+ 18
/790.3 =FIELD-LT201:- LT201 LEVEL TRANSMITTER LC D201 /950.0 =FIELD-TT108:- TT108 TEMP. TRANSMITTER TEMP. DISTILLATE TANK
CH7 PEW270 M7- 19 CH7 PEW286 M7- 19
/790.4 -1000U12:17 LT201 LEVEL TRANSMITTER LC D201 /950.1 =FIELD-PHIT201:- TT108 TEMP. TRANSMITTER TEMP. DISTILLATE TANK
M M
20 20
/1000.2 /1000.3
6ES7331-7KF02-0AB0 6ES7331-7KF02-0AB0
8x AI 12BIT 8x AI 12BIT
-1000U14
SIEMENS SM331
L+ 1
/1000.3
M0+ 2
CH0 PEW288 M0- 3
M1+ 4
CH1 PEW290 M1- 5
M2+ 6
CH2 PEW292 M2- 7
M3+ 8
CH3 PEW294 M3- 9
COMP+ 10
COMP MANA 11
M4+ 12
CH4 PEW296 M4- 13
M5+ 14
CH5 PEW298 M5- 15
M6+ 16
CH6 PEW300 M6- 17
M7+ 18
CH7 PEW302 M7- 19
M
20
/1000.3
6ES7331-7KF02-0AB0
8x AI 12BIT
-1000U15 -1000U16
SIEMENS SM332 SIEMENS SM332
1L+ 1 1L+ 1
/1000.3 /1000.4
2 2
QI0 3 QI0 3
/120.6 =FIELD+D103 D103
S+0 4 S+0 4
CH0 PAW320 S-0 5 CH0 PAW336 S-0 5
MANA 6 MANA 6
/120.6 =FIELD+D103 D103
QI1 7 QI1 7
/120.7 =FIELD+D103 D103
S+1 8 S+1 8
CH1 PAW322 S-1 9 CH1 PAW338 S-1 9
MANA 10 MANA 10
/120.7 =FIELD+D103 D103
QI2 11 QI2 11
/120.7 =FIELD+D103 D103
S+2 12 S+2 12
CH2 PAW324 S-2 13 CH2 PAW340 S-2 13
MANA 14 MANA 14
/120.7 =FIELD+D103 D103
QI3 15 QI3 15
/290.1 -290U1:53 P109 AEROBIC TREATMENT FEED PUMP
S+3 16 S+3 16
CH3 PAW326 S-3 17 CH3 PAW342 S-3 17
MANA 18 MANA 18
/290.1 -290U1:55 P109 AEROBIC TREATMENT FEED PUMP
19 19
1M 20 1M 20
/1000.3 /1000.4
21 21
22 22
QI4 23 QI4 23
/320.1 -320U1:53 P112A NaOH DOSING PUMP
S+4 24 S+4 24
CH4 PAW328 S-4 25 CH4 PAW344 S-4 25
MANA 26 MANA 26
/320.1 -320U1:55 P112A NaOH DOSING PUMP
QI5 27 QI5 27
/321.1 -321U1:53 P112B NaOH DOSING PUMP
S+5 28 S+5 28
CH5 PAW330 S-5 29 CH5 PAW346 S-5 29
MANA 30 MANA 30
/321.1 -321U1:55 P112B NaOH DOSING PUMP
QI6 31 QI6 31
S+6 32 S+6 32
CH6 PAW332 S-6 33 CH6 PAW348 S-6 33
MANA 34 MANA 34
QI7 35 QI7 35
S+7 36 S+7 36
CH7 PAW334 S-7 37 CH7 PAW350 S-7 37
MANA 38 MANA 38
39 39
40 40
6ES7332-5HF00-0AB0 6ES7332-5HF00-0AB0
8x AO 12BIT 8x AO 12BIT
DO DO DO DO DO DO DO DO
SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE
01 02 03 04 05 06 07 08
DO DO DO DO DO DO DO DO
-1000U07 -1000U07 -1000U07 -1000U07 -1000U07 -1000U07 -1000U07 -1000U07
/1003.5 /1003.5 /1003.5 /1003.5 /1003.5 /1003.5 /1003.5 /1003.5
A027.0 A027.1 A027.2 A027.3 A027.4 A027.5 A027.6 A027.7
32 33 34 35 36 37 38 39
14 14 14 14 14 14 14 14
-1050K1 -1050K2 -1050K3 -1050K4 -1050K5 -1050K6 -1050K7 -1050K8
13 13 13 13 13 13 13 13
1000.9 / -0V00 -0V00 /
1 9 1 9 1 9 1 9 1 9 1 9 1 9 1 9
5 9 5 9 5 9 5 9 5 9 5 9 5 9 5 9
4 12 4 12 4 12 4 12 4 12 4 12 4 12 4 12
8 12 8 12 8 12 8 12 8 12 8 12 8 12 8 12
Global Water Engineering CLIENT: AF SUGAR MAIN CONTROL PANEL = MCP + PNL1
Autobaan 22.01.01 DRAWN 13/10/2015 RL
BE-8210 Loppem PLC SPARE DIGITAL OUTPUTS CHECKED
+32 50 54 64 44 PROJECT: WASTEWATER TREATMENT PLANT APPROVED
+32 50 54 64 46 DATE NAME SIGN
This document is the property of GLOBAL WATER ENGINEERING (GWE) NV Belgium. It shall not be copied,
http://www.globalwe.com PROJECT No.: 34124 transmitted or communicated to thirdparties without the explicit agreement of GWE. International conven- REV DATE DESCRIPTION BY CHK PAGE:1050 NEXT: +CABLE/001 LAST: 1050
tions of Berne (1886) - Paris (1896) - Berlin (1908) - Berne (1914) - Rome (1928) - Brussels (1948)
0 1 2 3 4 5 6 7 8 9
Cable overview
Conductors Cross-section Length Graphical page
Cable name Source (from) Target (to) Cable type All conductors Page / column
used [ mm ] [m] of cable diagram
+PNL1-P/PO1 +PNL1-X1 +PNL1-015X1 LiYY-JZ (3G2,5) 3G 3 2,5 +PNL1/015.0
+PNL1-P/PO2 +PNL1-X1 +PNL1-015X2 LiYY-JZ (3G2,5) 3G 3 2,5 +PNL1/015.2
+PNL1-P/PO3 +PNL1-X0.5 +PNL1-015X3 LiYY-JZ (4G4) 4G 4 4 +PNL1/015.3
+PNL1-P/UPS.1 +PNL1-X3 +PNL1-031U1 LiYY-JZ (3G2,5) 3G 3 2,5 +PNL1/031.0
+PNL1-P/UPS.2 +PNL1-X3 +PNL1-031U1 LiYY-JZ (3G2,5) 3G 3 2,5 +PNL1/031.0
+PNL1-I/UPS +PNL1-X2 +PNL1-031U1 LiYY-JZ (4G1) 4G 3 1 +PNL1/031.9
+PNL1-P/A401A +PNL1-X0.5 =FIELD-A401A LiYY-JZ (4G2,5) 4G 4 2,5 +PNL1/060.0
+PNL1-S/LPES_A401A +PNL1-X2 =FIELD+LPES_A401A-ESA401A LiYY-JZ (3G1) 3G 2 1 +PNL1/060.4
+PNL1-P/A401B +PNL1-X0.5 =FIELD-A401B LiYY-JZ (4G2,5) 4G 4 2,5 +PNL1/061.0
+PNL1-S/LPES_A401B +PNL1-X2 =FIELD+LPES_A401B-ESA401B LiYY-JZ (3G1) 3G 2 1 +PNL1/061.4
+PNL1-P/A402 +PNL1-X0.5 =FIELD-A402 LiYY-JZ (4G2,5) 4G 4 2,5 +PNL1/062.0
+PNL1-S/LPES_A402 +PNL1-X2 =FIELD+LPES_A402-ESA402 LiYY-JZ (3G1) 3G 2 1 +PNL1/062.4
+PNL1-P/D103.1 +PNL1-120Q1 =FIELD+D103 NYY-O (3x95) 3 3 95 +PNL1/120.0
+PNL1-P/D103.2 +PNL1-PE =FIELD+D103 H07V-R(1x50) 1 1 50 +PNL1/120.0
+PNL1-S/D103.2 +PNL1-X2 =FIELD+D103 LiYY-JZ (7G1) 7G 6 1 +PNL1/120.2
+PNL1-S/D103.1 +PNL1-X6 =FIELD+D103 LiYY-JZ (3G1) 3G 3 1 +PNL1/120.3
+PNL1-I/D103.1 +PNL1-X13 =FIELD+D103 LiYCY-JZ (5G1) 5G 4 1 +PNL1/120.5
+PNL1-I/D103.2 +PNL1-X13 =FIELD+D103 LiYCY-JZ (7G1) 7G 6 1 +PNL1/120.6
+PNL1-P/E103 +PNL1-X0.2 =FIELD-E103 LiYY-JZ (4G16) 4G 4 16 +PNL1/130.0
+PNL1-P/I201A +PNL1-X0.3 =FIELD-I201A LiYY-JZ (4G10) 4G 4 10 +PNL1/170.0
+PNL1-S/LPES_I201A +PNL1-X2 =FIELD+LPES_I201A-ESI201A LiYY-JZ (3G1,5) 3G 2 1,5 +PNL1/170.4
+PNL1-P/I201B +PNL1-X0.3 =FIELD-I201B LiYY-JZ (4G10) 4G 4 10 +PNL1/171.0
+PNL1-S/LPES_I201B +PNL1-X2 =FIELD+LPES_I201B-ESI201B LiYY-JZ (3G1,5) 3G 2 1,5 +PNL1/171.4
+PNL1-P/M401 +PNL1-X0.5 =FIELD-M401 LiYY-JZ (4G2,5) 4G 4 2,5 +PNL1/180.0
+PNL1-P/P100 +PNL1-X0.5 =FIELD-P100 LiYY-JZ (4G2,5) 4G 4 2,5 +PNL1/200.0
+PNL1-P/P107 +PNL1-X0.5 =FIELD-P107 LiYY-JZ (4G4) 4G 4 4 +PNL1/270.0
+PNL1-P/P108 +PNL1-X0.5 =FIELD-P108 LiYY-JZ (4G2,5) 4G 4 2,5 +PNL1/280.0
+PNL1-P/P109 +PNL1-290U1 =FIELD-P109 FRECO-EMC (4G6) 4G 4 6 +PNL1/290.0
+PNL1-I/P109 +PNL1-X15 =FIELD-P109 LiYY-JZ (3G1) 3G 2 1 +PNL1/290.1
+PNL1-P/P110 +PNL1-X0.5 =FIELD-P110 LiYY-JZ (4G2,5) 4G 4 2,5 +PNL1/300.0
+PNL1-P/P111 +PNL1-X0.4 =FIELD-P111 LiYY-JZ (4G6) 4G 4 6 +PNL1/310.0
+PNL1-P/P112A +PNL1-320U1 =FIELD-P112A FRECO-EMC (4G2,5) 4G 4 2,5 +PNL1/320.0
+PNL1-P/P112A.1 +PNL1-X0.5 =FIELD-P112A.1 LiYY-JZ (4G2,5) 4G 4 2,5 +PNL1/320.1.0
+PNL1-P/P112B +PNL1-321U1 =FIELD-P112B FRECO-EMC (4G2,5) 4G 4 2,5 +PNL1/321.0
+PNL1-P/P112B.1 +PNL1-X0.5 =FIELD-P112B.1 LiYY-JZ (4G2,5) 4G 4 2,5 +PNL1/321.1.0
+PNL1-P/P117 +PNL1-X0.5 =FIELD-P117 LiYY-JZ (4G4) 4G 4 4 +PNL1/370.0
+PNL1-P/P118 +PNL1-X0.5 =FIELD-P118 LiYY-JZ (4G4) 4G 4 4 +PNL1/380.0
+PNL1-P/P200 +PNL1-X0.5 =FIELD-P200 LiYY-JZ (4G2,5) 4G 4 2,5 +PNL1/450.0
+PNL1-P/P201 +PNL1-X0.5 =FIELD-P201 LiYY-JZ (4G2,5) 4G 4 2,5 +PNL1/460.0
+PNL1-P/P400 +PNL1-X0.5 =FIELD-P400 LiYY-JZ (4G2,5) 4G 4 2,5 +PNL1/560.0
+PNL1-P/P401 +PNL1-X0.5 =FIELD-P401 LiYY-JZ (4G4) 4G 4 4 +PNL1/561.0
+PNL1-P/P402 +PNL1-X0.5 =FIELD-P402 LiYY-JZ (4G2,5) 4G 4 2,5 +PNL1/562.0
+PNL1-P/P403 +PNL1-X0.5 =FIELD-P403 LiYY-JZ (4G2,5) 4G 4 2,5 +PNL1/563.0
+PNL1-P/P406A +PNL1-X0.5 =FIELD-P406A LiYY-JZ (4G4) 4G 4 4 +PNL1/564.0
+PNL1-P/P406B +PNL1-X0.5 =FIELD-P406B LiYY-JZ (4G4) 4G 4 4 +PNL1/565.0
+PNL1-S/ACV107.1 +PNL1-X1 =FIELD-ACV107 LiYY-JZ (3G1) 3G 3 1 +PNL1/680.0
Global Water Engineering CLIENT: AF SUGAR MAIN CONTROL PANEL = MCP + CABLE
Autobaan 22.01.01 DRAWN 13/10/2015 RL
BE-8210 Loppem CABLE OVERVIEW CHECKED
+32 50 54 64 44 PROJECT: WASTEWATER TREATMENT PLANT APPROVED
+32 50 54 64 46 DATE NAME SIGN
This document is the property of GLOBAL WATER ENGINEERING (GWE) NV Belgium. It shall not be copied,
http://www.globalwe.com PROJECT No.: 34124 transmitted or communicated to thirdparties without the explicit agreement of GWE. International conven- REV DATE DESCRIPTION BY CHK PAGE:001 NEXT: 002 LAST: 003
tions of Berne (1886) - Paris (1896) - Berlin (1908) - Berne (1914) - Rome (1928) - Brussels (1948)
0 1 2 3 4 5 6 7 8 9
Cable overview
Conductors Cross-section Length Graphical page
Cable name Source (from) Target (to) Cable type All conductors Page / column
used [ mm ] [m] of cable diagram
+PNL1-S/ACV107.2 +PNL1-X2 =FIELD-ACV107 LiYY-JZ (4G1) 4G 3 1 +PNL1/680.1
+PNL1-S/ACV107.3 +PNL1-X1 =FIELD-ACV107 LiYY-JZ (3G1) 3G 2 1 +PNL1/680.2
+PNL1-S/FT107 +PNL1-X2 =FIELD-FT107 LiYY-JZ (5G1,5) 5G 5 1,5 +PNL1/750.0
+PNL1-I/FT107 +PNL1-X13 =FIELD-FT107 LiYCY-JZ (3G1) 3G 2 1 +PNL1/750.2
+PNL1-S/FT109 +PNL1-X2 =FIELD-FT109 LiYY-JZ (5G1,5) 5G 5 1,5 +PNL1/750.3
+PNL1-I/FT109 +PNL1-X13 =FIELD-FT109 LiYCY-JZ (3G1) 3G 2 1 +PNL1/750.5
+PNL1-S/FT201 +PNL1-X2 =FIELD-FT201 LiYY-JZ (5G1,5) 5G 5 1,5 +PNL1/750.6
+PNL1-I/FT201 +PNL1-X13 =FIELD-FT201 LiYCY-JZ (3G1) 3G 2 1 +PNL1/750.8
+PNL1-S/FT404 +PNL1-X2 =FIELD-FT404 LiYY-JZ (3G1,5) 3G 3 1,5 +PNL1/751.0
+PNL1-I/FT404 +PNL1-X13 =FIELD-FT404 LiYCY-JZ (3G1) 3G 2 1 +PNL1/751.2
+PNL1-S/KCV103 +PNL1-X2 =FIELD-KCV103 LiYY-JZ (3G2,5) 3G 3 2,5 +PNL1/760.0
+PNL1-S/KCV201.1 +PNL1-X1 =FIELD-KCV201 LiYY-JZ (3G1) 3G 3 1 +PNL1/760.5
+PNL1-S/KCV201.2 +PNL1-X2 =FIELD-KCV201 LiYY-JZ (4G1) 4G 3 1 +PNL1/760.6
+PNL1-S/KCV201.3 +PNL1-X1 =FIELD-KCV201 LiYY-JZ (3G1) 3G 2 1 +PNL1/760.7
+PNL1-I/LS101 +PNL1-X2 =FIELD-LS101L LiYY-JZ (7G1) 7G 6 1 +PNL1/780.0
=FIELD-LS101M
=FIELD-LS101H
+PNL1-I/LS104 +PNL1-X2 =FIELD-LS104L LiYY-JZ (7G1) 7G 6 1 +PNL1/780.3
=FIELD-LS104M
=FIELD-LS104H
+PNL1-I/LS107 +PNL1-X2 =FIELD-LS107L LiYY-JZ (5G1) 5G 4 1 +PNL1/780.6
=FIELD-LS107H
+PNL1-I/LS109 +PNL1-X2 =FIELD-LS109L LiYY-JZ (7G1) 7G 6 1 +PNL1/781.0
=FIELD-LS109M
=FIELD-LS109H
+PNL1-I/LS202 +PNL1-X2 =FIELD-LS202L LiYY-JZ (7G1) 7G 6 1 +PNL1/781.3
=FIELD-LS202M
=FIELD-LS202H
+PNL1-I/LS205 +PNL1-X2 =FIELD-LS205LL LiYY-JZ (5G1) 5G 4 1 +PNL1/781.6
=FIELD-LS205L
+PNL1-I/LS401 +PNL1-X2 =FIELD-LS401L LiYY-JZ (7G1) 7G 6 1 +PNL1/782.0
=FIELD-LS401M
=FIELD-LS401H
+PNL1-I/LS403 +PNL1-X2 =FIELD-LS403LL LiYY-JZ (5G1) 5G 4 1 +PNL1/782.3
=FIELD-LS403L
+PNL1-I/LT108 +PNL1-X13 =FIELD-LT108 LiYCY-JZ (3G1) 3G 3 1 +PNL1/790.0
+PNL1-I/LT201 +PNL1-X13 =FIELD-LT201 LiYCY-JZ (3G1) 3G 3 1 +PNL1/790.3
+PNL1-S/OIT201 +PNL1-X2 =FIELD-OIT201 LiYY-JZ (3G1,5) 3G 3 1,5 +PNL1/830.0
+PNL1-I/OIT201 +PNL1-X13 =FIELD-OIT201 LiYCY-JZ (3G1) 3G 2 1 +PNL1/830.4
+PNL1-S/PHIT100 +PNL1-X2 =FIELD-PHIT100 LiYY-JZ (3G1,5) 3G 3 1,5 +PNL1/870.0
+PNL1-I/PHIT100 +PNL1-X13 =FIELD-PHIT100 LiYCY-JZ (5G1) 5G 4 1 +PNL1/870.4
+PNL1-S/PHIT105 +PNL1-X2 =FIELD-PHIT105 LiYY-JZ (3G1,5) 3G 3 1,5 +PNL1/871.0
+PNL1-I/PHIT105 +PNL1-X13 =FIELD-PHIT105 LiYCY-JZ (5G1) 5G 4 1 +PNL1/871.4
+PNL1-S/PHIT201 +PNL1-X2 =FIELD-PHIT201 LiYY-JZ (3G1,5) 3G 3 1,5 +PNL1/872.0
+PNL1-I/PHIT201 +PNL1-X13 =FIELD-PHIT201 LiYCY-JZ (5G1) 5G 4 1 +PNL1/872.4
+PNL1-I/TS200 +PNL1-X15 =FIELD-JB_TS200 LiYCY-JZ (4G1,5) 4G 3 1,5 +PNL1/940.1
Global Water Engineering CLIENT: AF SUGAR MAIN CONTROL PANEL = MCP + CABLE
Autobaan 22.01.01 DRAWN 13/10/2015 RL
BE-8210 Loppem CABLE OVERVIEW CHECKED
+32 50 54 64 44 PROJECT: WASTEWATER TREATMENT PLANT APPROVED
+32 50 54 64 46 DATE NAME SIGN
This document is the property of GLOBAL WATER ENGINEERING (GWE) NV Belgium. It shall not be copied,
http://www.globalwe.com PROJECT No.: 34124 transmitted or communicated to thirdparties without the explicit agreement of GWE. International conven- REV DATE DESCRIPTION BY CHK PAGE:002 NEXT: 003 LAST: 003
tions of Berne (1886) - Paris (1896) - Berlin (1908) - Berne (1914) - Rome (1928) - Brussels (1948)
0 1 2 3 4 5 6 7 8 9
Cable overview
Conductors Cross-section Length Graphical page
Cable name Source (from) Target (to) Cable type All conductors Page / column
used [ mm ] [m] of cable diagram
+PNL1-S/TS201 +PNL1-X2 =FIELD-TS201 LiYY-JZ (3G1) 3G 2 1 +PNL1/940.3
+PNL1-I/TS400 +PNL1-X15 =FIELD-JB_TS400 LiYCY-JZ (4G1,5) 4G 3 1,5 +PNL1/940.7
+PNL1-I/TT108 +PNL1-X13 =FIELD-TT108 LiYCY-JZ (3G1) 3G 2 1 +PNL1/950.0
+PNL1-I/PB +PNL1-1000U01 +PNL1-1000U11 6XV1830-0EH10 2 1 0,34 +PNL1/1000.1
+PNL1-I/LAN J-2YY 8 0 0,25 +PNL1/1000.9
Global Water Engineering CLIENT: AF SUGAR MAIN CONTROL PANEL = MCP + CABLE
Autobaan 22.01.01 DRAWN 13/10/2015 RL
BE-8210 Loppem CABLE OVERVIEW CHECKED
+32 50 54 64 44 PROJECT: WASTEWATER TREATMENT PLANT APPROVED
+32 50 54 64 46 DATE NAME SIGN
This document is the property of GLOBAL WATER ENGINEERING (GWE) NV Belgium. It shall not be copied,
http://www.globalwe.com PROJECT No.: 34124 transmitted or communicated to thirdparties without the explicit agreement of GWE. International conven- REV DATE DESCRIPTION BY CHK PAGE:003 NEXT: +PARTS/001 LAST: 003
tions of Berne (1886) - Paris (1896) - Berlin (1908) - Berne (1914) - Rome (1928) - Brussels (1948)
0 1 2 3 4 5 6 7 8 9
Parts list
Device Description Type number Order number Manufacturer Qty Page
-000Q1 circuit breaker NSX compact; NSX630N; 630A; 4p; breaking capacity 50kA (380/415VAC) NSX630N LV432808 Schneider Electric 1 +PNL1/000.0
-000Q1 electronic trip unit; Micrologic 2.3; 4p4l,4p3l,4p3l+N/2; Io=250-630A; Ir=Iox0,9-1; Isd=Irx1,5-10 Micrologic 2.3 LV432084 Schneider Electric 1 +PNL1/000.0
-000Q1 extended rotary handle; NSX400/630; 209-600mm LV432603 Schneider Electric 1 +PNL1/000.0
-000F1 miniature circuit-breaker; Multi 9; NG125L; 2-pole; 32A; tripping characteristic C; breaking capacity 50kA; DIN rail mounting; IP20 NG125L 18792 Schneider Electric 1 +PNL1/000.2
-015F1 miniature circuit-breaker; Acti 9; iC60L; 2-pole; 16A; tripping characteristic C; breaking capacity 25kA; DIN rail mounting; IP20 iC60L A9F94216 Schneider Electric 1 +PNL1/015.0
-015F1 vigi module (residual current device); Acti 9; for iC60; AC type; 2p.; I<=25A; sensivity 30mA; Quick Vigi A9Q11225 Schneider Electric 1 +PNL1/015.0
-015F2 miniature circuit-breaker; Acti 9; iC60L; 2-pole; 16A; tripping characteristic C; breaking capacity 25kA; DIN rail mounting; IP20 iC60L A9F94216 Schneider Electric 1 +PNL1/015.2
-015F2 vigi module (residual current device); Acti 9; for iC60; AC type; 2p.; I<=25A; sensivity 30mA; Quick Vigi A9Q11225 Schneider Electric 1 +PNL1/015.2
-015F3 miniature circuit-breaker; Acti 9; iC60L; 3-pole; 16A; tripping characteristic C; breaking capacity 25kA; DIN rail mounting; IP20 iC60L A9F94316 Schneider Electric 1 +PNL1/015.3
-015F3 vigi module (residual current device); Acti 9; for iC60; AC type; 3p.; I<=25A; sensivity 30mA; Quick Vigi A9Q11325 Schneider Electric 1 +PNL1/015.3
-020F1 miniature circuit-breaker; Acti 9; iC60L; 2-pole; 6A; tripping characteristic C; breaking capacity 25kA; DIN rail mounting; IP20 iC60L A9F94206 Schneider Electric 1 +PNL1/020.0
-020H1 cabinet lightening module; 18W; 100-230V; 50-60Hz; with door switch; length 682mm SZ 4139.190 SZ 4139.350 Rittal 1 +PNL1/020.0
-020H1 connecting cable for cabinet lightening module; length 1000mm SZ 4315.200 SZ 4315.200 Rittal 1 +PNL1/020.0
-020H2 cabinet lightening module; 18W; 100-230V; 50-60Hz; with door switch; length 682mm SZ 4139.190 SZ 4139.350 Rittal 1 +PNL1/020.1
-020H2 connecting cable for cabinet lightening module; length 1000mm SZ 4315.200 SZ 4315.200 Rittal 1 +PNL1/020.1
-020H3 cabinet lightening module; 18W; 100-230V; 50-60Hz; with door switch; length 682mm SZ 4139.190 SZ 4139.350 Rittal 1 +PNL1/020.2
-020H3 connecting cable for cabinet lightening module; length 1000mm SZ 4315.200 SZ 4315.200 Rittal 1 +PNL1/020.2
-020F2 miniature circuit-breaker; Acti 9; iC60L; 2-pole; 6A; tripping characteristic C; breaking capacity 25kA; DIN rail mounting; IP20 iC60L A9F94206 Schneider Electric 1 +PNL1/020.7
-020X1 DIN mounted socket 2P+PE 16A MSC SPP 666502 GE Power Controls 1 +PNL1/020.7
-020F3 miniature circuit-breaker; Acti 9; iC60L; 2-pole; 6A; tripping characteristic C; breaking capacity 25kA; DIN rail mounting; IP20 iC60L A9F94206 Schneider Electric 1 +PNL1/020.8
-020X2 DIN mounted socket 2P+PE 16A MSC SPP 666502 GE Power Controls 1 +PNL1/020.8
-021F1 miniature circuit-breaker; Acti 9; iC60L; 2-pole; 6A; tripping characteristic C; breaking capacity 25kA; DIN rail mounting; IP20 iC60L A9F94206 Schneider Electric 1 +PNL1/021.0
-021F1 auxiliary contact; Acti 9; type OF; 1 changeover contact; 6A; DIN rail mounting OF A9A26924 Schneider Electric 2 +PNL1/021.0
-021M1 filter fan; 230 VAC; 50/60 Hz; 95/135W; 0,43/0,6A; 700/770m³/h; 65/66dB(A) SK 3244.100 SK 3244.100 Rittal 1 +PNL1/021.0
-021M1 outlet filter SK 3243.200 SK 3243.200 Rittal 1 +PNL1/021.0
-021M2 filter fan; 230 VAC; 50/60 Hz; 95/135W; 0,43/0,6A; 700/770m³/h; 65/66dB(A) SK 3244.100 SK 3244.100 Rittal 1 +PNL1/021.1
-021M2 outlet filter SK 3243.200 SK 3243.200 Rittal 1 +PNL1/021.1
-021M3 filter fan; 230 VAC; 50/60 Hz; 95/135W; 0,43/0,6A; 700/770m³/h; 65/66dB(A) SK 3244.100 SK 3244.100 Rittal 1 +PNL1/021.2
-021M3 outlet filter SK 3243.200 SK 3243.200 Rittal 1 +PNL1/021.2
-021M4 filter fan; 230 VAC; 50/60 Hz; 95/135W; 0,43/0,6A; 700/770m³/h; 65/66dB(A) SK 3244.100 SK 3244.100 Rittal 1 +PNL1/021.3
-021M4 outlet filter SK 3243.200 SK 3243.200 Rittal 1 +PNL1/021.3
-021M5 filter fan; 230 VAC; 50/60 Hz; 95/135W; 0,43/0,6A; 700/770m³/h; 65/66dB(A) SK 3244.100 SK 3244.100 Rittal 1 +PNL1/021.4
-021M5 outlet filter SK 3243.200 SK 3243.200 Rittal 1 +PNL1/021.4
-021F3 miniature circuit-breaker; Acti 9; iC60L; 1-pole; 0,5A; tripping characteristic C; breaking capacity 100kA; DIN rail mounting; IP20 iC60L A9F94170 Schneider Electric 1 +PNL1/021.6
-021S1 enclosure internal thermostat; 110/230VAC; 30W DC; 1NO; range : +35°C; 2/1,6A EFR201 EFR201 Eldon International S.A. 1 +PNL1/021.6
-021K1 contactor; 2NO; AC 230V; screw-type connection A9C22712 A9C22712 Schneider Electric 1 +PNL1/021.6
-021K2 contactor; 1NO; AC 230V; screw-type connection A9C22711 A9C22711 Schneider Electric 1 +PNL1/021.7
-030U1 surge arrestor plugtrab; type 3; L,N; Un=230VAC (TN-S); In=26A; isn(8/20)μs=3kA; Up<=1,35kV; ta<=25ns PLT-SEC-T3-230-FM 2905229 Phoenix Contact 1 +PNL1/030.0
-030Q1 motor circuit breaker; setting range 4-6,3A; Icu>100kA(400/415V) GV2 P10 GV2 P10 Schneider Electric 1 +PNL1/030.0
-030T1 1-phase control transformer 2x115V; Upri(V): 400, Usec(V): 2x115; F(Hz): 50...60; 1600VA; screw/tab connection 230TC1600 230TC1600 Erea 1 +PNL1/030.0
-030F1 modular fuse disconnect switch RM; 10x38; 2p. without signalisation 5701 0020 5701 0020 Socomec 1 +PNL1/030.0
-030F1 cylindrical fuse NF; 25A gG; 10x38; 500V; 120kA; without striker 6012 0025 6012 0025 Socomec 2 +PNL1/030.0
-030F2 miniature circuit-breaker; Acti 9; iC60N; 1-pole; 6A; tripping characteristic C; breaking capacity 10kA; DIN rail mounting; IP20 iC60N A9F79106 Schneider Electric 1 +PNL1/030.0
-030U2 voltage control relay; 3 ph.; Ui : 183-528VAC 1CO; screw terminal connection RM17 UB310 RM17 UB310 Schneider Electric 1 +PNL1/030.6
-030F3 modular fuse disconnect switch RM; 10x38; 3p. without signalisation 5701 0018 5701 0018 Socomec 1 +PNL1/030.6
-030F3 cylindrical fuse URD; 0,1A gG; 10x38; 600V; 200kA; without striker A 060 URD 0.100 A 060 URD 0.100 Ferraz Shawmut 3 +PNL1/030.6
Global Water Engineering CLIENT: AF SUGAR MAIN CONTROL PANEL = MCP + PARTS
Autobaan 22.01.01 DRAWN 13/10/2015 RL
BE-8210 Loppem PARTS LIST CHECKED
+32 50 54 64 44 PROJECT: WASTEWATER TREATMENT PLANT APPROVED
+32 50 54 64 46 DATE NAME SIGN
This document is the property of GLOBAL WATER ENGINEERING (GWE) NV Belgium. It shall not be copied,
http://www.globalwe.com PROJECT No.: 34124 transmitted or communicated to thirdparties without the explicit agreement of GWE. International conven- REV DATE DESCRIPTION BY CHK PAGE:001 NEXT: 002 LAST: 006
tions of Berne (1886) - Paris (1896) - Berlin (1908) - Berne (1914) - Rome (1928) - Brussels (1948)
0 1 2 3 4 5 6 7 8 9
Parts list
Device Description Type number Order number Manufacturer Qty Page
-030K1 auxiliary contactor; 5NO; DC 24V; screw-type connection CAD50BD CAD50BD Schneider Electric 1 +PNL1/030.7
-030K1 auxiliary contact block; off time delay 1NO + 1NC; 10-180s; screw-type connection LAD R4 LAD R4 Schneider Electric 1 +PNL1/030.7
-030K2 motor starter; 4kW 380/400V AC-3; 3P; 1NO+1NC; DC 24V; screw-type connection LC1-D09BD LC1-D09BD Schneider Electric 1 +PNL1/030.8
-031U1 smart-UPS XL; tower/rack convertible; in : 230VAC; out : 230VAC; 2200VA/1980W; 1 input socket IEC-320 C20; 8 output socket IEC-320 C13; 2 output socket IEC-320 C19; 1 USB; 1 Smartslot
SMX2200HV SMX2200HV American Power Conversion
1 +PNL1/031.0
-031U1 battery; 1200VAh; 120V SMX120BP SMX120BP American Power Conversion
1 +PNL1/031.0
-031U1 dry contact I/O smartslot card; connection board AP9613 AP9613 American Power Conversion
1 +PNL1/031.0
-031F1 miniature circuit-breaker; Acti 9; iC60L; 2-pole; 16A; tripping characteristic C; breaking capacity 25kA; DIN rail mounting; IP20 iC60L A9F94216 Schneider Electric 1 +PNL1/031.0
-031Q1 motor circuit breaker; setting range 9-14A; Icu:100kA(400/415V) GV2 P16 GV2 P16 Schneider Electric 1 +PNL1/031.2
-031T1 1-phase control transformer 2x115V; Upri(V): 400, Usec(V): 2x115; F(Hz): 50...60; 2500VA; screw/tab connection 230TC2500 230TC2500 Erea 1 +PNL1/031.2
-032F01 miniature circuit-breaker; Acti 9; iC60N; 1-pole; 2A; tripping characteristic C; breaking capacity 50kA; DIN rail mounting; IP20 iC60N A9F74102 Schneider Electric 1 +PNL1/032.0
-032F21 miniature circuit-breaker; Acti 9; iC60N; 2-pole; 4A; tripping characteristic C; breaking capacity 50kA; DIN rail mounting; IP20 iC60N A9F74204 Schneider Electric 1 +PNL1/032.5
-032F24 miniature circuit-breaker; Acti 9; iC60N; 2-pole; 10A; tripping characteristic C; breaking capacity 10kA; DIN rail mounting; IP20 iC60N A9F79210 Schneider Electric 1 +PNL1/032.8
-038U1 surge arrestor plugtrab; type 3; L1-L3,N,PE; Un=230VAC/400VAC(TN-S); In=26A; isn(8/20)μs=3kA; Up<=1,4kV; ta<=25ns PLT-SEC-T3-3S-230-FM 2905230 Phoenix Contact 1 +PNL1/038.0
-038F1 modular fuse disconnect switch RM; 10x38; 3p. without signalisation 5601 0018 5601 0018 Socomec 1 +PNL1/038.0
-038F1 cylindrical fuse NF; 25A gG; 10x38; 500V; 120kA; without striker 6012 0025 6012 0025 Socomec 3 +PNL1/038.0
-038Q1 motor circuit breaker; setting range 1-1,6A; Icu>100kA(400/415V) GV2 P06 GV2 P06 Schneider Electric 1 +PNL1/038.0
-038G1 power supply; SFB (selective fuse breaking); 3-phase input; Vi : 320-575V; Vo : 24VDC Io : 10A; QUINT-PS/3AC/24DC/10 2866705 Phoenix Contact 1 +PNL1/038.0
-038U2 surge arrestor plugtrab; type 3; L,N; Un=230VAC (TN-S); In=26A; isn(8/20)μs=3kA; Up<=1,35kV; ta<=25ns PLT-SEC-T3-230-FM 2905229 Phoenix Contact 1 +PNL1/038.8
-038F2 modular fuse disconnect switch RM; 10x38; 2p. without signalisation 5601 0020 5601 0020 Socomec 1 +PNL1/038.8
-038F2 cylindrical fuse NF; 25A gG; 10x38; 500V; 120kA; without striker 6012 0025 6012 0025 Socomec 2 +PNL1/038.8
-038Q2 motor circuit breaker; setting range 1-1,6A; Icu>100kA(400/415V) GV2 P06 GV2 P06 Schneider Electric 1 +PNL1/038.8
-038G2 power supply; SFB (selective fuse breaking); 1-phase input; Vi : 85-264V; Vo : 24VDC Io : 10A; QUINT-PS/1AC/24DC/10 2866763 Phoenix Contact 1 +PNL1/038.8
-039F01 miniature circuit-breaker; Acti 9; iC60N; 1-pole; 4A; tripping characteristic C; breaking capacity 50kA; DIN rail mounting; IP20 iC60N A9F74104 Schneider Electric 1 +PNL1/039.0
-039F02 miniature circuit-breaker; Acti 9; iC60N; 1-pole; 4A; tripping characteristic C; breaking capacity 50kA; DIN rail mounting; IP20 iC60N A9F74104 Schneider Electric 1 +PNL1/039.1
-039F03 miniature circuit-breaker; Acti 9; iC60N; 1-pole; 2A; tripping characteristic C; breaking capacity 50kA; DIN rail mounting; IP20 iC60N A9F74102 Schneider Electric 1 +PNL1/039.2
-039F04 miniature circuit-breaker; Acti 9; iC60N; 1-pole; 2A; tripping characteristic C; breaking capacity 50kA; DIN rail mounting; IP20 iC60N A9F74102 Schneider Electric 1 +PNL1/039.2
-039F21 miniature circuit-breaker; Acti 9; iC60N; 1-pole; 2A; tripping characteristic C; breaking capacity 50kA; DIN rail mounting; IP20 iC60N A9F74102 Schneider Electric 1 +PNL1/039.6
-039F22 miniature circuit-breaker; Acti 9; iC60N; 1-pole; 2A; tripping characteristic C; breaking capacity 50kA; DIN rail mounting; IP20 iC60N A9F74102 Schneider Electric 1 +PNL1/039.7
-039F24 miniature circuit-breaker; Acti 9; iC60N; 1-pole; 6A; tripping characteristic C; breaking capacity 10kA; DIN rail mounting; IP20 iC60N A9F79106 Schneider Electric 1 +PNL1/039.8
-040K1 auxiliary contactor; 5NO; DC 24V; screw-type connection CAD50BD CAD50BD Schneider Electric 1 +PNL1/040.0
-040K1 auxiliary contact block; 4NO; screw-type connection LAD N40 LAD N40 Schneider Electric 1 +PNL1/040.0
-060Q1 motor circuit breaker; setting range 0,63-1A; Icu>100kA(400/415V) GV2 P05 GV2 P05 Schneider Electric 1 +PNL1/060.0
-060Q1 auxiliary contacts for GV; 1NO + 1NC GV AE11 GV AE11 Schneider Electric 1 +PNL1/060.0
-060K1 motor starter; 2,2kW 380/400V AC-3; 3P; 1NO; DC 24V; screw-type connection LP1-K0610BD LP1-K0610BD Schneider Electric 1 +PNL1/060.4
-061Q1 motor circuit breaker; setting range 0,63-1A; Icu>100kA(400/415V) GV2 P05 GV2 P05 Schneider Electric 1 +PNL1/061.0
-061Q1 auxiliary contacts for GV; 1NO + 1NC GV AE11 GV AE11 Schneider Electric 1 +PNL1/061.0
-061K1 motor starter; 2,2kW 380/400V AC-3; 3P; 1NO; DC 24V; screw-type connection LP1-K0610BD LP1-K0610BD Schneider Electric 1 +PNL1/061.4
-062Q1 motor circuit breaker; setting range 0,63-1A; Icu>100kA(400/415V) GV2 P05 GV2 P05 Schneider Electric 1 +PNL1/062.0
-062Q1 auxiliary contacts for GV; 1NO + 1NC GV AE11 GV AE11 Schneider Electric 1 +PNL1/062.0
-062K1 motor starter; 2,2kW 380/400V AC-3; 3P; 1NO; DC 24V; screw-type connection LP1-K0610BD LP1-K0610BD Schneider Electric 1 +PNL1/062.4
-120Q1 motor circuit breaker; setting range 132-220A; Icu:35kA(400/415V) GV7 RE220 GV7 RE220 Schneider Electric 1 +PNL1/120.0
-120K1 mini contactor; 24VDC; 2 change over contacts; with LED indicator and test button: with built-in diode MY2IN-D2 MY2IN-D2 24VDC Omron 1 +PNL1/120.9
-120K1 socket for MY2IN PYF-08A-E PYF-08A-E Omron 1 +PNL1/120.9
-130U1 soft starter MCD202; 3x200-440V; 22kW; 48A; with motor protection; control voltage : 24VAC/VDC 175G5223 MCD202022T4CV1 Danfoss 1 +PNL1/130.0
-130Q1 motor circuit breaker; setting range 37-50A; Icu:50kA(400/415V) GV3 P50 GV3 P50 Schneider Electric 1 +PNL1/130.0
-130Q1 auxiliary contacts for GVE3; 1NO + 1NC GV3 A01 GV3 A01 Schneider Electric 1 +PNL1/130.0
Global Water Engineering CLIENT: AF SUGAR MAIN CONTROL PANEL = MCP + PARTS
Autobaan 22.01.01 DRAWN 13/10/2015 RL
BE-8210 Loppem PARTS LIST CHECKED
+32 50 54 64 44 PROJECT: WASTEWATER TREATMENT PLANT APPROVED
+32 50 54 64 46 DATE NAME SIGN
This document is the property of GLOBAL WATER ENGINEERING (GWE) NV Belgium. It shall not be copied,
http://www.globalwe.com PROJECT No.: 34124 transmitted or communicated to thirdparties without the explicit agreement of GWE. International conven- REV DATE DESCRIPTION BY CHK PAGE:002 NEXT: 003 LAST: 006
tions of Berne (1886) - Paris (1896) - Berlin (1908) - Berne (1914) - Rome (1928) - Brussels (1948)
0 1 2 3 4 5 6 7 8 9
Parts list
Device Description Type number Order number Manufacturer Qty Page
-130K1 motor starter; 22kW 380/400V AC-3; 3P; 1NO+1NC; AC 230V; 50/60Hz; screw-type connection LC1-D50AP7 LC1-D50AP7 Schneider Electric 1 +PNL1/130.4
-130K2 mini contactor; 24VDC; 2 change over contacts; with LED indicator and test button: with built-in diode MY2IN-D2 MY2IN-D2 24VDC Omron 1 +PNL1/130.7
-130K2 socket for MY2IN PYF-08A-E PYF-08A-E Omron 1 +PNL1/130.7
-130K3 mini contactor; 24VDC; 2 change over contacts; with LED indicator and test button: with built-in diode MY2IN-D2 MY2IN-D2 24VDC Omron 1 +PNL1/130.8
-130K3 socket for MY2IN PYF-08A-E PYF-08A-E Omron 1 +PNL1/130.8
-170U1 soft starter MCD202; 3x200-440V; 15kW; 34A; with motor protection; control voltage : 24VAC/VDC 175G5221 MCD202015T4CV1 Danfoss 1 +PNL1/170.0
-170Q1 motor circuit breaker; setting range 30-40A; Icu:50kA(400/415V) GV3 P40 GV3 P40 Schneider Electric 1 +PNL1/170.0
-170Q1 auxiliary contacts for GVE3; 1NO + 1NC GV3 A01 GV3 A01 Schneider Electric 1 +PNL1/170.0
-170K1 motor starter; 15kW 380/400V AC-3; 3P; 1NO+1NC; DC 24V; screw-type connection LC1-D32BD LC1-D32BD Schneider Electric 1 +PNL1/170.4
-170K3 mini contactor; 24VDC; 2 change over contacts; with LED indicator and test button: with built-in diode MY2IN-D2 MY2IN-D2 24VDC Omron 1 +PNL1/170.7
-170K3 socket for MY2IN PYF-08A-E PYF-08A-E Omron 1 +PNL1/170.7
-171U1 soft starter MCD202; 3x200-440V; 15kW; 34A; with motor protection; control voltage : 24VAC/VDC 175G5221 MCD202015T4CV1 Danfoss 1 +PNL1/171.0
-171Q1 motor circuit breaker; setting range 30-40A; Icu:50kA(400/415V) GV3 P40 GV3 P40 Schneider Electric 1 +PNL1/171.0
-171Q1 auxiliary contacts for GVE3; 1NO + 1NC GV3 A01 GV3 A01 Schneider Electric 1 +PNL1/171.0
-171K1 motor starter; 15kW 380/400V AC-3; 3P; 1NO+1NC; DC 24V; screw-type connection LC1-D32BD LC1-D32BD Schneider Electric 1 +PNL1/171.4
-171K3 mini contactor; 24VDC; 2 change over contacts; with LED indicator and test button: with built-in diode MY2IN-D2 MY2IN-D2 24VDC Omron 1 +PNL1/171.7
-171K3 socket for MY2IN PYF-08A-E PYF-08A-E Omron 1 +PNL1/171.7
-180Q1 motor circuit breaker; setting range 0,63-1A; Icu>100kA(400/415V) GV2 P05 GV2 P05 Schneider Electric 1 +PNL1/180.0
-180K1 motor starter; 2,2kW 380/400V AC-3; 3P; 1NO; DC 24V; screw-type connection LP1-K0610BD LP1-K0610BD Schneider Electric 1 +PNL1/180.4
-200Q1 motor circuit breaker; setting range 1,6-2,5A; Icu>100kA(400/415V) GV2 P07 GV2 P07 Schneider Electric 1 +PNL1/200.0
-200Q1 auxiliary contacts for GV; 1NO + 1NC GV AE11 GV AE11 Schneider Electric 1 +PNL1/200.0
-200K1 motor starter; 2,2kW 380/400V AC-3; 3P; 1NO; DC 24V; screw-type connection LP1-K0610BD LP1-K0610BD Schneider Electric 1 +PNL1/200.4
-270Q1 motor circuit breaker; setting range 4-6,3A; Icu>100kA(400/415V) GV2 P10 GV2 P10 Schneider Electric 1 +PNL1/270.0
-270Q1 auxiliary contacts for GV; 1NO + 1NC GV AE11 GV AE11 Schneider Electric 1 +PNL1/270.0
-270K1 motor starter; 4kW 380/400V AC-3; 3P; 1NO+1NC; DC 24V; screw-type connection LC1-D09BD LC1-D09BD Schneider Electric 1 +PNL1/270.4
-280Q1 motor circuit breaker; setting range 4-6,3A; Icu>100kA(400/415V) GV2 P10 GV2 P10 Schneider Electric 1 +PNL1/280.0
-280Q1 auxiliary contacts for GV; 1NO + 1NC GV AE11 GV AE11 Schneider Electric 1 +PNL1/280.0
-280K1 motor starter; 4kW 380/400V AC-3; 3P; 1NO+1NC; DC 24V; screw-type connection LC1-D09BD LC1-D09BD Schneider Electric 1 +PNL1/280.4
-290U1 variable speed drive; FC302; 3x380-500V; 11kW; GLCP; RFI filter; class A1/B; IP20; B3 case 131B9826 FC-302P11KT5E20H1XGXXXXSXXXXAXBXCXXXXDX Danfoss 1 +PNL1/290.0
-290Q1 motor circuit breaker; setting range 24-32A; Icu:50kA(400/415V) GV2 P32 GV2 P32 Schneider Electric 1 +PNL1/290.0
-290Q1 auxiliary contacts for GV; 1NO + 1NC GV AE11 GV AE11 Schneider Electric 1 +PNL1/290.0
-290K1 motor starter; 11kW 380/400V AC-3; 3P; 1NO+1NC; DC 24V; screw-type connection LC1-D25BD LC1-D25BD Schneider Electric 1 +PNL1/290.4
-290K3 mini contactor; 24VDC; 2 change over contacts; with LED indicator and test button: with built-in diode MY2IN-D2 MY2IN-D2 24VDC Omron 1 +PNL1/290.7
-290K3 socket for MY2IN PYF-08A-E PYF-08A-E Omron 1 +PNL1/290.7
-290U2 PTC resistor relay; 24VDC; 1NC+1NO contact; memory function; external reset; screw terminal connection LT3 SM00ED LT3 SM00ED Schneider Electric 1 +PNL1/290.8
-300Q1 motor circuit breaker; setting range 4-6,3A; Icu>100kA(400/415V) GV2 P10 GV2 P10 Schneider Electric 1 +PNL1/300.0
-300Q1 auxiliary contacts for GV; 1NO + 1NC GV AE11 GV AE11 Schneider Electric 1 +PNL1/300.0
-300K1 motor starter; 4kW 380/400V AC-3; 3P; 1NO+1NC; DC 24V; screw-type connection LC1-D09BD LC1-D09BD Schneider Electric 1 +PNL1/300.4
-310Q1 motor circuit breaker; setting range 20-25A; Icu:50kA(400/415V) GV2 P22 GV2 P22 Schneider Electric 1 +PNL1/310.0
-310Q1 auxiliary contacts for GV; 1NO + 1NC GV AE11 GV AE11 Schneider Electric 1 +PNL1/310.0
-310K1 motor starter; 11kW 380/400V AC-3; 3P; 1NO+1NC; DC 24V; screw-type connection LC1-D25BD LC1-D25BD Schneider Electric 1 +PNL1/310.4
-320U1 variable speed drive FC302; 3x380-500V; 0,37kW; GLCP; RFI filter; class A1/B1; IP20; A2 case 131B0033 FC-302PK37T5E20H1XGXXXXSXXXXAXBXCXXXXDX Danfoss 1 +PNL1/320.0
-320F1 miniature circuit-breaker; Acti 9; iC60L; 3-pole; 2A; tripping characteristic B; breaking capacity 100kA; DIN rail mounting; IP20 iC60L A9F93302 Schneider Electric 1 +PNL1/320.0
-320F1 auxiliary contact; Acti 9; type OF; 1 changeover contact; 6A; DIN rail mounting OF A9A26924 Schneider Electric 2 +PNL1/320.0
-320K1 motor starter; 2,2kW 380/400V AC-3; 3P; 1NO; DC 24V; screw-type connection LP1-K0610BD LP1-K0610BD Schneider Electric 1 +PNL1/320.4
-320K2 timing relay; Us=24VDC/24-230VAC; function C (off-delay); 1s-10s-1m-10m-1h-10h-100h; 1C/O; 8A; screw-type connection RE11 RC MU RE11 RC MU Schneider Electric 1 +PNL1/320.5
Global Water Engineering CLIENT: AF SUGAR MAIN CONTROL PANEL = MCP + PARTS
Autobaan 22.01.01 DRAWN 13/10/2015 RL
BE-8210 Loppem PARTS LIST CHECKED
+32 50 54 64 44 PROJECT: WASTEWATER TREATMENT PLANT APPROVED
+32 50 54 64 46 DATE NAME SIGN
This document is the property of GLOBAL WATER ENGINEERING (GWE) NV Belgium. It shall not be copied,
http://www.globalwe.com PROJECT No.: 34124 transmitted or communicated to thirdparties without the explicit agreement of GWE. International conven- REV DATE DESCRIPTION BY CHK PAGE:003 NEXT: 004 LAST: 006
tions of Berne (1886) - Paris (1896) - Berlin (1908) - Berne (1914) - Rome (1928) - Brussels (1948)
0 1 2 3 4 5 6 7 8 9
Parts list
Device Description Type number Order number Manufacturer Qty Page
-320K3 mini contactor; 24VDC; 2 change over contacts; with LED indicator and test button: with built-in diode MY2IN-D2 MY2IN-D2 24VDC Omron 1 +PNL1/320.7
-320K3 socket for MY2IN PYF-08A-E PYF-08A-E Omron 1 +PNL1/320.7
-320.1F1 miniature circuit-breaker; Acti 9; iC60L; 3-pole; 0,5A; tripping characteristic C; breaking capacity 100kA; DIN rail mounting; IP20 iC60L A9F94370 Schneider Electric 1 +PNL1/320.1.0
-320.1K1 motor starter; 2,2kW 380/400V AC-3; 3P; 1NO; DC 24V; screw-type connection LP1-K0610BD LP1-K0610BD Schneider Electric 1 +PNL1/320.1.4
-320.1U1 current control relay; setting range 2-500mA RM35 JA31MW RM35 JA31MW Schneider Electric 1 +PNL1/320.1.8
-321U1 variable speed drive FC302; 3x380-500V; 0,37kW; GLCP; RFI filter; class A1/B1; IP20; A2 case 131B0033 FC-302PK37T5E20H1XGXXXXSXXXXAXBXCXXXXDX Danfoss 1 +PNL1/321.0
-321F1 miniature circuit-breaker; Acti 9; iC60H; 3-pole; 4A; tripping characteristic B; breaking capacity 70kA; DIN rail mounting; IP20 iC60H A9F83304 Schneider Electric 1 +PNL1/321.0
-321F1 auxiliary contact; Acti 9; type OF; 1 changeover contact; 6A; DIN rail mounting OF A9A26924 Schneider Electric 2 +PNL1/321.0
-321K1 motor starter; 2,2kW 380/400V AC-3; 3P; 1NO; DC 24V; screw-type connection LP1-K0610BD LP1-K0610BD Schneider Electric 1 +PNL1/321.4
-321K2 timing relay; Us=24VDC/24-230VAC; function C (off-delay); 1s-10s-1m-10m-1h-10h-100h; 1C/O; 8A; screw-type connection RE11 RC MU RE11 RC MU Schneider Electric 1 +PNL1/321.5
-321K3 mini contactor; 24VDC; 2 change over contacts; with LED indicator and test button: with built-in diode MY2IN-D2 MY2IN-D2 24VDC Omron 1 +PNL1/321.7
-321K3 socket for MY2IN PYF-08A-E PYF-08A-E Omron 1 +PNL1/321.7
-321.1F1 miniature circuit-breaker; Acti 9; iC60H; 3-pole; 0,5A; tripping characteristic C; breaking capacity 70kA; DIN rail mounting; IP20 iC60H A9F84370 Schneider Electric 1 +PNL1/321.1.0
-321.1K1 motor starter; 2,2kW 380/400V AC-3; 3P; 1NO; DC 24V; screw-type connection LP1-K0610BD LP1-K0610BD Schneider Electric 1 +PNL1/321.1.4
-321.1U1 current control relay; setting range 2-500mA RM35 JA31MW RM35 JA31MW Schneider Electric 1 +PNL1/321.1.8
-370Q1 motor circuit breaker; setting range 9-14A; Icu:100kA(400/415V) GV2 P16 GV2 P16 Schneider Electric 1 +PNL1/370.0
-370Q1 auxiliary contacts for GV; 1NO + 1NC GV AE11 GV AE11 Schneider Electric 1 +PNL1/370.0
-370K1 motor starter; 7,5kW 380/400V AC-3; 3P; 1NO+1NC; DC 24V; screw-type connection LC1-D18BD LC1-D18BD Schneider Electric 1 +PNL1/370.4
-380Q1 motor circuit breaker; setting range 9-14A; Icu:100kA(400/415V) GV2 P16 GV2 P16 Schneider Electric 1 +PNL1/380.0
-380Q1 auxiliary contacts for GV; 1NO + 1NC GV AE11 GV AE11 Schneider Electric 1 +PNL1/380.0
-380K1 motor starter; 7,5kW 380/400V AC-3; 3P; 1NO+1NC; DC 24V; screw-type connection LC1-D18BD LC1-D18BD Schneider Electric 1 +PNL1/380.4
-450Q1 motor circuit breaker; setting range 2,5-4A; Icu>100kA(400/415V) GV2 P08 GV2 P08 Schneider Electric 1 +PNL1/450.0
-450Q1 auxiliary contacts for GV; 1NO + 1NC GV AE11 GV AE11 Schneider Electric 1 +PNL1/450.0
-450K1 motor starter; 2,2kW 380/400V AC-3; 3P; 1NO; DC 24V; screw-type connection LP1-K0610BD LP1-K0610BD Schneider Electric 1 +PNL1/450.4
-460Q1 motor circuit breaker; setting range 4-6,3A; Icu>100kA(400/415V) GV2 P10 GV2 P10 Schneider Electric 1 +PNL1/460.0
-460Q1 auxiliary contacts for GV; 1NO + 1NC GV AE11 GV AE11 Schneider Electric 1 +PNL1/460.0
-460K1 motor starter; 4kW 380/400V AC-3; 3P; 1NO+1NC; DC 24V; screw-type connection LC1-D09BD LC1-D09BD Schneider Electric 1 +PNL1/460.4
-560Q1 motor circuit breaker; setting range 1-1,6A; Icu>100kA(400/415V) GV2 P06 GV2 P06 Schneider Electric 1 +PNL1/560.0
-560Q1 auxiliary contacts for GV; 1NO + 1NC GV AE11 GV AE11 Schneider Electric 1 +PNL1/560.0
-560K1 motor starter; 2,2kW 380/400V AC-3; 3P; 1NO; DC 24V; screw-type connection LP1-K0610BD LP1-K0610BD Schneider Electric 1 +PNL1/560.4
-561Q1 motor circuit breaker; setting range 13-18A; Icu:50kA(400/415V) GV2 P20 GV2 P20 Schneider Electric 1 +PNL1/561.0
-561Q1 auxiliary contacts for GV; 1NO + 1NC GV AE11 GV AE11 Schneider Electric 1 +PNL1/561.0
-561K1 motor starter; 7,5kW 380/400V AC-3; 3P; 1NO+1NC; DC 24V; screw-type connection LC1-D18BD LC1-D18BD Schneider Electric 1 +PNL1/561.4
-562Q1 motor circuit breaker; setting range 0,63-1A; Icu>100kA(400/415V) GV2 P05 GV2 P05 Schneider Electric 1 +PNL1/562.0
-562Q1 auxiliary contacts for GV; 1NO + 1NC GV AE11 GV AE11 Schneider Electric 1 +PNL1/562.0
-562K1 motor starter; 2,2kW 380/400V AC-3; 3P; 1NO; DC 24V; screw-type connection LP1-K0610BD LP1-K0610BD Schneider Electric 1 +PNL1/562.4
-563Q1 motor circuit breaker; setting range 0,63-1A; Icu>100kA(400/415V) GV2 P05 GV2 P05 Schneider Electric 1 +PNL1/563.0
-563Q1 auxiliary contacts for GV; 1NO + 1NC GV AE11 GV AE11 Schneider Electric 1 +PNL1/563.0
-563K1 motor starter; 2,2kW 380/400V AC-3; 3P; 1NO; DC 24V; screw-type connection LP1-K0610BD LP1-K0610BD Schneider Electric 1 +PNL1/563.4
-564Q1 motor circuit breaker; setting range 9-14A; Icu:100kA(400/415V) GV2 P16 GV2 P16 Schneider Electric 1 +PNL1/564.0
-564Q1 auxiliary contacts for GV; 1NO + 1NC GV AE11 GV AE11 Schneider Electric 1 +PNL1/564.0
-564K1 motor starter; 7,5kW 380/400V AC-3; 3P; 1NO+1NC; DC 24V; screw-type connection LC1-D18BD LC1-D18BD Schneider Electric 1 +PNL1/564.4
-565Q1 motor circuit breaker; setting range 9-14A; Icu:100kA(400/415V) GV2 P16 GV2 P16 Schneider Electric 1 +PNL1/565.0
-565Q1 auxiliary contacts for GV; 1NO + 1NC GV AE11 GV AE11 Schneider Electric 1 +PNL1/565.0
-565K1 motor starter; 7,5kW 380/400V AC-3; 3P; 1NO+1NC; DC 24V; screw-type connection LC1-D18BD LC1-D18BD Schneider Electric 1 +PNL1/565.4
-680F1 miniature circuit-breaker; Acti 9; iC60N; 2-pole; 1A; tripping characteristic C; breaking capacity 50kA; DIN rail mounting; IP20 iC60N A9F74201 Schneider Electric 1 +PNL1/680.0
Global Water Engineering CLIENT: AF SUGAR MAIN CONTROL PANEL = MCP + PARTS
Autobaan 22.01.01 DRAWN 13/10/2015 RL
BE-8210 Loppem PARTS LIST CHECKED
+32 50 54 64 44 PROJECT: WASTEWATER TREATMENT PLANT APPROVED
+32 50 54 64 46 DATE NAME SIGN
This document is the property of GLOBAL WATER ENGINEERING (GWE) NV Belgium. It shall not be copied,
http://www.globalwe.com PROJECT No.: 34124 transmitted or communicated to thirdparties without the explicit agreement of GWE. International conven- REV DATE DESCRIPTION BY CHK PAGE:004 NEXT: 005 LAST: 006
tions of Berne (1886) - Paris (1896) - Berlin (1908) - Berne (1914) - Rome (1928) - Brussels (1948)
0 1 2 3 4 5 6 7 8 9
Parts list
Device Description Type number Order number Manufacturer Qty Page
-680K1 mini contactor; 24VDC; 2 change over contacts; with LED indicator and test button: with built-in diode MY2IN-D2 MY2IN-D2 24VDC Omron 1 +PNL1/680.3
-680K1 socket for MY2IN PYF-08A-E PYF-08A-E Omron 1 +PNL1/680.3
-760K1 mini contactor; 24VDC; 2 change over contacts; with LED indicator and test button: with built-in diode MY2IN-D2 MY2IN-D2 24VDC Omron 1 +PNL1/760.1
-760K1 socket for MY2IN PYF-08A-E PYF-08A-E Omron 1 +PNL1/760.1
-760F1 miniature circuit-breaker; Acti 9; iC60N; 2-pole; 1A; tripping characteristic C; breaking capacity 50kA; DIN rail mounting; IP20 iC60N A9F74201 Schneider Electric 1 +PNL1/760.5
-760K2 mini contactor; 24VDC; 2 change over contacts; with LED indicator and test button: with built-in diode MY2IN-D2 MY2IN-D2 24VDC Omron 1 +PNL1/760.8
-760K2 socket for MY2IN PYF-08A-E PYF-08A-E Omron 1 +PNL1/760.8
-940U1 stator protector; 12-24VAC/DC; 1 changeover contact; screw terminal connection STP-2A STP-2A Netzsch 1 +PNL1/940.0
-940K1 mini contactor; 24VDC; 2 change over contacts; with LED indicator and test button: with built-in diode MY2IN-D2 MY2IN-D2 24VDC Omron 1 +PNL1/940.1
-940K1 socket for MY2IN PYF-08A-E PYF-08A-E Omron 1 +PNL1/940.1
-940K2 mini contactor; 24VDC; 2 change over contacts; with LED indicator and test button: with built-in diode MY2IN-D2 MY2IN-D2 24VDC Omron 1 +PNL1/940.3
-940K2 socket for MY2IN PYF-08A-E PYF-08A-E Omron 1 +PNL1/940.3
-940U2 stator protector; 12-24VAC/DC; 1 changeover contact; screw terminal connection STP-2A STP-2A Netzsch 1 +PNL1/940.6
-940K3 mini contactor; 24VDC; 2 change over contacts; with LED indicator and test button: with built-in diode MY2IN-D2 MY2IN-D2 24VDC Omron 1 +PNL1/940.7
-940K3 socket for MY2IN PYF-08A-E PYF-08A-E Omron 1 +PNL1/940.7
-1000U00 SIMATIC S7-300; load power supply; AC 120/230V; DC 24V; 10A S7-300 6ES7307-1KA02-0AA0 Siemens 1 +PNL1/1000.0
-1000U01 SIMATIC S7-300; CPU 315-2PN/DP; central unit; DC 24V; memory 256kB; 2 interfaces; combined MPI/PROFIBUS DP master/slave 12MBit/s; interface ethernet PROFINET; micro memoryS7-300
card required 6ES7315-2EH14-0AB0 Siemens 1 +PNL1/1000.1
-1000U01 SIMATIC S7-300; power supply connector; 24VDC S7-300 6ES7391-1AA00-0AA0 Siemens 1 +PNL1/1000.1
-1000U01 SIMATIC S7-300; micro memory card; 2MB S7-300 6ES7953-8LL11-0AA0 Siemens 1 +PNL1/1000.1
-1000U01 ET 200M; Profinet connector; RJ45; metal housing ET 200M 6GK1901-1BB10-2AA0 Siemens 1 +PNL1/1000.1
-1000U01 SIMATIC NET; Profibus connector; 12MBaud; switchable termination; 9-pin Sub-D male; screw terminal connection; without PG interface; 90° cable output SIMATIC NET 6ES7972-0BA12-0XA0 Siemens 1 +PNL1/1000.1
-1000U11 Simatic ET 200M; IM 153-1; interface module; DC 24V; 2 interfaces; DP slave ET 200M 6ES7153-1AA03-0XB0 Siemens 1 +PNL1/1000.1
-1000U11 SIMATIC NET; Profibus connector; 12MBaud; switchable termination; 9-pin Sub-D male; screw terminal connection; without PG interface; 90° cable output SIMATIC NET 6ES7972-0BA12-0XA0 Siemens 1 +PNL1/1000.1
-1000U02 SIMATIC S7-300; digital input SM 321; 32 DI 24V DC; electrically isolated; 40-pole S7-300 6ES7321-1BL00-0AA0 Siemens 1 +PNL1/1000.2
-1000U02 SIMATIC S7-300; front connector; 40 pin; screw type connection S7-300 6ES7392-1AM00-0AA0 Siemens 1 +PNL1/1000.2
-1000U12 SIMATIC S7-300; analog input SM 331; optically isolated, 8 AI, U/I/thermocouple/resistors; diagnostics resolution 9/12/14 bit; 20 pole; remove and insert with active backplane bus S7-300 6ES7331-7KF02-0AB0 Siemens 1 +PNL1/1000.2
-1000U12 SIMATIC S7-300; front connector; 20 pin; screw type connection S7-300 6ES7392-1AJ00-0AA0 Siemens 1 +PNL1/1000.2
-1000U03 SIMATIC S7-300; digital input SM 321; 32 DI 24V DC; electrically isolated; 40-pole S7-300 6ES7321-1BL00-0AA0 Siemens 1 +PNL1/1000.2
-1000U03 SIMATIC S7-300; front connector; 40 pin; screw type connection S7-300 6ES7392-1AM00-0AA0 Siemens 1 +PNL1/1000.2
-1000U13 SIMATIC S7-300; analog input SM 331; optically isolated, 8 AI, U/I/thermocouple/resistors; diagnostics resolution 9/12/14 bit; 20 pole; remove and insert with active backplane bus S7-300 6ES7331-7KF02-0AB0 Siemens 1 +PNL1/1000.2
-1000U13 SIMATIC S7-300; front connector; 20 pin; screw type connection S7-300 6ES7392-1AJ00-0AA0 Siemens 1 +PNL1/1000.2
-1000U04 SIMATIC S7-300; digital input SM 321; 32 DI 24V DC; electrically isolated; 40-pole S7-300 6ES7321-1BL00-0AA0 Siemens 1 +PNL1/1000.3
-1000U04 SIMATIC S7-300; front connector; 40 pin; screw type connection S7-300 6ES7392-1AM00-0AA0 Siemens 1 +PNL1/1000.3
-1000U14 SIMATIC S7-300; analog input SM 331; optically isolated, 8 AI, U/I/thermocouple/resistors; diagnostics resolution 9/12/14 bit; 20 pole; remove and insert with active backplane bus S7-300 6ES7331-7KF02-0AB0 Siemens 1 +PNL1/1000.3
-1000U14 SIMATIC S7-300; front connector; 20 pin; screw type connection S7-300 6ES7392-1AJ00-0AA0 Siemens 1 +PNL1/1000.3
-1000U05 SIMATIC S7-300; digital input SM 321; 32 DI 24V DC; electrically isolated; 40-pole S7-300 6ES7321-1BL00-0AA0 Siemens 1 +PNL1/1000.3
-1000U05 SIMATIC S7-300; front connector; 40 pin; screw type connection S7-300 6ES7392-1AM00-0AA0 Siemens 1 +PNL1/1000.3
-1000U15 SIMATIC S7-300; analog output SM 332; optically isolated, 8 AO U/I; diagnostics resolution 11/12 bit; 40-pole; remove and insert with active backplane bus S7-300 6ES7332-5HF00-0AB0 Siemens 1 +PNL1/1000.3
-1000U15 SIMATIC S7-300; front connector; 40 pin; screw type connection S7-300 6ES7392-1AM00-0AA0 Siemens 1 +PNL1/1000.3
-1000U06 SIMATIC S7-300; digital output SM 322; 32 DO 24V DC 0,5A; electrically isolated; 40-pole S7-300 6ES7322-1BL00-0AA0 Siemens 1 +PNL1/1000.4
-1000U06 SIMATIC S7-300; front connector; 40 pin; screw type connection S7-300 6ES7392-1AM00-0AA0 Siemens 1 +PNL1/1000.4
-1000U16 SIMATIC S7-300; analog output SM 332; optically isolated, 8 AO U/I; diagnostics resolution 11/12 bit; 40-pole; remove and insert with active backplane bus S7-300 6ES7332-5HF00-0AB0 Siemens 1 +PNL1/1000.4
-1000U16 SIMATIC S7-300; front connector; 40 pin; screw type connection S7-300 6ES7392-1AM00-0AA0 Siemens 1 +PNL1/1000.4
-1000U07 SIMATIC S7-300; digital output SM 322; 32 DO 24V DC 0,5A; electrically isolated; 40-pole S7-300 6ES7322-1BL00-0AA0 Siemens 1 +PNL1/1000.4
-1000U07 SIMATIC S7-300; front connector; 40 pin; screw type connection S7-300 6ES7392-1AM00-0AA0 Siemens 1 +PNL1/1000.4
-1000U50 ethernet switch; 5 port; 24VDC EDS-205 EDS-205 Moxa 1 +PNL1/1000.8
Global Water Engineering CLIENT: AF SUGAR MAIN CONTROL PANEL = MCP + PARTS
Autobaan 22.01.01 DRAWN 13/10/2015 RL
BE-8210 Loppem PARTS LIST CHECKED
+32 50 54 64 44 PROJECT: WASTEWATER TREATMENT PLANT APPROVED
+32 50 54 64 46 DATE NAME SIGN
This document is the property of GLOBAL WATER ENGINEERING (GWE) NV Belgium. It shall not be copied,
http://www.globalwe.com PROJECT No.: 34124 transmitted or communicated to thirdparties without the explicit agreement of GWE. International conven- REV DATE DESCRIPTION BY CHK PAGE:005 NEXT: 006 LAST: 006
tions of Berne (1886) - Paris (1896) - Berlin (1908) - Berne (1914) - Rome (1928) - Brussels (1948)
0 1 2 3 4 5 6 7 8 9
Parts list
Device Description Type number Order number Manufacturer Qty Page
-1050K1 mini contactor; 24VDC; 2 change over contacts; with LED indicator and test button: with built-in diode MY2IN-D2 MY2IN-D2 24VDC Omron 1 +PNL1/1050.0
-1050K1 socket for MY2IN PYF-08A-E PYF-08A-E Omron 1 +PNL1/1050.0
-1050K2 mini contactor; 24VDC; 2 change over contacts; with LED indicator and test button: with built-in diode MY2IN-D2 MY2IN-D2 24VDC Omron 1 +PNL1/1050.1
-1050K2 socket for MY2IN PYF-08A-E PYF-08A-E Omron 1 +PNL1/1050.1
-1050K3 mini contactor; 24VDC; 2 change over contacts; with LED indicator and test button: with built-in diode MY2IN-D2 MY2IN-D2 24VDC Omron 1 +PNL1/1050.2
-1050K3 socket for MY2IN PYF-08A-E PYF-08A-E Omron 1 +PNL1/1050.2
-1050K4 mini contactor; 24VDC; 2 change over contacts; with LED indicator and test button: with built-in diode MY2IN-D2 MY2IN-D2 24VDC Omron 1 +PNL1/1050.2
-1050K4 socket for MY2IN PYF-08A-E PYF-08A-E Omron 1 +PNL1/1050.2
-1050K5 mini contactor; 24VDC; 2 change over contacts; with LED indicator and test button: with built-in diode MY2IN-D2 MY2IN-D2 24VDC Omron 1 +PNL1/1050.3
-1050K5 socket for MY2IN PYF-08A-E PYF-08A-E Omron 1 +PNL1/1050.3
-1050K6 mini contactor; 24VDC; 2 change over contacts; with LED indicator and test button: with built-in diode MY2IN-D2 MY2IN-D2 24VDC Omron 1 +PNL1/1050.3
-1050K6 socket for MY2IN PYF-08A-E PYF-08A-E Omron 1 +PNL1/1050.3
-1050K7 mini contactor; 24VDC; 2 change over contacts; with LED indicator and test button: with built-in diode MY2IN-D2 MY2IN-D2 24VDC Omron 1 +PNL1/1050.4
-1050K7 socket for MY2IN PYF-08A-E PYF-08A-E Omron 1 +PNL1/1050.4
-1050K8 mini contactor; 24VDC; 2 change over contacts; with LED indicator and test button: with built-in diode MY2IN-D2 MY2IN-D2 24VDC Omron 1 +PNL1/1050.4
-1050K8 socket for MY2IN PYF-08A-E PYF-08A-E Omron 1 +PNL1/1050.4
Global Water Engineering CLIENT: AF SUGAR MAIN CONTROL PANEL = MCP + PARTS
Autobaan 22.01.01 DRAWN 13/10/2015 RL
BE-8210 Loppem PARTS LIST CHECKED
+32 50 54 64 44 PROJECT: WASTEWATER TREATMENT PLANT APPROVED
+32 50 54 64 46 DATE NAME SIGN
This document is the property of GLOBAL WATER ENGINEERING (GWE) NV Belgium. It shall not be copied,
http://www.globalwe.com PROJECT No.: 34124 transmitted or communicated to thirdparties without the explicit agreement of GWE. International conven- REV DATE DESCRIPTION BY CHK PAGE:006 NEXT: +TERM/001 LAST: 006
tions of Berne (1886) - Paris (1896) - Berlin (1908) - Berne (1914) - Rome (1928) - Brussels (1948)
0 1 2 3 4 5 6 7 8 9
Terminal diagram
Strip
Cable name
Cable name
=MCP+PNL1-X0.2
-P/E103
Connection
Connection
Terminal
Jumper
point
point
Cable type
Cable type
LiYY-JZ
Function text Target designation Target designation Page / column
Global Water Engineering CLIENT: AF SUGAR MAIN CONTROL PANEL = MCP + TERM
Autobaan 22.01.01 DRAWN 13/10/2015 RL
BE-8210 Loppem TERMINAL DIAGRAM CHECKED
+32 50 54 64 44 PROJECT: WASTEWATER TREATMENT PLANT APPROVED
+32 50 54 64 46 DATE NAME SIGN
This document is the property of GLOBAL WATER ENGINEERING (GWE) NV Belgium. It shall not be copied,
http://www.globalwe.com PROJECT No.: 34124 transmitted or communicated to thirdparties without the explicit agreement of GWE. International conven- REV DATE DESCRIPTION BY CHK PAGE:001 NEXT: 002 LAST: 016
tions of Berne (1886) - Paris (1896) - Berlin (1908) - Berne (1914) - Rome (1928) - Brussels (1948)
0 1 2 3 4 5 6 7 8 9
Terminal diagram
Strip
Cable name
Cable name
=MCP+PNL1-X0.3
-P/I201A
-P/I201B
Connection
Connection
Terminal
Jumper
point
point
Cable type
Cable type
LiYY-JZ
LiYY-JZ
Function text Target designation Target designation Page / column
Global Water Engineering CLIENT: AF SUGAR MAIN CONTROL PANEL = MCP + TERM
Autobaan 22.01.01 DRAWN 13/10/2015 RL
BE-8210 Loppem TERMINAL DIAGRAM CHECKED
+32 50 54 64 44 PROJECT: WASTEWATER TREATMENT PLANT APPROVED
+32 50 54 64 46 DATE NAME SIGN
This document is the property of GLOBAL WATER ENGINEERING (GWE) NV Belgium. It shall not be copied,
http://www.globalwe.com PROJECT No.: 34124 transmitted or communicated to thirdparties without the explicit agreement of GWE. International conven- REV DATE DESCRIPTION BY CHK PAGE:002 NEXT: 003 LAST: 016
tions of Berne (1886) - Paris (1896) - Berlin (1908) - Berne (1914) - Rome (1928) - Brussels (1948)
0 1 2 3 4 5 6 7 8 9
Terminal diagram
Strip
Cable name
Cable name
=MCP+PNL1-X0.4
-P/P111
Connection
Connection
Terminal
Jumper
point
point
Cable type
Cable type
LiYY-JZ
Function text Target designation Target designation Page / column
Global Water Engineering CLIENT: AF SUGAR MAIN CONTROL PANEL = MCP + TERM
Autobaan 22.01.01 DRAWN 13/10/2015 RL
BE-8210 Loppem TERMINAL DIAGRAM CHECKED
+32 50 54 64 44 PROJECT: WASTEWATER TREATMENT PLANT APPROVED
+32 50 54 64 46 DATE NAME SIGN
This document is the property of GLOBAL WATER ENGINEERING (GWE) NV Belgium. It shall not be copied,
http://www.globalwe.com PROJECT No.: 34124 transmitted or communicated to thirdparties without the explicit agreement of GWE. International conven- REV DATE DESCRIPTION BY CHK PAGE:003 NEXT: 004 LAST: 016
tions of Berne (1886) - Paris (1896) - Berlin (1908) - Berne (1914) - Rome (1928) - Brussels (1948)
0 1 2 3 4 5 6 7 8 9
Terminal diagram
Strip
Cable name
Cable name
=MCP+PNL1-X0.5
-P/A401A
-P/A401B
-P/M401
-P/A402
-P/P100
-P/P107
-P/P108
-P/PO3
Connection
Connection
Terminal
Jumper
point
point
Cable type
Cable type
LiYY-JZ
LiYY-JZ
LiYY-JZ
LiYY-JZ
LiYY-JZ
LiYY-JZ
LiYY-JZ
LiYY-JZ
Function text Target designation Target designation Page / column
Global Water Engineering CLIENT: AF SUGAR MAIN CONTROL PANEL = MCP + TERM
Autobaan 22.01.01 DRAWN 13/10/2015 RL
BE-8210 Loppem TERMINAL DIAGRAM CHECKED
+32 50 54 64 44 PROJECT: WASTEWATER TREATMENT PLANT APPROVED
+32 50 54 64 46 DATE NAME SIGN
This document is the property of GLOBAL WATER ENGINEERING (GWE) NV Belgium. It shall not be copied,
http://www.globalwe.com PROJECT No.: 34124 transmitted or communicated to thirdparties without the explicit agreement of GWE. International conven- REV DATE DESCRIPTION BY CHK PAGE:004 NEXT: 005 LAST: 016
tions of Berne (1886) - Paris (1896) - Berlin (1908) - Berne (1914) - Rome (1928) - Brussels (1948)
0 1 2 3 4 5 6 7 8 9
Terminal diagram
Strip
Cable name
Cable name
=MCP+PNL1-X0.5
-P/P112A.1
-P/P112B.1
-P/P110
-P/P117
-P/P118
-P/P200
-P/P201
-P/P400
Connection
Connection
Terminal
Jumper
point
point
Cable type
Cable type
LiYY-JZ
LiYY-JZ
LiYY-JZ
LiYY-JZ
LiYY-JZ
LiYY-JZ
LiYY-JZ
LiYY-JZ
Function text Target designation Target designation Page / column
Global Water Engineering CLIENT: AF SUGAR MAIN CONTROL PANEL = MCP + TERM
Autobaan 22.01.01 DRAWN 13/10/2015 RL
BE-8210 Loppem TERMINAL DIAGRAM CHECKED
+32 50 54 64 44 PROJECT: WASTEWATER TREATMENT PLANT APPROVED
+32 50 54 64 46 DATE NAME SIGN
This document is the property of GLOBAL WATER ENGINEERING (GWE) NV Belgium. It shall not be copied,
http://www.globalwe.com PROJECT No.: 34124 transmitted or communicated to thirdparties without the explicit agreement of GWE. International conven- REV DATE DESCRIPTION BY CHK PAGE:005 NEXT: 006 LAST: 016
tions of Berne (1886) - Paris (1896) - Berlin (1908) - Berne (1914) - Rome (1928) - Brussels (1948)
0 1 2 3 4 5 6 7 8 9
Terminal diagram
Strip
Cable name
Cable name
=MCP+PNL1-X0.5
-P/P406A
-P/P406B
-P/P401
-P/P402
-P/P403
Connection
Connection
Terminal
Jumper
point
point
Cable type
Cable type
LiYY-JZ
LiYY-JZ
LiYY-JZ
LiYY-JZ
LiYY-JZ
Function text Target designation Target designation Page / column
Global Water Engineering CLIENT: AF SUGAR MAIN CONTROL PANEL = MCP + TERM
Autobaan 22.01.01 DRAWN 13/10/2015 RL
BE-8210 Loppem TERMINAL DIAGRAM CHECKED
+32 50 54 64 44 PROJECT: WASTEWATER TREATMENT PLANT APPROVED
+32 50 54 64 46 DATE NAME SIGN
This document is the property of GLOBAL WATER ENGINEERING (GWE) NV Belgium. It shall not be copied,
http://www.globalwe.com PROJECT No.: 34124 transmitted or communicated to thirdparties without the explicit agreement of GWE. International conven- REV DATE DESCRIPTION BY CHK PAGE:006 NEXT: 007 LAST: 016
tions of Berne (1886) - Paris (1896) - Berlin (1908) - Berne (1914) - Rome (1928) - Brussels (1948)
0 1 2 3 4 5 6 7 8 9
Terminal diagram
Strip
Cable name
Cable name
=MCP+PNL1-X1
-S/KCV201.1
-S/KCV201.3
-S/ACV107.1
-S/ACV107.3
-P/PO1
-P/PO2
Connection
Connection
Terminal
Jumper
point
point
Cable type
Cable type
LiYY-JZ
LiYY-JZ
LiYY-JZ
LiYY-JZ
LiYY-JZ
LiYY-JZ
Function text Target designation Target designation Page / column
Global Water Engineering CLIENT: AF SUGAR MAIN CONTROL PANEL = MCP + TERM
Autobaan 22.01.01 DRAWN 13/10/2015 RL
BE-8210 Loppem TERMINAL DIAGRAM CHECKED
+32 50 54 64 44 PROJECT: WASTEWATER TREATMENT PLANT APPROVED
+32 50 54 64 46 DATE NAME SIGN
This document is the property of GLOBAL WATER ENGINEERING (GWE) NV Belgium. It shall not be copied,
http://www.globalwe.com PROJECT No.: 34124 transmitted or communicated to thirdparties without the explicit agreement of GWE. International conven- REV DATE DESCRIPTION BY CHK PAGE:007 NEXT: 008 LAST: 016
tions of Berne (1886) - Paris (1896) - Berlin (1908) - Berne (1914) - Rome (1928) - Brussels (1948)
0 1 2 3 4 5 6 7 8 9
Terminal diagram
Strip
Cable name
Cable name
-S/LPES_A401A
-S/LPES_A401B
-S/LPES_I201A
-S/LPES_I201B
=MCP+PNL1-X2
-S/LPES_A402
-S/ACV107.2
-S/D103.2
-I/UPS
Connection
Connection
Terminal
Jumper
point
point
Cable type
Cable type
LiYY-JZ
LiYY-JZ
LiYY-JZ
LiYY-JZ
LiYY-JZ
LiYY-JZ
LiYY-JZ
LiYY-JZ
Function text Target designation Target designation Page / column
Global Water Engineering CLIENT: AF SUGAR MAIN CONTROL PANEL = MCP + TERM
Autobaan 22.01.01 DRAWN 13/10/2015 RL
BE-8210 Loppem TERMINAL DIAGRAM CHECKED
+32 50 54 64 44 PROJECT: WASTEWATER TREATMENT PLANT APPROVED
+32 50 54 64 46 DATE NAME SIGN
This document is the property of GLOBAL WATER ENGINEERING (GWE) NV Belgium. It shall not be copied,
http://www.globalwe.com PROJECT No.: 34124 transmitted or communicated to thirdparties without the explicit agreement of GWE. International conven- REV DATE DESCRIPTION BY CHK PAGE:008 NEXT: 009 LAST: 016
tions of Berne (1886) - Paris (1896) - Berlin (1908) - Berne (1914) - Rome (1928) - Brussels (1948)
0 1 2 3 4 5 6 7 8 9
Terminal diagram
Strip
Cable name
Cable name
=MCP+PNL1-X2
-S/KCV201.2
-S/KCV103
-S/FT107
-S/FT109
-S/FT201
-S/FT404
-I/LS101
-I/LS104
Connection
Connection
Terminal
Jumper
point
point
Cable type
Cable type
LiYY-JZ
LiYY-JZ
LiYY-JZ
LiYY-JZ
LiYY-JZ
LiYY-JZ
LiYY-JZ
LiYY-JZ
Function text Target designation Target designation Page / column
Global Water Engineering CLIENT: AF SUGAR MAIN CONTROL PANEL = MCP + TERM
Autobaan 22.01.01 DRAWN 13/10/2015 RL
BE-8210 Loppem TERMINAL DIAGRAM CHECKED
+32 50 54 64 44 PROJECT: WASTEWATER TREATMENT PLANT APPROVED
+32 50 54 64 46 DATE NAME SIGN
This document is the property of GLOBAL WATER ENGINEERING (GWE) NV Belgium. It shall not be copied,
http://www.globalwe.com PROJECT No.: 34124 transmitted or communicated to thirdparties without the explicit agreement of GWE. International conven- REV DATE DESCRIPTION BY CHK PAGE:009 NEXT: 010 LAST: 016
tions of Berne (1886) - Paris (1896) - Berlin (1908) - Berne (1914) - Rome (1928) - Brussels (1948)
0 1 2 3 4 5 6 7 8 9
Terminal diagram
Strip
Cable name
Cable name
=MCP+PNL1-X2
-S/OIT201
-I/LS104
-I/LS107
-I/LS109
-I/LS202
-I/LS205
-I/LS401
-I/LS403
Connection
Connection
Terminal
Jumper
point
point
Cable type
Cable type
LiYY-JZ
LiYY-JZ
LiYY-JZ
LiYY-JZ
LiYY-JZ
LiYY-JZ
LiYY-JZ
LiYY-JZ
Function text Target designation Target designation Page / column
Global Water Engineering CLIENT: AF SUGAR MAIN CONTROL PANEL = MCP + TERM
Autobaan 22.01.01 DRAWN 13/10/2015 RL
BE-8210 Loppem TERMINAL DIAGRAM CHECKED
+32 50 54 64 44 PROJECT: WASTEWATER TREATMENT PLANT APPROVED
+32 50 54 64 46 DATE NAME SIGN
This document is the property of GLOBAL WATER ENGINEERING (GWE) NV Belgium. It shall not be copied,
http://www.globalwe.com PROJECT No.: 34124 transmitted or communicated to thirdparties without the explicit agreement of GWE. International conven- REV DATE DESCRIPTION BY CHK PAGE:010 NEXT: 011 LAST: 016
tions of Berne (1886) - Paris (1896) - Berlin (1908) - Berne (1914) - Rome (1928) - Brussels (1948)
0 1 2 3 4 5 6 7 8 9
Terminal diagram
Strip
Cable name
Cable name
=MCP+PNL1-X2
-S/PHIT105
-S/PHIT100
-S/PHIT201
-S/TS201
Connection
Connection
Terminal
Jumper
point
point
Cable type
Cable type
LiYY-JZ
LiYY-JZ
LiYY-JZ
LiYY-JZ
Function text Target designation Target designation Page / column
Global Water Engineering CLIENT: AF SUGAR MAIN CONTROL PANEL = MCP + TERM
Autobaan 22.01.01 DRAWN 13/10/2015 RL
BE-8210 Loppem TERMINAL DIAGRAM CHECKED
+32 50 54 64 44 PROJECT: WASTEWATER TREATMENT PLANT APPROVED
+32 50 54 64 46 DATE NAME SIGN
This document is the property of GLOBAL WATER ENGINEERING (GWE) NV Belgium. It shall not be copied,
http://www.globalwe.com PROJECT No.: 34124 transmitted or communicated to thirdparties without the explicit agreement of GWE. International conven- REV DATE DESCRIPTION BY CHK PAGE:011 NEXT: 012 LAST: 016
tions of Berne (1886) - Paris (1896) - Berlin (1908) - Berne (1914) - Rome (1928) - Brussels (1948)
0 1 2 3 4 5 6 7 8 9
Terminal diagram
Strip
Cable name
Cable name
=MCP+PNL1-X3
-P/UPS.1
-P/UPS.2
Connection
Connection
Terminal
Jumper
point
point
Cable type
Cable type
LiYY-JZ
LiYY-JZ
Function text Target designation Target designation Page / column
Global Water Engineering CLIENT: AF SUGAR MAIN CONTROL PANEL = MCP + TERM
Autobaan 22.01.01 DRAWN 13/10/2015 RL
BE-8210 Loppem TERMINAL DIAGRAM CHECKED
+32 50 54 64 44 PROJECT: WASTEWATER TREATMENT PLANT APPROVED
+32 50 54 64 46 DATE NAME SIGN
This document is the property of GLOBAL WATER ENGINEERING (GWE) NV Belgium. It shall not be copied,
http://www.globalwe.com PROJECT No.: 34124 transmitted or communicated to thirdparties without the explicit agreement of GWE. International conven- REV DATE DESCRIPTION BY CHK PAGE:012 NEXT: 013 LAST: 016
tions of Berne (1886) - Paris (1896) - Berlin (1908) - Berne (1914) - Rome (1928) - Brussels (1948)
0 1 2 3 4 5 6 7 8 9
Terminal diagram
Strip
Cable name
Cable name
=MCP+PNL1-X6
-S/D103.1
Connection
Connection
Terminal
Jumper
point
point
Cable type
Cable type
LiYY-JZ
Function text Target designation Target designation Page / column
Global Water Engineering CLIENT: AF SUGAR MAIN CONTROL PANEL = MCP + TERM
Autobaan 22.01.01 DRAWN 13/10/2015 RL
BE-8210 Loppem TERMINAL DIAGRAM CHECKED
+32 50 54 64 44 PROJECT: WASTEWATER TREATMENT PLANT APPROVED
+32 50 54 64 46 DATE NAME SIGN
This document is the property of GLOBAL WATER ENGINEERING (GWE) NV Belgium. It shall not be copied,
http://www.globalwe.com PROJECT No.: 34124 transmitted or communicated to thirdparties without the explicit agreement of GWE. International conven- REV DATE DESCRIPTION BY CHK PAGE:013 NEXT: 014 LAST: 016
tions of Berne (1886) - Paris (1896) - Berlin (1908) - Berne (1914) - Rome (1928) - Brussels (1948)
0 1 2 3 4 5 6 7 8 9
Terminal diagram
Strip
Cable name
Cable name
=MCP+PNL1-X13
-I/D103.1
-I/D103.2
-I/FT107
-I/FT109
-I/FT201
-I/FT404
-I/LT108
-I/LT201
Connection
Connection
Terminal
Jumper
point
point
Cable type
Cable type
LiYCY-JZ
LiYCY-JZ
LiYCY-JZ
LiYCY-JZ
LiYCY-JZ
LiYCY-JZ
LiYCY-JZ
LiYCY-JZ
Function text Target designation Target designation Page / column
Global Water Engineering CLIENT: AF SUGAR MAIN CONTROL PANEL = MCP + TERM
Autobaan 22.01.01 DRAWN 13/10/2015 RL
BE-8210 Loppem TERMINAL DIAGRAM CHECKED
+32 50 54 64 44 PROJECT: WASTEWATER TREATMENT PLANT APPROVED
+32 50 54 64 46 DATE NAME SIGN
This document is the property of GLOBAL WATER ENGINEERING (GWE) NV Belgium. It shall not be copied,
http://www.globalwe.com PROJECT No.: 34124 transmitted or communicated to thirdparties without the explicit agreement of GWE. International conven- REV DATE DESCRIPTION BY CHK PAGE:014 NEXT: 015 LAST: 016
tions of Berne (1886) - Paris (1896) - Berlin (1908) - Berne (1914) - Rome (1928) - Brussels (1948)
0 1 2 3 4 5 6 7 8 9
Terminal diagram
Strip
Cable name
Cable name
=MCP+PNL1-X13
-I/PHIT105
-I/PHIT100
-I/PHIT201
-I/OIT201
-I/TT108
Connection
Connection
Terminal
Jumper
point
point
Cable type
Cable type
LiYCY-JZ
LiYCY-JZ
LiYCY-JZ
LiYCY-JZ
LiYCY-JZ
Function text Target designation Target designation Page / column
Global Water Engineering CLIENT: AF SUGAR MAIN CONTROL PANEL = MCP + TERM
Autobaan 22.01.01 DRAWN 13/10/2015 RL
BE-8210 Loppem TERMINAL DIAGRAM CHECKED
+32 50 54 64 44 PROJECT: WASTEWATER TREATMENT PLANT APPROVED
+32 50 54 64 46 DATE NAME SIGN
This document is the property of GLOBAL WATER ENGINEERING (GWE) NV Belgium. It shall not be copied,
http://www.globalwe.com PROJECT No.: 34124 transmitted or communicated to thirdparties without the explicit agreement of GWE. International conven- REV DATE DESCRIPTION BY CHK PAGE:015 NEXT: 016 LAST: 016
tions of Berne (1886) - Paris (1896) - Berlin (1908) - Berne (1914) - Rome (1928) - Brussels (1948)
0 1 2 3 4 5 6 7 8 9
Terminal diagram
Strip
Cable name
Cable name
=MCP+PNL1-X15
-I/TS200
-I/TS400
-I/P109
Connection
Connection
Terminal
Jumper
point
point
Cable type
Cable type
LiYCY-JZ
LiYCY-JZ
LiYY-JZ
Function text Target designation Target designation Page / column
Global Water Engineering CLIENT: AF SUGAR MAIN CONTROL PANEL = MCP + TERM
Autobaan 22.01.01 DRAWN 13/10/2015 RL
BE-8210 Loppem TERMINAL DIAGRAM CHECKED
+32 50 54 64 44 PROJECT: WASTEWATER TREATMENT PLANT APPROVED
+32 50 54 64 46 DATE NAME SIGN
This document is the property of GLOBAL WATER ENGINEERING (GWE) NV Belgium. It shall not be copied,
http://www.globalwe.com PROJECT No.: 34124 transmitted or communicated to thirdparties without the explicit agreement of GWE. International conven- REV DATE DESCRIPTION BY CHK PAGE:016 NEXT: LAST: 016
tions of Berne (1886) - Paris (1896) - Berlin (1908) - Berne (1914) - Rome (1928) - Brussels (1948)