Professional Documents
Culture Documents
* Mark of Schlumberger
PowerJet Shaped Charge
• New liner material
– High density
Schlumberger Private
• New liner design
– Optimized for penetration in hard rock
Schlumberger Private
– Increase effective well bore radius
– Reduce pressure drop across perforations
• Reduce sand production
• Delay scale, paraffin, asphaltene buildup
• Delay workover—reduce risk
• Consistent quality
– Unique manufacturing process
– Higher shot density with same penetration
– More deep shots
– Higher productivity
3 PowerJet
1/24/2004
PowerJet Benefits
Schlumberger Private
4 PowerJet
1/24/2004
Deeper Penetration for Increased Productivity
Penetration for Increased Production
Oil Well Esso Australia
Schlumberger Private
Increased production and stopped the flow of sand.
stop the flow of sand.
Before PowerJet 20 litres of sand/day
2 mm m3/day at 2,000 psi WHP
After PowerJet Sand Free production
2.5 mm m3/day gas at 2700 psi WHP
Schlumberger Private
Water Spacer
Steel Casing
Concrete Spacer
6 PowerJet
1/24/2004
Hardrock Targets
C
B
Schlumberger Private
A
Schlumberger Private
8 PowerJet
1/24/2004
The Deepest Shot
Schlumberger Private
9 PowerJet
1/24/2004