Project Reference Catalogue: Pre-Cast Segmental Bridges
Project Reference Catalogue: Pre-Cast Segmental Bridges
Bridge Services
Client
The Bombela Consortium and Vela
VKE a section detailed designer. Bombardier will supply a fleet of 24
Electrostar four car emus of similar
Project design to their rolling stock vehicles
Gautrain HSR Viaduct Section used in the United Kingdom; and the
Design Services. overall project has been estimated
to be 3.3 billion US$.
Services
- Detailed design Vela VKE; a section detail designer;
- Specialist consultant appointed Pöyry Infra as a specialist
consultant for five precast concrete
Services period segmental viaducts along the double
2006 - ongoing track HSR route between Midrand
and Marlboro Stations.
Background
Gautrain is an 80 km double track The services includes the preliminary
high speed railway system in South and detail design of the five viaducts;
Africa that will link Pretoria Station performing specialized rolling stock
and Johannesburg Park Station to calculations and providing consulting
OR Tambo International Airport. services support for precast concrete
segmental construction.
The BOT concession was awarded
to the Bombela Consortium; a JV The precast concrete box segments
between Bombardier, Bouygues are all 10.1 m wide and 3.5 m deep
and Travaux Publics of France, and in cross section; and the five viaduct
Murray & Roberts, a South African spans and lengths are:
engineering & contracting company. V01 5 spans, 230 m long
V03 13 spans, 638 m long
The BOT rail project started in May V11 5 spans, 230 m long
2006 and the initial planning is to be V13 10 spans, 444 m long
ready for the 2010 FIFA World Cup. V14 15 spans, 638 m long
Project Reference Catalogue
Bridge Services
Client Background
THSRC; the Taiwan High Speed Rail Services were provided for detailed
Corporation; the BOT concessionaire design and construction support for
company responsible for the 345 km two overpass road bridges across
high speed rail project between the high speed rail alignment near
Taipei and Kaoshiung. Taichung.
Project
4.9 km of Second Freeway Viaducts,
in Contract C 327, Taiwan.
Services
- Design of the precast segmental
erection equipment.
- Design of the precast segmental
takeover tower.
- Construction stage calculations
- Camber calculations and adviser
for the geometry control
- Project planning, consulting and
supervision
- Shop drawing preparation
Services period
2001 - 2003
Background
The 4.9 km and 32 m wide precast
concrete segmental viaducts were a
part of the Taiwan Second Freeway
Contract C 327 near Taichung; with spans
varying from 40 m to 45 m.
Project
The Second Freeway Viaducts
Contract C 383 A; 7.45 km long.
Services
- Design of precast segmental
moulds and erection equipment
- Construction stage calculations
- Casting yard layout design
- Camber and segment casting
control calculations
- Project planning, consulting and
site supervision
- Shop drawings
Services period
1999 – 2002
Background
7.45 km long and 24 m wide precast
concrete segmental viaducts were
used to construct 40 m spans on the
Second Freeway C 383 A.
Project
The 6.8 km long Second Freeway
Viaducts Contract C 383 B.
Services
- Design of precast segmental
moulds and erection equipment
- Construction stage calculations
- Casting yard layout and design
- Camber and segment casting
control calculations
- Project planning,
- Consulting and site supervision
- Shop drawings
Services period
1999 – 2002
Background
The 6.8 km long, 24 m wide precast
segmental concrete viaducts were
used to construct 40 m spans on the
Taiwan Second Freeway C 383 B.
Project
Contract C 336, for a 2 x 2.5 km
section of the Second Freeway.
Services
- Equipment design and fabrication
- Construction stage calculations
- Casting mould and casting yard
design
- Camber calculations and casting
geometry control
- Construction planning, consulting
and supervision
- Shop drawings
Services period
1996 - 2000
Background
Services were provided to BES for
the detail design, construction and
engineering planning; and all the
construction equipment design.
Project
3.66 km were built using a precast
segmental prestressing method with
standard spans of 45 or 50 m; and
640 m were built as two balanced
cantilever sections on C 376.
Services
- Construction engineering
- Design of precast segmental
moulds and erection equipment
- Construction stage calculations
- Casting yard layout design
- Camber and segment casting
control calculations
- Project planning, consulting and
site supervision
- Shop drawings
Background
Eight short bed casting moulds were
designed for the production of over
1,800 single cell precast segments
erected on Contract C 376.
Project
3.66 km were built using a precast
segmental prestressing method with
standard spans of 45 or 50 m; and
640 m were built as two balanced
cantilever sections on C 376.
Services
- Design of precast segmental
erection girders and moulds
- Construction stage calculations
- Casting yard layout design
- Camber calculations and bearing
presets
- Project planning, consulting and
site supervision
- Shop drawings
Background
Eight long bed casting moulds were
designed for the production of single
cell precast box segments; and over
2,300 units were precast.