Professional Documents
Culture Documents
Item Rate Boq: Validate Print Help
Item Rate Boq: Validate Print Help
Name of Work: ANNUAL MAINTENANCE CONTRACT FOR BOILER & ITS AUXILIARY SYSTEM INCLUDING PIECE MEAL JOB OF UNIT-1 TO
UNIT-3 OF BKTPP.
Bidder
Name :
PRICE SCHEDULE
(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to
be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )
1 2 4 5 13 53 55
1 MAIN AMC
1.01 AMC for Boiler & its Auxiliary of U# 1 to 3 24.0000 MONTH #VALUE! #VALUE!
Total in Figures #VALUE! #VALUE!
Name of Work: ANNUAL MAINTENANCE CONTRACT FOR BOILER & ITS AUXILIARY SYSTEM INCLUDING PIECE MEAL JOB OF UNIT-1 TO UNIT-3
OF BKTPP.
Bidder
Name :
PRICE SCHEDULE
(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be
rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )
1 2 4 5 6 53 55
1 PIECEMEAL JOB [Quantity is tentitive]
1.01 BTL repairing,D-met etc for 1st 05 joint 1.00 LUMPSUM 31498.5000 #VALUE! #VALUE!
1.02 BTL repairing 6-10 joint plus I. No.10 1.00 NO 2099.0000 #VALUE! #VALUE!
1.03 BTL repairing 11-20 joint plus I.No10-20 1.00 NO 679.9200 #VALUE! #VALUE!
1.04 BTLrepairing > 20 joint plus INo10, 20,30 1.00 NO 1154.9500 #VALUE! #VALUE!
1.05 De-metering of Boiler pressure parts 1.00 POINT 21.0000 #VALUE! #VALUE!
1.06 Mill OH with all necessary consumables 1.00 NO 393731.2500 #VALUE! #VALUE!
1.07 Mill OH with YOKE replacement&consumable 1.00 NO 414730.2500 #VALUE! #VALUE!
1.08 Mill GB replacement with asoociated work 1.00 NO 94495.5000 #VALUE! #VALUE!
1.09 Mill GB oil lkg. rec with associated job 1.00 NO 94495.5000 #VALUE! #VALUE!
1.10 Mill Turret Replacement & consumables, 1.00 NO 36748.2500 #VALUE! #VALUE!
1.11 Repairing Mill Turret with wear liners. 1.00 NO 47247.7500 #VALUE! #VALUE!
1.12 IDF runner replacement,brg checking etc 1.00 NO 41998.0000 #VALUE! #VALUE!
1.13 Coal Feeder OH including consumables 1.00 NO 37168.2300 #VALUE! #VALUE!
1.14 RW coupling spool piece replacement 1.00 NO 5249.7500 #VALUE! #VALUE!
1.15 Rplnt of PAF runner with brg change etc 1.00 NO 15749.2500 #VALUE! #VALUE!
1.16 Manual cleaning APH tube up to 50 nos. 1.00 LUMPSUM 5249.7500 #VALUE! #VALUE!
1.17 Manual cleaning APH tube for 51-100 nos. 1.00 LUMPSUM 10499.5000 #VALUE! #VALUE!
1.18 Manual cleaning APH tube for 101-200 nos 1.00 LUMPSUM 15749.2500 #VALUE! #VALUE!
1.19 HP valve replacement from 65 to 100 NB 1.00 NO 8399.6000 #VALUE! #VALUE!
1.20 HP v/v replacement> 100 to 150 NB. 1.00 NO 10499.5000 #VALUE! #VALUE!
1.21 CCP-Straight replac. after scaff&de-met 1.00 METER 7399.6000 #VALUE! #VALUE!
1.22 Mill Inlet S.S.Pipe replacement. 1.00 METER 11549.4500 #VALUE! #VALUE!
1.23 CCP bend replacement 1.00 PCS 12599.4000 #VALUE! #VALUE!
1.24 CP ' Y' piece(P.F.bifurcator)replacement 1.00 PCS 15749.2500 #VALUE! #VALUE!
1.25 Serv. of old coal compartment assembly 1.00 PCS 24148.8500 #VALUE! #VALUE!
1.26 Mill I/L&O/L gate serv Power cyl fitting 1.00 NO 8399.6000 #VALUE! #VALUE!
1.27 Mill I/L Non-metalic Bellow replacement. 1.00 NO 5249.7500 #VALUE! #VALUE!
1.28 Coal Mill o/LNon-metalic Bellow rplacmnt 1.00 NO 5249.7500 #VALUE! #VALUE!
1.29 Fuel inlet elbow replacement of CCP 1.00 PCS 6299.7000 #VALUE! #VALUE!
1.30 SOFdr I/LknifeG&rplmnt ofs.r.p&actr serv 1.00 NO 7349.7500 #VALUE! #VALUE!
1.31 CoalFdr to mill i/l chute replmnt by new 1.00 PCS 16799.2000 #VALUE! #VALUE!
1.32 PAF to Mill i/l metallic below replacmnt 1.00 PCS 6299.7000 #VALUE! #VALUE!
1.33 LRSB LTreplacement with all etc work. 1.00 NO 5249.7500 #VALUE! #VALUE!
1.34 WB replacement with all etc work. 1.00 NO 2624.8800 #VALUE! #VALUE!
1.35 Gates/Dampers Servicing 1.00 NO 5774.7300 #VALUE! #VALUE!
1.36 FGduct patch work during s/u&s/d of unit 1.00 M² 4199.8000 #VALUE! #VALUE!
1.37 Jet Cleaning of APH .(rate per tube) 1.00 NO 23.1000 #VALUE! #VALUE!
1.38 Replacement of coal compartment assembly 1.00 NO 13599.4000 #VALUE! #VALUE!
1.39 Mill ClssfrO/Lreplacmnt &new/rpr,etcO/H. 1.00 NO 26248.7500 #VALUE! #VALUE!
1.40 Ash cleaning from Eco to DUCT 1.00 MANDAY 472.4800 #VALUE! #VALUE!
1.41 Radiography of welding joints 1.00 DAY 12599.4000 #VALUE! #VALUE!
1.42 S.R of welding joint as per requirement 1.00 DAY 14699.3000 #VALUE! #VALUE!
1.43 Manual cleaning APH tube for 201-500 nos 1.00 LUMPSUM 26248.7500 #VALUE! #VALUE!
1.44 ccp orifice check and replacement 1.00 NO 4199.8000 #VALUE! #VALUE!
1.45 ccp venturi replacement 1.00 NO 12599.4000 #VALUE! #VALUE!
1.46 mill inlet chute repair(electrode exclud 1.00 NO 26248.7500 #VALUE! #VALUE!
1.47 red oxide paint(two coat) 1.00 M² 335.9800 #VALUE! #VALUE!
1.48 epoxy resin paint(two coat) 1.00 M² 598.4700 #VALUE! #VALUE!
1.49 aluminium oxide paint(two coat) 1.00 M² 808.4600 #VALUE! #VALUE!
1.50 fabrication,erection structure,gratings 1.00 TON 12599.4000 #VALUE! #VALUE!
1.51 bunker repairing 1.00 TON 50960.0000 #VALUE! #VALUE!