Professional Documents
Culture Documents
of Refinance Limit under Renewable Energy Refinance Scheme For FY 20xx‐yy
Category I
Name of Bank/DFI:
Expected
Sources of Financing Share of
Total Disbursement up Refinance
Bank in
Technology Total Project Foreign Equity Total Debt till June 20yy Limit
Name of Size (in Syndicate (if Status of Bank/DF's
S. No. (e.g. Solar, Cost (in Million Exchange Requested
Project/Borrower MW) Local Local Foreign any) Amount Internal Approval
Wind etc.) PKR) Required Foreign (in Million
(in Million (in Million (in US$) (in Million Date (in Million
(in US$ M) (in US$) PKR)
PKR) PKR) Million PKR) PKR)
TOTAL
Prepared By: __________________________________ Verfied By:
(Name, Designation & Signature) (Name, Designation & Signature)
Officer must not be below the rank of SVP or equivalent
Requision of Refinance Limit under Renewable Energy Refinance Scheme For FY 20xx‐yy
Category II
Name of Bank/DFI:
Expected Disbursement up till
No of Total Project Refinance Limit
Technology (e.g. Total Size (in June 20yy Status of Bank/DF's Internal
S. No. Projects/ Cost (in Million Requested
Solar, Wind etc.) MW) Approval
Borrowers PKR) Amount (in (in Million PKR)
Date
Million PKR)
Total
Prepared By: __________________________________ Verfied By:
(Name, Designation & Signature) (Name, Designation & Signature)
Officer must not be below the rank of SVP or equivalent
Requision of Refinance Limit under Renewable Energy Refinance Scheme For FY 20xx‐yy
Category III
Name of Bank/DFI:
Pipeline of projects of vendor Expected Disbursement up till
AEDB for FY 20xx‐yy June 20yy Refinance Limit
Technology (e.g. Status of Bank/DF's Internal
S. No. Name of Vendor Certification Requested
Solar, Wind etc.) No. of Project Cost (in Amount (in Approval
Category Size (in MW) Date (in Million PKR)
Projects Million PKR) Million PKR)
TOTAL
Prepared By: __________________________________ Verfied By:
(Name, Designation & Signature) (Name, Designation & Signature)
Officer must not be below the rank of SVP or equivalent