Pretreatment of Waste Fuels for the

Cement Industry

ECRA – Seminar
Retznei - Austria
2011, September 16th

Hubert Baier

Vecoplan FuelTrack GmbH


A company of ThyssenKrupp Polysius AG and Vecoplan AG
Pretreatment of waste fuels for the Cement Industry
Dr. Hubert Baier
16.09.2011
1
ThyssenKrupp Polysius and Vecoplan established the joint venture
“Vecoplan FuelTrack GmbH”
a Company dedicated to the environmental technology
in Cement and Lime Industry

Pretreatment of waste fuels for the Cement Industry


Dr. Hubert Baier
16.09.2011
2
Table of Content

1. Initial position
2. Mechanical processing for the use at the calciner
3. Use of alternative fuels in a main burner
4. Optimised clinkering zone firing system at the rotary kiln

Pretreatment of waste fuels for the Cement Industry


Dr. Hubert Baier
16.09.2011
3
Cost cake and Development of the Thermal Substitution Rate*

Thermal Substitution Rate (TSR) of


Engineered Fuels + Biomass
70%

60%
Cost cake of cement production
50%
Germany
40% EU 27
TSR

Emerging Countries
30% Industrial Countries
global
20%

10%

0%
2006 2009 2030 2050
Period
*Source: VDZ 2010

Pretreatment of waste fuels for the Cement Industry


Dr. Hubert Baier
16.09.2011
4
Seeking + Sourcing

Pretreatment of waste fuels for the Cement Industry


Dr. Hubert Baier
16.09.2011
5
Waste-Assessment
food

textile

• Identify feasible waste high calorific paper


glass fraction
compounds + shares
leather, rubber

• Identify chemical and metal polymeric pack


wood
process benefits or construction
obstacles waste
stones

• Define capabilities and


requirements for co-
processing

Pretreatment of waste fuels for the Cement Industry


Dr. Hubert Baier
16.09.2011
6
Technical Assessment

• Exploring capabilities and the best


options for co-processing
• Detect technical defaults and process
faults
• Define basic conditions for dimensioning
pro-processing and handling and dosage

Pretreatment of waste fuels for the Cement Industry


Dr. Hubert Baier
16.09.2011
7
From Waste to Engineered Energy

< 250 mm PREPOL


Sourcing + Identification cv ~ 14.000 kJ/kg
SC

Pre-Processing
< 80 mm Calciner
cv ~ 16.000 kJ/kg

< 25 mm
cv ~22.000kJ/kg
Main-
burner
< 3 mm
cv ~24.000kJ/kg

Pretreatment of waste fuels for the Cement Industry


Dr. Hubert Baier
16.09.2011
8
Impacts of Missing Quality Assurance
alkaline corrosion

ring creation

chlorine corrosion

reductive burn

Pretreatment of waste fuels for the Cement Industry


Dr. Hubert Baier
16.09.2011
9
Fundamental Principles of Fuel Conversion

Useful
heat

Pretreatment of waste fuels for the Cement Industry


Dr. Hubert Baier
16.09.2011
10
Table of Content

1. Initial position
2. Mechanical processing for the use at the calciner
3. Use of alternative fuels in a main burner
4. Optimised clinkering zone firing system at the rotary kiln

Pretreatment of waste fuels for the Cement Industry


Dr. Hubert Baier
16.09.2011
11
Preparation: High Calorific Fraction (HCF < 300 mm)
HCF < 300 mm
Pre-sorting

< 300 mm
Sieving

Residues, Wastes & Biomass

Classifier

Drop out QM
HCF < 300 mm

Screening

Pretreatment of waste fuels for the Cement Industry


Dr. Hubert Baier
16.09.2011
12
HCF-handling to feed the PREPOL Step-Combustor
HCF < 300 mm

Step-Combustor
& Calciner

HCF < 300 mm

MS - Calciner

Tertiary air

Rotary kiln
Step combustor

HCF < 300 mm

Pretreatment of waste fuels for the Cement Industry


Dr. Hubert Baier
16.09.2011
13
PREPOL StepCombustor
tertiary air HCF < 300 mm
suspending coke
with meal
and ash fraction

No mechanical installations
– only fixed shockblowers
Calciner separate light from heavy
2-3 unburnt fractions and feeds
~12 min
min the material into the calciner
Ignition/ Drying/
by controlled steps.
conversion pyrolisis
Pretreatment of waste fuels for the Cement Industry
Dr. Hubert Baier
16.09.2011
14
RDF-handling to feed the Calciner

Calciner

RDF < 80 mm

RDF < 80 mm

Pretreatment of waste fuels for the Cement Industry


Dr. Hubert Baier
16.09.2011
15
Dust-proof Fuel Transport for RDF and SRF

 closed system = no dust and air emission


 air cushion effect = low energy consumption
 no track wheels = low maintenance efforts

Pretreatment of waste fuels for the Cement Industry


Dr. Hubert Baier
16.09.2011
16
Type of Calciner as a function of retention time

Air-Separate (AS) Multi-Stage (MSC) AS + Combustion- MSC + CC


Chamber (CC)

Pretreatment of waste fuels for the Cement Industry


Dr. Hubert Baier
16.09.2011
17
Tire chips

RDF 80 mm

Biomass

coal/ petcoke

Pretreatment of waste fuels for the Cement Industry


Dr. Hubert Baier
16.09.2011
18
Table of Content

1. Initial position
2. Mechanical processing for the use at the calciner
3. Use of alternative fuels in a main burner
4. Optimised clinkering zone firing system at the rotary kiln

Pretreatment of waste fuels for the Cement Industry


Dr. Hubert Baier
16.09.2011
19
Preparation: Solid Recovered Fuel (SRF < 30 mm)

RDF < 80 mm

Classifier

SRF < 30 mm
QM

Pretreatment of waste fuels for the Cement Industry


Dr. Hubert Baier
16.09.2011
20 RDF < 80 mm
Table of Content

1. Initial position
2. Mechanical processing for the use at the calciner
3. Use of alternative fuels in a main burner
4. Optimised clinkering zone firing system at the rotary kiln

Pretreatment of waste fuels for the Cement Industry


Dr. Hubert Baier
16.09.2011
21
SRF-Feeding to Main Burner

Pretreatment of waste fuels for the Cement Industry


Dr. Hubert Baier
16.09.2011
22
The Main Burner POLFLAME©

SRF < 30 mm

Pretreatment of waste fuels for the Cement Industry


Dr. Hubert Baier
16.09.2011
23
RDF-Mill to feed the Sinter Zone Burner

Pretreatment of waste fuels for the Cement Industry


Dr. Hubert Baier
16.09.2011
24
Pre-Processing for a Customized Co-Processing…

Solid Waste

1. Level:
High Calorific Fraction PREPOL SC™
(250 – 80 mm)

2. Level:
RDF PREPOL™
(< 80 mm)

3. Level:
SRF POLFLAME™
(30 - < 20mm)

RDF-Mill
POLFLAME™
100% < 3 mm

Pretreatment of waste fuels for the Cement Industry


Dr. Hubert Baier
16.09.2011
25
Contact to fit your process right …
www.vecoplan-fueltrack.com
Vecoplan FuelTrack GmbH
Vor der Bitz 10
D - 56470 Bad Marienberg

Fon: +49 2661 6267-871


info@vecoplan-fueltrack.com

Pretreatment of waste fuels for the Cement Industry


Dr. Hubert Baier
16.09.2011
26