Document no: BTS/ETS/E210349

Issue number 0
Page 1 of 3

Design Appraisal Document


Lloyd's Register Asia Date
Busan Technical Support Office 24 March 2021
10th Floor, CJ Korea Express Bldg., #119
Daegyo-ro (2,6-ga, Jungang-dong), Jung-gu, 48943, Busan Please quote the document number on all future communications
Republic of Korea
Tel: +82 (0)51 640 5000, Fax: +82 (0)51 637 4114

IMO NO. 9325685, 9325697, 9325702


SHIP NAME. AL MARROUNA, AL AREESH, AL DAAYEN
(Built at DSME Co., Ltd. Hull No. 2238, 2239, 2240)
NAKILAT-KEPPEL OFFSHORE & MARINE LTD.
RETROFIT OF BALLAST WATER TREATMENT SYSTEM
ELECTRICAL AND CONTROL ENGINEERING

1. The Documents listed in paragraph 1 of the appendix have been examined for compliance with Part
5, Chapter 25 and Part 6, Chapters 1 & 2 the Rules and Regulations for the Classification of Ships, July
2020 and are assigned an appraisal status as indicated, subject to satisfactory resolution of the
following matters: -
Status
DETAILED SINGLE LINE DIAGRAM (DRWG. NO.: H00123-E-101)
1.1 The status of type approval for newly added circuit breakers and cables is to be advised. AQP

CONTROL BLOCK DIAGRAM (DRWG. NO.: H00123-E-103A)


1.2 The status of type approval for newly added cables is to be advised. AQP
1.3 A gas detection system with audible and visual alarm is to be provided for spaces, where dangerous AQP
gas could be present. For flammable atmospheres, the BWTS shutdown is to be activated at a
flammable concentration of not more than 60 per cent of LFL. The alarm is also to be provided at
manned ballast water control station(s) and in the engine control room, as applicable. Audible and
visual alarm signals are to be activated both locally and at the control station(s) when the
flammable concentration reaches a pre-set value, which should not be higher than 30 per cent of
the LFL of the product concerned.
1.4 Confirmation is requested that BWTS shutdown is activated upon failure of ventilation system in AQP
accordance with Part 5, Chapter 25, Section 10.4.1 of the Rules.
1.5 Clarification is requested that activation of by-pass or isolation arrangements is to activate an alarm AQP
in all stations from which the ballast water operations are controlled and be automatically recorded
in control equipment in accordance with Part 5, Chapter 25, Section 9.1.9 of the Rules.
1.6 It is to be confirmed during survey that modification of software on-board system are to be under AQS
taken in accordance with Part 6, Chapter 1, Section 1.5.2 of the Rules.

FINAL ACCEPTANCE OF ACTUAL ITEM(S) DEPEND(S) ON SATISFACTORY SURVEY AND TESTING

Lloyd's Register Asia


Is a member of Lloyd’s Register group

Lloyd's Register Group Limited, its affiliates and subsidiaries and their respective officers, employees or agents are, individually and collectively, referred to in this clause
as 'Lloyd's Register'. Lloyd's Register assumes no responsibility and shall not be liable to any person for any loss, damage or expense caused by reliance on the information
or advice in this document or howsoever provided, unless that person has signed a contract with the relevant Lloyd's Register entity for the provision of this information
or advice and in that case any responsibility or liability is exclusively on the terms and conditions set out in that contract.

Form 6438MAR (2020.02)

This is a copy of an electronic document. In the event of any conflict or ambiguity between the copy and the electronic document,
which is retained and published by Lloyd's Register, the original electronic and certified version shall always prevail.
Document no: BTS/ETS/E210349
Issue number 0
Page 2 of 3
Lloyd's Register Asia Date
Busan Technical Support Office 24 March 2021
10th Floor, CJ Korea Express Bldg., #119
Daegyo-ro (2,6-ga, Jungang-dong), Jung-gu, 48943, Busan Please quote the document number on all future communications
Republic of Korea
Tel: +82 (0)51 640 5000, Fax: +82 (0)51 637 4114

UPDATED HAZARDOUS AREA PLAN (DRWG. NO.: H.00123-E-113)


1.7 Electrical equipment, cable and etc, located within the range of H2 VENT (DEGAS-1&2) OUTLET is AQP
to be suitable for hazardous area zone in accordance with Part 6, Chapter 2, Section 14 of the
Rules.
1.8 Air inlets for non-hazardous enclosed spaces of accommodation shall be taken from non-hazardous AQP
areas at least 1.5m from the boundries of H2 VENT (DEGAS-1&2) OUTLET in accordance with IEC
60092-502, 8.2.5.

Busan Technical Support Office


Lloyd's Register Asia
LR031.1.2016.06

Tae-Wook Hur
Senior Specialist
Electrotechnical Systems Group
Busan Technical Support Office
Lloyd’s Register Marine & Offshore
Tel: +82 51 640 4956
Email: taewook.hur@lr.org

Delete page break if only one page is required.

FINAL ACCEPTANCE OF ACTUAL ITEM(S) DEPEND(S) ON SATISFACTORY SURVEY AND TESTING

Lloyd's Register Asia


Is a member of Lloyd’s Register group

Form 6438MAR (2020.02)

This is a copy of an electronic document. In the event of any conflict or ambiguity between the copy and the electronic document,
which is retained and published by Lloyd's Register, the original electronic and certified version shall always prevail.
Document no: BTS/ETS/E210349
Issue number 0
Page 3 of 3
Lloyd's Register Asia Date
Busan Technical Support Office 24 March 2021
10th Floor, CJ Korea Express Bldg., #119
Daegyo-ro (2,6-ga, Jungang-dong), Jung-gu, 48943, Busan Please quote the document number on all future communications
Republic of Korea
Tel: +82 (0)51 640 5000, Fax: +82 (0)51 637 4114

Appendix

1. The documents listed below have been examined


Document No. Rev. Title Status Date
H.00123-E-101 01 DETAILED SINGLE LINE DIAGRAM AQ 24-Mar-2021
H.00123-E-102A 0 UPDATED LOAD BALANCE BOOKLET A 24-Mar-2021
H.00123-E-103A 0 CONTROL BLOCK DIAGRAM AQ 24-Mar-2021
H.00123-E-108 0 ELECTRICAL SHORT CIRCUIT CALCULATIONS A 24-Mar-2021
H.00123-E-113 00 UPDATED HAZARDOUS AREA PLAN AQ 24-Mar-2021

2. The document listed below has been considered together with the submitted documents in the appraisal.

Document No. Rev. Title

H.00123-CD-M101 2 UPDATED MACHINERY ARRANGEMENT PLAN

Appraisal Status Key


AQ Approved subject to the matters raised that require resolution - and provided the arrangements are to the surveyor’s satisfaction
AQP Details to be submitted by the client to the plan approval office for approval/re-approval
AQS Details to be submitted by the client to the local surveyor’s Office responsible for surveying the building and the arrangements
verified in accordance with the Rule/Regulations requirements by the surveyor.
A Approved - provided the arrangements are to the surveyor's satisfaction

FINAL ACCEPTANCE OF ACTUAL ITEM(S) DEPEND(S) ON SATISFACTORY SURVEY AND TESTING

Lloyd's Register Asia


Is a member of Lloyd’s Register group

Form 6438MAR (2020.02)

This is a copy of an electronic document. In the event of any conflict or ambiguity between the copy and the electronic document,
which is retained and published by Lloyd's Register, the original electronic and certified version shall always prevail.

You might also like