You are on page 1of 12

Rev.

1 01S26
10-2008 TABLE OF CONTENTS CSP0000160-01
MCN2008-0154 1

GENERAL PAGE NO.

1. Foreword ..................................................................................................... 1
2. General Information
– Installation and Start-Up Services ....................................................... 2
– Parts and Repair Orders ....................................................................... 2
– Warranty Conditions ............................................................................ 3
– Shipment and Receiving ...................................................................... 4
– Storage .................................................................................................. 4
3. Safety Instructions, WARNINGS, and CAUTIONS.............................. 7
4. Component Description.............................................................................. 14

INSTALLATION

1. Press Installation......................................................................................... 25
– Installation Site..................................................................................... 25
– Mounting Stud Installation .................................................................. 27
– Leveling Plate Installation ................................................................... 28
– Load Cell Installation........................................................................... 29
– Slide Pad and Spacers Installation....................................................... 30
2. Drip Tray Lifting and Installation.............................................................. 31
– Chute (not by FLSmidth Minerals) Installation and Cut-Out ............ 31
– Lifting the Drip Tray............................................................................ 32
– Center Support Installation .................................................................. 34
– Drip Tray Halves Installation .............................................................. 34
– Center Bridge Installation and Connect the Drip Tray Skins............. 35
3. Core Separation Tank Installation ............................................................. 37
4. Press Skeleton Installation and Adjustments............................................. 38
– Head Lifting, Installation, and Alignment .......................................... 39
– Tail Bracket Lifting, Installation, and Alignment............................... 40
– Sidebars Installation ............................................................................. 42
– Shaker/Sidebar Supports Installation .................................................. 43
– CHECK Sidebar Alignment ................................................................ 45
– CHECK the Skeleton for Square Alignment ...................................... 46
– Anchor the Skeleton............................................................................. 48
– Stop-Guide Bar Installation ................................................................. 49
5. Crosshead, Follower, and Crosshead Cylinder Installation...................... 51
– Crosshead and Follower Lifting and Installation................................ 51
– Lifting the Equipment ......................................................................... 51
– Crosshead Installation .......................................................................... 51
– Follower Installation ............................................................................ 52
– Connect the Follower ........................................................................... 53
– Crosshead Cylinders Installation......................................................... 55

For confidential use only. Not for circulation, distribution, or reproduction without prior
permission, in writing, by FLSmidth Minerals. All Rights Reserved.
Rev. 1 01S26
10-2008 TABLE OF CONTENTS CSP0000160-01
MCN2008-0154 2

INSTALLATION PAGE NO.

6. Shaker Assembly Installation..................................................................... 59


– Lifting the Shaker Assembly ............................................................... 59
– Shaker Support Legs Installation......................................................... 60
– Lift Cylinder and Lift Beam Guide Assemblies Installation.............. 62
– Lift Beams Installation......................................................................... 63
– Shaker Drive Assembly Installation.................................................... 65
– Checks and Adjustments...................................................................... 67
7. Final Adjustments....................................................................................... 69
– CHECK Follower and Closing Cylinders for Alignment .................. 69
– Leveling Plates, Anchor/Mounting Nuts, and Stop-Guide Bars........ 71
8. Lube System Installation............................................................................ 77
– Tubes and Interconnecting Hoses........................................................ 77
– Pressure Switch Installation................................................................. 77
– Brackets, Injectors, Tubing, Hoses, Etc at Head End of Press........... 79
– Brackets, Injectors, Tubing, Hoses, Etc at Tail Bracket End of Press 81
9. Flood Wash Assembly Installation............................................................ 84
– Wash Pipe Installation ......................................................................... 85
– Manifold Installation............................................................................ 86
– Crossover Manifold Installation .......................................................... 87
– CHECK Wash Pipes and Tighten Connections.................................. 87
– Connect the Hoses................................................................................ 88
– CHECK the Cloth Shaker Bars on the Three-Button Filter Plates .... 89
10. Hydraulic System Installation and Adjustments ....................................... 91
– Installation ............................................................................................ 93
– Start-Up to Prime and CHECK of the System.................................... 103
11. Plate Installation ......................................................................................... 110
– Lift the Plates........................................................................................ 112
– Plate Sequencing .................................................................................. 112
– Install the Head and Follower Liner Plates ......................................... 113
– Install the Intermediate Plates.............................................................. 114
12. Chain Installation........................................................................................ 115
– Load Cell Installation........................................................................... 115
– Hydroshift Chain Installation .............................................................. 116
– Cloth Shaker Bar Chain Installation.................................................... 118
– Chain Checks........................................................................................ 119
13. Media Installation ....................................................................................... 120
– Intermediate Plate Media Installation.................................................. 121
– Head Liner Plate Media Installation.................................................... 124
– Follower Liner Plate Media Installation.............................................. 128
14. Liner Pipe Installation ................................................................................ 132
– Feed Liner Pipe Installation................................................................. 133
– Corner Discharge Liner Pipe Installation............................................ 135

For confidential use only. Not for circulation, distribution, or reproduction without prior
permission, in writing, by FLSmidth Minerals. All Rights Reserved.
Rev. 1 01S26
10-2008 TABLE OF CONTENTS CSP0000160-01
MCN2008-0154 3

INSTALLATION PAGE NO.

15. Filtrate Manifold Installation ..................................................................... 137


16. Feed/Core Blow/Core Wash Piping Assembly Installation ..................... 141
– Liner Pipe Installation .......................................................................... 141
– Feed Inlet Assembly Installation ......................................................... 143
– Feed/Core Blow/Core Wash Piping Assembly Installation............... 144
17. Safety Lanyard Installation ........................................................................ 147
18. Accessory Equipment Installation ............................................................. 151
19. Connect Electrical Wiring.......................................................................... 152

LUBRICATION

1. Press Lubrication and Hydraulic Oil System ............................................ 153


Lube System
Sidebars
Shaker Gearboxes
Crosshead Assembly
2. Hydraulic Oil Precautions .......................................................................... 163
– Hydraulic Oil Equivalents List ............................................................ 164
3. Grease Lubricant Equivalents List............................................................. 165

MAINTENANCE

1. Maintenance and Operation WARNINGS............................................... 166


– Safety Statement................................................................................... 166
– Before Operation, Maintenance, or Repair of this Equipment........... 167
2. Hydraulic System Maintenance ................................................................. 168
– Hydraulic System Adjustments ........................................................... 173
3. Drip Tray Maintenance .............................................................................. 179
– Hydraulic Safety Shut-Off Valves....................................................... 179
– Adjustments.......................................................................................... 179
– Maintenance ......................................................................................... 181
4. Shaker Assembly Maintenance.................................................................. 182
– General Maintenance ........................................................................... 184
– Shaker Supports.................................................................................... 184
– Shaker Bars and Cams ......................................................................... 186
– Gearboxes and Hydraulic Drive Maintenance.................................... 188
– Lube System Maintenance................................................................... 188
5. Food Wash System Maintenance............................................................... 189
6. Filtrate Manifold Maintenance................................................................... 193
7. Feed/Core Blow/Core Wash Piping Assembly Maintenance .................. 195
8. Filter Media Maintenance .......................................................................... 197
9. Accessory Equipment Maintenance .......................................................... 208

For confidential use only. Not for circulation, distribution, or reproduction without prior
permission, in writing, by FLSmidth Minerals. All Rights Reserved.
Rev. 1 01S26
10-2008 TABLE OF CONTENTS CSP0000160-01
MCN2008-0154 4

OPERATION PAGE NO.

1. Feed Pump WARNINGS.......................................................................... 209


2. Filter Plate Operating PRECAUTIONS .................................................. 211
3. Operation (General System)....................................................................... 213
4. Emergency Stop of Operations
– Safety Lanyard Shutoff System (For Reference Only) .................... 222
– Emergency Stop Push/Pull Button (For Reference Only)................ 225
5. Mechanical Operation
AFP IV™ Minerals Press Controls (For Reference Only) .................. 228
– Minerals Press System....................................................................... 228
– Equipment Controls and Operation Switches .................................. 228
AFP IV™ Operation................................................................................ 234
– Filter Press Safety WARNINGS...................................................... 234
– Preliminary Start-Up.......................................................................... 235
– Manual Operation (For Reference Only) ....................................... 240
– Automatic Operation (For Reference Only)................................... 240
– Filter Press Shut Down (For Reference Only) ............................... 250
6. Cake Discharge........................................................................................... 253
– Hydroshift Chains.............................................................................. 253
– Cloth Shaker....................................................................................... 254
– Flood Wash System........................................................................... 254
– Complete Cake Discharge is Necessary ........................................... 254
– Remove all Cake................................................................................ 255
– Discharge Paddles.............................................................................. 256
– CHECKS after Cake Discharge........................................................ 257

TROUBLESHOOTING

1. General Troubleshooting............................................................................ 258


– Leakage .............................................................................................. 258
– Cloudy Filtrates.................................................................................. 258
– Uneven Filter Cakes .......................................................................... 259
– Slow Filtration Rates ......................................................................... 259
– Checklist for Operational Difficulties............................................... 260
– Poor Pre-Coats or Filter Aid.............................................................. 261
– Plate Breakage ................................................................................... 261
2. Hydraulic Power Unit Troubleshooting (For Reference Only).............. 263

OFFICES

1. Offices ......................................................................................................... 276


2. Standard Warranty...................................................................................... 278

For confidential use only. Not for circulation, distribution, or reproduction without prior
permission, in writing, by FLSmidth Minerals. All Rights Reserved.
Rev. 1 01S26
10-2008 TABLE OF CONTENTS CSP0000160-01
MCN2008-0154 5

PARTS LIST

CSP0000160-01 FLSmidth Minerals Current Bill of Materials

CERTIFIED DRAWINGS

CSP0000160-01 (rev B) AFP IV™ Minerals Press Top Level Assembly


561749 (rev D) General Arrangement AFP IV™ Minerals Press
561750 (rev C) Anchor Bolt Plan And Foundation Loading
575379 (rev A) Press Mounting Assembly (Steel Mounting)
561755 (rev B) Core Separation Tank General Arrangement
567413 (rev A) Core Separation Tank Assembly
561751 (rev C) Drip Tray General Arrangement
567411 (rev A) Drip Tray Assembly
561756 (rev A) Press Assembly
561757 (rev A) Skeleton Assembly
561758 (rev A) Cross Head Assembly
561754 (rev B) General Arrangement Filtrate Manifold
561759 (rev A) Filtrate Manifold Assembly
561760 (rev A) Chamber Assembly
561761 (rev B) Plate Mounting Hardware Assembly
571914 (rev A) Plate Handle Assembly Guided Side
571945 (rev A) Plate Handle Assembly Non-Guided Side
561762 (rev A) Filter Media Assembly
553348 (rev A) Liner Pipe Assembly Feed Inlet @ Head
BAP1954-203 (rev 1) Liner Pipe Assembly Corner
561765 (rev A) Shaker Assembly
1161345 (rev A) Shaker Drive Assembly
574162 (rev A) Flood Wash Assembly
575371 (rev A) Feed/Core Blow/Wash Piping Assembly
561768 (rev A) Crosshead Cylinder Assembly
561770 (rev A) Liner Pipe Assembly 8” Feed Inlet @ Follower
BAP1954-204 (rev 1) Feed Eye Assembly
575378 (rev A) Hydroshift Chain Assembly
561772 (rev A) Lube System Assembly
561773 (rev A) Limit Switch Mounting Assembly
567417 (rev A) Safety Lanyard Assembly
575363 (rev A) Feed Inlet Assembly
BAP1954-271 (rev 1) Junction Box Mounting
1167096 (rev 1) NEMA 4X Stainless Steel Junction Box
567412 (rev A) Hose Support Assembly
574680 (rev A) Accessories Assembly
561752 (rev B) Hydraulic Power Unit General Arrangement
567421 (rev B) Hydraulic Power Unit

For confidential use only. Not for circulation, distribution, or reproduction without prior
permission, in writing, by FLSmidth Minerals. All Rights Reserved.
Rev. 1 01S26
10-2008 TABLE OF CONTENTS CSP0000160-01
MCN2008-0154 6

CERTIFIED DRAWINGS (continued)

567422 (rev A) Hydraulic Manifold – (5) Station


567423 (rev A) Hydraulic Manifold – (2) Station
561753 (rev A) Hydraulic Schematic Minerals Press
BAP1954-261 (rev 1) Interconnecting Hydraulic Hose Assembly
561769 (rev A) Hydraulic Piping Assembly
553169 (rev D) Piping & Instrumentation Diagram
553214 (rev C) Process Flow Diagram
114808 (rev B) Torque Values
567414 (rev B) Spare Parts Installation & Commissioning
567415 (rev B) Spare Parts One Year Operation

ACCESSORY EQUIPMENT

Hydraulic Power Unit: ......................................................................................................TAB 1


(FLSmidth Minerals Part No. 568580)
Bosch Rexroth: Warranty Policies and Procedures
Bosch Rexroth: Petroleum Based Fluids with Gear Pumps & Motors Guide
Bosch Rexroth: Petroleum Hydraulic Fluids Recommendations Guide
Bosch Rexroth: Hydraulic Power Units Assembly & Start Up Guide
Bosch Rexroth: HAA4VSO250DR/30R-VKD75U99E Vari. Displacement Pump Tech Guide
Bosch Rexroth: 4WE6Y6X/EW110N9K4/62 Directional Control Valve Technical Guide
Bosch Rexroth: Z55L 12-240V Electrical Connections for Directional Valve
Hydro-Craft: 150 Gallon L-Shape Tank Dimensions
Thermal Transfer: AOVH-30-S-3PH-50HZ AOVH Air Cooled Series
Bosch Rexroth: DB30G2-5X/315/12 Pressure Relief Valve Technical Guide
Hydac: DFBN/HC660F10B1.1/16B6 High Pressure Filter Data
Des Case: DC-4 Disposable Filter Product Data
Hydac: FSA-254-1.1/T/12 Fluid Level Indicator Data
Magnaloy: 500-2x1/2 & 500-2-3/8x5/8 Coupling Technical Data
Magnaloy: M570H5 Coupling Insert Technical Data
BSF: 1504-340-X-10.38 Bell Housing Data
Advanced Control: B40033BFD2M704 Fluid Level & Temperature Switch Data
Advanced Control: B4177FD304-P125 Fluid Temperature Switch Data
Hydac: RFBN/3HC950DO10B1.01/16B6 Low Pressure Filter Data
Hydac: RV-30-01.X/12 Flow Control Valve Data
Anchor Flange: W48-24-24U Flanged Fitting Dimensions
Anchor Flange: 32SFO/48SFO Split Flange Data
Hoffman: A1008CH/A-10P8 Enclosure/Panel Data
Wika: 213.40-LM-7500 PSI/KPA Industrial Gauge Data
Wika: 213.40-LM-7500 PSI/KPA Industrial Gauge I&O Instructions
Vescor: ET8-2502 Immersion Heater Data
Vescor: ET8-2502 Immersion Heater Installation & Wiring Instructions

For confidential use only. Not for circulation, distribution, or reproduction without prior
permission, in writing, by FLSmidth Minerals. All Rights Reserved.
Rev. 1 01S26
10-2008 TABLE OF CONTENTS CSP0000160-01
MCN2008-0154 7

ACCESSORY EQUIPMENT (continued)

Main Manufacturing: 1317-56-32/MK3504 Flange Adaptor/Mounting Kit Data


Korfund: R-3 Red Shock Neoprene Mountings Data
Pressure Components Inc.: 171N-114-NPT 1 ¼” Ball Valve Data
Toshiba: BY154FLF2AOZ 1.5HP Motor Specifications
Toshiba: BY154FLF2AOZ 1.5HP Motor Dimensions
Toshiba: BY154FLF2AOZ 1.5HP Motor Wiring Diagram
Toshiba: BY154FLF2AOZ 1.5HP Motor Recommended Spare Parts
Toshiba: B0604FLT3UMH 60HP Motor Specifications
Toshiba: B0604FLT3UMH 60HP Motor Dimensions
Toshiba: B0604FLT3UMH 60HP Motor Wiring Diagram
Toshiba: B0604FLT3UMH 60HP Motor Curves
Toshiba: B0604FLT3UMH 60HP Motor Recommended Spare Parts
Toshiba: Motor Lubrication Data
Toshiba: Motor Storage Instructions
Toshiba: Motor I&M Instructions

Proximity Sensor: Pepperl+Fuchs....................................................................................TAB 2


(FLSmidth Minerals Part No. 902887A)
Pepperl+Fuchs Model NJ20+U4+W Proximity Sensor Data

Hydraulic Cylinder: Parker...............................................................................................TAB 3


(FLSmidth Minerals Part No. 42079B32A, 42079B33A)
Parker Model 12JJ3HLTS39A-18 Hydraulic Cylinder Technical Data
Parker Hydraulic Cylinder Parts ID & Maintenance Instructions

Tie Rod Cylinder: Hydroline............................................................................................TAB 4


(FLSmidth Minerals Part No. 1165581-01, 561778)
Hydroline N5CS Tie Rod Cylinder Technical Manual

Pinch Valve: ......................................................................................................................TAB 5


(FLSmidth Minerals Part No. 574682, 568944, 574689, 568946)
Larox: PVE AU/AK Pinch Valve & Actuator Product Data
Larox: PVE AU/AK Pinch Valve & Actuator Dimensions
Larox: PVE AU/AK Pinch Valve & Actuator Installation Instructions
Larox: PVE AU/AK Valve & Actuator Operating Manual
Hawkeye: HK3077-SG/HK3077SR Limit Switch Installation & Adjusting Instructions
ASCO: 8344G072 Solenoid Valve Data
ASCO: 8344G072 Solenoid Valve Installation & Maintenance Instructions

For confidential use only. Not for circulation, distribution, or reproduction without prior
permission, in writing, by FLSmidth Minerals. All Rights Reserved.
Rev. 1 01S26
10-2008 TABLE OF CONTENTS CSP0000160-01
MCN2008-0154 8

ACCESSORY EQUIPMENT (continued)

Actuated Plug Valve: ........................................................................................................TAB 6


(FLSmidth Minerals Part No. 568950, 574681)
Durco: G4-1-1-A-D1D2 Plug Valve Technical Guide
Durco: G4-1-1-A-D1D2 Plug Valve IO&M Manual
Durco: G4-1-1-A-D1D2 Plug Valve Automax Actuator IO&M Manual
ASCO: 8320G702 Solenoid Valve Data
ASCO: 8320G702 Solenoid Valve I&M Instructions
Westlock: Accutrak 2000 Limit Switch Data
Westlock: Accutrak 2000 Limit Switch I&O Instructions

Pillow Block Bearing: Dodge...........................................................................................TAB 7


(FLSmidth Minerals Part No. 1162263-01, BAP1954-228-01)
Dodge P2B-E-112R & PB2B-E-207R Type E Pillow Block Bearing Dimensions
Dodge P2B-E-112R & PB2B-E-207R Type E Pillow Block Bearing Instruction Manual

Journal Bearing: Dodge ....................................................................................................TAB 8


(FLSmidth Minerals Part No. 42079A44A)
Dodge P2B-BZSP-211 Journal Bearing Dimensions
Dodge P2B-BZSP-211 Journal Bearing Instruction Manual

Shaker Drive Speed Reducer: Hub City ..........................................................................TAB 9


(FLSmidth Minerals Part No. 42079A39A)
Hub City Worm Gear Speed Reducer Data
Hub City Worm Gear Speed Reducer Information, Warnings & Cautions
Hub City Worm Gear Speed Reducer Lubrication & Installation
Hub City Worm Gear Speed Reducer Maintenance Instructions

Shaker Drive Hydraulic Motor: Bosch Rexroth ..............................................................TAB 10


(FLSmidth Minerals Part No. BAP1954-229-01)
Bosch Rexroth AA2FM45/61W-VSD520 Hydraulic Motor Technical Guide

Right Angle Gear Box: Browning....................................................................................TAB 11


(FLSmidth Minerals Part No. BAP1954-226-01, BAP1954-227-01)
Browning 15HB1-SN10 Right Angle Gear Box Data
Browning 15HB1-SN10 Right Angle Gear Box Dimensions
Browning 15HB1-SN10 Right Angle Gear Box Installation & Lubrication Instructions

Ball Check Valve: HDL....................................................................................................TAB 12


(FLSmidth Minerals Part No. 574690)
HDL 5087A-080Z Ball Check Valve Data

For confidential use only. Not for circulation, distribution, or reproduction without prior
permission, in writing, by FLSmidth Minerals. All Rights Reserved.
Rev. 1 01S26
10-2008 TABLE OF CONTENTS CSP0000160-01
MCN2008-0154 9

ACCESSORY EQUIPMENT (continued)

Crosshead Cylinder: Hampton Hydraulics ......................................................................TAB 13


(FLSmidth Minerals Part No. 561777-01)
Hampton Hydraulics Crosshead Cylinder Assembly Drawing

Hydraulic 5 Station Manifold:..........................................................................................TAB 14


(FLSmidth Minerals Part No. 567422)
Bosch Rexroth: Warranty Policies and Procedures
Bosch Rexroth: Petroleum Based Fluids for use with Pumps & Motors Guide
Bosch Rexroth: Petroleum Hydraulic Fluids Recommendations Guide
Bosch Rexroth: Hydraulic Power Units Assembly & Start Up Guide
Bosch Rexroth: 4WE10J3X/CW110N9K4 Directional Valve Technical Guide
Sun Hydraulics: PPHB-LAN/PPJB-LAN Relief Valve Data
Sun Hydraulics: CKEB-XAN Check Valve Data
Sun Hydraulics: RPGC-LAN Relief Valve Data
Bosch Rexroth: H-4WEH25J6X/6EW110N9ETSK4 Directional Control Valve Tech Guide
Sun Hydraulics: NCGB-LCN/NCFB-LCN Flow Control Valve Data
Bosch Rexroth: Z55L Electrical Connections
Noshok: 25.901-1000/2000/3000 PSI/BAR-1/4NPT-PCM Pressure Gauge Data
Noshok: 25.911-1000/2000/3000 PSI/BAR-1/4NPT-PCM Pressure Gauge Data
Noshok: 25.901/25.911 Pressure Gauge Dimensions
Noshok: 25.901/25.911 Pressure Gauge I&M Guide
Sun Hydraulics: NSABKXVBA Adjustable Snubber Data

Hydraulic 2 Station Manifold:..........................................................................................TAB 15


(FLSmidth Minerals Part No. 567423)
Bosch Rexroth: Warranty Policies and Procedures
Bosch Rexroth: Petroleum Based Fluids for use with Pumps & Motors Guide
Bosch Rexroth: Petroleum Hydraulic Fluids Recommendations Guide
Bosch Rexroth: Hydraulic Power Units Assembly & Start Up Guide
Sun Hydraulics: CKEB-XAN/CKGBXCN Check Valve Data
Bosch Rexroth: 4WE10J3X/CW110N9K4 Directional Valve Technical Guide
Sun Hydraulics: PPHB-LAN Relief Valve Data
Sun Hydraulics: NCFB-LCN Flow Control Valve Data
Bosch Rexroth: H-4WEH25J7X/6EW110N9ETSK4 Directional Control Valve Tech Guide
Bosch Rexroth: DBDS6K-1X/400 Pressure Relief Valve Technical Guide
Hydac: WSM06020Z-01-C-N-115AAG 2-Way Directional Cartridge Valve Data
Sun Hydraulics: NSABKXVBA Adjustable Snubber Data
Bosch Rexroth: Z55L/Z14 Electrical Connections
Bosch Rexroth: HED50P1-2X/350K14 & 2X/210K14 Pressure Switch Technical Guide
Noshok: 25.911-1500/5000PSI/BAR-1/4NPT Pressure Gauge Data
Noshok: 25.911-1500/5000PSI/BAR-1/4NPT Pressure Gauge Dimensions
Noshok: 25.911-1500/5000PSI/BAR-1/4NPT Pressure Gauge I&M Guide

For confidential use only. Not for circulation, distribution, or reproduction without prior
permission, in writing, by FLSmidth Minerals. All Rights Reserved.
Rev. 1 01S26
10-2008 TABLE OF CONTENTS CSP0000160-01
MCN2008-0154 10

ACCESSORY EQUIPMENT (continued)

Flow Control Valve: Rego................................................................................................TAB 16


(FLSmidth Minerals Part No. 851027A)
Rego MF-750-SBC Flow Control Data

Shut Off Valve: Hydac......................................................................................................TAB 17


(FLSmidth Minerals Part No. 851028A)
Hydac KHB-20NPT-114-11X Shut Off Valve Data
Hydac KHB-20NPT-114-11X Shut Off Valve Maintenance Instructions

In-Line Tension Load Cell: Sensotec...............................................................................TAB 18


(FLSmidth Minerals Part No. 573393)
Sensotec AL616-EJ-2K13B In-Line Tension Load Cell Data

Manifold Injector: Lincoln Industrial...............................................................................TAB 19


(FLSmidth Minerals Part No. 1163235-01, 902875A, BAP2038-188-01)
Lincoln Industrial SL-1 Manifold Injector Data

Grease Pump: Lincoln Industrial......................................................................................TAB 20


(FLSmidth Minerals Part No. 571925)
Lincoln Industrial 83599 Grease Pump Data
Lincoln Industrial 83599 Grease Pump Technical Guide
Lincoln Industrial 350241 Solenoid Valve Data
Lincoln Industrial 83671 Low Level Switch Data
Lincoln Industrial 69630 Pressure Switch Data

Air Pressure Regulator w/ Gauge: Parker........................................................................TAB 21


(FLSmidth Minerals Part No. 900872A/852849D)
Parker 14E11B13F/K4515N18160 Air Pressure Regulator/Gauge Data
Parker 14E11B13F/K4515N18160 Air Pressure Regulator/Gauge Install & Service

Proximity Switch: Allen Bradley .....................................................................................TAB 22


(FLSmidth Minerals Part No. BAP1954-257-01)
Allen Bradley 871L-B10E10-T2 Proximity Switch Data
Allen Bradley 871L-B10E10-T2 Proximity Switch Installation Instructions

Limit Switch W/ Lever: Square D....................................................................................TAB 23


(FLSmidth Minerals Part No. 850561A/C/D)
Square D Class 9007 Model C54B2/CA-11 & EA-11 Limit Switch/Lever Product Data
Square D Class 9007 Model C54B2/CA-11 & EA-11 Limit Switch/Lever Tech Data
Square D Class 9007 Model C54B2/CA-11 & EA-11 Limit Switch/Lever Instructions

For confidential use only. Not for circulation, distribution, or reproduction without prior
permission, in writing, by FLSmidth Minerals. All Rights Reserved.
Rev. 1 01S26
10-2008 TABLE OF CONTENTS CSP0000160-01
MCN2008-0154 11

ACCESSORY EQUIPMENT (continued)

Safety Switch: Telemecanique .........................................................................................TAB 24


(FLSmidth Minerals Part No. 900758A/C)
Telemecanique XY2C Safety Switch Product Data
Telemecanique XY2C Safety Switch Technical Data

Load Cell: Kistler-Morse ..................................................................................................TAB 25


(FLSmidth Minerals Part No. 541047)
Kistler-Morse LD360s-2-25K-X-X Load Cell Technical Data
Kistler-Morse LD360s-2-25K-X-X Load Cell Installation Manual

Hydraulic Cylinder: Parker...............................................................................................TAB 26


(FLSmidth Minerals Part No. BAP1954-287-01)
Parker Model 3 1/4CBC-3LLT14AC16 Hydraulic Cylinder Technical Data
Parker Hydraulic Cylinder Parts ID & Maintenance Instructions

Butterfly Valve: ................................................................................................................TAB 27


(FLSmidth Minerals Part No. 568947)
Tyco: Keystone 222-786-8” Butterfly Valve Technical Data
Tyco: Keystone 222-786-8” Butterfly Valve I&M Manual
Tyco: Morin MRP-070 Actuator Technical Data
Tyco: Morin MRP-070 Actuator I&M Instructions
Tyco: Keystone Avid 791 Solenoid Valve Technical Data
Westlock: AccuTrak 2000 Limit Switch Data
Westlock: AccuTrak 2000 Limit Switch I&O Instructions

Solenoid Valve: ASCO.....................................................................................................TAB 28


(FLSmidth Minerals Part No. 568948)
ASCO 8221G013MO Solenoid Valve Data
ASCO 8221G013MO Solenoid Valve I&M Instructions

Pressure Transmitter: Rosemount ....................................................................................TAB 29


(FLSmidth Minerals Part No. 574684)
Rosemount 2088-G3-S22-A1-S1-Q4-M7 Pressure Transmitter Quick Install Guide
Rosemount 2088-G3-S22-A1-S1-Q4-M7 Pressure Transmitter Reference Manual
Rosemount 1199-WDA-95S-FFW-G1-CAA-97H Flush Flanged Seal Data
Rosemount 1199-WDA-95S-FFW-G1-CAA-97H Flush Flanged Seal Systems Manual

For confidential use only. Not for circulation, distribution, or reproduction without prior
permission, in writing, by FLSmidth Minerals. All Rights Reserved.
Rev. 1 01S26
10-2008 TABLE OF CONTENTS CSP0000160-01
MCN2008-0154 12

ACCESSORY EQUIPMENT (continued)

Pressure Gauge: Ashcroft .................................................................................................TAB 30


(FLSmidth Minerals Part No. 574686, 574685)
Ashcroft Series 1279 Pressure Gauge Data
Ashcroft Series 1279 Pressure Gauge Dimensions
Ashcroft Type 100 Capsule Diaphragm Seal Data
Ashcroft Series 1279 Pressure Gauge Converting Instructions
Ashcroft Series 1279 Pressure Gauge I&M Instructions

Magnetic Flowmeter: Rosemount ....................................................................................TAB 31


(FLSmidth Minerals Part No. 574688-01)
Rosemount 8700 Series Magnetic Flowmeter/Flowtube Data
Rosemount 8700 Series Magnetic Flowmeter/Flowtube Manual Supplement
Rosemount 8712HR12N0M4 Magnetic Flowmeter Manual
Rosemount 8707FSE060S1W0N0 Flowtube Manual

Flow Switch: Gems Sensors .............................................................................................TAB 32


(FLSmidth Minerals Part No. 574687)
Gems Sensors FS55029608 Flow Switch Instruction Bulletin

Level Transmitter: Siemens..............................................................................................TAB 33


(FLSmidth Minerals Part No. 568955)
Siemens PROBE LU #7ML5221-2AA11 Level Transmitter Quick Start Manual
Siemens PROBE LU #7ML5221-2AA11 Level Transmitter Instruction Manual

Turbidimeter: Yokogawa..................................................................................................TAB 34
(FLSmidth Minerals Part No. 568956)
Yokogawa TB750G Turbidimeter Data
Yokogawa TB750G/K9411UA Turbidimeter/Filter Assembly Specifications & Dimensions
Yokogawa TB750G/K9411UA Turbidimeter/Filter Assembly User Manual

FINAL MECHANICAL CHECKLIST

For confidential use only. Not for circulation, distribution, or reproduction without prior
permission, in writing, by FLSmidth Minerals. All Rights Reserved.

You might also like