You are on page 1of 317

SAP ECC

USER MANUAL

PLANT
MAINTENANCE
Plant Maintenance

Contents

01. How to Logon In SAP Server.........................................................................4


02. Creating Functional Locations......................................................................8
03. Creating Equipment......................................................................................17
04. Structural Display Functional Location.....................................................29
05. Creating a Material with Serial Number Profile.........................................32
06. Creating Equipment for the Maintenance Planning..................................40
07. Creating a General Maintenance Task List................................................50
08. Creating a Maintenance Plan.......................................................................56
09. Scheduling the Maintenance Plan..............................................................65
10. Viewing the Work List for Orders................................................................71
11. Viewing the Maintenance History of Equipment.......................................75
12. Process Flow of Malfunction Notification..................................................83
12.1 Creating a Malfunction Report.......................................................................................83
13. Entering a Breakdown Maintenance Order................................................90
14. Case: 1 Internal processing with stock item as component....................93
14.1 Goods issue to maintenance order Procedure...........................................................101
14.2 Confirming a Maintenance Order.................................................................................109
14.3 Technically Completing a Maintenance Order............................................................114
14.4 Settling the Maintenance Order...................................................................................119
14.5 Closing the Maintenance Order - Business View.......................................................125
14.6 Show Costs on maintenance order.............................................................................130
15. Case: 2 Internal processing with non stock item as component..........133
15.1 Purchase Requisition in Maintenance Order..............................................................140
15.2 Release of Purchase Requisition.................................................................................145
15.3 Create Purchase Order from Purchase Requisition of Maintenance Order.............150
15.4 Release of purchase order........................................................................................... 157
15.5 Goods receipt to purchase order.................................................................................161
15.6 Confirming a Maintenance Order.................................................................................166
15.7 Technically Completing a Maintenance Order............................................................171
15.8 Settlement of the Maintenance Order..........................................................................176
15.9 Closing the Maintenance Order - Business View.......................................................182
15.10 Show Costs on maintenance order...........................................................................186
16. Case: 3 Service procurement for maintenance order.............................189

© Pridevel Group 2007 2 Confidential


Plant Maintenance

16.1 Purchase Requisition in Maintenance Order..............................................................199


16.2 Release of Purchase Requisition.................................................................................204
16.3 Create Purchase Order from Purchase Requisition...................................................210
16.4 Release of purchase order........................................................................................... 219
16.5 Service entry sheet against purchase order...............................................................224
16.6 Invoice verification........................................................................................................ 232
16.7 Technically Completing a Maintenance Order............................................................237
16.8 Settling the Maintenance Order...................................................................................242
16.9 Closing the Maintenance Order - Business View.......................................................248
16.10 Show Costs on maintenance order...........................................................................253
18. Maintenance Bill of Materials....................................................................266
18.1 Creating a Material........................................................................................................ 267
18.2 Creating Bill of Material................................................................................................ 271
18.3 Link BOM to a piece of equipment...............................................................................274
18.4 Structural Display of BOM............................................................................................ 277
19. Scheduling a Maintenance Plan Automatically.......................................280
20. Creating a Quantitative Measuring Point.................................................284
21. Creating a Measuring Point as a Counter................................................288
22. Creating a Qualitative Measuring Point...................................................291
23. Creating Measurement Documents..........................................................295
24. Creating Measurement Documents collectively for a Technical Object
............................................................................................................................301

© Pridevel Group 2007 3 Confidential


Plant Maintenance

01. How to Logon In SAP Server

On the Desktop we can see the SAP Logon screen . Double click on it. Next
screen will be as below.

In the above screen we can see 2 types of servers.

1> USCB Prototype 100 & 120 Client.


2> USCB Quality server 200 client.

To start and Login’s.

Double click or select and click on the Log on .

to login to server.

© Pridevel Group 2007 4 Confidential


Plant Maintenance

Once we login the next screen will be as follows.

On the above screen enter the User name and Password to go to SAP Easy Access
screen.

After entering the User name and password the main screen will be as under.

© Pridevel Group 2007 5 Confidential


Plant Maintenance

The above screen is the SAP Easy Access screen.

In this screen we can enter the Tcodes to go the main


screen of the required Tcode.

For eg. Posting of GL account Tcode  F-02

© Pridevel Group 2007 6 Confidential


Plant Maintenance

Note: From the SAP Easy Access screen we can enter directly the Tcode, whereas from
the above screen we must compulsory enter the /N before the Tcode.

Eg: Posting of GL account Tcode /NF-02.

© Pridevel Group 2007 7 Confidential


Plant Maintenance

02. Creating Functional Locations


Use
Functional locations are elements of a technical structure (for example functional sub-
units of a plant). Functional locations are created hierarchically and can be structured
according to the following criteria:
 Functional
 Process-oriented
 Spatial
Each functional location is managed individually in the system using a specific master
record. A functional location represents the place where a maintenance task is to be
performed.

Prerequisites
To be able to create functional locations, you must define the structure to be used in the
system. This can be accomplished by using a structure indicator.
A structure indicator is defined in the Plant Maintenance Customizing. With the help of
structure indicators you can:
 Define and control the generic structure of the location label
 Make the hierarchy of the location structure visible within the location label
 Use the automatic system functions to create a generic location structure when
defining the locations
The structure indicator REFX is predefined in the system.

© Pridevel Group 2007 8 Confidential


Plant Maintenance

Procedure
Access the transaction choosing one of the following navigation options:

SAP menu Logistics  Plant Maintenance  Management of


Technical Objects  Functional Location  Create
Transaction IL01
code

© Pridevel Group 2007 9 Confidential


Plant Maintenance

You are now on the initial screen for creating functional locations. The
following is an example of the kind of data you must maintain in the master
record of a functional location. The data you must enter depend mainly on the
hierarchy level of the functional location you want to create.

© Pridevel Group 2007 10 Confidential


Plant Maintenance

On the Create functional location: Initial screen, enter the necessary data:

Field name Description User action Comment


and values
Str Indicator RE-FX: Flexible Real REFX Enter shown
Estate Management value
Functional CRUDE OIL Enter the label
Location STORAGE for Func. Loc.
Func.Loc. Technical system - M Enter shown
Category standard value
Superior Func.Loc. Beatrice Biodiesel U001 As required

Choose Enter

© Pridevel Group 2007 11 Confidential


Plant Maintenance

On the Create Functional Location: Master data screen, enter the necessary data (e.g.
Functional Location Description).

Enter reference data and manufacturer data on the General tab:

Field name Description User action and Comment


values
Description CRUDE OIL CRUDE OIL
STORAGE STORAGE
Object Type TANK TANK
Start-up date 01.06.2007
Acquisition Date 01.06.2007

Press Enter

© Pridevel Group 2007 12 Confidential


Plant Maintenance

Choose the Location tab.


Maintain/check the following data:

Field name Description User action and Comment


values
Maint Plant BioDiesel Plant U001 Enter the shown
value
Work Center Mechanical MECHANIC Enter as you require
Department
Sort field OIL STORAGE Enter as you require

© Pridevel Group 2007 13 Confidential


Plant Maintenance

Choose the Organization tab.


Maintain/ check the following data:

Field name Description User action Comment


and values
Cost center Maintenance 1004 Enter as required
Planning plant BioDiesel Plant U001 Enter as the value
Planner group Maintenance M01 Enter as required
Main work ctr Mechanical Dept. MECHANIC Enter as required
Catalog profile General Catalog Profile 000000001 Standard

© Pridevel Group 2007 14 Confidential


Plant Maintenance

Choose the Structure tab


Maintain/ check the following data:

Field name Description User action Comment


and values
InstallSpecs Set flag To allow
installation of eqpt.

Save your entries.

© Pridevel Group 2007 15 Confidential


Plant Maintenance

Result
You have now created a functional location. Depending on the structure indicator and
the name of the functional location you have assigned on the initial screen, the created
functional location is incorporated automatically into the structure.

© Pridevel Group 2007 16 Confidential


Plant Maintenance

03. Creating Equipment


Use
Equipment is an individual object that must be maintained as an autonomous unit. Each
piece of equipment is managed individually in the system. Therefore, for each technical
object you can
Manage individual data from the maintenance point of view
Carry out individual plant maintenance actions
Document each plant maintenance task
Collect and evaluate technical data over long periods of time
Equipment can be installed and dismantled on functional locations. The operating times
of a piece of equipment on a functional location can be documented chronologically.

Prerequisites
 A functional location structure has been defined
 Organization of Plant Maintenance has been defined in configuration
 Cost centers

© Pridevel Group 2007 17 Confidential


Plant Maintenance

Procedure
Access the transaction choosing one of the following navigation options:

SAP menu Logistics  Plant Maintenance  Management of Technical


Objects  Equipment  Create (General)
Transaction code IE01

© Pridevel Group 2007 18 Confidential


Plant Maintenance

On the Create Equipment: Initial screen,

In the Equipment Category field, enter M (Machines), Date comes by default

This category groups individual pieces of equipment according to usage

Choose Enter

© Pridevel Group 2007 19 Confidential


Plant Maintenance

On the Create Equipment: General data screen,

Field name Description User action and values Comment


Description Centrifugal Pump
Object Type Pump PUMP
Start-up Date 01.06.2007
Acquisition Value 850 USD
Acquisition Date 01.06.2007
Manufacturer KENT
Model Number 123456
Manuf Serial No 456321
Manuf Country US

© Pridevel Group 2007 20 Confidential


Plant Maintenance

The tabs on this screen are identical to the master record of a functional
location. For more information, refer to the Functional location business
process procedure.
Choose the Location tab.

Field name Description User action and Comment


values
Maint Plant BioDiesel Plant U001 Plant, where equipment
is located
Work Center Mechanical MECHANIC
department
ABC Critical A
indicator
Sort Field CF PUMP

© Pridevel Group 2007 21 Confidential


Plant Maintenance

Press Enter

Choose the Organization tab.

Field name Description User action and Comment


values
Cost Center Maintenance 1004
Planning Plant BioDiesel Plant U001
Planner Group Maintenance M01
Main Work Center Mechanical Dept. MECHANIC / U001
Catalog profile General Catalog Profile 000000001

© Pridevel Group 2007 22 Confidential


Plant Maintenance

Save

Equipment created with number 10000025

© Pridevel Group 2007 23 Confidential


Plant Maintenance

© Pridevel Group 2007 24 Confidential


Plant Maintenance

After you have maintained the equipment master data, you can assign the equipment to a
functional location. To do this, access the transaction choosing one of the following navigation
options:

SAP menu Logistics  Plant Maintenance  Management of


Technical Objects  Equipment  Change
Transaction code IE02

© Pridevel Group 2007 25 Confidential


Plant Maintenance

On the Change Equipment: Initial screen, in the Equipment field, enter your
previously-created equipment number and choose Enter

© Pridevel Group 2007 26 Confidential


Plant Maintenance

On the Change Equipment: General data screen,


From the menu, choose Structure  Change Install Loc.

On the Change Equipment Installation Overview screen,


in the Functional location field,
enter the functional location (for example, CRUDE OIL STORAGE)
choose Install w. Data transfer

Choose Enter

© Pridevel Group 2007 27 Confidential


Plant Maintenance

On the Data Transfer: Install Equipment screen


Choose Install Loc. (whole)
And then Back

On the Change Equipment Installation Location screen,

Choose Enter , the following screen appears,

© Pridevel Group 2007 28 Confidential


Plant Maintenance

Choose Save

Result
You have created new equipment and have assigned it to a functional location.
You can check whether your action has been successful by choosing Structural Display
Transaction code IH01. It is shown in next step.

© Pridevel Group 2007 29 Confidential


Plant Maintenance

04. Structural Display Functional Location


Procedure
Access the transaction choosing one of the following navigation options:

SAP menu Logistics  Plant Maintenance  Management of


Technical Objects  Functional Location
 Structural Display
Transaction code IH01

© Pridevel Group 2007 30 Confidential


Plant Maintenance

On the Functional Location Structure: Selection screen, enter the necessary data
and choose Execute (F8)

Field name Description User action and Comment


values
Functional Location U001
Location hierarchy Set Flag
Equipment installed Set Flag
Equipment hierarchy Set Flag
BOM explosion Set Flag

© Pridevel Group 2007 31 Confidential


Plant Maintenance

The system displays a brief overview of the functional location structure. You can see
the first and second level of the functional location structure. If you further expand the
functional location CRUDE OIL STORAGE you will come to a lower level of hierarchy.
Drill down in the structure until you can see the equipment “Centrifugal pump”.
Check whether your previously created equipment has been installed on the functional
location “CRUDE OIL STORAGE” by drilling-down.

Explanation
The functional location represents the place where a technical task is performed. The
equipment is the object that is used to carry out the task. A technical object can be
further structured by bills of materials requiring the definition of maintenance assemblies.

© Pridevel Group 2007 32 Confidential


Plant Maintenance

05. Creating a Material with Serial Number Profile


Use
This material is assigned to equipment in the serialization view, enabling a maintenance
history to be created. The material is not used for any other operations.
Prerequisites
Organizational units such as plant and storage location
Material type: spare part (Standard)
Serial number profile: 0001 (Standard)
Procedure
Access the transaction choosing one of the following navigation options:

SAP menu Logistics  Plant Maintenance  Management of


Technical Objects  Material  Create (General)
Transaction code MM01

© Pridevel Group 2007 33 Confidential


Plant Maintenance

On the Create Material (Initial Screen), enter the required data:

Field name Description User action and values Comment


Material number System generates
Industry sector Chemical industry
Material type Spare parts

Choose Enter

© Pridevel Group 2007 34 Confidential


Plant Maintenance

On the Select View(s) dialog box, select the following views and choose Enter

 Basic Data 1
 Purchasing
 General Plant Data / Storage 2
Click on Organization levels Icon

© Pridevel Group 2007 35 Confidential


Plant Maintenance

In Organization Levels, enter the following data.

Field name Description User action and values Comment


Plant U001
Stor. location 0001

Choose Enter

© Pridevel Group 2007 36 Confidential


Plant Maintenance

On the Basic data 1 view tab, make the following entries:

Field name Description User action and values Comment


Description PUMP
Base unit of measure EA
Material group 01

Choose Enter

© Pridevel Group 2007 37 Confidential


Plant Maintenance

On the Purchasing view tab,


In the Purchasing Group field, enter 001 and choose Enter

© Pridevel Group 2007 38 Confidential


Plant Maintenance

On the Storage 2 view tab,


In the Serial no. profile field, enter 0001 and choose Enter

Save

© Pridevel Group 2007 39 Confidential


Plant Maintenance

The following screen appears with material number.

Result
A material (Material No.49) with a serial number profile has been created.

© Pridevel Group 2007 40 Confidential


Plant Maintenance

06. Creating Equipment for the Maintenance Planning


Use
This equipment is the subject of the maintenance planning. This scenario relates to a
single laboratory weighing scale that requires regular calibration. A material with serial
number is assigned to the equipment so that the calibrations can be documented.

Prerequisites
 Organizational units
 Cost center for the calculation of the orders
 Material with serial number profile

© Pridevel Group 2007 41 Confidential


Plant Maintenance

Procedure
Access the transaction choosing one of the following navigation options:

SAP menu Logistics  Plant Maintenance  Management of


Technical Objects  Equipment  Create (General)
Transaction code IE01

© Pridevel Group 2007 42 Confidential


Plant Maintenance

On the Create Equipment: Initial Screen,


In the Equipment category field, enter M (Machines)
And choose Enter

© Pridevel Group 2007 43 Confidential


Plant Maintenance

On the Create Equipment: General data view,


In the Description field, enter an equipment description (such as MOTOR)
In the Object type field, enter the type (such as MOTOR)
And choose Enter

© Pridevel Group 2007 44 Confidential


Plant Maintenance

On the Create Equipment: Location view,


In the MaintPlant field, enter U001
In the ABC Indicator field, enter A – Critical
In the Sort field, enter MOTOR
And choose Enter

© Pridevel Group 2007 45 Confidential


Plant Maintenance

Choose the Organization view and enter the following data:

Field name Description User action and values Comment

Company Code Beatrice U001


BioDiesel,LLC
Cost center Maintenance 1004
Planning plant BioDiesel plant U001
Planner group Electrical M02
Main WorkCtr Electrical Dept ELECTRIC / U001
Catalog profile General Catalog 000000001
Profile

© Pridevel Group 2007 46 Confidential


Plant Maintenance

Choose Enter

On the Change Equipment: General data screen,


From the Menu bar, choose Edit  View selection
The following Create Equipment: View Selection screen appears.
Set flag on Serial Numbers,

© Pridevel Group 2007 47 Confidential


Plant Maintenance

Choose Enter

The SerData Tab gets added.

© Pridevel Group 2007 48 Confidential


Plant Maintenance

Choose the SerData view and enter the following data:

© Pridevel Group 2007 49 Confidential


Plant Maintenance

Field name Description User action and Comment


values
Material 50 The material with serial number
created above
Serial number 1

Choose Enter

Then Save

© Pridevel Group 2007 50 Confidential


Plant Maintenance

The following screen appears with equipment number 10000033

Result
Equipment with the serial number has been created for which an order history is
managed.

© Pridevel Group 2007 51 Confidential


Plant Maintenance

07. Creating a General Maintenance Task List


Use
The general maintenance task list is a prerequisite for the creation of a maintenance
plan. The operations that are to be carried out in a maintenance order are created in a
general maintenance task list and assigned to the maintenance plan.

Prerequisites
 Organizational data
 Work Centers

© Pridevel Group 2007 52 Confidential


Plant Maintenance

Procedure
Access the transaction choosing one of the following navigation options:

SAP menu Logistics  Plant Maintenance  Preventive Maintenance 


Work Scheduling  Task Lists  General Maintenance Task
Lists  Create
Transaction code IA05

© Pridevel Group 2007 53 Confidential


Plant Maintenance

On the Create General Task List: Initial Screen, the system assigns a task list group
number. Choose Enter

© Pridevel Group 2007 54 Confidential


Plant Maintenance

On the Create General Task List: Header General View screen, enter the data:

Field name Description User action and Comment


values
Description Pump maintenance
Planning plant U001
Work center MECHANIC / U001
Usage Plant maintenance 4
Planner group Mechanical Dept. M01
Status Released (General) 4
Inspection points 300 For equipment

© Pridevel Group 2007 55 Confidential


Plant Maintenance

Choose Enter and then choose Operation Icon

On the Create General Task List: Operation overview screen, enter the data:

Field name Description User action and values Comment


Operation 10
Work center MECHANIC
Control Key PM01
Operation Change the shaft
description
Work 1
Unit Hr
No. 1

© Pridevel Group 2007 56 Confidential


Plant Maintenance

Choose Enter and then Save

Result

A general maintenance task list has been created with group number 15 and counter 1

© Pridevel Group 2007 57 Confidential


Plant Maintenance

08. Creating a Maintenance Plan


Use
The maintenance plan describes the maintenance cycle and the execution of the
maintenance. A general maintenance task list is assigned to the maintenance plan that
in turn is assigned to equipment.

Prerequisites
 Organizational data
 General maintenance task list
 Equipment must be available.

© Pridevel Group 2007 58 Confidential


Plant Maintenance

Procedure
Access the transaction choosing one of the following navigation options:

SAP menu Logistics  Plant Maintenance  Preventive Maintenance 


Maintenance Planning  Maintenance Plans  Create 
Single Cycle Plan
Transaction code IP41

© Pridevel Group 2007 59 Confidential


Plant Maintenance

On the Create Maintenance Plan: Initial screen,


In the Maint.plan cat field, enter the PM Maintenance Order
And choose Enter

© Pridevel Group 2007 60 Confidential


Plant Maintenance

On the Create Maintenance Plan: Single cycle plan view, enter the following data:

Field name Description User action and values Comment


Description Change the shaft of pump

Cycle 3
Unit MON
Equipment 10000026

Choose Enter

© Pridevel Group 2007 61 Confidential


Plant Maintenance

Part of the following data picks from equipment mater data


If you want to change, can change

Field name Description User action and Comment


values
Order type PM03 Preventive Maintenance
Order
Planning plant U001
Main WorkCtr MECHANIC
Priority High
Planner group M01 Maintenance
Maint Activity 003 Repair
Type
Type A Task list type
Task LstGrp 15
GrpCr 1

© Pridevel Group 2007 62 Confidential


Plant Maintenance

Choose Enter

© Pridevel Group 2007 63 Confidential


Plant Maintenance

Choose the Maintenance plan scheduling parameters view & enter the data:

Field name Explanation of field User Comment


action
and
values
Shift Factor Late Indicates amount in % of 100% The shift factor for late
Compl. delay by which next completion of a
planned date is shifted. maintenance task defines
the percentage of the
shift to be applied to the
calculation of the next
date.
It is only applied when
the variance between
target and actual date is
outside the tolerance
range.
Tolerance (+) Allowed deviation for late 10 %
confirmation. No date
shift takes place if within
tolerance
Shift Factor Indicates amount in % of 100% See comment above of
Early Compl. earliness by which next SF Late Completion,
planned date is shifted. same functionality, here
for earlier completion
Tolerance (-) See above. 10%
Cycle For short-term 1.00
ModificFactor adjustments without
changing the entire plan
Call horizon Indicates % of cycle end 0% 0% - immediate call
value at which 100% - On scheduled
order/notification is called date/time
Scheduling Indicates period (one 365 DAY
period cycle length and more)
for which maintenance
orders are to be created
(Long-term)
Completion Indicates whether Set flag
Requirement confirmation is required
for order operations. For
monitoring calibration

© Pridevel Group 2007 64 Confidential


Plant Maintenance

orders
Start of cycle Blank

Choose Enter and then Save

© Pridevel Group 2007 65 Confidential


Plant Maintenance

The system pop up window comes,


Choose NO and then Enter

© Pridevel Group 2007 66 Confidential


Plant Maintenance

Result
A maintenance plan for the equipment has been created 90000000007.

09. Scheduling the Maintenance Plan


Use
Before you can use the created maintenance plan, it must be scheduled and started.
Scheduling is based on the scheduling parameters maintained above.

Prerequisites
The maintenance plan must exist.

© Pridevel Group 2007 67 Confidential


Plant Maintenance

Procedure
Access the transaction choosing one of the following navigation options:

SAP menu Logistics  Plant Maintenance  Preventive Maintenance


 Maintenance Planning  Scheduling for Maintenance
Plans  Schedule
Transaction IP10
code

© Pridevel Group 2007 68 Confidential


Plant Maintenance

On the Schedule Maintenance Plan: Initial screen,


In the Maintenance plan field, enter the maintenance plan number from the previous
step and choose Enter

© Pridevel Group 2007 69 Confidential


Plant Maintenance

On the Schedule Maintenance Plan: Single Cycle Plan screen, view the scheduling
parameters for the maintenance plan, manually access maintenance orders and view
manual and scheduled calls.
To start the maintenance plan, choose Start.
The system then defaults to you the current date as the start of the cycle.

© Pridevel Group 2007 70 Confidential


Plant Maintenance

On the Start Date dialog box, enter the Date and choose Enter .

The system displays the called and maintained plant maintenance orders in the
Scheduled Calls view.

© Pridevel Group 2007 71 Confidential


Plant Maintenance

Select the first call ( Row ) and Click on Green flag to release then
Choose Save

© Pridevel Group 2007 72 Confidential


Plant Maintenance

Result
The maintenance plan has been started, and the maintenance orders are set in the work
list according to the call horizon and scheduling period.

The released maintenance order is created automatically when the maintenance plan is
started.

© Pridevel Group 2007 73 Confidential


Plant Maintenance

10. Viewing the Work List for Orders


Use
You can use this transaction to display or change orders. By restricting to outstanding
and orders in process, the pool of orders existing in the system can be displayed,
changed and set for processing in the work centers.

Prerequisites
Organizational data must exist.
Called maintenance orders must exist.

© Pridevel Group 2007 74 Confidential


Plant Maintenance

Procedure
Access the transaction choosing one of the following navigation options:

SAP menu Logistics  Plant Maintenance  Maintenance Processing


 Order  Order List  Change
Transaction code IW38

© Pridevel Group 2007 75 Confidential


Plant Maintenance

On the Change PM orders: Selection of Orders screen, enter the required data:

This is a list display that enables a variety of types of evaluations to be carried out. If
you select just the outstanding orders and execute the list display, the system
displays all the outstanding orders. In the same way, you can restrict the selection by
entering a range of parameters so that the system displays just a few or even no
orders.

Field name Description User action and values Comment


Order status Outstanding Set flag
In process Set flag
Order type PM03
Equipment 10000026
Period from < current date >
Period to < current date + 1 year >

© Pridevel Group 2007 76 Confidential


Plant Maintenance

Choose Execute (F8) .

The system displays a list of all orders in process of order type PM03 for the specified
equipment.

Result
It is possible to display and change the created maintenance order.

© Pridevel Group 2007 77 Confidential


Plant Maintenance

11. Viewing the Maintenance History of Equipment


Use
A maintenance history is managed for equipment with serial number. All orders for this
equipment can be viewed via this history. This includes released orders so that after the
start of a maintenance plan you can already view the first order in the history.

Prerequisites
Equipment with serial number
At least one released order for the equipment

Procedure
Access the transaction choosing one of the following navigation options:

SAP menu Logistics  Plant Maintenance  Management of


Technical Objects  Equipment  Change
Transaction code IE02

© Pridevel Group 2007 78 Confidential


Plant Maintenance

On the Change Equipment: Initial screen, in the Equipment field, enter the
equipment number of equipment with the serial number, and choose Enter

© Pridevel Group 2007 79 Confidential


Plant Maintenance

Choose the SerData tab

Choose History

© Pridevel Group 2007 80 Confidential


Plant Maintenance

On the History: Serial number tab, the system displays the released maintenance
order, created when the maintenance plan was started, and a maintenance notification
that was automatically created with the order.
To display the order, select it and choose Document.

© Pridevel Group 2007 81 Confidential


Plant Maintenance

On the Display Maintenance Order: Center Header screen,


Choose the Operations tab.

© Pridevel Group 2007 82 Confidential


Plant Maintenance

Choose Act. Data to display the completion confirmations. If the completion confirmation
is already created you can display it in the Serial Number History.

© Pridevel Group 2007 83 Confidential


Plant Maintenance

To display confirmation details, choose the Icon shown,

© Pridevel Group 2007 84 Confidential


Plant Maintenance

Result
All orders for the equipment are documented in the history and can be viewed up to
document level.

© Pridevel Group 2007 85 Confidential


Plant Maintenance

12. Process Flow of Malfunction Notification


Repairing the malfunction is demonstrated using the example of the Motor. The cost
center for the order settlement is found via the equipment.

Maintenance Notification
The maintenance notification allows you to describe in detail a technical exception state
on a defective reference object. You request the necessary maintenance task by means
of a maintenance notification and document the tasks carried out.
In the ERP component Plant Maintenance, the notification creation distinguishes
between the following default notification types:
 Malfunction Report: This describes the state or malfunction of a maintenance
object that impairs its performance in some way.
 Maintenance Request: This requests a service or task from the maintenance
department without there being a malfunction.
In this scenario, the maintenance notification means specifically the malfunction report.
This primarily records the malfunctions on a technical object. The notification makes
reference to the Functional Location of the equipment.
The damage is specified in detail via a damage catalog.
Notification type: M2 Malfunction Report

12.1 Creating a Malfunction Report


Use
A malfunction report describes a malfunction on a maintenance object that in some way
impairs the performance of the object. The malfunction report documents that:
A technical system is not functioning correctly.
A technical system is not working as well as it should or is not working at all.
The system is producing poor results.

Prerequisites
Technical objects in the form of functional locations, equipment and maintenance
assemblies
Organizational units such as maintenance planners and work centers
Catalogs for verifying malfunctions for recording technical findings

© Pridevel Group 2007 86 Confidential


Plant Maintenance

Procedure
Access the transaction choosing one of the following navigation options:

SAP menu Logistics  Plant Maintenance  Maintenance Processing


 Notification  Create (General)
Transaction code IW21

© Pridevel Group 2007 87 Confidential


Plant Maintenance

On the Create PM Notification: Initial screen,


In the Notification type field, enter M2 and
Choose Enter

© Pridevel Group 2007 88 Confidential


Plant Maintenance

On the Create PM Notification: Malfunction Report,

You can enter different equipment using the match code (F4) . After you enter the

equipment and choose Enter , several fields in the notification are filled with

values. You can consider these values as default values stored in the master record of
the equipment.

This ensures that all the required notification data is maintained on the header data
screen of the report. Further down on the same page, you can describe the malfunction
report in more detail with help from the catalogs. The values entered here are updated in
the maintenance history and as a result are available for later evaluations.

After making these entries, you have described the damage and the cause of a
malfunction in detail.

Breakdown duration: If you select the Breakdown field, the system automatically
calculates the duration of a malfunction based on the time data that you entered. The
duration is also updated in the history of the object and is also available for evaluations
in the Plant Maintenance Information System.
Make the following entries in the same sequence mentioned below:

Field name Description User action and values Comment


Description Shaft damaged
Equipment PUMP 10000026
Coding System is MECH / 0001
down
Planner group M01 / U001
Main work center MECHANIC / U001
Reported by Lawrence
Breakdown Set flag
Object part Shaft YQ-CHME1 / ME00

© Pridevel Group 2007 89 Confidential


Plant Maintenance

Damage Crack YQ-CHME1 / ME01


Cause code Breakage YQ-CHME1 / ME03

© Pridevel Group 2007 90 Confidential


Plant Maintenance

Choose Release (Green flag)

© Pridevel Group 2007 91 Confidential


Plant Maintenance

System status changes to NOPR notification in process.

Choose Save

© Pridevel Group 2007 92 Confidential


Plant Maintenance

The following screen appears

Result
You have now entered a malfunction report.
Explanation
You have now been presented with all of the required fields and possible entries within a
malfunction report. This is just one example of how you can enter a malfunction report. It
is only one method for documenting and reporting malfunctions. In a broader sense, the
malfunction report forms the basis for making Plant Maintenance technically transparent
in the breakdown maintenance process. It mainly depends on how you organize the
process of malfunction processing in your company.
Because experience shows that each malfunction primarily has an individual character
and is not a predictable event, it depends on which data is to be maintained when
entering a malfunction report.

© Pridevel Group 2007 93 Confidential


Plant Maintenance

13. Entering a Breakdown Maintenance Order

Maintenance Order Processing


The notification is converted into an order. The following are determined from the master
data of the Functional Location:
Account assignment information
Responsible work center and the
Assigned PM item.
The following aspects can be planned for the maintenance order:
Spare parts required (internal/external)
Affected work centers
Decision whether internal or external processing
In particular, the maintenance order is used for the following purposes:
Managing maintenance activities respective to their planning and implementation
Collecting costs arising from tasks
As a subsequent maintenance history for the technical objects
The respective position of an investment program can be found via the equipment to
display the PM costs in reporting (PM budget).

Maintenance Order Release and Implementation


Before order release, the issuing of permits is shown using the example of a general
work permit.
The following actions can only be carried out if the order has been released:
Printing the shop papers for the maintenance order
Making planned and unplanned withdrawals of material for the order from the warehouse
Executing purchase orders for requirement coverage requests
Posting goods receipts
Entering external services
Posting the invoice receipt
Entering time confirmations
After granting order release, the individual activities can be carried out by internal
maintenance workshops or external service companies (external services).
In our example, the spare parts required for order execution are taken for the order from
warehouse stocks via spare parts BOMs.

© Pridevel Group 2007 94 Confidential


Plant Maintenance

Maintenance Confirmation
The following confirmation types can be carried out via the order confirmation:
Time confirmations
Goods receipts
Invoice receipts
Service entries
Goods issues from the warehouse
Technical report
Measurement and counter readings
Changes to the equipment

Maintenance Completion and Settlement


Both the maintenance notification and the maintenance order are settled after the
required maintenance work has been carried out. There are two completion phases
relating to this:
Technical completion
Business completion
The technical completion reduces all the purchase requisitions, open reservations and
capacities still outstanding for the maintenance order.
Nevertheless, the order can still continue to receive costs, for example, through invoice
receipts for delivered and used materials, however it is blocked for all changes in the
processing.
The order settlement transfers the costs incurred that were temporarily collected for the
maintenance order, to the recipient, for example, to the cost center for the maintained
object.
The business completion signifies that the order is completed in accounting terms. It
cannot receive any further postings.
In our example, the order costs are settled to the assigned Workshop/Maintenance cost
center using an all-inclusive cost element.

Entry of Technical Findings


The documentation of the work performed takes place via technical findings. Catalogs
are available as an entry tool.

Reporting
Key figures have been set up in PM-IS for the examples ball mill and container.

Result
Breakdown maintenance is carried out for the example.

© Pridevel Group 2007 95 Confidential


Plant Maintenance

Use
Order processing helps you to plan maintenance tasks in greater detail, for example,
those from a malfunction report. You decide whether the tasks to be carried out should
be processed internally or externally and which components (materials) you need for
them.
Furthermore, the maintenance order is used to collect all costs for a maintenance task
and to debit the cost center that incurred the costs using the settlement functions in the
CO module (Controlling).

Prerequisites
Technical objects in the form of functional locations, equipment and maintenance
assemblies
Organizational units such as maintenance planners and work centers
Costs centers defined in the master data of the technical objects
Cost elements
Procurement processing in the MM (Materials Management) module for entering
purchase requisitions in the maintenance order

© Pridevel Group 2007 96 Confidential


Plant Maintenance

Procedure
14. Case: 1 Internal processing with stock item as component
Access the transaction choosing one of the following navigation options:

SAP menu Logistics  Plant Maintenance  Maintenance Processing


 Order  Create (General)
Transaction code IW31

© Pridevel Group 2007 97 Confidential


Plant Maintenance

On the Create Order: Initial screen, enter the required data:

Field name Description User action and Comment


values
Order type Malfunction Maintenance PM02
order

Equipment PUMP 10000026

Choose Enter

In the initial screen for entering maintenance orders, you only need to specify the order
type and the equipment. All required data are then entered in the order from the
equipment master record, as in notification processing. You are now in the Create order:
Central Header screen. As you can see, all the fields for the responsibilities and the
reference object have been filled except for the assembly field.

© Pridevel Group 2007 98 Confidential


Plant Maintenance

Make the following entries:

Field name Description User action and values Comment


Order short text Shaft is broken
Costs <Optional> Estimated cost
PMActType Preventive 002 Default value can be
maintenance changed
System <Optional>
condition
Basic start 01.07.2007 Order start date
Basic finish 01.07.2007 Order finish date

Choose the Operations tab

© Pridevel Group 2007 99 Confidential


Plant Maintenance

On the Operation overview, enter the following data for Operation 10:

Field name Description User action Comment


and values
Operation Shaft is broken Activity to be carried out
text
Work 4H Time planned required for
duration execution
Number 2 Number of people required for
operation to be carried out

Choose Enter

The system calculates the duration of the operation based on the time you entered in the
Work field and on how many people you schedule in the Number field to carry out this
operation. You have now made all of the entries in the header data screen of the order.
On the Operations tab, add another operation to the operation list if required. When
doing so, ensure that the control key contains the default value PM01.

© Pridevel Group 2007 100 Confidential


Plant Maintenance

Assignment of components: To assign components to an operation, select the


operation and choose Components tab and give the components. You can also select
components using F4 help. Quantity and Item category are must for all components
assigned.

Field name Description User action and values Comment


Material 48
Description SHAFT
Unit of measure EA
Quantity 1
IC L

Choose Check Material Availability .

The availability check tells you if the material has been allocated to you. A reservation is
created for the order in Materials Management for this material.

© Pridevel Group 2007 101 Confidential


Plant Maintenance

Return to the order header. You have now made all the required minimum specifications
for a maintenance order. This concludes the planning phase of a maintenance order.
To execute the order, you must release it or put it in process. From the menu, choose
Order  Functions  Release or Put in process or
Choose Release Icon(Green flag)

© Pridevel Group 2007 102 Confidential


Plant Maintenance

System status changes to REL and planned costs updates.

Choose Save

© Pridevel Group 2007 103 Confidential


Plant Maintenance

Both functions (Release or Put in process) release the order. This means that purchase
requisitions are created for external processing or for including components to be
procured. Reservations are created in Materials Management via availability checks.

The difference between the two functions is that in the Put in process function, the shop
papers can be printed. You can determine which shop papers are printed and what kind
of layout the papers have by using Customizing.

Result
You have created a maintenance order 4000545.

© Pridevel Group 2007 104 Confidential


Plant Maintenance

14.1 Goods issue to maintenance order Procedure


Access the transaction choosing one of the following navigation options:

SAP menu Logistics  Materials Management  Inventory


Management  Goods Movement  Goods Movement
Transaction code MIGO

© Pridevel Group 2007 105 Confidential


Plant Maintenance

On the Goods issue Order screen, enter the required data:

Field name Description User action Comment


and values
Action to be carried out Goods issue Different options are
in transaction MIGO available for using in the
MIGO transaction
Reference Document Order Different options are
for transaction MIGO available for using in the
MIGO transaction

Choose Enter

Good issue: Reservation can also be executed .In this case you have to give
reservation number which was generated by the system after the release of order.

© Pridevel Group 2007 106 Confidential


Plant Maintenance

On the Material tab, select the Item OK checkbox and choose Check

© Pridevel Group 2007 107 Confidential


Plant Maintenance

On the Where tab,


Enter the Plant U001, and Storage Location 0001 (Std. warehouse)

© Pridevel Group 2007 108 Confidential


Plant Maintenance

On the Reservation tab, select the Final issue checkbox

© Pridevel Group 2007 109 Confidential


Plant Maintenance

And choose Check give Serial number if material is serialized.

© Pridevel Group 2007 110 Confidential


Plant Maintenance

Message Document is OK displays. Choose Post or Save icon

© Pridevel Group 2007 111 Confidential


Plant Maintenance

Document gets posted

© Pridevel Group 2007 112 Confidential


Plant Maintenance

14.2 Confirming a Maintenance Order


Procedure
Access the transaction choosing one of the following navigation options:

SAP menu Logistics  Plant Maintenance  Maintenance Processing 


Completion Confirmation  Entry  Individual Time
Confirmation
Transaction code IW41

© Pridevel Group 2007 113 Confidential


Plant Maintenance

On the Create PM Order Confirmation: Initial screen, in the Order number field,
enter your maintenance order number and choose Enter . The system generates

an overview of the operations you have planned for this order.

© Pridevel Group 2007 114 Confidential


Plant Maintenance

Select an operation, and then choose Actual data (F8)

On the Actual data detail screen, make the following entries:

Field name Description User action Comment


and values
Actual work 4H Working time only
Work start Date and time
Work end Date and time
Final Set flag Documents that the operation is
confirmation finally completed
No remaining Set flag Documents that there is no
work remaining work for this operation
Clear open Set flag Open reservations(if any) gets
reservations cleared

Explanation of Confirmation Function: If all of the operations of a


maintenance order have been confirmed as a final confirmation, the order is
given status CNF. If not all of the operations have been finally confirmed, the
order has status PCNF. This means that the order still has at least one
operation that is still outstanding.
You can also enter a PM notification in the form of an activity report in the
confirmation detail screen for an operation. This enables you to document the
operation, technically supported by catalogs (see malfunction report). In this
way, several PM notifications can be created and assigned for an order.
Usually, material withdrawals are always posted for an order by Materials
Management. The activities of external companies are handled in exactly the
same way. However, you can carry out these movements or confirmations
yourself. For this, refer to the MM (Materials Management) module
documentation.

© Pridevel Group 2007 115 Confidential


Plant Maintenance

Choose Save

© Pridevel Group 2007 116 Confidential


Plant Maintenance

Confirmation is saved.

Result
You have confirmed the operations

© Pridevel Group 2007 117 Confidential


Plant Maintenance

14.3 Technically Completing a Maintenance Order


Use
If an order has been executed, it must be completed in the system. This shows that the
order has been dealt with. In the PM module, there are two types of completion,
technical completion and business completion.
Technical completion shows that an order was technically successful or can be
considered as being technically completed by Plant Maintenance.
The following shows how technical completion works.

Procedure
Access the transaction choosing one of the following navigation options:

SAP menu Logistics  Plant Maintenance  Maintenance


Processing  Order  Change
Transaction code IW32

© Pridevel Group 2007 118 Confidential


Plant Maintenance

On the Change Order: Initial screen,


In the Order field, enter the Order number
Choose Enter

© Pridevel Group 2007 119 Confidential


Plant Maintenance

Choose Complete (technically) to technically complete the order.

© Pridevel Group 2007 120 Confidential


Plant Maintenance

In the dialog box, change the proposed date and time,


Then choose Continue

System gives the message that order is saved.

© Pridevel Group 2007 121 Confidential


Plant Maintenance

To check the change in the system status, Choose Enter ,

The system status TECO Technically completed

© Pridevel Group 2007 122 Confidential


Plant Maintenance

Result
The order has been technically completed. The case is technically completed with
regards to Plant Maintenance.

© Pridevel Group 2007 123 Confidential


Plant Maintenance

14.4 Settling the Maintenance Order


Use
In this activity, you settle the actual costs of the maintenance order to the cost center,
WBS element or asset under construction.

Procedure
Access the transaction using one of the following navigation options:

SAP Menu Logistics  Plant Maintenance  Maintenance Processing


 Completion  Individual Processing  Settle
Transaction code KO88

© Pridevel Group 2007 124 Confidential


Plant Maintenance

If the transaction is accessed the first time, from the


Menu  Extras  Set controlling area

In the Controlling area field, enter U001 and choose Enter

© Pridevel Group 2007 125 Confidential


Plant Maintenance

On the Actual Settlement: Order screen, make the following entries:

Field Name Description User Action and Values Comment


Order 4000545
Settlement period 01 ( July )
Fiscal year 2007
Test run Set flag

Choose Execute

© Pridevel Group 2007 126 Confidential


Plant Maintenance

Ensure the ‘Settlement execution in test run’

Choose Back

© Pridevel Group 2007 127 Confidential


Plant Maintenance

In the processing options, Unset the flag in the Test run checkbox and
Choose Execute again.

© Pridevel Group 2007 128 Confidential


Plant Maintenance

The settlement log is displayed. Check the data and choose Back .

© Pridevel Group 2007 129 Confidential


Plant Maintenance

14.5 Closing the Maintenance Order - Business View


Use
In this activity, you complete the maintenance order.
Business completion takes place when purchasing or invoice verification has posted
outstanding invoices for external services or external materials for the order and the
order is then settled via the settlement functions in the CO (Controlling) module.

Procedure
Access the transaction using one of the following navigation options:

SAP Menu Logistics  Plant Maintenance  Maintenance Processing


 Order  Change
Transaction code IW32

© Pridevel Group 2007 130 Confidential


Plant Maintenance

Enter the Order number and choose Enter .

© Pridevel Group 2007 131 Confidential


Plant Maintenance

From the menu, choose Order  Functions  Complete  Complete business or


choose the Completion button. The service order now has the system status CLSD
and you cannot assign any more costs or revenues to it.

© Pridevel Group 2007 132 Confidential


Plant Maintenance

System gives the message that order is saved.

To check the change in the system status, Choose Enter again

© Pridevel Group 2007 133 Confidential


Plant Maintenance

The system status CLSD closed is displayed

© Pridevel Group 2007 134 Confidential


Plant Maintenance

14.6 Show Costs on maintenance order


Procedure
Access the transaction choosing one of the following navigation options:

SAP menu Logistics  Plant Maintenance  Maintenance Processing


 Order  Display
Transaction code IW33

© Pridevel Group 2007 135 Confidential


Plant Maintenance

Enter the PM Order Number created above and choose Costs.

© Pridevel Group 2007 136 Confidential


Plant Maintenance

Check if the costs have been posted to the correct Group

.
Choose Back

© Pridevel Group 2007 137 Confidential


Plant Maintenance

15. Case: 2 Internal processing with non stock item as


component
Access the transaction choosing one of the following navigation options:

SAP menu Logistics  Plant Maintenance  Maintenance Processing


 Order  Create (General)
Transaction code IW31

© Pridevel Group 2007 138 Confidential


Plant Maintenance

On the Create Order: Initial screen, enter the required data:

Field name Description User action and Comment


values
Order type Malfunction PM02
Maintenance
order
Equipment PUMP 10000026 Equipment number for
Pump

Choose Enter .

In the initial screen for entering maintenance orders, you only need to specify
the order type and the equipment. All required data are then entered in the
order from the equipment master record, as in notification processing. You
are now in the Create order: Central Header screen. As you can see, all the
fields for the responsibilities and the reference object have been filled except
for the assembly field.

© Pridevel Group 2007 139 Confidential


Plant Maintenance

Make the following entries:

Field name Description User action Comment


and values
Order short text Shaft is broken
Costs < Optional > Estimated total cost
PMActType Preventive 002 Default value can be changed
maintenance
Basic start 01.07.2007 Default value can be changed
Basic finish 01.07.2007 Default value can be changed

Choose the Operations tab.

© Pridevel Group 2007 140 Confidential


Plant Maintenance

On the Operation overview, enter the following data for Operation 10:

Field name Description User action and Comment


values
Operation text Shaft is broken Default value can be changed
Work duration 4
Number 2 Number of people required for
operation to be carried out
Work Ctr MECHANIC Default value can be changed
Control key PM01 Default value can be changed

Choose Enter

The system calculates the duration of the operation based on the time you entered in the
Work field and on how many people you schedule in the Number field to carry out this
operation. You have now made all of the entries in the header data screen of the order.
On the Operations tab, add another operation to the operation list if required. When
doing so, ensure that the control key contains the default value PM01.

© Pridevel Group 2007 141 Confidential


Plant Maintenance

Assignment of components: To assign components to an operation, select the


operation and choose Components tab and give the components. You can also select
components using F4 help. Quantity and Item category are must for all components
assigned

Field name Description User action and values Comment


Material Induction 42
motor
Quantity 1
IC N Non-Stock item
Storage location Std. 0001
Warehouse

Choose Enter and then

Choose Release Icon(Green flag)

© Pridevel Group 2007 142 Confidential


Plant Maintenance

System status changes to REL and planned costs updates

Choose Save

© Pridevel Group 2007 143 Confidential


Plant Maintenance

Both functions (Release or Put in process) release the order. This means that purchase
requisitions are created for external processing or for including components to be
procured.

The difference between the two functions is that in the Put in process function, the shop
papers can be printed. You can determine which shop papers are printed and what kind
of layout the papers have by using Customizing.

Result
You have created a maintenance order 4000546.

© Pridevel Group 2007 144 Confidential


Plant Maintenance

15.1 Purchase Requisition in Maintenance Order

SAP menu Logistics  Plant Maintenance  Maintenance Processing


 Order  Change
Transaction code IW32

© Pridevel Group 2007 145 Confidential


Plant Maintenance

In the Order field, enter the maintenance order number and

Choose Enter

© Pridevel Group 2007 146 Confidential


Plant Maintenance

On Components overview screen, choose Purchasing data Icon

© Pridevel Group 2007 147 Confidential


Plant Maintenance

Note the Purchase requisition number, shown in Actual Data

Choose Save

© Pridevel Group 2007 148 Confidential


Plant Maintenance

The order is saved.

© Pridevel Group 2007 149 Confidential


Plant Maintenance

15.2 Release of Purchase Requisition

SAP menu Logistics  Materials Management Purchasing 


Purchase requisition  Release  Individual Release
Transaction code ME54N

© Pridevel Group 2007 150 Confidential


Plant Maintenance

Click on other Purchase requisition Icon shown

On Select Document screen, enter the Purchase requisition number

Press Enter

© Pridevel Group 2007 151 Confidential


Plant Maintenance

The item details are picked from the corresponding maintenance order.

Choose Release Icon as shown

© Pridevel Group 2007 152 Confidential


Plant Maintenance

System gives the message effecting the release

The change in the icons will be observed.

Choose Save

© Pridevel Group 2007 153 Confidential


Plant Maintenance

The system displays the following screen

Choose Back

© Pridevel Group 2007 154 Confidential


Plant Maintenance

15.3 Create Purchase Order from Purchase Requisition of


Maintenance Order
Procedure
Access the transaction choosing one of the following navigation options:

SAP menu Logistics  Materials Management  Purchasing 


Purchase Order  Create  Vendor/Supplying Plant
Known
Transaction code ME21N

© Pridevel Group 2007 155 Confidential


Plant Maintenance

Choose Document Overview On.

© Pridevel Group 2007 156 Confidential


Plant Maintenance

Select the purchase requisition Click the icon shown to adapt

Or Drag the required purchase requisition into the shopping basket that is to the left
of the field filled with Purchase Order.

© Pridevel Group 2007 157 Confidential


Plant Maintenance

Enter a price for the item, such as 1000 USD.


And Confirm the messages Can delivery date be met?
Choose Enter

Choose Check

© Pridevel Group 2007 158 Confidential


Plant Maintenance

No messages are issued.

© Pridevel Group 2007 159 Confidential


Plant Maintenance

Save the purchase order

© Pridevel Group 2007 160 Confidential


Plant Maintenance

Purchase order is created with number 4500000126

© Pridevel Group 2007 161 Confidential


Plant Maintenance

15.4 Release of purchase order


Access the transaction choosing one of the following navigation options:

© Pridevel Group 2007 162 Confidential


Plant Maintenance

SAP menu Logistics  Materials Management  Purchasing 


Purchase order  Release  Individual release
Transaction code ME29N

Choose Document Overview On.


Select the purchase requisition Click the icon shown to adapt

Or Drag the required purchase requisition into the shopping basket that is to the left

© Pridevel Group 2007 163 Confidential


Plant Maintenance

of the field filled with Purchase Order.

Click on the release Icon to release

Choose Save

On Release strategy Tab, the Status is shown as marked.

© Pridevel Group 2007 164 Confidential


Plant Maintenance

Choose Back

The PO is released

© Pridevel Group 2007 165 Confidential


Plant Maintenance

© Pridevel Group 2007 166 Confidential


Plant Maintenance

15.5 Goods receipt to purchase order


Procedure
Access the transaction choosing one of the following navigation options:

SAP menu Logistics  Materials Management  Inventory Management


 Goods Movement  Goods Receipt  For Purchase Order
 PO Number Known
Transaction MIGO
code

© Pridevel Group 2007 167 Confidential


Plant Maintenance

Enter the required data on the Goods receipt purchase order screen:

Field name Description User action and Comment


values
Executable Action in Goods receipt Different options
transaction MIGO are available
Reference Document for Purchase Order
transaction MIGO 4500000126

Choose Enter

© Pridevel Group 2007 168 Confidential


Plant Maintenance

Double-click each of the line items from the desired purchase order number.
The purchase order and corresponding line item then displays on the upper
half of the main Goods receipt purchase order screen.
On the Material tab, select the Item OK checkbox, and then choose Next Item (Incase
of multiple items).
Set flag in the Item OK checkbox. Repeat this procedure until all items have been
accepted. Choose Check.

© Pridevel Group 2007 169 Confidential


Plant Maintenance

The message Document is OK displays, choose Post or Save .

© Pridevel Group 2007 170 Confidential


Plant Maintenance

Material document posted with number 5000000088

© Pridevel Group 2007 171 Confidential


Plant Maintenance

15.6 Confirming a Maintenance Order


Procedure
Access the transaction choosing one of the following navigation options:

SAP menu Logistics  Plant Maintenance  Maintenance Processing


 Completion Confirmation  Entry  Individual Time
Confirmation
Transaction code IW41

© Pridevel Group 2007 172 Confidential


Plant Maintenance

On the Create PM Order Confirmation: Initial screen, in the Order field, enter your
maintenance order number and choose Enter . The system generates an overview

of the operations you have planned for this order.

© Pridevel Group 2007 173 Confidential


Plant Maintenance

Select an operation, and then choose Actual data (F8)

On the Actual data detail screen, make the following entries:

Field name Description User action Comment


and values
Actual work 4H Working time only
Work start Date and time
Work end Date and time
Final Set flag Documents that the operation is
confirmation finally completed
No remaining Set flag Documents that there is no
work remaining work for this operation
Clear open Set flag Open reservations(if any) gets
reservations cleared

Explanation of Confirmation Function: If all of the operations of a


maintenance order have been confirmed as a final confirmation, the order is
given status CNF. If not all of the operations have been finally confirmed, the
order has status PCNF. This means that the order still has at least one
operation that is still outstanding.
You can also enter a PM notification in the form of an activity report in the
confirmation detail screen for an operation. This enables you to document the
operation, technically supported by catalogs (see malfunction report). In this
way, several PM notifications can be created and assigned for an order.
Usually, material withdrawals are always posted for an order by Materials
Management. The activities of external companies are handled in exactly the
same way. However, you can carry out these movements or confirmations
yourself. For this, refer to the MM (Materials Management) module
documentation.

© Pridevel Group 2007 174 Confidential


Plant Maintenance

Choose Save

© Pridevel Group 2007 175 Confidential


Plant Maintenance

Confirmation is saved

Result
You have confirmed the operations

© Pridevel Group 2007 176 Confidential


Plant Maintenance

15.7 Technically Completing a Maintenance Order


Use
If an order has been executed, it must be completed in the system. This shows that the
order has been dealt with. In the PM module, there are two types of completion,
technical completion and business completion.
Technical completion shows that an order was technically successful or can be
considered as being technically completed by Plant Maintenance.
The following shows how technical completion works.

Procedure
Access the transaction choosing one of the following navigation options:

SAP menu Logistics  Plant Maintenance  Maintenance


Processing  Order  Change
Transaction code IW32

© Pridevel Group 2007 177 Confidential


Plant Maintenance

On the Change Order: Initial screen, in the Order field, enter the maintenance order
number and choose Enter .

© Pridevel Group 2007 178 Confidential


Plant Maintenance

Choose Complete (technically) to technically complete the order.

In the dialog box, change the proposed date and time, then choose Continue .

© Pridevel Group 2007 179 Confidential


Plant Maintenance

Result
The order has been technically completed. The case is technically completed with
regards to Plant Maintenance.
To view change in system status, choose Enter again

© Pridevel Group 2007 180 Confidential


Plant Maintenance

System status TECO technically complete

Choose Save

© Pridevel Group 2007 181 Confidential


Plant Maintenance

15.8 Settlement of the Maintenance Order


Use
In this activity, you settle the actual costs of the maintenance order to the cost center,
WBS element or asset under construction.
Procedure
Access the transaction using one of the following navigation options:

SAP Menu Logistics  Plant Maintenance  Maintenance Processing


 Completion  Individual Processing  Settle
Transaction code KO88

© Pridevel Group 2007 182 Confidential


Plant Maintenance

If the transaction is accessed the first time, from the


Menu  Extras  Set controlling area

In the Controlling area field, enter U001 and choose Enter .

© Pridevel Group 2007 183 Confidential


Plant Maintenance

On the Actual Settlement: Order screen, make the following entries:

Field Name Description User Action and Values Comment


Order 4000546
Settlement period 01 ( July )
Fiscal year 2007
Processing type Automatic
Test run Set flag

Choose Execute .

© Pridevel Group 2007 184 Confidential


Plant Maintenance

Ensure the ‘Settlement execution in test run’


Choose Back

© Pridevel Group 2007 185 Confidential


Plant Maintenance

In the processing options, Unset flag in the Test run checkbox and
Choose Execute again.

© Pridevel Group 2007 186 Confidential


Plant Maintenance

The settlement log is displayed. Check the data and choose Back

© Pridevel Group 2007 187 Confidential


Plant Maintenance

15.9 Closing the Maintenance Order - Business View


Use
In this activity, you complete the maintenance order.
Business completion takes place when purchasing or invoice verification has posted
outstanding invoices for external services or external materials for the order and the
order is then settled via the settlement functions in the CO (Controlling) module.

Procedure
Access the transaction using one of the following navigation options:

SAP Menu Logistics  Plant Maintenance  Maintenance Processing


 Order  Change
Transaction code IW32

© Pridevel Group 2007 188 Confidential


Plant Maintenance

Enter the Order number and choose Enter

© Pridevel Group 2007 189 Confidential


Plant Maintenance

From the menu, choose Order  Functions  Complete  Complete business or


choose the Completion button. The service order now has the system status CLSD and
you cannot assign any more costs or revenues to it.

© Pridevel Group 2007 190 Confidential


Plant Maintenance

Order is Completed(Business)
To check the system status,
Choose Enter

© Pridevel Group 2007 191 Confidential


Plant Maintenance

15.10 Show Costs on maintenance order


Procedure
Access the transaction choosing one of the following navigation options:

SAP menu Logistics  Plant Maintenance  Maintenance


Processing  Order  Change
Transaction code IW32

© Pridevel Group 2007 192 Confidential


Plant Maintenance

Enter the PM Order Number created above and choose Costs.

© Pridevel Group 2007 193 Confidential


Plant Maintenance

Check if the costs have been posted to the correct Group

Choose Save

© Pridevel Group 2007 194 Confidential


Plant Maintenance

16. Case: 3 Service procurement for maintenance order


Access the transaction choosing one of the following navigation options:

SAP menu Logistics  Plant Maintenance  Maintenance Processing


 Order  Create (General)
Transaction code IW31

© Pridevel Group 2007 195 Confidential


Plant Maintenance

On the Create Order: Initial screen, enter the required data:

Field name Description User action and Comment


values
Order type Malfunction PM02
Maintenance
order
Equipment PUMP 10000026 Equipment number for
Pump

Choose Enter

In the initial screen for entering maintenance orders, you only need to specify the order
type and the equipment. All required data are then entered in the order from the
equipment master record, as in notification processing. You are now in the Create
order: Central Header screen. As you can see, all the fields for the responsibilities and
the reference object have been filled except for the assembly field.

© Pridevel Group 2007 196 Confidential


Plant Maintenance

Make the following entries:

Field name Description User action Comment


and values
Order short text Impeller
damaged
Costs < Optional > Estimated total cost
PMActType Preventive 002 Default value can be changed
maintenance
Basic start Default value can be changed
Basic finish Default value can be changed

Choose the Operations tab

© Pridevel Group 2007 197 Confidential


Plant Maintenance

On the Operation overview, enter the following data for Operation 10:

Field name Description User action and Comment


values
Operation text Shaft is broken Default value can be changed
Work Ctr MECHANIC Default value can be changed
Control key PM03 Default value can be changed

Choose Enter

On the Operations tab, add another operation to the operation list if required. When
doing so, ensure that the control key contains the value PM03.

© Pridevel Group 2007 198 Confidential


Plant Maintenance

Choose Enter for pop up window with message’ External operation – please

enter material group’ as control key PM03 is an external operation.

© Pridevel Group 2007 199 Confidential


Plant Maintenance

Give material group, purchasing organization and Choose Enter

© Pridevel Group 2007 200 Confidential


Plant Maintenance

Select the operation and choose ‘External Icon ‘ and enter the services required

© Pridevel Group 2007 201 Confidential


Plant Maintenance

Enter the services required in Short text,Quantity,Unit and Gross price fields

Services can be selected from Service No. field provided service master
is maintained using F4 help

Return to the order Header data. You have now made all the required minimum
specifications for a maintenance order. This concludes the planning phase of a
maintenance order.

© Pridevel Group 2007 202 Confidential


Plant Maintenance

To execute the order, you must release it or put it in process.


From the menu, choose Order  Functions  Release or Put in process.
System status changes to REL and planned costs updates
Both functions (Release or Put in process) release the order. This means that
purchase requisitions are created for external processing
Choose Save

© Pridevel Group 2007 203 Confidential


Plant Maintenance

Result
You have created a maintenance order 4000547.

© Pridevel Group 2007 204 Confidential


Plant Maintenance

16.1 Purchase Requisition in Maintenance Order

SAP menu Logistics  Plant Maintenance  Maintenance Processing


 Order  Change
Transaction code IW32

© Pridevel Group 2007 205 Confidential


Plant Maintenance

Enter the maintenance order number

Choose Enter

© Pridevel Group 2007 206 Confidential


Plant Maintenance

On Operations Tab, choose Actual Data

© Pridevel Group 2007 207 Confidential


Plant Maintenance

In purchasing data, Requisition number is displayed (System generated)

Choose Save

© Pridevel Group 2007 208 Confidential


Plant Maintenance

Order gets saved.

© Pridevel Group 2007 209 Confidential


Plant Maintenance

© Pridevel Group 2007 210 Confidential


Plant Maintenance

16.2 Release of Purchase Requisition

SAP menu Logistics  Materials Management Purchasing 


Purchase requisition  Release  Individual Release
Transaction code ME54N

© Pridevel Group 2007 211 Confidential


Plant Maintenance

Click on Other Purchase requisition Icon shown

Enter the Purchase requisition number

Press Enter

© Pridevel Group 2007 212 Confidential


Plant Maintenance

The item details are picked from the corresponding maintenance order.

Choose Pencil Icon as shown to get the change mode from display mode

© Pridevel Group 2007 213 Confidential


Plant Maintenance

Choose Release Icon as shown

© Pridevel Group 2007 214 Confidential


Plant Maintenance

System gives the message affecting the release

The change in the icons will be observed.

Choose Save

© Pridevel Group 2007 215 Confidential


Plant Maintenance

The system displays the following screen

Choose Back

© Pridevel Group 2007 216 Confidential


Plant Maintenance

16.3 Create Purchase Order from Purchase Requisition


Procedure
Access the transaction choosing one of the following navigation options:

SAP menu Logistics  Materials Management  Purchasing 


Purchase Order  Create  Vendor/Supplying Plant Known
Transaction code ME21N

© Pridevel Group 2007 217 Confidential


Plant Maintenance

Choose Document Overview On.

© Pridevel Group 2007 218 Confidential


Plant Maintenance

In the Document Overview area, select purchase requisition and click on Adopt icon

OR Drag the required purchase requisition into the shopping basket that is
to the left of the field filled with Purchase Order.

© Pridevel Group 2007 219 Confidential


Plant Maintenance

Click on Document Overview off

© Pridevel Group 2007 220 Confidential


Plant Maintenance

Enter the Vendor or Select vendor using F4 help


Enter price for the item, such as 1000 USD.
And Confirm the messages Can delivery date be met?

Choose Enter

© Pridevel Group 2007 221 Confidential


Plant Maintenance

Choose Check

© Pridevel Group 2007 222 Confidential


Plant Maintenance

No messages are issued

© Pridevel Group 2007 223 Confidential


Plant Maintenance

Save the purchase order

© Pridevel Group 2007 224 Confidential


Plant Maintenance

Purchase order is saved.

© Pridevel Group 2007 225 Confidential


Plant Maintenance

16.4 Release of purchase order

Access the transaction choosing one of the following navigation options:

SAP menu Logistics  Materials Management  Purchasing 


Purchase order  Release  Individual release
Transaction code ME29N

© Pridevel Group 2007 226 Confidential


Plant Maintenance

Choose Document Overview On.


Select the purchase requisition Click the icon shown to adapt

Or Drag the required purchase requisition into the shopping basket that is to the left
of the field filled with Purchase Order.

Click on the release Icon to release

© Pridevel Group 2007 227 Confidential


Plant Maintenance

Choose Check

© Pridevel Group 2007 228 Confidential


Plant Maintenance

No message is issued. Choose Save

© Pridevel Group 2007 229 Confidential


Plant Maintenance

The PO is released

© Pridevel Group 2007 230 Confidential


Plant Maintenance

16.5 Service entry sheet against purchase order


Procedure
Access the transaction choosing one of the following navigation options:

SAP menu Logistics  Materials Management  Purchasing 


Purchase Order  Follow-on functions  Service Entry
Sheet  Maintain (ML81N)
Transaction code ML81N

© Pridevel Group 2007 231 Confidential


Plant Maintenance

Click on Other Purchase Order Icon

Enter the Purchase Order number

Choose Enter

© Pridevel Group 2007 232 Confidential


Plant Maintenance

Select the Purchase Order (Description) and Click on Create Icon

© Pridevel Group 2007 233 Confidential


Plant Maintenance

Service Entry sheet with System generates number corresponding to selected purchase
Order

Choose Service selection Icon

© Pridevel Group 2007 234 Confidential


Plant Maintenance

Choose From Purchase order


Tick Adopt full quantity, Choose Enter

Choose Services to adapt services

© Pridevel Group 2007 235 Confidential


Plant Maintenance

Services adapted

Give Short Text

Choose Release icon (Green Flag)

© Pridevel Group 2007 236 Confidential


Plant Maintenance

Service will be accepted

Choose Save

© Pridevel Group 2007 237 Confidential


Plant Maintenance

Services Accepted

Choose Back

© Pridevel Group 2007 238 Confidential


Plant Maintenance

16.6 Invoice verification

SAP menu Logistics  Materials Management  Logistics Invoice

© Pridevel Group 2007 239 Confidential


Plant Maintenance

Verification  Document Entry  Enter Invoice (MIRO)


Transaction code MIRO

Enter the Invoice date

Tick on Calculate tax, Choose I1

© Pridevel Group 2007 240 Confidential


Plant Maintenance

Choose Purchase Order and enter the number

Choose Enter

System calculates the balance amount

Enter the amount equal to balance amount

© Pridevel Group 2007 241 Confidential


Plant Maintenance

Choose Simulate

Enter the Baseline date

© Pridevel Group 2007 242 Confidential


Plant Maintenance

Choose Save

Document is saved

© Pridevel Group 2007 243 Confidential


Plant Maintenance

Choose Back

© Pridevel Group 2007 244 Confidential


Plant Maintenance

16.7 Technically Completing a Maintenance Order


Use
If an order has been executed, it must be completed in the system. This shows that the
order has been dealt with. In the PM module, there are two types of completion,
technical completion and business completion.
Technical completion shows that an order was technically successful or can be
considered as being technically completed by Plant Maintenance.
The following shows how technical completion works.

Procedure
Access the transaction choosing one of the following navigation options:

SAP menu Logistics  Plant Maintenance  Maintenance


Processing  Order  Change
Transaction code IW32

© Pridevel Group 2007 245 Confidential


Plant Maintenance

On the Change Order: Initial screen, in the Order number field, enter the maintenance
order number and choose Enter

© Pridevel Group 2007 246 Confidential


Plant Maintenance

Choose Complete (technically) to technically complete the order.

In the dialog box, change the proposed date and time, then choose Continue .

© Pridevel Group 2007 247 Confidential


Plant Maintenance

Result
The order has been technically completed. The case is technically completed with
regards to Plant Maintenance.

To view change in system status, choose Enter

© Pridevel Group 2007 248 Confidential


Plant Maintenance

System status TECO technically complete

Choose Back

© Pridevel Group 2007 249 Confidential


Plant Maintenance

16.8 Settling the Maintenance Order


Use
In this activity, you settle the actual costs of the maintenance order to the cost center,
WBS element or asset under construction.

Procedure
Access the transaction using one of the following navigation options:

SAP Menu Logistics  Plant Maintenance  Maintenance Processing


 Completion  Individual Processing  Settle
Transaction code KO88

© Pridevel Group 2007 250 Confidential


Plant Maintenance

If the transaction is accessed the first time, from the


Menu  Extras  Set controlling area

In the Controlling area field, enter U001 and choose Enter

© Pridevel Group 2007 251 Confidential


Plant Maintenance

On the Actual Settlement: Order screen, make the following entries:

Field Name Description User Action and Values Comment


Order Enter the order number
Settlement period For example, 01 for July
Fiscal year Current fiscal year 2007
Processing type Automatic
Test run Set flag

Choose Execute

© Pridevel Group 2007 252 Confidential


Plant Maintenance

Ensure the ‘Settlement execution in test run’


Choose Back

© Pridevel Group 2007 253 Confidential


Plant Maintenance

In the processing options, deselect the Test run checkbox and


Choose Execute again.

© Pridevel Group 2007 254 Confidential


Plant Maintenance

The settlement log is displayed. Check the data and choose Back

© Pridevel Group 2007 255 Confidential


Plant Maintenance

16.9 Closing the Maintenance Order - Business View


Use
In this activity, you complete the maintenance order.
Business completion takes place when purchasing or invoice verification has posted
outstanding invoices for external services or external materials for the order and the
order is then settled via the settlement functions in the CO (Controlling) module.

Procedure
Access the transaction using one of the following navigation options:

SAP Menu Logistics  Plant Maintenance  Maintenance Processing


 Order  Change
Transaction code IW32

© Pridevel Group 2007 256 Confidential


Plant Maintenance

Enter the maintenance Order number and choose Enter

© Pridevel Group 2007 257 Confidential


Plant Maintenance

From the menu, choose Order  Functions  Complete  Complete business or


choose the Completion button. The service order now has the system status CLSD and
you cannot assign any more costs or revenues to it.

© Pridevel Group 2007 258 Confidential


Plant Maintenance

To view change in system status, choose Enter

© Pridevel Group 2007 259 Confidential


Plant Maintenance

System status is CLSD Closed i.e. Completion (Business)

Choose Back

© Pridevel Group 2007 260 Confidential


Plant Maintenance

16.10 Show Costs on maintenance order


Procedure
Access the transaction choosing one of the following navigation options:

SAP menu Logistics  Plant Maintenance  Maintenance Processing


 Order  Change
Transaction code IW32

© Pridevel Group 2007 261 Confidential


Plant Maintenance

Enter the PM Order Number created above and choose Costs.

© Pridevel Group 2007 262 Confidential


Plant Maintenance

Check if the costs have been posted to the correct Group

Choose Back

© Pridevel Group 2007 263 Confidential


Plant Maintenance

17. Completion of notification


Procedure
Access the transaction choosing one of the following navigation options:

SAP menu Logistics  Plant Maintenance  Maintenance Processing


 Notification  Change
Transaction code IW22

© Pridevel Group 2007 264 Confidential


Plant Maintenance

Enter the Notification number

Choose Enter

© Pridevel Group 2007 265 Confidential


Plant Maintenance

Choose the System availability tab. On this tab, you can describe the effects of the
malfunction on the system or on another system whose performance has been impaired
by the malfunction.

Field name Description User action Comment


and values
Functional If Functional Location is
Location affected affected
Equipment PUMP 10000026 It picks from reference
affected object
Effect Production 3 Effect on
breakdown plant/production
Availability before 100 It is a percentage
malfunction
Availability after 0 It is a percentage
malfunction
Availability after 100 It is a percentage
task
Condition before Operational 1 1 = Operational
malfunction
Condition after Out of order 3 3 = Out of order
malfunction
Condition after Operational 1 1 = Operational
task

System Availability: System availability is an important key figure in Plant Maintenance.


This is expressed in percentage. The percentage expresses the availability of the
affected technical object before and after the malfunction occurred and the extent to
which it was available after the malfunction was repaired (task). Using this data, it is
possible to create the system availability key figure over a period of time, object-related,
in the Plant Maintenance Information System.
System condition: The system condition describes the condition of the affected system
before and after the malfunction occurred as well as after it has been repaired (task).
Various statuses are made available for this. You can adjust the statuses to the
requirements of your company in Customizing. This data is updated on an object-related
basis in the Plant Maintenance Information System and as a result is available for later
evaluations.

© Pridevel Group 2007 266 Confidential


Plant Maintenance

© Pridevel Group 2007 267 Confidential


Plant Maintenance

Choose the Malfunction, breakdown Tab and fill the following data

Field name Description User action Comment


and values
Malfunction start Enter a date The time when the malfunction
and a time occurred
Malfunction end Enter a date The time when the malfunction
and a time was repaired
Breakdown Select Indicates that a system is in
breakdown condition
Breakdown No entry System calculates
duration

Breakdown duration: If you select the Breakdown field, the system automatically
calculates the duration of a malfunction based on the time data that you entered. The
duration is also updated in the history of the object and is also available for evaluations
in the Plant Maintenance Information System.

© Pridevel Group 2007 268 Confidential


Plant Maintenance

Choose the Activities tab. You can enter the activities here that have been carried out
to repair the malfunction. When you do this, you are supported by catalogs.

Field name Description User action and values Comment


Activity Part YQ-CHME1 / ME00 The activity is coded
code replaced
Choose Enter

Activity text Shaft replaced Short description of


coded activity

Explanation of Activities tab: You can also adjust the catalogs to the requirements of
your company via Customizing. However, you do not have to use these catalogs.
Because each malfunction is an individual occurrence, the activities for repairing the
malfunction can also be individual. If none of the specified coded activities is sufficient,
maintain the MATXT (activity text) field only. This way you ensure that the repair of the
malfunction gets documented. By entering date and time data, you can also document
the time required for the individual activities.

© Pridevel Group 2007 269 Confidential


Plant Maintenance

Choose the Tasks tab.


Explanation of Tasks Tab: If a malfunction has not been repaired or if, for production
reasons, only provisional maintenance has been carried out, you can use this tab to
document which tasks still must be undertaken to finally repair the malfunction. Here too
the catalogs provide support as you enter data. You can also adjust these catalogs to
the requirements of your company using Customizing.

Field name Description User action and values Comment


Task code Replace part YQ-CHME1 / ME02 (Replace part) The task is
coded

Choose Enter .

In the Task text field, enter a short text for the task (for example, Shaft replaced) and
Choose Enter .

© Pridevel Group 2007 270 Confidential


Plant Maintenance

Every task is monitored using an individual system status. You can also document the
progress or technical success of a task by choosing Release, Complete and
Successful.

© Pridevel Group 2007 271 Confidential


Plant Maintenance

System status ATCO All tasks completed

Choose Complete Icon or F7

© Pridevel Group 2007 272 Confidential


Plant Maintenance

Enter the date and time

Choose Enter

Notification Completed

© Pridevel Group 2007 273 Confidential


Plant Maintenance

© Pridevel Group 2007 274 Confidential


Plant Maintenance

18. Maintenance Bill of Materials


Structuring with maintenance BOMs covers the following tasks:
 Specification of a technical object in its individual parts from a Plant Maintenance
point of view
 Exact specification of a location within a technical object to localize errors or
during maintenance procedure
 Supplemented with Materials Management (Assignment of Spare parts) to
facilitate the planning of maintenance tasks
Prerequisites
Maintenance assemblies must exist.
Spare parts as material master records must exist in module MM
(Material Management).

Procedure
Because maintenance assemblies are a precondition for maintenance BOMs, it is
important you know how to create an assembly in the PM module. Refer to the MM
module documentation on material master records (spare parts).

© Pridevel Group 2007 275 Confidential


Plant Maintenance

18.1 Creating a Material

SAP menu Logistics  Plant Maintenance  Management of


Technical Objects  Material  Create(General)
Transaction code MM01

© Pridevel Group 2007 276 Confidential


Plant Maintenance

On the Create maintenance assembly: Initial screen, enter the necessary data:

Field name Description User action and values Comment


Material Number Generates
Automatically
Industry sector Industry sector of the Chemical Industry
material
Material Type ERSA Spare Parts

Choose Enter .

© Pridevel Group 2007 277 Confidential


Plant Maintenance

In the dialog box,


Select the Basic data 1, 2 ,
Purchasing , General Plant Date/Storage1 and Accounting 1 views
And choose Enter .

In the dialog box,


Choose Plant as U001
Stor. Location as 0001
And choose Enter .

© Pridevel Group 2007 278 Confidential


Plant Maintenance

Look at the individual fields in the tabs. You can store different kinds of information about an
assembly in the master record, all of which is important for Plant Maintenance. However, at a
minimum, the following specifications must be entered:

Field name Description User action and values Comment


Description Drive mechanism As required
Base unit of measure EA As required
Material Group 007 As required

© Pridevel Group 2007 279 Confidential


Plant Maintenance

Choose Save .

Note the number of the PM assembly. Define the following assemblies by the same procedure
and note the respective numbers:

Description (PM assembly) Number


Drive mechanism 16

18.2 Creating Bill of Material


To create the Drive mechanism BOM using the maintenance assembly list, access the
transaction choosing one of the following navigation options:

SAP menu Logistics  Plant Maintenance  Management of Technical


Objects  Bill of Material  Material BOM  Create
Transaction code CS01

© Pridevel Group 2007 280 Confidential


Plant Maintenance

On the Create material BOM: Initial screen, enter the necessary data:

Field name Description User action and values Comment


Material Drive 16
mechanism
Plant U001 Plant, where BOM is
valid
BOM Usage 4 (Plant Maintenance) BOM is only valid for

© Pridevel Group 2007 281 Confidential


Plant Maintenance

plant maintenance

Choose Enter .

In the Create material BOM: General item overview, enter the assemblies you have
created item by item as follows:

Field name Description User action Comment


and values
Component 1 Bearing for motor Bearing-11
Quantity 1 ( EA )
Item Category (ICt) PM structure element I

© Pridevel Group 2007 282 Confidential


Plant Maintenance

Component 2 Shaft Shaft


Quantity 1 ( EA )
Item Category (ICt) PM structure element I

Choose Enter .

Choose Save . You have now entered the BOM for the Drive mechanism

assembly. Match codes provide help when you enter the data.

If you also maintain the spare parts in the MM module now, you can also
include them in the BOM.

18.3 Link BOM to a piece of equipment


To access the transaction choosing one of the following navigation options:

SAP menu Logistics  Maintenance  Management of Technical


Objects  Bill of material  Equipment BOM  Create
Transaction code IB01

© Pridevel Group 2007 283 Confidential


Plant Maintenance

On the Create Equipment BOM: Initial screen, enter the necessary data:

Field name Description User action and values Comment


Equipment 10000006
Plant U001
BOM Usage 4 Plant Maintenance

© Pridevel Group 2007 284 Confidential


Plant Maintenance

Choose Enter .

You are now in the equipment BOM general item overview.


Enter the number of the drive mechanism maintenance assembly in the first item as
described above in the maintenance BOM:

Field name Description User action and values Comment


Item Category I PM structure

© Pridevel Group 2007 285 Confidential


Plant Maintenance

(ICt) element
Component Drive 16
mechanism
Quantity 1

Choose Enter .

Choose Save .

18.4 Structural Display of BOM


Procedure
Access the transaction choosing one of the following navigation options:

© Pridevel Group 2007 286 Confidential


Plant Maintenance

SAP menu Logistics  Plant Maintenance  Management of


Technical Objects  Functional Location
 Structural Display
Transaction code IH01

On the Functional Location Structure: Selection screen, enter the necessary data
and choose Execute (F8)

Field name Description User action and Comment

© Pridevel Group 2007 287 Confidential


Plant Maintenance

values
Functional Location U001
Location hierarchy Set Flag
Equipment installed Set Flag
Equipment hierarchy Set Flag
BOM explosion Set Flag

The system displays a brief overview of the functional location structure. You can see
the first and second level of the functional location structure. If you further expand the
functional location WATER DISTRIBUTION you will come to a lower level of hierarchy.

© Pridevel Group 2007 288 Confidential


Plant Maintenance

Drill down in the structure until you can see the equipment “Boiler Feed Water Supply
Motor” for which BOM is created
Check whether your previously created BOM has been displayed for the equipment
“Boiler Feed Water Supply Motor” by drilling-down.

Result
The technical system structure is represented in your system. These functions enable
you to represent each individual technical structure hierarchically in the system. You can
link several BOMs to a BOM and then assign them to a technical object.
The representation of a technical system structure in the SAP ERP system is a
precondition for the success of the BOM module. You should carefully consider how you
want to represent the technical system structures in the system. All PM module
applications will be based on this structure.

19. Scheduling a Maintenance Plan Automatically


(Dead Line Monitoring)

© Pridevel Group 2007 289 Confidential


Plant Maintenance

Use
You can use the automatic deadline monitoring to schedule a maintenance plan again or
for the first time. For further information, see scheduling and rescheduling.

Prerequisites
You have entered a start date or an initial counter reading in the scheduling parameters
for the maintenance plan, or you have already scheduled the maintenance plan once
(see First-Time Scheduling).

Procedure
Access the transaction choosing one of the following navigation options:
SAP menu Logistics  Plant Maintenance  Preventive Maintenance

© Pridevel Group 2007 290 Confidential


Plant Maintenance

 Maintenance Planning  Scheduling for Maintenance


Plans  Deadline Monitoring
Transaction code IP30

On the Deadline Monitoring for Maintenance Plans (Batch Input IP10) screen

Enter the Maintenance plans (Like from 900000000006 to 900000000007).

© Pridevel Group 2007 291 Confidential


Plant Maintenance

Enter he Interval for Call Objects (Like 365 DAY)

Choose Execute .

The system generates maintenance calls and/or maintenance call objects for the
maintenance plan(s) selected

© Pridevel Group 2007 292 Confidential


Plant Maintenance

The plans are scheduled

20. Creating a Quantitative Measuring Point  


Access the transaction choosing one of the following navigation options:

SAP menu Logistics  Plant Maintenance  Management of

© Pridevel Group 2007 293 Confidential


Plant Maintenance

Technical Objects  Environment  Measuring points


Create
Transaction code IK01

On the “Create Measuring Point: Initial screen”

Enter MeasPointObject, Measuring Pt Category and Equipment fields

© Pridevel Group 2007 294 Confidential


Plant Maintenance

Choose Continue .

On the Create Measuring Point: General Data screen

Measuring point number 14 is generated by the system

© Pridevel Group 2007 295 Confidential


Plant Maintenance

Enter MeasPosition,Description,Characteristic,Decimal places

And choose Enter

Then choose Additional data

On Additional Data screen,

© Pridevel Group 2007 296 Confidential


Plant Maintenance

Enter values in Upper range limit, Lower range limit fields, Choose Enter

‘Create measuring point: General data’ Screen appears,

Choose Save

© Pridevel Group 2007 297 Confidential


Plant Maintenance

21. Creating a Measuring Point as a Counter  


Access the transaction choosing one of the following navigation options:

SAP menu Logistics  Plant Maintenance  Management of


Technical Objects  Environment  Measuring points
Create
Transaction code IK01

  From the point of view of technical data, a counter represents a

Particular type of measuring point.

© Pridevel Group 2007 298 Confidential


Plant Maintenance

On the “Create Measuring Point: Initial screen”

Enter MeasPointObject, Measuring Pt Category and Equipment fields

Set flag in MeasPoint is counter field and Choose Continue

© Pridevel Group 2007 299 Confidential


Plant Maintenance

On the “Create Measuring Point: General Data” screen

Measuring point number 15 is generated by the system

Enter MeasPosition,Description,Characteristic,Decimal places fields

Enter CntrOverReadg, Annual Estimate values

Counter data can be entered in the fields in the lower half of the screen.

If the counter is to be used for scheduling maintenance plans, you must

make an entry in the field Annual Estimate.

And choose Enter and then choose Save

© Pridevel Group 2007 300 Confidential


Plant Maintenance

22. Creating a Qualitative Measuring Point  


Access the transaction choosing one of the following navigation options:

SAP menu Logistics  Plant Maintenance  Management of


Technical Objects  Environment  Measuring points
Create
Transaction code IK01

© Pridevel Group 2007 301 Confidential


Plant Maintenance

On the “Create Measuring Point: Initial screen”

Enter MeasPointObject, Measuring Pt Category and Equipment fields

Choose Continue

© Pridevel Group 2007 302 Confidential


Plant Maintenance

On the Create Measuring Point: General Data screen

Measuring point number 17 is generated by the system

Enter MeasPosition, Description,Characteristic,Decimal places, Code group,

Set flag for Value code sufficient field,

You can only enter a valuation code on its own when the indicator

ValCode sufficient has been set in the master record of the measuring point.

Enter Target value

And choose Enter

Then choose Additional data

© Pridevel Group 2007 303 Confidential


Plant Maintenance

On Additional Data screen,

Enter values in Upper range limit, Lower range limit fields, Choose Enter

‘Create measuring point: General data’ Screen appears,

Choose Save

© Pridevel Group 2007 304 Confidential


Plant Maintenance

23. Creating Measurement Documents 


Prerequisites
Please note the following rules when creating a measurement document for a
measuring point:

You can only enter a valuation code on its own when the indicator ValCode sufficient
has been set in the master record of the measuring point.

Please note the following rules when creating a measurement document for a counter:

Enter either the counter reading, or the difference between the current reading and the
last reading. The system will automatically calculate the other value in each case.

© Pridevel Group 2007 305 Confidential


Plant Maintenance

Procedure
Creating a Measurement Document 
Access the transaction choosing one of the following navigation options:

SAP menu Logistics  Plant Maintenance  Management of


Technical Objects  Equipment  Measurement
Documents Create
Transaction code IK11

Choose Enter

© Pridevel Group 2007 306 Confidential


Plant Maintenance

On ‘Create Measurement Document: Initial Screen’

Enter the Measuring point (Directly or Select using F4 help)

Selection of measuring point:

Place cursor in Measuring Point field, choose icon or F4

The following screen appears,

Enter the equipment number and choose Enter

© Pridevel Group 2007 307 Confidential


Plant Maintenance

The list of measuring points for that equipment will be displayed,

Select the Measuring point and choose Enter

Measuring point gets copied in the field. Choose Enter

© Pridevel Group 2007 308 Confidential


Plant Maintenance

On ‘Create Measurement Document: General Data’ screen,

Enter MeasRdg for example 155

In case of Qualitative Measuring point Value code to be selected.

© Pridevel Group 2007 309 Confidential


Plant Maintenance

Choose Enter and then Save

Measurement document is created with number 52

© Pridevel Group 2007 310 Confidential


Plant Maintenance

© Pridevel Group 2007 311 Confidential


Plant Maintenance

24. Creating Measurement Documents collectively for a


Technical Object
Access the transaction choosing one of the following navigation options:

SAP menu Logistics  Plant Maintenance  Management of


Technical Objects  Equipment  Measurement
Documents  List Editing  Create
Transaction code IK22

You use this function if you want to create measurement documents for several
measuring points or counters of a single technical object Equipment.

© Pridevel Group 2007 312 Confidential


Plant Maintenance

In the Equipment field, enter the equipment number

Choose Enter

© Pridevel Group 2007 313 Confidential


Plant Maintenance

On the ‘Collective Entry of Measurement Documents: Overview’ screen

Choose ‘All measuring points on object’ icon

© Pridevel Group 2007 314 Confidential


Plant Maintenance

All measuring points assigned to the object can be seen

Enter the readings in corresponding fields

For Measuring point 17 value code to be selected as it is a qualitative measuring point

Place the cursor in the corresponding field and choose of F4

Choose Code and choose

© Pridevel Group 2007 315 Confidential


Plant Maintenance

Code selected is displayed

Choose Save

© Pridevel Group 2007 316 Confidential


Plant Maintenance

© Pridevel Group 2007 317 Confidential

You might also like