Machining & Cam Grinding MAP-IN MSI MSI/MAP-IN
13
12 11 8
3 2 1
5 4
7 6
10 9
Power to Value
Finishing
5 3 1
4
2
Power to Value
3 2 1
KAIZOU MC NEW MC
1 Gun Drilling 30
2 Trust Grind 43
3 Cam Grind 121
TOTAL 194
Power to Value
New Machine
3 2
1 Lathe 32
2 Broachi 20
3 Honing 15
TOTAL 67
Power consumtion Diff Gear project, new machine 3 unit total 67KVA
Additional Power Consumtion New Project Cam 4W 6/17
Power to Value
Power to Value
5000 90 %
peak 4635Kva ( 67%)
4000
3000
2000
1000
0
1 1223 3 1425 8 19301021 2 1324 4 1526 7 1829 9 20311122 3 1425 5 1627 8 19301021 1 1223 5 1627 7 18291021 1 1223 4 1526 6 1728 8 19301122 2 1324 5 1627 7 18
Kontrak PLN Kva Power Kva Peak Kva Estimasi power
Power to Value
Project AP2Pi
Project D31
Power to Value
TR 21 CAP 1600Kva
4000 Ampere
TO SS 2 FROM PLN
TO SS 3
Power to Value
TR 21 CAP 1600Kva
4000 Ampere
2
TO SS 2 FROM PLN
TO SS 3
3
Kebutuhan Tambahan :
1.Panel MV
2.TR cap 1600kva
CUT
3.Join busduc ( TR TO LV )
4.Cut Bus Tie
Note :
1.untuk pemerataan power
harus dilakukan ,pengecekan 4
lebih lanjut
2.Untuk kebutuhan TOB,legran
Kabel menyesuaikan mesin
KEBUTUHAN PART ALTERNATIF 1 11/17
Power to Value
TOTAL KEBUTUHAN TOB
TOB &
AP2PI KVA AMPERE 60%*AMPERE
LEGRAN
TOB
CAP KEBUTUHAN
STOCK
MAP IN
TOTAL KETERANGAN
SPARE 2 150A 1 21 26 -5
stock di
SPARE 3 2 21 27 -6 musashi
masih
12 Cam Grinding Machine 121 349.7 209.8 350A
tercukupi
13 Cam Grinding Machine 121 349.7 209.8 350A 42 53 -11
AP2PI FINISHING
1 Cam Side Baritory 9 26.0 15.6
2 Lapping 6 17.3 10.4 150A
SPARE 4
3 Washing 52 150.3 90.2 150A
4 Inspection 4 11.6 6.9
5 Press Fit 10 28.9 17.3 150A
SPARE 5
D31
1
2
Gun Drilling
Trust Grind
30
43
86.7
124.3
52.0
74.6 150A
TYPE :211A
MENNEKES
Type : 13218
MENNEKES Kebutuhan projek AP2PI & 31
3 Cam Grind 121 349.7 209.8 350A
DIFF GEAR
1 Lathe 32 92.5 55.5
NO PART TYPE JUMLAH KETERANGAN
2
3
Broachi
Honing
20
15
57.8
43.4
34.7
26.0
250A
1 PANEL MVMDB 1 SET NEW
2 TRAFO 20KV T0 200 V 1600KVA 1 SET NEW
3 JOIN BUSDUCT TRAFO TO LVMDB 1 SET OLD
4 CUT BUS TIE MODIFIKASI 1 SET NEW
5 TOB 650 A 1 SET NEW
6 TOB 150 A 7 SET NEW
7 TOB 250 A 4 SET NEW
8 TOB 350 A 3 SET NEW
9 KABEL DAN ASESORIES 1 LOT NEW
MATERIAL BUSDUC
10 LINE NEW BUSDUCT 1 LOT
DARI MAPIN
RE LAY OUT BUSDUC
11 2 LOT