You are on page 1of 3

Subject :

EQUIPMENT SCHEDULE

PEMBANGUNAN TANGKI TIMBUN Quotation No. :


Rev. No. : 0
Date :
NO DESKRIPSI CAP JUMLAH M1 M2 M3 M4 M5 M6 M7 M8 M9 M10
15 25 06 16 26 05 15 25 06 16 26 05 15 25 05 15 25 06 16 26 05 15 25 06 16 26 05 15 25 05

1 PERALATAN UTAMA

A. PERALATAN FABRIKASI

LIFTING TOOLS & HEAVY EQUIPMENT


HIAB CRANE 5T 1 unit 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
SLING BELT 3T 4 pcs 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
SLING BAJA (WIRE ROPE) 10 T 4 pcs 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
HORIZONTAL CLAMP 2T 8 pcs 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8
VERTICAL CLAMP 2T 4 pcs 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4

EQUIPMENT & HAND TOOLS


MESIN ROLL (by WIKON) 10 T 1 unit 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
GAS CUTTING MACHINE 6-10MM 6 unit 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6
CUTTING TORCH BLANDER POTONG 12" 4 pcs 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
CUTTING WHEEL 7" 2 pcs 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
HAND GRINDING MACHINE 3/8" 8 pcs 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8
HAND GRINDING MACHINE 4" 8 unit 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8
AIR COMPRESSOR U/ SANDBLAST 30 KPA 2 pcs 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
AIR SPRAY & AIRLESS PAINTING - 2 pcs 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
HAMMER 1 KG 5 unit 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5
HAMMER 3 KG 5 unit 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5
HAND DRILL - 5 unit 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5

B. PERALATAN ERECTION
WELDING EQUIPMENT
RECTIFIER - 3 unit 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
REGULATOR LAS 400A 24 unit 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24
GENSET 250KVA 2 pcs 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
WELDING ROD - 3 unit 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
DRY OVEN 1 unit 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
THERMOS LAS 5 kg 24 unit 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24

LIFTING TOOLS & HEAVY EQUIPMENT


Crane 25 Ton (by WIKON) 25 T 1 unit 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Crane 50 Ton (by WIKON) 50 T 1 unit 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Subject :
EQUIPMENT SCHEDULE

PEMBANGUNAN TANGKI TIMBUN Quotation No. :


Rev. No. : 0
Date :
NO DESKRIPSI CAP JUMLAH M1 M2 M3 M4 M5 M6 M7 M8 M9 M10
15 25 06 16 26 05 15 25 06 16 26 05 15 25 05 15 25 06 16 26 05 15 25 06 16 26 05 15 25 05
PICK UP / TRUCK 1T 1 unit 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
SLING BELT 3T 3 pcs 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
SLING BAJA (WIRE ROPE) 10 T 3 pcs 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
CHAIN BLOCK 5T 5 unit 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5
LEVER BLOCK 2T 5 unit 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5
JACK-UP (HYDRAULIC) 70 unit 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70

HAND TOOLS
CUTTING TORCH BLANDER POTONG 12" 6 pcs 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6
CUTTING WHEEL 7" 3 pcs 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
HAND GRINDING MACHINE 3/8" 3 pcs 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
HAND GRINDING MACHINE 4" 15 unit 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15
HAND GRINDING MACHINE 5" 3 unit 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
HAND GRINDING MACHINE 7" 3 unit 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
BABY GRINDER - 2 unit 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
CROWBAR - 4 unit 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
HAMMER 3 KG 8 unit 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8
HAMMER 5 KG 4 unit 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
SPANNER - 4 set 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
WRENCH - 4 set 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
TORQUE WRENCH - 1 lot 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
HAND DRILL - 1 unit 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
PIPE BENDING - 1 unit 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

ELECTRICAL TOOLS
PLIER - 4 unit 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
AVO - 1 pcs 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
TEST PEN - 4 pcs 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
SCHOEN PLIER - 4 pcs 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
RING SPANNER - 1 set 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
SCREWDRIVER - 4 pcs 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4

C. HYDROTEST & COMMISSIONING
HYDROPUMP 1 unit 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

AUTO LEVEL / TOTAL STATION 1 unit 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1


Subject :
EQUIPMENT SCHEDULE

PEMBANGUNAN TANGKI TIMBUN BBM KAP. 2 x 10.000 KL Quotation No. :


Rev. No. : 0
TBBM TELUK KABUNG, PADANG, SUMATERA BARAT
Date : 18 August 2020
NO DESKRIPSI CAP JUMLAH M1 M2 M3 M4 M5 M6 M7 M8 M9 M10
15 25 06 16 26 05 15 25 06 16 26 05 15 25 05 15 25 06 16 26 05 15 25 06 16 26 05 15 25 05

2 PERALATAN PENDUKUNG
LAMPU LED 20W 10 unit 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10
EXHAUST FAN - 5 unit 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5
BLOWER - 6 pcs 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6