Professional Documents
Culture Documents
Price (INR)
Fixed Cost (Rent, Salary etc) 20,000
Total Cost 35,000
Note: Sensitivity analysis of two variables (Price & Qty sold) on Profit
Techniques used:
1 Data Table
2 Conditional Formatting
3 Buttons
4,000 4,250
Goal Seek - Case 1
DISC % 10.00%
Client Name (Kolkata, India) Location Amt. Rs. Discount Amt. Rs.
ABN AMRO Shantiniketan 3,660.0
ABS Consultant Pvt Ltd Stephens House 6,840.0
ABS Finance Computer & Consultancy Siddha Point 1,740.0
Access & Sniper Shantiniketan 3,660.0
Accord Global Logistics Pvt. Ltd. Shantiniketan 4,290.0
Apeejay Surrendra Corporate Services Stephens House 6,310.0
Apeejay Surrendra Land Pvt. Ltd. Apeejay House 2,840.0
Apeejay Surrendra Overseas Ltd. Apeejay House 9,320.0
Apple Electronics Pvt. Ltd. Shantiniketan 8,380.0
ARCHII System Pvt. Ltd. Shantiniketan 9,840.0
-
Goal Seek - Case 2
Revenue-Cost-Profit Analysis
Revenue-Cost-Profit Analysis
Profit (Rs.) 2,000 At what level of Variable Cost, P/L will be Nil?
Constraints
Constraints
The
The example
example model
model contains
contains four
four constraints
constraints which
which
limit
limit the number of parts or pressing time
the number of parts or pressing time used
used per
per
product
product to
to the
the amount
amount available.
available. In
In the
the Model
Model tab
tab of
of
the
the Task
Task Pane,
Pane, these
these constraints
constraints appear
appear as:
as:
Number_Used
Number_Used <= <= Number_Available.
Number_Available.