Professional Documents
Culture Documents
Brownvsille PARD MaintenanceOperationsPlan
Brownvsille PARD MaintenanceOperationsPlan
PREPARED BY:
OCTOBER 2015
Park Maintenance Operations Plan
Table of Contents
i
Park Maintenance Operations Plan
The process for developing the Maintenance Operations Plan for the Parks Division consisted of the
following elements:
1
1.2 KEY FINDINGS
The objective of the Maintenance Operations Plan is to provide guidance for the staff involved in parks
and grounds maintenance to manage forward in an efficient manner. Changes will be required within the
City’s Parks Division to increase efficiency and effectiveness.
The following are the key findings that need to be addressed:
1. Work Order Management System - The Parks Division does not have a Work Order Management
System that identifies maintenance and asset replacement schedules. The lack of such a system
creates uncertainty around:
a. The longevity and replacement costs of the assets in the parks system because work being
performed is not quantitatively tracked.
b. The development of consistent preventative maintenance work plans.
c. The “actual unit cost” of park maintenance work being performed.
2. Maintenance Standards and Development of Work Plans – Through the review of limited data,
the PROS Consulting team determined that the Parks Division does have institutional and informal
routine maintenance practices in place. However, the maintenance practices have limited written
standards, are based on “one-size-fits-all” approach to parks maintenance and are inconsistently
applied in the field. Additionally, the high volume of special projects that are accommodated on
an annual basis makes it difficult for staff to adhere to these practices.
3. Systematic Approach to Third Party Contracting of Services - Given the varying cycles of
Brownville’s economy, it is imperative that the Division continually evaluate the capacity and cost
of service in the private sector. Currently without a work order management system, the Parks
Division cannot track unit activity costs and therefore cannot analyze the unit cost to perform
work internally against the unit cost to perform work by a third party vendor. Without this level
of analysis the division is unable to determine if it is more effective and efficient to perform work
in-house or to contract it out.
4. Organizational Functionality and Structure - The Parks Division does not have a process to tie
staffing levels to maintenance task frequency requirements. The key is to tie the right staff person
with the right skill set and pay level to the right maintenance requirement to achieve the
outcomes desired with the right equipment at the most efficient costs. A stronger more flexible
organizational structure is needed for the Division that gives them the ability to complete routine
maintenance within the system per the standards while being able to respond to the community
for every day requests and special projects.
5. Development of Performance Measures - Currently, the Parks Division does not have
performance measures in place. Without quantitative data and analysis, the Parks Division cannot
accurately determine how successful their services are in meeting their intended outcomes, as
well as the processes that produce them.
2
Park Maintenance Operations Plan
PROS Consulting utilizes the following National Recreation and Park Association guidelines in classifying
park typology. It is important to be consistent in the classification of parks as maintenance standards for
parks are typically tied to its typology. PROS Consulting recommends that the City of Brownsville consider
reclassifying its park system according to the following definitions.
PURPOSE
This general classification of parks includes parks that serve neighborhoods and other residential areas of
the City. Neighborhood parks primarily offer a variety of active or passive recreation opportunities, or a
combination of both, in close proximity to residents and employment centers. Areas designated for
natural and/or cultural resource protection may also be included within these parks.
3
2.1.2 URBAN PARKS AND GROUNDS
PURPOSE
Publicly accessible urban parks and grounds should include facilities that are pedestrian-oriented and
provide visual enhancement, a sense of identity, opportunities for social interaction, enjoyment of
outdoor open space and performing and visual arts.
PURPOSE
Community Parks include larger parks that serve larger geographic areas of the City and provide a variety
of indoor and/or outdoor recreation facilities and park experiences. Portions of these parks may be
designated for natural and/or cultural resource protection.
4
Park Maintenance Operations Plan
topography, amount of developable acreage, and access. Appropriate facilities include those that support
active and passive recreation, often clustered together, areas for programmed activities and gathering
places and areas designated for resource protection. Lighted facilities and extended hours of operation
are also present in these parks.
These parks offer diverse experiences and activities that typically involve an individual or group for a time
period of up to a half day and may attract spectators or participants. Typical recreation activities at
Community Parks include athletics, trail usage, swimming, gardening, skating, special events and
performing arts. Additionally, woodlands, open space, trails and open play areas are highly desirable
features. Sensitive environmental areas and cultural resource sites within the parks will be managed as
Natural or Cultural Resource Areas. Visits to Community parks are can range from two (2) to six (6) hours.
PURPOSE
This park classification includes larger parks that serve regionally and provide a variety of large-scale
indoor or outdoor recreation facilities, or both, and facilities that are unique within the City. Areas
designated for natural and/or cultural resource protection may also be included within these parks.
5
CHAPTER THREE TASK TIME ANALYSIS
As part of the development of the Maintenance Operations Plan, the Brownsville Parks Division conducted
a high-level task time analysis for the core areas in which it performs regular routine maintenance. The
following provides a summary of the results of this effort.
• 42% of all labor efforts for general parks and grounds maintenance is attributed to scheduled
maintenance. This equates to only 3.36 hours of every 8 hour day per person.
• 37% of all labor efforts for general parks and grounds maintenance is expended on traveling from
location to location as well as “loading and unloading” of equipment at the beginning and end of
each work day. This equates to 2.96 hours of every 8 hour day per person.
• Overall, approximately 5.06 hours (or 63%) of every 8 hour work day per person is spent
performing actual work. This falls slightly below the best practice guideline of 5.5 hours.
• Achieving the best practice guideline would equate to an additional 3,336 hours of actual work
performed annually.
Aquatics
Task # of Staff Hours Spent Per Total Annual Manhours Percentage of Time
Morning Load 2.00 0.25 Day 125.00 3%
Windshield Time 2.00 0.50 Day 250.00 6%
Park Grounds Scheduled Maintenance 2.00 2.00 Day 1000.00 23%
Park Facility Scheduled Maintenance 2.00 4.00 Day 2000.00 45%
Recreation Facility Scheduled Maintenance 2.00 1.00 Day 500.00 11%
Repair 2.00 0.00 Year 0.00 0%
Special Events 2.00 175.00 Year 350.00 8%
Meetings/Training/Misc. 2.00 36.00 Year 72.00 2%
End of Day Unload 2.00 0.25 Day 125.00 3%
TOTAL 4422.00 100%
• 68% of all labor efforts for aquatic maintenance is attributed to scheduled maintenance. This
equates to 5.44 hours of every 8 hour day per person.
• Only 11% of all labor efforts for aquatic maintenance is expended on traveling from location to
location as well as “loading and unloading” of equipment at the beginning and end of each work
day. This equates to ONLY 0.88 hours of every 8 hour day per person.
6
Park Maintenance Operations Plan
• Overall, approximately 7.12 hours (or 89%) of every 8 hour work day per person is spent
performing actual work. This actual work rate is well above the best practice guideline for
aquatics of 6.5 hours.
Athletics
Task # of Staff Hours Spent Per Total Annual Manhours Percentage of Time
Morning Load 2.00 0.50 Day 250.00 6%
Windshield Time 2.00 2.00 Day 1000.00 24%
Park Grounds Scheduled Maintenance 2.00 4.50 Day 2250.00 54%
Park Facility Scheduled Maintenance 2.00 0.00 Day 0.00 0%
Recreation Facility Scheduled Maintenance 2.00 0.00 Day 0.00 0%
Repair 2.00 0.00 Year 0.00 0%
Special Events 2.00 208.00 Year 416.00 10%
Meetings/Training/Misc. 2.00 12.00 Year 24.00 1%
End of Day Unload 2.00 0.50 Day 250.00 6%
TOTAL 4190.00 100%
• 54% of all labor efforts for athletic field maintenance is attributed to scheduled maintenance. This
equates to only 4.32 hours of every 8 hour day per person.
• 36% of all labor efforts for athletic field maintenance is expended on traveling from location to
location as well as “loading and unloading” of equipment at the beginning and end of each work
day. This equates to 2.88 hours of every 8 hour day per person.
• Overall, approximately 5.12 hours (or 64%) of every 8 hour work day per person is spent
performing actual work. This falls slightly below the best practice guideline of 5.5 hours.
• Achieving the best practice guideline would equate to an additional 630 hours of actual work
performed annually.
7
3.4 SPORTS PARK MAINTENANCE
• 77% of all labor efforts for sports park maintenance is attributed to scheduled maintenance. This
equates to 6.16 hours of every 8 hour day per person.
• Only 3% of all labor efforts for sports park maintenance is expended on daily preparation. This is
to be expected as maintenance operations are all “contained” on-site at the sports park. This
equates to only 0.24 hours of every 8 hour day per person.
• Overall, approximately 7.76 hours (or 97%) of every 8 hour work day per person is spent
performing actual work. This actual work rate is well above the best practice guideline for on-site
sports complex maintenance of 7.0 hours.
• 92% of all labor efforts for event center maintenance is attributed to scheduled maintenance.
This equates to 7.36 hours of every 8 hour day per person.
• Only 5% of all labor efforts for event center maintenance is expended on daily preparation at the
beginning and end of each work day. This is to be expected as maintenance operations are all
“contained” on-site at the event center. This equates to only 0.4 hours of every 8 hour day per
person.
• Overall, approximately 7.6 hours (or 95%) of every 8 hour work day per person is spent performing
actual work. This actual work rate is well above the best practice guideline for on-site event center
maintenance of 7.0 hours.
8
Park Maintenance Operations Plan
• 93% of all labor efforts for golf course maintenance is attributed to scheduled maintenance. This
equates to 7.44 hours of every 8 hour day per person.
• Only 5% of all labor efforts for event center maintenance is expended on daily preparation at the
beginning and end of each work day. This is to be expected as maintenance operations are all
“contained” on-site at the golf course. This equates to only 0.4 hours of every 8 hour day per
person.
• Overall, approximately 7.6 hours (or 95%) of every 8 hour work day per person is spent performing
actual work. This actual work rate is well above the best practice guideline for golf course
maintenance of 7.0 hours.
• 75% of all labor efforts for the Ringgold Civic Pavilion maintenance is attributed to scheduled
maintenance with another 20% being attributed to special events. This equates to 7.6 hours (or
95%) of every 8 hour day per person. This is to be expected as maintenance operations are all
“contained” on-site at the pavilion. This equates to only 0.4 hours of every 8 hour day per person
being spent on daily preparation.
9
3.8 PARKS DIVISION SUMMARY
• Given that “on-site” maintenance operations exist at four of the seven core areas in which the
Parks Division performs maintenance, the potential for “unproductive work time” (travel time and
load/unload) has been greatly minimized.
• Opportunities to further reduce “unproductive time” exists within Parks and Grounds and Athletic
Field Maintenance. Efforts to meet best practice guidelines can increase actual work performed
by nearly 4,000 hours (or the near equivalent of 2 FTE).
10
Park Maintenance Operations Plan
The Parks Division does not have a Work Order Management System that identifies maintenance and
asset replacement schedules. The lack of such a system creates uncertainty around:
• The longevity and replacement costs of the assets in the parks system because work being
performed is not quantitatively tracked.
• The development of consistent preventative maintenance work plans.
• The “actual unit cost” of work being performed.
• Task-time data for work that is being performed.
The Division should consider a system such as Lucity, Cityworks, or Cartegraph. These examples are asset
and work order management software systems that could be include a work order system for the park
maintenance operation program. This work order system will be used to track lifecycle maintenance
requirements that are tied to weekly and monthly work order requirements. This will help the staff to
stay ahead of preventative maintenance requirements and limit breakdowns. Further, the system will
also provide staff the necessary “actual cost” data for work being performed. The costing process allows
the staff to track the cost of maintenance at a unit cost level – costs on a per function basis based on
staffing costs, level of task frequency, the type of equipment and supplies used, as well as the utility costs.
Primary functions of work where the determination of actual costs will be beneficial in future strategic
operational planning and where opportunities exist to recover costs through user fees are as follows:
• Special Projects
• Athletic Field Maintenance
• Landscape Beautification
It will be necessary to dedicate one full-time employee to the management of the system to ensure proper
implementation, utilization, training, data integrity and reporting.
Through the review of limited data, PROS Consulting determined that the Parks Division does have
“institutional and informal” routine maintenance practices in place. However, the maintenance practices
have limited written standards, are based on “one-size-fits-all” approach to system wide community,
neighborhood, and Urban Parks maintenance and are inconsistently applied in the field. Additionally, the
high volume of special projects that are accommodated on an annual basis makes it difficult for staff to
adhere to these practices. The maintenance standards, as detailed on the following pages, are based on
a Level (1), (2) and (3) modes (tasks and frequencies of each task) and follow best practices as established
by the National Recreation and Park Association. The Division can customize the standards based on the
park and recreation values of the Brownsville community and need to be adopted and implemented by
staff and followed regardless of whether work is performed by City staff or third party contractors.
11
4.2.1 GENERAL PARK MAINTENANCE
GENERAL PARKS MAINTENANCE
Both the frequency and timeframe vary for each level.
Level 1 Level 2 Level 3
Task Frequency Frequency Frequency
Turf
1x/month and as
Trim Shrubs needed
1x/year As needed
Pick up trash prior to mowing 1x/5 days 1x/10 days 1x/10 days
Pavilion/Shelters
Restrooms
2x/day (weekdays); 1x/day (weekdays);
Clean and restock 2x/day (weekends) 2x/day (weekends)
Daily
Fence
1x/year and following 1x/year and following
Inspect 1x/week
storms storms
Vegetation Control 1x/year and as needed 1x/year and as needed 1x/year and as needed
Mulching
4.2.2 PLAYGROUNDS
PLAYGROUNDS
The difference in levels is the frequency of the task. Timeframes are the same for every level.
Level 1 Level 2 Level 3
Task Frequency Frequency Frequency
4.2.3 FLORAL
FLORAL
Both the frequency and timeframe vary for each level.
Level 1 Level 2 Level 3
Task Frequency Frequency Frequency
Plant landscape flowers (perennial) 2x/year 1x/year 1x/year
13
4.2.4 GROUNDS MAINTENANCE
GROUNDS MAINTENANCE
Both the frequency and timeframe vary for each level.
Level 1 Level 2 Level 3
Task Frequency Frequency Frequency
General Maintenance
Mow/Trim/Blow Clippings 1x/5 days 1x/7 to 10 days 1 or 2x/year
Pick up trash prior to mowing 1x/5 days 1x/10 days 1x/10 days
Monuments
4x/year and following 1x/year and following
Inspect 1x/week
storms storms
Mulching
14
Park Maintenance Operations Plan
Given the service and special project requests that the City of Brownsville Parks Division receives, the
need for Parks staff to be flexible and reactive to citizens is high. Currently, priority is often placed on the
resolution of citizen requests which in turn “pulls Parks staff away” from the routine planned work. By
expanding contracting services in areas where routine work is able to be planned and the scope of work
defined, not only can potential cost savings be realized, but an even greater level of customer satisfaction
can be achieved as not only will the routine work be completed as scheduled but Parks will be even more
responsive to citizen requests. Opportunities exist to expand third party contracting across all
neighborhood and community parks.
Given the “varying” cycles of Brownsville’s economy, it is imperative that Parks continually evaluate the
capacity and cost of service in the private sector. Through the development of a managed competition
process, the Parks Business Unit must begin to track unit activity costs through the implementation of a
work order management system and in turn, would internally analyze each fall the unit cost to perform
work internally against the unit cost to perform work by a third party vendor. The introduction of
managed competition will reinforce the concept of performing work in an effective and efficient manner
by striving to meet unit cost and level of productivity targets as established by new performance
measures. This will provide The City with the opportunity to strike a balance of total work performed
between City staff and that of a contractor.
As the Parks Division continues to turn to the private sector for park maintenance services, quality control
processes must be developed and institutionalized. The establishment of these processes and the cost of
implementing them must be considered. It is recommended that the Agronomy Specialist provide direct
oversight of contract administration for every function the city chooses to pursue with the private sector.
The processes will hold the vendor accountable to the standards set forth in the scope of work, and also
result in a consistent level of maintenance across the system. Most importantly, the “park experience”
will meet the expectations of citizens of Brownsville.
Currently, the Parks Division does not have true performance measures in place to measure the
effectiveness or efficiency of the operation.
Performance measures should quantitatively inform organizations about how successful their services are
in meeting their intended outcomes, as well as the processes that produce them. They are a critical tool
that assists in the understanding, management, and improvement of organizations. Performance
measures provide organizations with the information necessary to make intelligent decisions about work
that is performed.
Performance measures can tell us:
• How successful work is being performed
• If processes are in statistical control
• If goals are being met
• If and where improvements are necessary
• If customers are satisfied
15
Performance measures in recent years have become the backbone of successful organizations and moved
beyond the simple collection of facts that measure volume of work. The key components of modern
performance measurement are:
• Outcomes are the benefits or changes for participants in programs or recipients of services during
or after the program or strategy is implemented.
• Inputs are the physical, financial and human resources allocated to or consumed to do work
• Activities are what the program or strategy does with the inputs provided. Activities include the
tasks, steps, methods, techniques and operations performed
• Outputs are the elements of operation or level of effort, the products or services resulting from
the implementation or accomplishment of work.
• Efficiency is measured by the unit cost required to perform the work in terms of dollars. “How
well did you “use” your budget to perform work?”
• Effectiveness is a service quality measure of the work that you performed. Effectiveness is
measured in % of work you set out to perform.
The performance measures on the following page are an example of the type of measures that the Parks
Division should develop and implement to determine the level of success in which it is accomplishing
work.
16
Park Maintenance Operations Plan
17
4.5 ORGANIZATIONAL FUNCTIONALITY AND STRUCTURE
The Parks Division does not have a process to tie staffing levels to maintenance task frequency
requirements. The key is to tie the right staff person with the right skill set and pay level to the right
maintenance requirement to achieve the outcomes desired with the right equipment at the most efficient
costs. By developing a plan that focuses on organizational sustainability, the division will not only be able
to further develop a highly professional staff, but also ensure that the division can seamlessly manage
itself forward. Brownsville’s workforce management planning must be a conscious effort to build and
sustain a competent workforce, a process that begins with intake. The building of organizational
competence to both create a competitive pool of talent and preserve levels of performance is ultimately
dependent on specific internal and external actions that achieve workforce planning outcomes. The
following table outlines the key components to building organizational sustainability
A stronger more flexible organizational structure is needed for the Division that gives them the ability to
complete routine maintenance within the system per the standards while being able to respond to the
highly engaged Brownsville community for every day requests and special projects.
BUILDING
WORKFORCE
INTAKE ORGANIZATIONAL
SUSTAINABILITY
COMPETENCE
Recruitment Leadership Training
Infrastructure (cross-dept. Individual Development
Interview process
task mgmt.) Plans
Pre-hire skills & Focus on skills, knowledge
Mentoring
attitude assessment and productive attitude
New employee Community & Inter-Agency
Post separation consulting
orientation engagements
Culturally competent
Probation review programs, services and Experiential learning
workplace
Teaching/learning
Performance-based modeling
experiences
Operational adaptability
Creative problem solving
Training
18
Park Maintenance Operations Plan
If it is necessary to develop a process to fully realize the benefits of a concentrated focus on the effective
and efficient development and implementation of special projects, PROS Consulting recommends the
following proactive process:
• September – meet with community stakeholders to gather input for special project
requests for the following fiscal year.
• September-November – Develop concepts for special projects, including budget.
• December-January – Affirm concepts with community stakeholders and submit as
part of annual budget process
• May – Report back to community stakeholders which projects can be implemented
based on budget appropriation and communicate details of project including
conceptual designs, timelines, communication process.
• July – Begin implementation of special projects
19
CHAPTER FIVE MEDIUM PRIORITY RECOMMENDATIONS
Based on the site visits and discussions with the Director, the Superintendent and staff the following other
recommendations should be considered for implementation in the future.
20
Park Maintenance Operations Plan
21
5.1.4 CAPITAL IMPROVEMENT CRITERIA AND DECISION MAKING
The Parks Division has a loosely defined capital improvement criteria and decision making process they
follow. The capital improvements plans are developed as part of the annual budget based on the needs
of the various parks in the system. Developing criteria for what capital improvements make the most
sense to invest in will help the City achieve the goals they desire.
The purpose of the Capital Projects Evaluation Model (CPEM) is to evaluate proposed capital projects
across numerous financial and business variables, while accounting for measures of public need, health
and safety, regulatory, and mission‐oriented priorities of the City.
This model should not be used as a sole determination of the priority of capital projects, but can be utilized
as a component of the evaluation process to determine those priorities.
RESULTS
The results of the model are produced in two phases:
• Cost Benefit Ratio (Cost Benefit Model)
• Total Project Prioritization
22
Park Maintenance Operations Plan
23
CHAPTER SEVEN - MAINTENANCE STANDARDS COST ANALYSIS
PROS created appropriate frequency standards for mowing, edging, restroom cleaning, trash removal,
turf care, trail maintenance, and natural area care against current practices. From this information, PROS
has provided functional cost of service targets that include direct costs and indirect costs associated with
providing maintenance tasks to assist in measuring the allocation of costs to results derived. These results
are to be compared to the current unit cost of services provided by third party contractors.
The City of Brownsville currently does not track costs of service beyond a “rolled-up” line item budget and
a true cost of service is not provided in this plan.
As Brownsville Parks develops a work order management system, it is imperative that it track costs for
the following major functions of work to determine its true annual cost of service:
• Sports Park
• Brownsville Event Center
• Dean Porter Park overall and the enterprises within (e.g., Ringgold Civic Pavilion, Children’s
Museum, Camille Playhouse, Sam’s Memorial Pool, etc.)
• Aquatics
• Athletic Fields
• Neighborhood Parks
• Community Parks
• Regional Park Conservation Areas
• Trails
• Irrigation
• Special Projects and Citizen Requests
Once actual unit costs are established for the major functions, Brownsville Parks can begin tracking costs
at a task level (mowing, restroom cleaning, trash removal and begin making data-driven, informed
decisions on what is the more efficient way to provide services: in-house or expanding third party
contracting.
The following represent annual cost per acre targets in Southern California as derived from the National
Recreation and Parks Association for the following park classifications:
• Natural Turf Athletic Fields maintained at a Level 1 maintenance standard - $12,500/acre
• Natural Turf Athletic Fields maintained at a Level 2 maintenance standard - $9,000/acre
• All Weather Turf Athletic Fields - $4,000/acre
• Community Parks maintained at a Level 2 maintenance standard - $8,500/acre
• Neighborhood Parks maintained at a Level 2 maintenance standard - $5,000/acre
• Regional Park Conservation Areas maintained at a Level 3 maintenance standard - $3,500 per acre
24
Park Maintenance Operations Plan
FOUNDATION
A foundation partnership is a joint-development funding source or operational funding source between a
foundation and a government agency. The foundation operates as a non-profit organization, working on
behalf of the public agency to raise needed dollars to support its vision and operational needs.
The dollars raised by the conservancy are tax-exempt. Foundations promote specific causes, activities, or
issues that a park-and-recreation system needs to address. They offer a variety of means to fund capital
projects, including capital campaigns, gifts catalogs, fundraisers, endowments, sales of park-related
memorabilia, etc.
Private donations may be received in the form of cash, securities, land, facilities, recreation equipment,
art, or in-kind services. Donations from local and regional businesses as sponsors of events or facilities
should be pursued.
FRIENDS ASSOCIATION
Friends associations are a foundation that typically are formed to raise money for a single purpose, such
as a park facility or program that will better the community as a whole and, at the same time, meet special
interests.
25
GRANTS
The grant market continues to grow annually. Grant writers and researchers are essential if the Division
is to pursue grants. Matching dollars are required for most federal grants and many state grants. The
types of grants available to the Division include:
• Safe Routes to Schools
• Federal Transportation Enhancement Grants (FHWA)
• Land and Water Conservation Fund (LWCF) Grants
• Community Development Block Grants (CDBG)
• Economic Development Administration (EDA) Grants
• Storm-water grants that limit the storm-water runoff in and through parks
• Trail Enhancement Grants for regional trails systems
• Development grants from community foundations to support specific park projects
• Redevelopment grants to support parks and facilities that will increase revenue from the
enhanced value of property or from activities that create sales and tourism taxes
DONATIONS
Private donations are a popular form of fundraising by public agencies, particularly for facilities and
services that are highly visible and valued by the public. Donations can either be received directly by the
City or channeled through a foundation or conservancy aligned with the City’s park, recreation, and trail
priorities. Donations can be made through one or more of the following methods:
• Donations of cash to a specific park or trail segment by community members and businesses
• Donations of services by large corporations to reduce the cost of park or trail implementation,
including equipment and labor to construct and install elements of a specific park or trail
• Reductions in the cost of materials purchased from local businesses that support parks and trails
implementation, and can supply essential products for facilities
ADOPT-A-TRAIL PROGRAMS
These are typically small-grant programs that fund new
construction, repair or renovation, maps, trail brochures, and
facilities (bike racks, picnic areas, birding equipment, etc.), as
well as providing maintenance support. These programs are
similar to the popular “adopt-a-mile” highway programs most
states utilize. Adopt-a-trail programs can also take the form of
cash contributions in the range of $12,000 to $16,000 per mile
to cover operational costs.
ADOPT-A-PARK PROGRAMS
These are small-grant programs that fund new construction and
provide maintenance support. Adopt-A-Park programs can also take the form of cash contributions in the
range of $1,000 to $5,000 per acre to cover operational costs.
26
Park Maintenance Operations Plan
DEDICATED MILLAGE
This source provides the opportunity for the park-and-recreation system to demonstrate how well it is
meeting the community’s needs through a voter-approved millage. In the last five years in the United
States, 93% of all park-related bond and millage issues have passed. Communities demonstrate the value
of parks when given the opportunity to vote on an increase.
USER FEES
User fees are fees paid by a user of recreational facilities or programs to offset the costs of services
provided by the Division in operating a park or a recreation facility, or in delivering programs. A perception
of “value” needs to be instilled in the community for the benefits the City is providing to the user for
exclusive use. Future fees could be charged by the Division based on cost-recovery goals for the parks and
core recreation services, based on the level of exclusivity the user receives compared to the general
taxpayer. The consultant highly recommends that user fees for programs and facilities continue to be
charged in order to create value and provide operational revenues. If the City feels that it cannot increase
user fees, then it might consider contracting with a non-profit entity to manage its recreation facilities
27
and programs. The City then could take the dollars it has invested in staff members and in subsidized
recreation facilities, and use those dollars to support an improvement bond for existing parks and to build
new parks and recreation facilities. This would change the role of the City to that of a facility provider only
versus a facility provider and program operator. The cost savings could be substantial.
CAPITAL-IMPROVEMENT FEES
Many park-and-recreation systems add a capital-improvement fee onto an existing user fee when they
develop or enhance major recreation facilities. This is usually applied to golf courses, aquatic facilities,
recreation centers, ice rinks, amphitheaters, and special-use facilities like sports complexes. The dollars
gained either offset the cost of the capital improvement or the revenue bond that was used to develop or
enhance the special-use facility. Once the capital improvement is paid off, the fee typically expires and is
discontinued.
28
Park Maintenance Operations Plan
ADVERTISING SALES
Advertising can occur with sports complexes, scoreboards, gym floors, trash cans, playgrounds, locker
rooms, dog parks, trails, flower pots, and as part of special events held in the city to pay for operational
costs.
PERMIT FEES
This fee could apply to the exclusive reservation of picnic shelters, sports fields, special events, and
competition tournaments held in the city by other organizations. Permit fees include a base fee for all
direct and indirect costs to provide the space on an exclusive basis plus a percentage of the gross
revenues. The income could be applied to the park revolving fund to support park improvements.
29
CHAPTER NINE CONCLUSION
The City of Brownsville’s parks system is a defining asset and a key natural resource. The desirability and
value the parks system a key attractor for residents and visitors alike. Currently, Brownsville’s parks are
generally in good condition despite the lack of several key formal standard operating procedures.
This Maintenance Operations Plan provide key recommendations that if implemented will improve not
only the parks system as a whole, but create an even more efficient and effective service delivery model
that is financially more sustainable. The key is to align the goals for Brownsville’s parks system with
current and future resources as well as the expectations, values and recreational desires of the
community.
As the Division implements this plan additional areas of study are recommended and include the
following:
• Detailed Time-task Analysis
• Private Sector Market Analysis
• Business Plan for Dean Porter Park
• Development of managed competition process
• Work order management system development
• Performance measure development
30