from average
Sub area Residential
Avg unit Avg w.w
Connected Population Avg unit flow
Line F/T Area (ha) Pop (cap) flow flow
Surface Density (cap/ha) (m3/capita.d)
(L/capita.d) (m3/d)
1 1-2 A-1 100 38 3800 300 0.3 1140
A-2 112 38 4256 300 0.3 1276.8
A-10 48
2 2-3 A-9 48 124 5952 225 0.225 1339.2
3 3-4 A-3 112 38 4256 300 0.3 1276.8
4 4-5 A-8 60 124 7440 225 0.225 1674
5 5-6 A-4 114 74 8436 268.333333 0.2683333333 2263.66
School 16
6 6-7 A-5 110
A-7 70 124 8680 225 0.225 1953
8 7-8 A-6 110
n 0.013 - concrete
Slope 0.002 -
h 0.325 m
A 0.16591536 m2 (= phiD2/8
P 1.02101761 m (= phiD/2)
Rh 0.1625 m (=D/4)
Dia 0.65 m
U 1.02441019 m/s velocity > 0.6
Qcal 0.16996539 m3/s once you got q cal, you have to fix the n and roughn
Qgoal 0.16736111 m3/s 14460 m3/d target/design
Delta 2604.27612 multiply by 1 million to amplify the error
Peakflow from cumulative line flow 3.1 find infiltration inflow, and find the peaking flow from 3.5 (use 1.6 is okay) no need t
Residential Commercial
Cumulative Cumulative Cum peak
Peaking Avg unit Avg w.w Cumulativ Peaking
avg flow avg flow flow
factor Cum Peak (m3/ha.d) (cmd) e avg flow factor
(m3/d) (m3/s) m3/d
flow
2.9 0.081119 7008.72 - - - -
2416.8 0.02797222
- - - -
20 960 960 1.8
3756 0.04347222 2.8 0.121722 10516.8 - - 960 -
5032.8 0.05825 2.7 0.157275 13588.56 - - 960 -
6706.8 0.077625 2.7 0.209588 18108.36 - - 960 -
8970.46 0.10382477 2.6 0.269944 23323.2 - - 960 -
960
20 2200 3160 1.8
10923.46 0.12642894 2.6 0.328715 28401 - - 3160 -
al School Industrial
Number Cumulativ
Cumulative Unit flow Avg unit Avg w.w
of Avg w.w Cumulativ Peaking e Peaking Cum wwd
Peak flow (L/capita. Q unit
student Q (cmd) e w.w Q Factor flow (cmd)
(cmd) d) (m3/ha.d) (cmd)
(cap) (cmd)
- - - - - - -
- - - - - - -
1728
1728 - - - - - -
1728 - - - - - -
1728 - - - - - -
1728 - - - - - -
1728 2000 75 150 150 4 600
5688 600
5688 - - - - - 600
5688 600 30 3300 3300
Industrial Design Q
Cum peak Total Total cum Cumulative Avg I/I Peak i/I
Average
P.F flow cumulative peaking flow surface area (m3/ha.d) I/I (m3/d) (use 1.6)
(cmd)
(cmd) Avg Q (cmd) (cmd) (ha) F.3.1 or F.3.5
Peak
(cmd)
5
f(x) = − 0.448908309071981 ln(x) + 2.52137031575543
0
0.001 0.01 0.1 1
n 0.013 - concrete
Slope 0.002 -
h 0.325 m
A 0.165915 m2 (= phiD2/8
P 1.021018 m (= phiD/2)
Rh 0.1625 m (=D/4)
Dia 0.65 m
U 1.02441 m/s
Qcal 0.169965 m3/s once you got q cal, you have to fix the n and roughness
Qgoal 0.167361 m3/s 14460 m3/d target/design
Delta 2604.276 multiply by 1 million to amplify the error
Chart Title
0.1 1 10
assume
Rainfall and verify
intensity td it later min Index ((All code provide on table, (Match from previous), 2)
based on
Tr project
i THIS CALCULATION CAN BE APPLIED TO BUILDING SANITATION, MORE E
depth of
only
gutter
check
(from
point h<a
elevation)
Rectangul A a P
ar
channel Q target b assume u use manning
depends a/drainag
on
e length
Delta Q s elevation yc Critical depth
Wetted perimeter at
Rh Pc critical condition
h Rhc Radius at critical
long formula
Circular C n A
A dia assume p
Q target s u
Delta Q Qfull cms yc
Rh m Pc
h m Rhc
Qchannel cms Sc
(Number of array colunm))
UILDING SANITATION, MORE EFFECTIVE THAN USING TABLE FROM COUNCIL OF ENGINEERING
Drainage
m2 lngth m
drainage
length/flo
m2 tc w velocity s
m/s min
m delta t
m
m
Avoid
super
critical
flow in
drainage
systen
A
p
Rh
Area
Rainfall td 10
intensity Tr 25
i 183.7 mm/h
long formula
Circular C n A
A dia assume p
Q target s u
Delta Q Qfull cms yc
Rh m Pc
h m Rhc
Qchannel cms Sc
Drainage
lngth 1000 m
tc 489.9292 s
m/s 0 min
delta t
Avoid
super
critical
flow in
drainage
systen
A
p
Rh