Include the unit everytime different approach to calculate flow because of land use Peakflow from cumulati

from average
Sub area Residential
Avg unit Avg w.w
Connected Population Avg unit flow
Line F/T Area (ha) Pop (cap) flow flow
Surface Density (cap/ha) (m3/capita.d)
(L/capita.d) (m3/d)
1 1-2 A-1 100 38 3800 300 0.3 1140
A-2 112 38 4256 300 0.3 1276.8
A-10 48
2 2-3 A-9 48 124 5952 225 0.225 1339.2
3 3-4 A-3 112 38 4256 300 0.3 1276.8
4 4-5 A-8 60 124 7440 225 0.225 1674
5 5-6 A-4 114 74 8436 268.333333 0.2683333333 2263.66
School 16
6 6-7 A-5 110
A-7 70 124 8680 225 0.225 1953
8 7-8 A-6 110

Flow in a HALF full pipe

n 0.013 - concrete
Slope 0.002 -
h 0.325 m
A 0.16591536 m2 (= phiD2/8
P 1.02101761 m (= phiD/2)
Rh 0.1625 m (=D/4)
Dia 0.65 m
U 1.02441019 m/s velocity > 0.6
Qcal 0.16996539 m3/s once you got q cal, you have to fix the n and roughn
Qgoal 0.16736111 m3/s 14460 m3/d target/design
Delta 2604.27612 multiply by 1 million to amplify the error
Peakflow from cumulative line flow 3.1 find infiltration inflow, and find the peaking flow from 3.5 (use 1.6 is okay) no need t

Residential Commercial
Cumulative Cumulative Cum peak
Peaking Avg unit Avg w.w Cumulativ Peaking
avg flow avg flow flow
factor Cum Peak (m3/ha.d) (cmd) e avg flow factor
(m3/d) (m3/s) m3/d
flow
2.9 0.081119 7008.72 - - - -
2416.8 0.02797222
- - - -
20 960 960 1.8
3756 0.04347222 2.8 0.121722 10516.8 - - 960 -
5032.8 0.05825 2.7 0.157275 13588.56 - - 960 -
6706.8 0.077625 2.7 0.209588 18108.36 - - 960 -
8970.46 0.10382477 2.6 0.269944 23323.2 - - 960 -
960
20 2200 3160 1.8
10923.46 0.12642894 2.6 0.328715 28401 - - 3160 -

e to fix the n and roughness

plify the error


om 3.5 (use 1.6 is okay) no need to read another log log graph

al School Industrial
Number Cumulativ
Cumulative Unit flow Avg unit Avg w.w
of Avg w.w Cumulativ Peaking e Peaking Cum wwd
Peak flow (L/capita. Q unit
student Q (cmd) e w.w Q Factor flow (cmd)
(cmd) d) (m3/ha.d) (cmd)
(cap) (cmd)
- - - - - - -
- - - - - - -
1728
1728 - - - - - -
1728 - - - - - -
1728 - - - - - -
1728 - - - - - -
1728 2000 75 150 150 4 600
5688 600
5688 - - - - - 600
5688 600 30 3300 3300
Industrial Design Q
Cum peak Total Total cum Cumulative Avg I/I Peak i/I
Average
P.F flow cumulative peaking flow surface area (m3/ha.d) I/I (m3/d) (use 1.6)
(cmd)
(cmd) Avg Q (cmd) (cmd) (ha) F.3.1 or F.3.5

3376.8 8736.72 260 5 1300 2080 5456.8


4716 12244.8 308 5 1540 2464 7180
5992.8 15316.56 420 4.9 2058 3292.8 9285.6
7666.8 19836.36 480 4.9 2352 3763.2 11430
13984.46
10080.46 25651.196 2440
610 4 3904
19036.66
14233.46 34688.996 3002 4803.2
790 3.8
2.1 6930 17533.46 41618.996 900 3.6 3240 5184 22717.46
Design Q

Peak
(cmd)

10816.72 Darcy for pump helping


14708.8
18609.36
23599.56 Gravity transporting use
29555.2 Assume, the pipe is half full Rh = D/4
Drainage (0.6 m/s)
39492.2 Slope is from elevation

46803 Use maning equation


y x
3.34 0.004
1.98 5
y = -0.449ln(x) + 2.5214 Chart Title
4.126822
6

5
f(x) = − 0.448908309071981 ln(x) + 2.52137031575543

0
0.001 0.01 0.1 1

Flow in a HALF full pipe

n 0.013 - concrete
Slope 0.002 -
h 0.325 m
A 0.165915 m2 (= phiD2/8
P 1.021018 m (= phiD/2)
Rh 0.1625 m (=D/4)
Dia 0.65 m
U 1.02441 m/s
Qcal 0.169965 m3/s once you got q cal, you have to fix the n and roughness
Qgoal 0.167361 m3/s 14460 m3/d target/design
Delta 2604.276 multiply by 1 million to amplify the error
Chart Title

9071981 ln(x) + 2.52137031575543

0.1 1 10

fix the n and roughness


Function on excel 1. Match
Area Match ((Code you put), (All code provided on table), (Number of array colunm))

assume
Rainfall and verify
intensity td it later min Index ((All code provide on table, (Match from previous), 2)
based on
Tr project
i THIS CALCULATION CAN BE APPLIED TO BUILDING SANITATION, MORE E

From Q = CIA Gutter


from a rougness
C 0.6 book n coeff A

depth of
only
gutter
check
(from
point h<a
elevation)
Rectangul A a P
ar
channel Q target b assume u use manning
depends a/drainag
on
e length
Delta Q s elevation yc Critical depth
Wetted perimeter at
Rh Pc critical condition
h Rhc Radius at critical

(How steep the


slope can be, if the
slope is higher than
critical slope then
the flow is super
critical, very high
velocity, more
Qchannel Sc erosion)

long formula
Circular C n A
A dia assume p
Q target s u
Delta Q Qfull cms yc
Rh m Pc
h m Rhc
Qchannel cms Sc
(Number of array colunm))

2 is the column that you need

UILDING SANITATION, MORE EFFECTIVE THAN USING TABLE FROM COUNCIL OF ENGINEERING

Drainage
m2 lngth m

drainage
length/flo
m2 tc w velocity s
m/s min

m delta t

m
m

Avoid
super
critical
flow in
drainage
systen

A
p
Rh
Area
Rainfall td 10
intensity Tr 25
i 183.7 mm/h

From Q = CIA Gutter

C 0.6 n 0.013 A 1.5


Rectangul A 100000 m2 a 1.5 m P 1.95153462123897
ar Q target 3.061667 m3/s b 1 m u 2.04111111111158
channel Delta Q 7.092E-07 s 0.001 yc
Rh 0.768626 Pc
h 0.475767 m Rhc

Qchannel 3.061667 m3/s Sc

long formula
Circular C n A
A dia assume p
Q target s u
Delta Q Qfull cms yc
Rh m Pc
h m Rhc
Qchannel cms Sc
Drainage
lngth 1000 m
tc 489.9292 s
m/s 0 min
delta t

Avoid
super
critical
flow in
drainage
systen

A
p
Rh

You might also like