If it is a normal BOM scenario, check the following note:-

 Note 938666 - VPRS for cumulation and bills of material


On the other hand, if the scenario is multi-level BOM, then have a look at the following note:-
 Note 1586479 - Cumulate costs for multi-level BOM - SD Billing

Note 352441 - Accumulated cost is missing in the main item

Check OSS 1586479 - Cumulate costs for multi-level BOM - SD Billing for information to resolve
your issue.
You can refer OSS Note 65908 - Cumulation of VPRS in main item
Note 938666 - VPRS for cumulation and bills of material

and
Note 1063387 - VPRS for cumulation and BOMs (2)