GLOSSARY ACRONYMS

ACRONYM TERM

ACWP Actual Cost of Work Performed


ATP Authorization To Proceed
AUW Authorized Unpriced Work

BAC Budget at Completion


BCWP Budgeted Cost for Work Performed
BCWS Budgeted Cost for Work Scheduled
BOM Bill of Materials

CAM Control Account Manager


CAP Control Account Plan
CAS Cost Accounting Standards
CASB Control Accounting Standards Board
CBB Contract Budget Base
CDRL Contract Data Requirements List
CEAC Comprehensive Estimate at Completion
CFSR Contract Funds Status Report
CPR Contract Performance Report
CSDR Cost and Software Data Reporting
CWBS Contract Work Breakdown Structure
CV Cost Variance

DCMA Defense Contract Management Agency


DFARS Defense Federal Acquisition Regulation Supplement
DoDI DoD Instruction

EA Estimated Actuals
EAC Estimate at Completion
EIA Electronic Industries Alliance
EOC Elements of Costs
ERP Enterprise Resource Planning
ETC Estimate to Complete
EV Earned Value
EVM Earned Value Management
EVMS Earned Value Management System
EVT Earned Value Technique

Page 1 of 3
ACRONYM TERM

FAR Federal Acquisition Regulation


FPRA Forward Pricing Rate Agreement

G&A General & Administrative


GAAP Generally Accepted Accounting Principles
GPD Grouping, Pegging, and Distribution

IC Intelligence Community
IMP Integrated Master Plan
IMS Integrated Master Schedule
IPT Integrated Product Team
IPMR Integrated Program Management Report

LOE Level of Effort

M/ERP Manufacturing/Enterprise Resource Planning


MMAS Material Management and Accounting System
MR Management Reserve
MRP Manufacturing Resource Planning

NCC Negotiated Contract Cost


NAVSEA Naval Sea Systems Command
NTE Not To Exceed

OBS Organizational Breakdown Structure


ODC Other Direct Costs
OMB Office of Management and Budget
OTB Over Target Baseline
OTS Over Target Schedule

PARCA Performance Assessment and Root Cause Analysis


PBOM Priced Bill of Materials
PERT Program Evaluation and Review Technique
PMB Performance Measurement Baseline
POP Period of Performance
PP Planning Package

RAM Responsibility Assignment Matrix

Page 2 of 3
ACRONYM TERM

SD System Description
SLPP Summary Level Planning Package
SOW Statement of Work
SPA Single Point Adjustment
SRA Schedule Risk Assessment
SUPSHIP Navy Supervisor of Shipbuilding
SV Schedule Variance
SVTs Schedule Visibility Tasks

TAB Total Allocated Budget

UB Undistributed Budget

VARs Variance Analysis Reports


VAC Variance at Completion

WAD Work Authorization Documentation


WBS Work Breakdown Structure
WP Work Package

Page 3 of 3