Major Electrical Component Method Of Statement /ITPs/Fo
Component
Chilled & Hot Water Pipe Flushing
HVAC flushing & water treatment drainage
Air Balancing
Package Chiller Installation & Commissioning
Chilled Water piping
Chilled Water piping Insulation
Grille & Diffuser
Fabrication & Installation Kitchen Canopy
Duct Pipe Cladding
Duct Thermal Insulation
HVAC Pumps
Cooling Towers
Chemical Unit
Plate Heat Exchangers
Chilled Water Pressurization Unit
Air Separator
Boilers
Air Handling Units
Fan Coil Units
Installation & Commissioning of Extract Fan / Fresh Air
no. 1 - 2
no. 1 - 2
no. 1 - 2
no. 1 - 2
no. 1 - 2
no. 1 - 2
no. 1 - 2
no. 1 - 2
no. 1 - 2
no. 1 - 2
no. 1 - 2
no. 1 - 2
no. 1
no. 1
no. 1
no. 1
no. 1
no. 1
no. 1
no. 1
no. 1
no. 1
no. 1
no. 1
on
Related Forms/Check List
no. 1 - 2- 3 - 4
no. 11
no. 5
no. 19 - 20 - 21
no. 18
no. 27
no. 22 - 30
no. 28
no. 28
no. 3
no. 6
no. 1
no. 9
no. 5
no. 6
no. 1 - 2 (irrigation)
no. 4 - 11
Major Electrical Component Method Of Statement /ITPs/
System Component Related MST
Switchgear
Ring Main Units and Load Break
Medium Voltage Switches
Distribution System
Transformers
M.V. Cabling
Busways
UPS
Wirring accseories
Distribution Panels
Earthing
Earthing System
Lightning Protection
BMS
Acess Control
VESDA
RFID
ICT
PIRIDS
Low Current Systems
Fire Alarm - VESDA
Disable Alarm
Refuge Call
X-Ray Equipment
Hard of Hearing
SCADA
Public Adress
CCTV
MATV / IP TV
MATV / IP TV
Moving Walks
Inclined Lifts
Vertical
Transportation BMU Monorail
Platforms
HIDRAL Elevator
ethod Of Statement /ITPs/Forms/Check List For Construction
Related ITPs Number Related ITPs Descrption Related Forms/Check List
METHOD STEATEMENTS LIST
9/10/2017
Mechanical Systems
ITEM SYSTEM MAJOR COMPONENT ITEM SYSTEM
1 Chilled & Hot Water Piping Pr. Test 1
2 Chilled & Hot Water Pipe Flushing 2
3 Chilled & Hot Water Balancing 3
4 Ventilation Ductwork Leak Test 4
5 Air Balancing 5
6 Chillers 6
7 Chilled Water Pumps 7
8 Cooling Towers 8
9 Condenser Water Pumps 9 HVAC
10 Plate Heat Exchangers 10
11 Chilled Water Pressurization Unit 11
12 Air Separator 12
13 HVAC Filtration Unit 13
14 Boilers 14
15 Boiler Flue Dilution System 15
16 Hot Water Pumps 16
17 Air Handling Units 17
18 Fan Coil Units 18
19 Ventilation Fans 19
20 Staircase / Liftwell Pressurization 20
21 Noise Control 21 firefighting
22 Steam Humidifiers 22
23 VAV / CAV Boxes 23
24 Fire Dampers & Smoke Dampers 24
25 Split A/c Units 25 Irrigation
26 VRV A/c System 26
27 Inergen Gas Systems 27
Domestic Water
28 Fire Pumps 28
System
29 Sprinkler System 29
30 Fire Hose Cabinets 30
firefighting
31 Fire Hydrants 31
Drainage System
32 Foam System 32
33 Preaction System
34 Distribution Piping Pr. Test
35 GRP Water Tanks
36 Transfer / Booster / Circulation
Domestic Water
System
METHOD STEATEMENTS LIST
9/10/2017
37 Pumps
38 Domestic Water Water Filtration Plant
39 System Calorifiers
40 Electric Water Heaters
41 Distribution Piping Pr. Test
42 System Disinfection
43 Sump pumps
44 Drainage
System Oil / Grease Separation Systems
45 Piping Leak Test
Electrical Systems
ITEM SYSTEM MAJOR COMPONENT
1 Switchgear
2 Medium Voltage Ring Main Units
3 Distribution Load Break Switches
4 System Transformers
5 Cabling
6 Busways
7 MDB / SMDB
8 Capacitor Banks
9 UPS
10 Low Voltage Generators & SynchronizationPanel
Distribution
11 System Automatic Transfer Switches
12 Motor Control Centres
13 Variable Frequency Drives
14 Power Outlets
15 Cabling & Wiring
16 Distribution Panels
17 Lighting & Exit Fixtures
18 Lighting Control System
Lighting System
19 Central Battery
20 Cabling & Wiring
21 Earthing
22 Earthing System Lightning Protection
23 Cabling & Wiring
24 Gate Barriers- Vehicle Access Contro
25 BMS
26 Access Control
27 CCTV
METHOD STEATEMENTS LIST
9/10/2017
28 PIRIDS
29 Perimeter Intrusion
30 RFID
31 Security Management System
32 Fire Alarm
Low Current
33 VESDA
Systems
34 Disable Alarm
35 Refuge Call
36 Hard of Hearing
37 SCADA
38 ICT
39 System Integration
40 X-Ray Equipment
41 Voice Evacuation
42 Cabling & Wiring
43 Elevators
44 Inclined Moving Walkways
45 Vertical
Transportation Funiculars
46 Platforms
47 BMU Monorail
METHOD STEATEMENTS LIST