COMMISSIONING INSPECTION TEST REPORT (CITR)


Project: The Royal Atlantis – The Palm, Dubai Resort & Residences Ref No. TRA-SPE-CIR-EL-B00-01219 Rev : 0

Employer: The Royal Atlantis Date: 20 August 2020 Page 1 of 2


Project MANAGER TURNER Inspection Date: 22 August 2020
LEAD CONSULTANT DEC
Area / Building: Room Designation/No. Level:
T&C MANAGERS: CML International (Dubai)
Main Contractor: Ssangyong-Besix JV
19 B-1911 Basement
Subcontractor/Specialist:

Systems: VESDA HV/MV PLUMBING & DRAINAGE FIRE FIGHTING FUEL OIL
FAS LV GAS HVAC Air LIFTS
EMERGENCY LIGHTING ELV WATER TREATMENT HVAC Water OTHER
C&E GENERATOR OTHER
Sub-Systems:
Extra Low Voltage System (ELV) Low Voltage System (LV) Plumbing & Drainage Sys.(PH) Fire Fighting System (FF)

CCTV Disabled Alarm LV Distribution Sewer Drainage Sprinkler

Structed Cabling (CAT6) BMS Standby Gen. & ATS Storm Water Drainage Fire Hydrant

Structed Cabling Fiber Optic SCADA UPS Kitchen Drainage Fire Suppression (FOAM)

Sec.&Access Cntrl PMS Lighting & Lighting Control Compressed Air Fire Extinguishing

IPTV & HITV GSM / Wi-Fi Earthing & Bonding Steam Boiler FM200

Paid Parking/Parking Mgt Gate Barrier Lightning Protection Water Heaters Fire Pump Sets

IP Telephone IP PABX MCC (include VFD) Transfer & Booster Pumps Pre-Action

Site Comm Video Intercom Capacitor Bank Filtration & Softener Hose Reel & Land'g Valves

Audio-Visual Intruder Detection LV Emerg. Batt. Back-up LPG HVAC Water

PAVA Access Control SysT Busbars SNG CHW Balancing

2-Way Radio VESDA High/Medium Voltage System (HV/MV) Gas Leak Detection CHW Filtration

Radio Paging 11 KV Switchgear Legionnaires Treatment Plant Energy Metering

GRMS MV Emerg. Batt. Back-up Chlorination Flushing

Time & Attendance 11 KV/400V Transformers Pumps

Data Networking Emergency Lighting HVAC AIR

Doomsday Test Emergency Central Battery System FCU Fire Dampers MSFD

Guard Tour Emergency Lighting - Integral Batteries Exhaust Air Balancing AHU

Detailed description of this Testing and Commissioning report :

Live test & Functional Test for SMDB-H1-B101 at Area-19, Basement. (Partial)

Test Sheet(s) including Ref. No. (attached): Date Witnessed:

Kindly find attached file.

Approved T&C Method Statement Ref. No and Revision:

TRA-SPE-TCM-EL-GEN-00106

Approved Final Inspection Request No:

TRA-SPE-WIR-EL-B00-121788, CIR -00159

Commissioned by Subcontractor/Specialist Witnessed by Main Contractor (Ssangyong-Besix JV)


Name Vankat

Signature Rafael Nogoy

Date

CITR rev. 00 (25 Nov 19)


The Royal Atlantis – The Palm, Dubai Resort &
Residences

COMMISSIONING INSPECTION TEST REPORT (CITR)


Project: The Royal Atlantis – The Palm, Dubai Resort & Residences Ref No. TRA-SPE-CIR-EL-B00-01219 Rev : 0

Employer: The Royal Atlantis Date: 20 August 2020 Page 2 of 2


Project MANAGER TURNER Inspection Date: 22 August 2020
LEAD CONSULTANT DEC
Area / Building: Room Designation/No. Level:
T&C MANAGERS CML International (Dubai)
Main Contractor: Ssangyong-Besix JV
19 B-1911 Basement
Subcontractor/Specialist: SPECON

CML (COMMISSIONING MANAGERS) Comments (if applicable):

1. Cable Live Testing was only partial. Remaining circuit still to be offer for verification.
2. Drawing including load schedule to be update and submit in as built for consultant approval.
3. Refer to the comments of permanent earthing on CITR ref TRA-SPE-CIR-EL-L00-00695 and 00696 to be complied by
SPECON.
4. Latest and Approved Panel Diagram and Load Schedule to be placed inside the Panel.
5. Permanent identification labels to all cables and panel to be provided / completed.
6. Attached Test report for SAT and COLD Testing were validated and found satisfactory results.

Remaining Test to be done:


- Cable Testing of the remaining circuits

Summary:

SMDB Panel Functional and Partial Cable Live Testing of 10 out of 19 for SMDB-H1-B101 has been verified on site and found
Acceptable to CML with comments mentioned above.

DEC (LEAD CONSULTANT) Comments (if applicable):

1. Cable Live Testing was only partial. Remaining circuit still to be offer for verification.

2. Drawing including load schedule to be update and submit in as built for consultant approval.

3. Refer to the comments of permanent earthing on CITR ref TRA-SPE-CIR-EL-L00-00695 and 00696 to be complied by SPECON.

4. Latest and Approved Panel Diagram and Load Schedule to be placed inside the Panel.

5. Permanent identification labels to all cables and panel to be provided / completed.

6. Attached Test report for SAT and COLD Testing were validated and found satisfactory results.

7. Remaining Test to be done:- Cable Testing of the remaining circuits


8. SMDB Panel Functional and Partial Cable Live Testing of 10 out of 19 for SMDB-H1-B101 has been Inspected. Remaining circuits to be submitted for
approval.

9. Installation WIR-EL-B00-121788 comments to be complied

(A) Approved (B) Approved With Comments ✓ (C) Resubmit


Verified by CML (COMMISSIONING MANAGERS) DEC (LEAD CONSULTANT)
Name

Signature

Date

CITR rev. 00 (25 Nov 19)


Project: THE ROYAL ATLANTIS RESORT
AND RESIDENCES (TRA)

Doc. No: TRA/SPE Sht No.


Checklist /QCS/EL
/GEN/00106/05, Rev- 0
1 of 1

Checklist
Commissioning of
Particular Date: Date Revised: Discipline: Electrical
SMDB
Details:

SUB-CONTRACTOR CONTRACTOR

SMDB Reference: SMDB-H1-B101 Room #: Electrical closet (B-1951)


LEVEL: BASEMENT CIR No.: TRA-SPE-CIR-EL-B00-01219
CHECKED BY: REMARKS
STAGE ITEM
S/C CONT. DEC

Safety permit in place and area barricaded prior to live √ √


testing
Ensure that the test meter is calibrated, and calibration √ √
certificate is valid
Ensure that cold test, SAT & Torque tests WIR are √

approved prior to energizing and live testing the panel
Check that the indicator lamps R Y B are working √

properly
Check and record the voltage between phase to phase, √

phase to Neutral at panel incomer & load side
Check the functioning of meters (A/M, V/M, PMU) √ √
Commissioning Check and record the perspective fault current at the √
(Live Testing) √
panel incomer and for each outgoing.
Check and record the external earth fault loop √

impedance Ze at the panel incomer side
Check the total earth fault loop impedance Zs at the √

farthest point in each circuit
Ensure that the RCD/ELCB does not trip while NA
NA
injecting current at 50% of the residual current rating
Ensure that the tripping time for RCD/ELCB does not NA
exceed 200ms when injecting 1-time residual current
NA
rating and 40ms when injecting 5-time residual
current rating
Ensure correct phase polarity at incomer & outgoing √ √
For S/C: FOR CONTRACTOR: Date: For Engineer: For
Engineer:

Name: Amrit Name: Rafael Nogoy DEC Engineer CML


Engineer

Page 1 of 1
Project: THE ROYAL ATLANTIS RESORT
AND RESIDENCES (TRA)

Doc. No: TRA/SPE Sht No.


Checklist /QCS/EL
/GEN/00106/05, Rev- 0
1 of 1

Checklist
Commissioning of
Particular Date: Date Revised: Discipline: Electrical
SMDB
Details:

Page 1 of 1
CML Eman John Dela Peña 26-08-2020
THE ROYAL ATLANTIS RESORT AND RESIDENCES SUBMITTAL & REVIEW FORM

TRA/SBJ/DEC/50490
SSANGYONG-BESIX Joint Venture Date: 21-Jun-20
Submitted For * Code
SUBMISSION OF DOCUMENTS, DRAWINGS, SAMPLES, ETC. APPROVAL 1
YOUR INFORMATION 2

ACTION **
RE: THE ROYAL ATLANTIS RESORT & RESIDENCES-MAIN CONTRACT Contract No.:
APPROVED A
CN0063 APPROVED AS NOTED B
DEC Dynamic Engineering Consultants
REVISE & RESUBMIT C
WE ARE SENDING HEREWITH / UNDER SEPARATE COVER, THE DRAWINGS/ REJECTED D
DOCUMENTS / SAMPLES LISTED BELOW. (DELETE AS NECESSARY)
DRWS., SPEC. OR CODE
Item REV DESCRIPTION TYPE
Submittal Action
BOQ. REF.

B
M2/M3:Technical Submittal for Manufacturing Drawings of MDB-H-21 & Associated
1 TRA-SPE-TEC-EL-GEN-00135 01 TEC 1
Panels

SBJV INTERNAL QA/QC CHECK COORDINATION

MEP __________________________ ARCHITECTURE ________________________ FAÇADE ____________________

OTHERS ( __________, __________ ) __________________


STRUCTURAL - STEEL ____________________ STRUCTURAL - CONCRETE ______________________

TYPE

PQD : PRE-QUALIFICATION DOCUMENTS OCT: ORGANIZATION CHART DDG : DESIGN DRAWINGS


MAR : MATERIAL SUBMITTAL
SDG : SHOP DRAWINGS MST : METHOD STATEMENT GEN : GENERAL CAL : CALCULATION
Programme of Work Activity ID Ref: Planned Start: 21-Jun-20
Programme of Work Description:
Planned Finish: 28-Jun-20
Copies
Electronic Copy to:

VALERY PAQUIER, PROJECT DIRECTOR S.P. HAN , DEPUTY PROJECT DIRECTOR


FM
Mr.Andrew Pugh - Sr.Project Manager,F +G

Document Control,F +G For Contractor


CONSULTANT'S COMMENTS
29.06.2020
Refer to the comments in attached sheet and also refer to comments in manufacturing drawings.
Copies To:

Project Director:

For DEC Dynamic Engineering Consultants


EMPLOYER'S COMMENTS

Copies To:

For Employer
Corrections or comments made relative to submittals during this review do not relieve the contractor from compliance with the requirements of the drawings and specifications. This check is only for review of general conformance with the design concept of the project and general compliance with
the information given in the contract documents. The contractor is responsible for confirming and correlating all quantities and dimensions selecting fabrication processes and techniques of construction; coordinating his work with that of other trades, and performing his work in a safe and
satisfactory manner.

1.08 Technical Transmittal Form.xls


TRA-SBJ-QCD-QA-GEN-00013 Rev.02 Date: 28/03/19
1 2 3 4 5 6 7 8

E E

D D

CLIENT: PANEL REF:

ATLANTIS THE PALM LIMITED 2 (ATP2)


SMDB-H1-B101
[ FED FROM : MDB-H-21]
C C
PROJECT: MAIN CONTRACTOR:

THE ROYAL ATLANTIS RESORT


AND RESIDENCES M/s. SsangYong - Besix Joint Venture (SBJV)
PALM JUMEIRAH CRESCENT, DUBAI, U.A.E.

CONSULTANT: MEP subcontractor:

B M/s. DYNAMIC ENGINEERING CONSULTANTS M/s. SPECON L.L.C. B

5 16.06.2020 FOR MODIFICATION ADAM ADAM VENKATESH Design & Assembly By :


QTY. 01 No.
4 14.11.19 SITE MOD. ASBUILT AQL SIDDIQ VENKATESH PACIFIC OCEAN ELECTRICAL QTN NO. 12098
3 18-04-19 FOR MODIFICATION SIDDIQ SIDDIQ VENKATESH SWITCHGEAR INDUSTRIES L.L.C
A
JOB NO. 3391
SIDDIQ VENKATESH P.O. BOX 62154, SHARJAH, U.A.E E-mail: sales@pacificocean.ae, poet7@eim.ae
2 27-10-18 ASBUILT KANNAN
TEL. 06 - 5345334, FAX. 06 - 5347212 Web: www.pacificoceansg.com A
1 23-07-18 REVISION 1 SIDDIQ SIDDIQ VENKATESH REV: 5
0 02-06-18 FIRST ISSUE SIDDIQ SIDDIQ VENKATESH 0 1 2 3 4
REV DATE NATURE OF REVISION DRAWN DESIGNED CHECKED DRAWING. No.: POET - 017 / 18 - 1 - 134 SHEET No. 01 / 09
1 2 3 4 5 6 7 8

ENCLOSURES POWER SUPPLY CONNECTIONS CIRCUIT MARKING


E E
MOUNTING INC OUTG
POWER
ALFANAR
SUPPLY VOLTAGE : 400V/50HZ DIRECT TO DEVICE
TERMINALS (EXTN. LINK) RYB

THRU TERMINAL BLOCKS LABELS

ACCESS PVC

FRONT
MOUNTING TYPE
REAR COLOR : BLACK LETTERS ON WHITE BACKGROUND
NEUTRAL SYSTEM
WALL MOUNTED LEFT SIDE:RIGHT SIDE
LANGUAGE : ENGLISH
D FLOOR MOUNTED D
DIRECT TO EARTH (TT)
ENTRY
ISOLATED (IT) INC OUTG
PRESENTATION WITH WITHOUT
EARTHED (IN) TOP

FIXED FRONT SEPARATE (TN-S) BOTTOM

FUNCTIONAL DOOR NEUTRAL & EARTH


SHROUDING
PLAIN DOOR
TRANSPARENT DOOR ALL LIVE PARTS

WITH KEY
OTHER

BUSBAR SUPPLY OF AUXILIARIES REMARKS


C C
FORM OF CONST.
MATERIAL
VOLTAGE
FORM - 1 COPPER
FORM - 2
form 2b type 2 TIN PLATED
CONTROL 230 V/50Hz

FORM - 3 MAIN
FORM - 4 RATING : 1600A
SIZE : 2x60x10mm ORIGIN EXTERNAL

DEGREE OF PROTECTION IP41 FROM BUS BAR


NEUTRAL
AUXILIARY TRANSFORMER
SIZE : 2x60x10mm
COLOR FINISH RAL 7035

PE WIRING
B COMPONENTS MOUNTING SIZE : 1x60x10mm
VOLTAGE 1.5mm2
B
INC OUTG CURRENT 2.5mm2
FIXED

QTY. : 01 No.
A A
5 16.06.2020 FOR MODIFICATION ADAM ADAM PANEL REF/DRG. TITLE : THE ROYAL ATLANTIS RESORT AND RESIDENCES
PROJECT:
4 14.11.19 SITE MOD. ASBUILT AQL SIDDIQ PACIFIC OCEAN ELECTRICAL SMDB-H1-B101 PALM JUMEIRAH CRESCENT, DUBAI, U.A.E.
2 27-10-18 ASBUILT KANNAN SIDDIQ MEP
SWITCHGEAR INDUSTRIES L.L.C. [ FED FROM : MDB-H-21] CONTRACTOR:
M/s. SPECON L.L.C.
0 02-06-18 FIRST ISSUE SIDDIQ SIDDIQ

REV DATE NATURE OF REVISION DRAWN DESIGNED SHARJAH: TEL.06 - 5345334, FAX 06 - 5347212 DRG. No. POET - 017 / 18-1-134 REV. : 5 SHEET NO. : 02 / 09
1 2 3 4 5 6 7 8

E detachable gland plate E


500

500

500
R Y B

A 100
V 100
PMU
50 50
E 1(60x10)mm
AE AE

T2 T18

D ASS VSS
T1 D

N 2(60x10)mm

1x50x10mm
ELR18

17F01

1 2
17F02
17F03
Q2

Q3 Q4
2000

2000

2000
Q5 Q6

Q7 Q8
Q19

INCOMER Q9 Q10
C C
Q0 Q1
Q11 Q12

Q14
F13
Q13 F14

F15 Q16 F16


Q15
DEPTH : 600mm

DEPTH : 600mm
17T01
Q17 Q18

17T02
17T03
3

L1,L2,L3 1600A TINNED CU BUSBAR 2(60x10)mm


100 mm plinth
B B
1000 1000 1000 1000
2000 2000 600

FRONT LAYOUT INTERNAL LAYOUT SIDE VIEW


It is contractor's responsibility to mount the panel and achieve the front clearance
as per dewa standards.

X1
CABLE ENTRY:
INCOMING - TOP
Provide fixed frame for LDS F03
F02
F01
F04
ELR1 17F01-17F03
X1 TERMINALS AND
17F01-17F03
FUSES ARE FIXED ON
ELR2
RIGHT SIDE OF THE
ENCLOSURE
OUTGOING - TOP
1 2 3
QTY. : 01 No.
A A
5 16.06.2020 FOR MODIFICATION ADAM ADAM PANEL REF/DRG. TITLE : THE ROYAL ATLANTIS RESORT AND RESIDENCES
PROJECT:
4 14.11.19 SITE MOD. ASBUILT AQL SIDDIQ PACIFIC OCEAN ELECTRICAL SMDB-H1-B101 PALM JUMEIRAH CRESCENT, DUBAI, U.A.E.
2 27-10-18 ASBUILT KANNAN SIDDIQ MEP
SWITCHGEAR INDUSTRIES L.L.C. [ FED FROM : MDB-H-21] CONTRACTOR:
M/s. SPECON L.L.C.
0 02-06-18 FIRST ISSUE SIDDIQ SIDDIQ

REV DATE NATURE OF REVISION DRAWN DESIGNED SHARJAH: TEL.06 - 5345334, FAX 06 - 5347212 DRG. No. POET - 017 / 18-1-134 REV. : 5 SHEET NO. : 03 / 09
1 2 3 4 5 6 7 8

1600A TPN TINNED CU BUSBAR 2x60x10mm


L1 L1
L2 L2
E L3 L3 E

S2
T01 S1 C1 A1
A P02
A2

L2
L3
L1
0
6 5 9
S2 1
T02 S1 C3 2
S02
8
S2 AMMETER
SELECTOR
T03 S1 C5 SWITCH L1 L2 L3 L1 L2 L3

D PE D

ELR1 Q1 ELR2 Q2
Earth Leakage Relay Earth Leakage Relay
F01-F03
L1 L2 L3 L1 L2 L3
R 01
230V AC 230V AC
Y Supply Supply
01
P01
B
V V2
01 V1 L3-L1
L2-L3
L1-L2

L3-N
L1-N
L2-N
9 10 12
1X1 2X1
0
L1 L2 L3 5 To T1 To T2
1 Control Core Control Core
1X2 Balance 2X2 Balance
11
S01
Circuit CT Circuit CT
X1 X1 X1
C VOLTMETER C
Q0 Shield Cable Shield Cable

X2 X2 X2

L1 L2 L3 N
RED YELLOW BLUE
H01 H02 H03

R Y B
N
N
E
E

B FEEDER
INCOMER ELECT STEAM BOILER-1(VL-29) LP-LMR-H1-B101-02-LBS-02 B
DESIGNATION

PHASES 3PHASE 3PHASE 3PHASE

RATING & TYPE 1250A TP ISOLATOR 160A TP MCCB+ELR+CBCT 100A TP MCCB+ELR+CBCT

BREAKING --
CAPACITY
36KA 36KA
INTERCONNECTION
2x60x10mm 1x20x10mm 1x15x5mm
BUSBAR

CABLE SIZE 4x4Cx300mm2 + 4x1Cx150mm2 4Cx70mm2 + 1Cx35mm2 4Cx35mm2 + 1Cx16mm2

TOTAL
520.44KW 67.00KW 44.00KW
CONNECTED LOAD QTY. : 01 No.
A A
5 16.06.2020 FOR MODIFICATION ADAM ADAM PANEL REF/DRG. TITLE : THE ROYAL ATLANTIS RESORT AND RESIDENCES
PROJECT:
4 14.11.19 SITE MOD. ASBUILT AQL SIDDIQ PACIFIC OCEAN ELECTRICAL SMDB-H1-B101 PALM JUMEIRAH CRESCENT, DUBAI, U.A.E.
2 27-10-18 ASBUILT KANNAN SIDDIQ MEP
SWITCHGEAR INDUSTRIES L.L.C. [ FED FROM : MDB-H-21] CONTRACTOR:
M/s. SPECON L.L.C.
0 02-06-18 FIRST ISSUE SIDDIQ SIDDIQ

REV DATE NATURE OF REVISION DRAWN DESIGNED SHARJAH: TEL.06 - 5345334, FAX 06 - 5347212 DRG. No. POET - 017 / 18-1-134 REV. : 5 SHEET NO. : 04 / 09
1 2 3 4 5 6 7 8

1600A TPN TINNED CU BUSBAR 2x60x10mm


L1
L2
E L3 E
800A TPN TINNED CU BUSBAR 1x50x10mm
L1 L1
L2 L2
L3 L3

L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3

D D
Q3 Q4 Q5 Q6 Q7 Q8 Q9

L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3

C C

N
N
E
E
FEEDER
DESIGNATION DB-H1-B101-01 DB-H1-B101-02 DB-H1-B101-04 DB-H1-B101-05 DB-H1-B101-06 DB-H1-B101-07 EHT-DB-01

PHASES 3PHASE 3PHASE 3PHASE 3PHASE 3PHASE 3PHASE 3PHASE


B 40A TP MCCB
B
RATING & TYPE 63A TP MCCB 40A TP MCCB 40A TP MCCB 40A TP MCCB 63A TP MCCB 63A TP MCCB
(SET AT 28A)
BREAKING
CAPACITY
36KA 36KA 36KA 36KA 36KA 36KA 36KA
INTERCONNECTION
BUSBAR
1x15x5mm 1x15x5mm 1x15x5mm 1x15x5mm 1x15x5mm 1x15x5mm 1x15x5mm
CABLE SIZE 4Cx16mm2 + 1Cx16mm2 4Cx25mm2 + 1Cx16mm2 4Cx10mm2 + 1Cx10mm2 4Cx35mm2 + 1Cx16mm2 4Cx25mm2 + 1Cx16mm2 4Cx16mm2 + 1Cx16mm2 4Cx16mm2 + 1Cx16mm2

TOTAL
CONNECTED LOAD
20.31KW 13.39KW 12.04KW 14.58KW 27.68KW 30.60KW 6.80KW

QTY. : 01 No.
A A
5 16.06.2020 FOR MODIFICATION ADAM ADAM PANEL REF/DRG. TITLE : THE ROYAL ATLANTIS RESORT AND RESIDENCES
PROJECT:
4 14.11.19 SITE MOD. ASBUILT AQL SIDDIQ PACIFIC OCEAN ELECTRICAL SMDB-H1-B101 PALM JUMEIRAH CRESCENT, DUBAI, U.A.E.
2 27-10-18 ASBUILT KANNAN SIDDIQ MEP
SWITCHGEAR INDUSTRIES L.L.C. [ FED FROM : MDB-H-21] CONTRACTOR:
M/s. SPECON L.L.C.
0 02-06-18 FIRST ISSUE SIDDIQ SIDDIQ

REV DATE NATURE OF REVISION DRAWN DESIGNED SHARJAH: TEL.06 - 5345334, FAX 06 - 5347212 DRG. No. POET - 017 / 18-1-134 REV. : 5 SHEET NO. : 05 / 09
1 2 3 4 5 6 7 8

800A TPN TINNED CU BUSBAR 1x50x10mm


L1 L1
L2 L2
L3 L3
E E

L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3

Q10 Q11 Q12 Q13 Q14 Q15 Q16 Q17


D D
L1 L2 L3
L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3

13 14 15 16 P2 S2 17C2
17T01 S1 17C1
P1 17C4
P2 S2
17T02 S1 17C3
F13 F14 F15 F16 P1 P2 S2 17C6
17T03 S1 17C5
P1
10 11 12 13 14 15
PMU
I1+ I1- I2+ I2- I3+ I3-
17P01
CONTROL
POWER 230V RS-485
PE

VN
V1
V2
V3
L1 L2

17
D1+ D0- SH OV

1 2 3 4 8 9 22 23 24 25

17F01-17F03 017 A B C G

PMU METER
COMMUNICATION
RS 485

C
Ensure ELCB in CPs. C

N
N
E
E

FEEDER
DESIGNATION DB-H1-B101-08 USF-B1-17 USF-B1-18 WASHER EXTRACTOR VL-14 WASHER EXTRACTOR VL-15 DRY CLEAN MACHINE VL-18 DRYER VL-16 DB-H1-B101-03

PHASES 3PHASE 3PHASE 3PHASE 3PHASE 3PHASE 3PHASE 3PHASE 3PHASE

25A TP MCCB 40A TP MCCB+ 40A TP MCCB+ 40A TP MCCB+ 40A TP MCCB+
RATING & TYPE 40A TP MCCB 63A TP MCCB 63A TP MCCB
B SET@20A 40A,30mA 4P RCCB 40A,30mA 4P RCCB 40A, 30mA 4P RCCB 40A,30mA 4P RCCB
B
BREAKING
CAPACITY
36KA 36KA 36KA 36KA 36KA 36KA 36KA 36KA
INTERCONNECTION
BUSBAR
1x15x5mm 1x15x5mm 1x15x5mm 1x15x5mm 1x15x5mm 1x15x5mm 1x15x5mm 1x15x5mm
CABLE SIZE 4Cx16mm2 + 1Cx16mm2 4Cx25mm2 + 1Cx16mm2 4Cx6mm2 + 1Cx6mm2 4Cx10mm2 + 1Cx10mm2 4Cx10mm2 + 1Cx10mm2 4Cx16mm2 + 1Cx16mm2 -- 4Cx25mm2 + 1Cx16mm2

TOTAL
CONNECTED LOAD
20.30KW 22.00KW 4.00KW 12.00KW 12.00KW 14.00KW 12.00KW 28.48KW

QTY. : 01 No.
A A
5 16.06.2020 FOR MODIFICATION ADAM ADAM PANEL REF/DRG. TITLE : THE ROYAL ATLANTIS RESORT AND RESIDENCES
PROJECT:
4 14.11.19 SITE MOD. ASBUILT AQL SIDDIQ PACIFIC OCEAN ELECTRICAL SMDB-H1-B101 PALM JUMEIRAH CRESCENT, DUBAI, U.A.E.
2 27-10-18 ASBUILT KANNAN SIDDIQ MEP
SWITCHGEAR INDUSTRIES L.L.C. [ FED FROM : MDB-H-21] CONTRACTOR:
M/s. SPECON L.L.C.
0 02-06-18 FIRST ISSUE SIDDIQ SIDDIQ

REV DATE NATURE OF REVISION DRAWN DESIGNED SHARJAH: TEL.06 - 5345334, FAX 06 - 5347212 DRG. No. POET - 017 / 18-1-134 REV. : 5 SHEET NO. : 06 / 09
1 2 3 4 5 6 7 8

800A TPN TINNED CU BUSBAR 1x50x10mm


L1 L1
L2 L2
L3 L3 E
E

L1 L2 L3 L1 L2 L3

D D

ELR1 Q18 Q19


Earth Leakage Relay
L1 L2 L3 L1 L2 L3

230V AC
Supply

To 1X1 T1
Core
Control 1X2 Balance
Circuit CT
C Shield Cable C

N N
E E

B FEEDER
DESIGNATION
ELECT STEAM BOILER-2(VL-29) LVFP-03 B

PHASES 3PHASE 3PHASE

RATING & TYPE 160A TP MCCB+ELR+CBCT 200A TP MCCB

BREAKING
CAPACITY
36KA 36KA
INTERCONNECTION
BUSBAR
1x20x10mm 1x20x10mm

CABLE SIZE 4Cx70mm2 + 1Cx35mm2 4Cx300mm2 + 1Cx150mm2

TOTAL
67.00KW 92.27KW
CONNECTED LOAD
QTY. : 01 No.
A A
5 16.06.2020 FOR MODIFICATION ADAM ADAM PANEL REF/DRG. TITLE : THE ROYAL ATLANTIS RESORT AND RESIDENCES
PROJECT:
4 14.11.19 SITE MOD. ASBUILT AQL SIDDIQ PACIFIC OCEAN ELECTRICAL SMDB-H1-B101 PALM JUMEIRAH CRESCENT, DUBAI, U.A.E.
2 27-10-18 ASBUILT KANNAN SIDDIQ MEP
SWITCHGEAR INDUSTRIES L.L.C. [ FED FROM : MDB-H-21] CONTRACTOR:
M/s. SPECON L.L.C.
0 02-06-18 FIRST ISSUE SIDDIQ SIDDIQ

REV DATE NATURE OF REVISION DRAWN DESIGNED SHARJAH: TEL.06 - 5345334, FAX 06 - 5347212 DRG. No. POET - 017 / 18-1-134 REV. : 5 SHEET NO. : 07 / 09
1 2 3 4 5 6 7 8

02
E L F04 E

13 13 13

ELR1 ELR2
ELR1 ELR18

230V AC SUPPLY (AFTER INCOMER-Q0)


14 12 14 12 14 12
D D
5 5 5
230V AC 230V AC 230V AC
SUPPLY SUPPLY SUPPLY
TO ELR1 TO ELR2 TO ELR18
7 7 7

03
04 04

C C

C1 C1 C1

Q1-MX Q2-MX Q18-MX

C2 C2 C2
N

SHUNT TRIP SHUNT TRIP SHUNT TRIP

CONTROL CIRCUIT FOR ELR + SHUNT TRIP


FOR OUTGOING MCCB'S (Q1,Q2 & Q18)
B B

QTY. : 01 No.
A A
5 16.06.2020 FOR MODIFICATION ADAM ADAM PANEL REF/DRG. TITLE : THE ROYAL ATLANTIS RESORT AND RESIDENCES
PROJECT:
4 14.11.19 SITE MOD. ASBUILT AQL SIDDIQ PACIFIC OCEAN ELECTRICAL SMDB-H1-B101 PALM JUMEIRAH CRESCENT, DUBAI, U.A.E.
2 27-10-18 ASBUILT KANNAN SIDDIQ MEP
SWITCHGEAR INDUSTRIES L.L.C. [ FED FROM : MDB-H-21] CONTRACTOR:
M/s. SPECON L.L.C.
0 02-06-18 FIRST ISSUE SIDDIQ SIDDIQ

REV DATE NATURE OF REVISION DRAWN DESIGNED SHARJAH: TEL.06 - 5345334, FAX 06 - 5347212 DRG. No. POET - 017 / 18-1-134 REV. : 5 SHEET NO. : 08 / 09
1 2 3 4 5 6 7 8

MATERIAL LIST
ITEM DESCRIPTION REF No. MAKE QTY
E 2000mm(H) x1000mm(W) x 600mm(D) - RAL 7035 E
ENCLOSURE 053-EE-201060DR35 ALFANAR 1
SHEET STEEL ENCLOSURE
2000mm(H) x 1000mm(W) x 600mm(D) - RAL 7035
053-EE-201060DR35 ALFANAR 1
SHEET STEEL ENCLOSURE
I/C- Q0 1250A TP ISOLATOR + HANDLE INS1250- 31334+31288 SCHNEIDER ELECTRIC 1
Q1,Q18 160A TP MCCB 36KA+SHUNT TRIP CVS160F-LV516638+LV429387 SCHNEIDER ELECTRIC 2
Q2 100A TP MCCB 36KA+SHUNT TRIP CVS100F-LV510809+LV429387 SCHNEIDER ELECTRIC 1
Q3,Q7,Q11,Q15
Q17 63A TP MCCB 36KA CVS100F-LV510807 SCHNEIDER ELECTRIC 5
D D
Q4-Q6,Q10,Q13 40A TP MCCB 36KA CVS100F-LV510805 SCHNEIDER ELECTRIC 7
Q14,Q16
Q15 40A TP MCCB 36KA CVS100F-LV510805 SCHNEIDER ELECTRIC 1

Q8 63 TP MCCB 36KA CVS100F-LV510807 SCHNEIDER ELECTRIC 1


Q9 40A TP MCCB 36KA CVS100F-LV510805 SCHNEIDER ELECTRIC 1

Q12 25A TP MCCB 36KA SET@20A CVS100F-LV510803 SCHNEIDER ELECTRIC 1

Q19 200A TP MCCB 36KA CVS250F-LV525622 SCHNEIDER ELECTRIC 1

C 17P01 DIGITAL POWER MONITORING UNIT(PMU) METSEPM2120 SCHNEIDER ELECTRIC 1 C

17T01-17T03 60/5A CURRENT TRANSFORMER CLASS-1 143-5-A5 HOBUT 3


H01-H03 RYB INDICATION LAMPS 230V AC XB7-EV04,05,06MP SCHNEIDER ELECTRIC 1 SET
F01-F04 4A CONTROL FUSE CARRIER STI-15636 SCHNEIDER ELECTRIC 7
17F01-17F03
ELR1,ELR2,ELR18 EARTH LEAKAGE RELAY 100mA-30A RCR-V30 HOBUT 3
T1,T18 EARTH FAULT TOROID - 70mm DIAMETER CTB 70 HOBUT 2
T2 EARTH FAULT TOROID - 35mm DIAMETER CTB 35 HOBUT 1
F13,F14,F16 40A,30mA 4P RCCB EZ9R36440 SCHNEIDER ELECTRIC 3
B B
F15 40A,30mA 4P RCCB EZ9R36440 SCHNEIDER ELECTRIC 1
P01 VOLTMETER (0-500V) 96mmx96mm D96SD-500V HOBUT 1

P02 AMMETER (0-1200A) 96mmx96mm D96SD5A - (1200A/5A) HOBUT 1

S01 VOLTMETER SELECTOR SWITCH V308E HOBUT 1

S02 AMMETER SELECTOR SWITCH AU318E HOBUT 1

T01-T03 1200/5A CURRENT TRANSFORMER CLASS-1 196-5-F8 HOBUT 3


QTY. : 01 No.
A A
5 16.06.2020 FOR MODIFICATION ADAM ADAM PANEL REF/DRG. TITLE : THE ROYAL ATLANTIS RESORT AND RESIDENCES
PROJECT:
4 14.11.19 SITE MOD. ASBUILT AQL SIDDIQ PACIFIC OCEAN ELECTRICAL SMDB-H1-B101 PALM JUMEIRAH CRESCENT, DUBAI, U.A.E.
2 27-10-18 ASBUILT KANNAN SIDDIQ MEP
SWITCHGEAR INDUSTRIES L.L.C. [ FED FROM : MDB-H-21] CONTRACTOR:
M/s. SPECON L.L.C.
0 02-06-18 FIRST ISSUE SIDDIQ SIDDIQ

REV DATE NATURE OF REVISION DRAWN DESIGNED SHARJAH: TEL.06 - 5345334, FAX 06 - 5347212 DRG. No. POET - 017 / 18-1-134 REV. : 5 SHEET NO. : 09 / 09
THE ROYAL ATLANTIS RESORT AND RESIDENCES SUBMITTAL & REVIEW FORM

TRA/SBJ/DEC/49549
SSANGYONG-BESIX Joint Venture Date: 12-May-20
Submitted For * Code
SUBMISSION OF DOCUMENTS, DRAWINGS, SAMPLES, ETC. APPROVAL 1
YOUR INFORMATION 2

ACTION **
RE: THE ROYAL ATLANTIS RESORT & RESIDENCES-MAIN CONTRACT Contract No.:
APPROVED A
CN0063 APPROVED AS NOTED B
DEC Dynamic Engineering Consultants
REVISE & RESUBMIT C

WE AREp SENDING HEREWITH / UNDER SEPARATE COVER, THE DRAWINGS/ REJECTED D


DOCUMENTS / SAMPLES LISTED BELOW. (DELETE AS NECESSARY)
DRWS., SPEC. OR CODE
Item
BOQ. REF.
REV DESCRIPTION TYPE
Submittal Action

1 TRA-SPE-TEC-EL-GEN-00202 02 M2/M3 - Technical Submittal for MDB H-21 & Associated Panels Load Schedules TEC 1 B

MEP __________________________ ARCHITECTURE ________________________ FAÇADE ____________________

OTHERS ( __________, __________ ) __________________


STRUCTURAL - STEEL ____________________ STRUCTURAL - CONCRETE ______________________

TYPE
MAR : MATERIAL SUBMITTAL PQD : PRE-QUALIFICATION DOCUMENTS RPO : REPORT DDG : DESIGN DRAWINGS SAM : SAMPLE
SDG : SHOP DRAWINGS MST : METHOD STATEMENT GEN : GENERAL TCM : TESTING &
TEC : TECHNICAL SUBMITTAL
CAL : CALCULATION HSE : HEALTH, SAFETY & TRE : TEST REPORT CRT : CERTIFICATE PLA : PLAN

Programme of Work Activity ID Ref: Planned Start: 12-May-20


Programme of Work Description:
Planned Finish: 19-May-20
Copies
Electronic Copy to:

VALERY
TRA_TIME Gatekeeper - Turner Construction International LLC PAQUIER, PROJECT DIRECTOR S.P. HAN , DEPUTY PROJECT DIRECTOR
For Contractor
CONSULTANT'S COMMENTS
FM
Refer to comments in the attached Load distribution schedule DEC
Copies To: 17-05-2020
Project Director:

For DEC Dynamic Engineering Consultants


EMPLOYER'S COMMENTS

Copies To:

For Employer
Corrections or comments made relative to submittals during this review do not relieve the contractor from compliance with the requirements of the drawings and specifications. This check is only for review of general conformance with the design conceptof the project and general compliance with the
information given in the contract documents. The contractor is responsible for confirming and correlating all quantities and dimensions selecting fabrication processes and techniques of construction; coordinating his work with that of other trades, and performing his work in a safe and satisfactory manner.

1.08 Technical Transmittal Form.xls


TRA-SBJ-QCD-QA-GEN-00013 Rev.02 Date: 28/03/19
DETAILS OF CONNECTED LOAD/MAXIMUM DEMAND
AREA: Palm Jumeirah Crescent, Dubai U.A.E.
PROJECT : THE ROYAL ATLANTIS RESORT AND RESIDENCES CLIENT : KERZNER INTERNATIONAL
PLOT: PJCRC 19-27C
SMDB REF: SMDB-H1-B101
CONSULTANT: DEC/WSP LOCATION : ELEC. CLOSET (B-1951)
SMDB CONNECTED TO: MDB-H-21
CIRCUIT/ SP/ RATING - AMPS FAULT PVC/ CABLE SIZE ECC LENGTH OF CONNECTED LOAD IN kW TOTAL MAX. PROBE TYPE & NO OF kWh METERS
FEEDER/ TP ACB MCCB ISO/ DUTY XLPE/ 2/4 x 1C 2/3/4C SIZE CABLE R-PHASE Y-PHASE B-PHASE CONNECTED DEMAND 1 PHASE 3 PHASE LV/HV CT REMARKS
DB NO. MCCB kA SWA/LSF mm2 mm2 mm2 (Mtrs) kW kW kW LOAD(TCL) LOAD (MDL) (1) (2) (3)
N/A KW KW
INCOMER TP 1250 XLPE/LSF/SWA/LSF/CU 4x4C 300 4x1C 150 127
OUTGOING

DB-H1-B101-01 TP 63 35 XLPE/LSF/SWA/LSF/CU 4C 16 1C 16 77 7.10 6.56 6.64 20.31 14.62 Proposed DF = 0.72


DB-H1-B101-02 TP 40 35 XLPE/LSF/SWA/LSF/CU 4C 25 1C 16 150 5.13 4.06 4.11 13.29 9.57 Proposed DF = 0.72
DB-H1-B101-03 TP 63 35 XLPE/LSF/SWA/LSF/CU 4C 25 1C 16 64 10.00 9.10 9.38 28.48 22.82 BMS METER ,Kitchen Panel
DB-H1-B101-04 TP 40 35 XLPE/LSF/SWA/LSF/CU 4C 10 1C 10 64 3.37 4.71 4.02 12.09 8.71 Proposed DF = 0.72
DB-H1-B101-05 TP 40 35 XLPE/LSF/SWA/LSF/CU 4C 35 1C 16 178 5.15 4.24 5.19 14.58 10.50
verify the cable Proposed DF = 0.72
DB-H1-B101-06 TP 63 35 XLPE/LSF/SWA/LSF/CU 4C 25 1C 16 67 9.46 9.13 9.09 27.68 19.93 termination. Proposed DF = 0.72
DB-H1-B101-07 TP 63 35 XLPE/LSF/SWA/LSF/CU 4C 16 1C 16 53 11.33 10.23 9.03 30.60 22.03 Proposed DF = 0.72
ELECT STEAM BOILER-1 (VL-29) TP 160 35 XLPE/LSF/SWA/LSF/CU 4C 70 1C 35 70 22.33 22.33 22.33 67.00 58.29 100mA ELCB (VALET LAUNDRY)
LP-LMR-H1-B101-02-LBS-02 TP 100 35 XLPE/LSF/SWA/LSF/CU 4C 35 1C 16 38 14.67 14.67 14.67 44.00 30.80 500mA ELCB (Proposed DF = 0.70)

FEEDER PILLAR -03(AS PER EIP 547 &


LVFP-03 TP 200 35 XLPE/LSF/SWA/LSF/CU 4C 300 1C 150 130 29.76 32.27 30.25 92.27 73.87
424 C15 Ancillary Buidling Update IFC )

DB-H1-B101-08 TP 40 35 XLPE/LSF/SWA/LSF/CU 4C 16 1C 16 63 6.60 6.20 6.60 19.40 17.22


With Starter and ELCB PROVIDED IN
USF-B1-17 TP 63 35 XLPE/LSF/SWA/LSF/CU 4C 25 1C 16 120 7.33 7.33 7.33 22.00 19.14
CONTROL PANEL
With Starter and ELCB PROVIDED IN
USF-B1-18 TP 20 35 XLPE/LSF/SWA/LSF/CU 4C 6 1C 6 90 1.33 1.33 1.33 4.00 3.48
CONTROL PANEL
Washer Extractor VL-14 TP 40 35 XLPE/LSF/SWA/LSF/CU 4C 10 1C 10 70 4.00 4.00 4.00 12.00 10.44 30mA ELCB ( VALET LAUNDRY)
Washer Extractor VL-15 TP 40 35 XLPE/LSF/SWA/LSF/CU 4C 10 1C 10 72 4.00 4.00 4.00 12.00 10.44 30mA ELCB ( VALET LAUNDRY)
30mA ELCB (VALET LAUNDRY)( AS
Dry Clean Machine VL-18 TP 40 35 XLPE/LSF/SWA/LSF/CU 4C 16 1C 16 65 4.67 4.67 4.67 14.00 12.18
PER SDIR 237)
DRYER VL-16 TP 40 35 XLPE/LSF/SWA/LSF/CU 4C 10 1C 10 65 4.00 4.00 4.00 12.00 10.44 30mA ELCB (VALET LAUNDRY)
ELECT STEAM BOILER-2( VL-29) TP 160 35 XLPE/LSF/SWA/LSF/CU 4C 70 1C 35 70 22.33 22.33 22.33 67.00 58.29 100mA ELCB (VALET LAUNDRY)
AS PER RFI 10913 (LOCATION:LG FAN
EHT-DB-01 TP 40A SET 32A 35 XLPE/LSF/SWA/LSF/CU 4C16 1C 16 80 2.70 2.90 1.20 6.80 6.12
ROOM(L-1901)

FM
SMDB CONNECTED TO: MDB-BP-1B1 TOTAL CONNECTED LOAD PER PHASE 175.26 174.06 170.18 519.50 418.88 0 DEC
MAXIMUM DEMAND [3PH] @ D.F 0.81 = 418.88kW TOTAL CONNECTED LOAD [3 PH] 519.50 kW 17-05-2020
TYPE OF METER [RATING OF INCOMER] : [1] Upto 60A [2] Upto 125A [3] LV CT............./A / HV CT....../......A
[1 Phase] [3 Phase]
CONTRACTOR : SSANGYONG - BESIX JOINT VENTURE (SBJV)
MEP CONTRACTOR : SPECON L.L.C DATE: 12-May-20

TRA-SPE-TEC-EL-GEN-00202
Page 2 MDB-H-21 (REV 02)
8/17/2020 Aconex

MAIL TYPE MAIL NUMBER REFERENCE NUMBER


Response to Work Inspection Request DECAE-RWIR-103534 SPE-WIRQ-035219

Re: Inspection for witness the Site Acceptance Test(SAT) for SMDB-H2-0401,
SMDB-HP-B101, SMDB-H2-B101, SMDB-H2-B101-03, SMDB-H1-B102, SMDB-H2-
LG01, SMDB-H3-B101, SMDB-H3-B104, SMDB-H3-B105, SMDB-H1-B103, SMDB-
H1-B105 & SMDB-H1-B101 as per attached r

From Mr Rajesh Nair - DEC Dynamic Engineering Consultants

To (2) Mr Zafar Mustafa - DEC Dynamic Engineering Consultants (+1 more...)

Cc (21) Mr Mohammed Imran - DEC Dynamic Engineering Consultants (+20 more...)

Sent Thursday, 7 November 2019 2:19:57 PM GST (GMT +04:00)

Status Closed-Out

DETAILS

Project Reference Number TRA-SPE-WIR-EL-B00-111085-0

Inspection Status B - Approved As Noted

Consultant Comments Final approval is subject to DEWA acceptance and commissioning.

WIR - Date of Inspection 07/11/2019

WIR - Time of 01:00


Inspection(HH:MM)

QAQC - ITP Reference TRA-SPE-ITP-EL-GEN-00013 [02]- Installation of LV Switch Gear, Capacitor Bank, SMDB & DB

Discipline Electrical

WIR - Activity EL

WIR - Responsible DEC


Organisation

WIR - Activities and Items to Inspection for witness the Site Acceptance Test(SAT) for SMDB-H2-0401, SMDB-HP-B101, SMDB-H2-B101,
be Inspect SMDB-H2-B101-03, SMDB-H1-B102, SMDB-H2-LG01, SMDB-H3-B101, SMDB-H3-B104, SMDB-H3-B105,
SMDB-H1-B103, SMDB-H1-B105 & SMDB-H1-B101 at Basement as per attached reports.

Levels & Grids 1 BMT Zone 05 - T7-T9

https://mea.aconex.com/Logon 1/3
8/17/2020 Aconex

Area/Structure/Location Basement

WIR - Required Date of 07/10/2019


Inspection

WIR - Required Time of 10:00


Inspection(HH:MM)

ATTRIBUTES

Attribute 1 Basement

MESSAGE

From: R Nogoy
Sent: 07/11/2019 8:13:16 AM GST (GMT +04:00)
To: Zafar Mustafa, Rajesh Nair
Cc: Ibrahim Ahmed, Muhammad Akmal, Muhammad Aslamuddin, Abhishek Balasubarmanian, Abdul Baseer, Mohammed Imran, Shoeb Kaleem, Khaled
Mohammad, Ganesha Moorthi, Shahid Mulani, Ranjith Puthen, Ghouse Quadri, Mohammed Abrar, Asfak Al Ameen, Farman Baig, Justo Caliguiran,
Bernie Escat, Jennifer Mejia, Amritpal Singh, Jess Teodosio, Aradhana Thulasi
Mail Number: SBJV-WIRQ-115734
Subject: Inspection for witness the Site Acceptance Test(SAT) for SMDB-H2-0401, SMDB-HP-B101, SMDB-H2-B101, SMDB-H2-B101-03, SMDB-H1-
B102, SMDB-H2-LG01, SMDB-H3-B101, SMDB-H3-B104, SMDB-H3-B105, SMDB-H1-B103, SMDB-H1-B105 & SMDB-H1-B101 as per attached r

Project Reference
TRA-SPE-WIR-EL-B00-111085-0
Number:
QAQC - ITP Reference: TRA-SPE-ITP-EL-GEN-00013 [02]- Installation of LV Switch Gear, Capacitor Bank, SMDB & DB
Discipline: Electrical
WIR - Activity: EL
WIR - Responsible
DEC
Organisation:
Inspection for witness the Site Acceptance Test(SAT) for SMDB-H2-0401, SMDB-HP-B101, SMDB-H2-B101, SMDB-H2-
WIR - Activities and
B101-03, SMDB-H1-B102, SMDB-H2-LG01, SMDB-H3-B101, SMDB-H3-B104, SMDB-H3-B105, SMDB-H1-B103, SMDB-H1-
Items to be Inspect:
B105 & SMDB-H1-B101 at Basement as per attached reports.
Levels & Grids: 1 BMT Zone 05 - T7-T9
Area/Structure/Location: Basement
WIR - Required Date of
07/10/2019
Inspection:
WIR - Required Time of
10:00
Inspection(HH:MM):

https://mea.aconex.com/Logon 2/3
8/17/2020 Aconex

MAIL TYPE MAIL NUMBER REFERENCE NUMBER


Response to Work Inspection Request DECAE-RWIR-121565 SPE-WIRQ-041935

Re: Inspection for the installation of Outgoing cables,Insulation Resistance


Test,Continuity Test, Glanding,Termination and Torque for SMDB-H1-B101 at
Basement as per attached highlighted drawing.

From Mr Rajesh Nair - DEC Dynamic Engineering Consultants

To (2) Mr Zafar Mustafa - DEC Dynamic Engineering Consultants (+1 more...)

Cc (25) Mr Mohammed Imran - DEC Dynamic Engineering Consultants (+24 more...)

Sent Sunday, 9 February 2020 6:53:40 PM GST (GMT +04:00)

Status Closed-Out

DETAILS

Project Reference Number TRA-SPE-WIR-EL-B00-121788-02

Inspection Status B - Approved As Noted

Consultant Comments * * This inspection limited to only Early access area Power cables for energization Purpose. However,
Contractor should comply the below comments for final system approval and handing over. Contractor is fully
responsible if any modification required later accordingly **

- Approved based on the complinace provided by the contractor, Contractor to revise the panel manufacturer
drawing and obtain the approval for the SMDB with Gland box in due course.

- Only 7 outgoing cables inspected ( DB-H1-B101-01, DB-H1-B101-02, DB-H1-B101-04, DB-H1-B101-06, DB-


H1-B101-07, USF-B1-17, USF-B1-18)

- DB-H1-B101-01 : 16 Sqmm Cable size shown as per approved load schedule, but actual installation at site is
35 Sqmm. Contractor to provide the approved document to confirm the same

- DB-H1-B101-02 : 25 Sqmm Cable size shown as per approved load schedule, but actual installation at site is
35 Sqmm. Contractor to provide the approved document to confirm the same

- USF-B1-17 : 25 Sqmm Cable size shown as per approved load schedule, but actual installation at site is 35
Sqmm. Contractor to provide the approved document to confirm the same

- Unused opening in Cable gland plate to be closed with approved material to maintain IP rating of the panel

https://mea.aconex.com/Logon 1/4
8/17/2020 Aconex

- Cable Size, type and number of cores inspected as per attached highlighted documents and found ok.

- Cable bending radius is subject to DEWA inspection approval.

- Incoming and Outgoing cables installed outside from the cable tray at some panel entry location. Rectify

- Replace the GI Bolt nut With Brass material used for Bonding conductor installation.

- Provide Identification ferrules for Neutral, Earth and Phase cores inside SMDB panel.

- Provide Engraved identification tag for incoming and outgoing cables.

- Most of the areas cable dressing not completed in cable tray, Small size cable used for cable dressing to be
replaced with appropriate cable tie.

- Approved Load schedule, Manufacturer drawings to be kept inside the Panel considering future maintenance.

- Cables which are not part of the early access area to be removed from MCBs and separated properly in safe
manner.

- Provide approved document to confirm the Control panel location installed on the car parking slots and inside
Mechanical Rooms.

- Provide approved Containment installation WIR.

- Power shop drawing / Red line drawing to be attached as per actual containment route and location.

- Provide and Typical installation detail shop drawing

Note :

Contractor should resubmit the WIR after complying the above comments for final approval.

WIR - Date of Inspection 09/02/2020

WIR - Time of 13.00


Inspection(HH:MM)

QAQC - ITP Reference TRA-SPE-ITP-EL-GEN-00008-[00] Installation of Wires & Power Cable Pulling For Building ( LV& ELV)

Discipline Electrical

WIR - Activity EL

WIR - Responsible DEC


Organisation

WIR - Activities and Items to Inspection for the installation of Outgoing cables,Insulation Resistance Test,Continuity Test, Glanding and
be Inspect Termination for SMDB-H1-B101 at Basement as per attached highlighted Load Schedule.

https://mea.aconex.com/Logon 2/4
8/17/2020 Aconex

Levels & Grids 1 BMT Zone 06 - T9-T11

Area/Structure/Location Basement

WIR - Required Date of 13/02/2020


Inspection

WIR - Required Time of 09.00


Inspection(HH:MM)

ATTRIBUTES

Attribute 1 Basement

MESSAGE

From: R Nogoy
Sent: 09/02/2020 10:25:13 AM GST (GMT +04:00)
To: Zafar Mustafa, Rajesh Nair
Cc: Ibrahim Ahmed, Muhammad Akmal, Muhammad Aslamuddin, Abhishek Balasubarmanian, Abdul Baseer, Mohammed Imran, Shoeb Kaleem, Khaled
Mohammad, Ganesha Moorthi, Shahid Mulani, Ranjith Puthen, Ghouse Quadri, Mohammed Abrar, Asfak Al Ameen, Farman Baig, Justo Caliguiran,
Bernie Escat, Jennifer Mejia, Amritpal Singh, Jess Teodosio, Aradhana Thulasi, TRA_TIME Gatekeeper, Agostinho Mascarewhas, Joyce Moutran, Haissam
Said
Mail Number: SBJV-WIRQ-136740
Subject: Inspection for the installation of Outgoing cables,Insulation Resistance Test,Continuity Test, Glanding,Termination and Torque for SMDB-H1-
B101 at Basement as per attached highlighted drawing.

Project Reference
TRA-SPE-WIR-EL-B00-121788-02
Number:
QAQC - ITP Reference: TRA-SPE-ITP-EL-GEN-00008-[00] Installation of Wires & Power Cable Pulling For Building ( LV& ELV)
Discipline: Electrical
WIR - Activity: EL
WIR - Responsible
DEC
Organisation:
WIR - Activities and Inspection for the installation of Outgoing cables,Insulation Resistance Test,Continuity Test, Glanding and Termination for
Items to be Inspect: SMDB-H1-B101 at Basement as per attached highlighted Load Schedule.
Levels & Grids: 1 BMT Zone 06 - T9-T11
Area/Structure/Location: Basement
WIR - Required Date of
13/02/2020
Inspection:
WIR - Required Time of
09.00
Inspection(HH:MM):

https://mea.aconex.com/Logon 3/4
8/17/2020 Aconex

MAIL TYPE MAIL NUMBER REFERENCE NUMBER


Response to Work Inspection Request DECAE-RWIR-119279 SPE-WIRQ-042532

Re: Inspection for the Glanding and Termination at MDB-H-21 to SMDB-H1-B101 at


Basement as per attached highlighted drawing.

From Mr Rajesh Nair - DEC Dynamic Engineering Consultants

To (2) Mr Zafar Mustafa - DEC Dynamic Engineering Consultants (+1 more...)

Cc (25) Mr Mohammed Imran - DEC Dynamic Engineering Consultants (+24 more...)

Sent Thursday, 30 January 2020 8:28:56 AM GST (GMT +04:00)

Status Closed-Out

DETAILS

Project Reference Number TRA-SPE-WIR-EL-B00-125859-01

Inspection Status B - Approved As Noted

Consultant Comments -Inspection done for termination inside the LV room only, contractor to raise another inspection for termination
in SMDB side.

-Contractor to clean the cables along the routing from dust.

-Final approval is subject to DEWA.

WIR - Date of Inspection 30/01/2020

WIR - Time of 01:00


Inspection(HH:MM)

QAQC - ITP Reference TRA-SPE-ITP-EL-GEN-00008-[00] Installation of Wires & Power Cable Pulling For Building ( LV& ELV)

Discipline Electrical

WIR - Activity EL

WIR - Responsible DEC


Organisation

WIR - Activities and Items to Inspection for the Glanding and Termination at MDB-H-21 to SMDB-H1-B101 at Basement as per attached
be Inspect highlighted drawing.

https://mea.aconex.com/Logon 1/3
8/17/2020 Aconex

Levels & Grids 1 BMT Zone 07 - T11-T12

Area/Structure/Location Basement

WIR - Required Date of 29/01/2020


Inspection

WIR - Required Time of 10.00


Inspection(HH:MM)

ATTRIBUTES

Attribute 1 Basement

MESSAGE

From: R Nogoy
Sent: 28/01/2020 8:23:38 AM GST (GMT +04:00)
To: Zafar Mustafa, Rajesh Nair
Cc: Ibrahim Ahmed, Muhammad Akmal, Muhammad Aslamuddin, Abhishek Balasubarmanian, Abdul Baseer, Mohammed Imran, Shoeb Kaleem, Khaled
Mohammad, Ganesha Moorthi, Shahid Mulani, Ranjith Puthen, Ghouse Quadri, Mohammed Abrar, Asfak Al Ameen, Farman Baig, Justo Caliguiran,
Bernie Escat, Jennifer Mejia, Amritpal Singh, Jess Teodosio, Aradhana Thulasi, TRA_TIME Gatekeeper, Agostinho Mascarewhas, Joyce Moutran, Haissam
Said
Mail Number: SBJV-WIRQ-133460
Subject: Inspection for the Glanding and Termination at MDB-H-21 to SMDB-H1-B101 at Basement as per attached highlighted drawing.

Project Reference
TRA-SPE-WIR-EL-B00-125859-01
Number:
QAQC - ITP Reference: TRA-SPE-ITP-EL-GEN-00008-[00] Installation of Wires & Power Cable Pulling For Building ( LV& ELV)
Discipline: Electrical
WIR - Activity: EL
WIR - Responsible
DEC
Organisation:
WIR - Activities and Inspection for the Glanding and Termination at MDB-H-21 to SMDB-H1-B101 at Basement as per attached highlighted
Items to be Inspect: drawing.
Levels & Grids: 1 BMT Zone 07 - T11-T12
Area/Structure/Location: Basement
WIR - Required Date of
29/01/2020
Inspection:
WIR - Required Time of
10.00
Inspection(HH:MM):

https://mea.aconex.com/Logon 2/3
8/17/2020 Aconex

MAIL TYPE MAIL NUMBER REFERENCE NUMBER


Response to Work Inspection Request DECAE-RWIR-121059 SPE-WIRQ-044388

Re: Inspection for the Torque test for MDB-H-21 outgoing feeder SMDB-H-B101 at
Basement, Area-20, LV room

From Mr Rajesh Nair - DEC Dynamic Engineering Consultants

To (2) Mr Zafar Mustafa - DEC Dynamic Engineering Consultants (+1 more...)

Cc (25) Mr Mohammed Imran - DEC Dynamic Engineering Consultants (+24 more...)

Sent Saturday, 8 February 2020 11:21:58 AM GST (GMT +04:00)

Status Closed-Out

DETAILS

Project Reference Number TRA-SPE-WIR-EL-B00-129775-00

Inspection Status B - Approved As Noted

Consultant Comments Final approval is subject to testing and commissioning.

WIR - Date of Inspection 08/02/2020

WIR - Time of 01:00


Inspection(HH:MM)

QAQC - ITP Reference TRA-SPE-ITP-EL-GEN-00013 [02]- Installation of LV Switch Gear, Capacitor Bank, SMDB & DB

Discipline Electrical

WIR - Activity EL

WIR - Responsible DEC


Organisation

WIR - Activities and Items to Inspection for the Torque test for MDB-H-21 outgoing feeder SMDB-H-B101 at Basement, Area-20, LV room
be Inspect

Levels & Grids 1 BMT Zone 06 - T9-T11

Area/Structure/Location Basement, Area-20, LV room

WIR - Required Date of 06/02/2020

https://mea.aconex.com/Logon 1/2
8/17/2020 Aconex

Inspection

WIR - Required Time of 10:00


Inspection(HH:MM)

ATTRIBUTES

Attribute 1 Basement

MESSAGE

From: R Nogoy
Sent: 05/02/2020 11:24:21 AM GST (GMT +04:00)
To: Zafar Mustafa, Rajesh Nair
Cc: Ibrahim Ahmed, Muhammad Akmal, Muhammad Aslamuddin, Abhishek Balasubarmanian, Abdul Baseer, Mohammed Imran, Shoeb Kaleem, Khaled
Mohammad, Ganesha Moorthi, Shahid Mulani, Ranjith Puthen, Ghouse Quadri, Mohammed Abrar, Asfak Al Ameen, Farman Baig, Justo Caliguiran,
Bernie Escat, Jennifer Mejia, Amritpal Singh, Jess Teodosio, Aradhana Thulasi, TRA_TIME Gatekeeper, Agostinho Mascarewhas, Joyce Moutran, Haissam
Said
Mail Number: SBJV-WIRQ-135810
Subject: Inspection for the Torque test for MDB-H-21 outgoing feeder SMDB-H-B101 at Basement, Area-20, LV room

Project Reference
TRA-SPE-WIR-EL-B00-129775-00
Number:
QAQC - ITP Reference: TRA-SPE-ITP-EL-GEN-00013 [02]- Installation of LV Switch Gear, Capacitor Bank, SMDB & DB
Discipline: Electrical
WIR - Activity: EL
WIR - Responsible
DEC
Organisation:
WIR - Activities and
Inspection for the Torque test for MDB-H-21 outgoing feeder SMDB-H-B101 at Basement, Area-20, LV room
Items to be Inspect:
Levels & Grids: 1 BMT Zone 06 - T9-T11
Area/Structure/Location: Basement, Area-20, LV room
WIR - Required Date of
06/02/2020
Inspection:
WIR - Required Time of
10:00
Inspection(HH:MM):

This mail was prepared by R Nair

https://mea.aconex.com/Logon 2/2
8/17/2020 Aconex

MAIL TYPE MAIL NUMBER REFERENCE NUMBER


Response to Work Inspection Request SBJV-RWIR-009179 SPE-WIRQ-015650

Fwd: Inspection for the Installation of SMDB-H1-B101 as per attached highlighted


layout drawing.

From Mr Rafael Nogoy - SsangYong — BESIX Joint Venture

To Robert Sinampayan - SPECON LLC

Sent Wednesday, 3 July 2019 9:14:49 AM GST (GMT +04:00)

Status N/A

DETAILS

Project Reference Number TRA-SPE-WIR-EL-B00-75139-01

Inspection Status B - Approved As Noted

Consultant Comments Contractor responsibility to follow the latest IFC for rating of circuit brakers and to adhere with all the comments
given in MAR ,technical submittal and manufacturer drawings.

WIR - Date of Inspection 10/06/2019

WIR - Time of 01:00


Inspection(HH:MM)

QAQC - ITP Reference TRA-FMT-ITP-EL-GEN-00004-[02] Installation of LV Switchgears (DB)

Discipline Electrical

WIR - Activity EL

WIR - Responsible DEC


Organisation

WIR - Activities and Items to Inspection for the Installation of SMDB-H1-B101 as per attached highlighted layout drawing.
be Inspect

Levels & Grids 1 BMT Zone 12 - South East

Area/Structure/Location Basement area 19 Electrical room B-1951

WIR - Required Date of 10/06/2019


Inspection

https://mea.aconex.com/Logon 1/3
8/17/2020 Aconex

WIR - Required Time of 10:00


Inspection(HH:MM)

ATTRIBUTES

Attribute 1 Basement

MESSAGE

From: R Nair
Sent: 10/06/2019 8:43:37 AM GST (GMT +04:00)
To: Zafar Mustafa, Rafael Nogoy
Cc: Ibrahim Ahmed, Muhammad Akmal, Muhammad Aslamuddin, Abhishek Balasubarmanian, Abdul Baseer, Mohammed Imran, Shoeb Kaleem, Khaled
Mohammad, Ganesha Moorthi, Shahid Mulani, Gary Oliphant, Mohammed Abrar, Farman Baig, Zoran Baklar, Justo Caliguiran, John Darla, Bernie Escat,
Nikolas Georgiou, Mohamed Iftikhar, Jennifer Mejia, Ahmad Nofal, Amritpal Singh, Radomir Stanisic, Jess Teodosio, Aradhana Thulasi, Tony Fermin,
Abishek Lakde
Mail Number: DECAE-RWIR-073832
Subject: Re: Inspection for the Installation of SMDB-H1-B101 as per attached highlighted layout drawing.

Project Reference
TRA-SPE-WIR-EL-B00-75139-01
Number:
Inspection Status: B - Approved As Noted
Contractor responsibility to follow the latest IFC for rating of circuit brakers and to adhere with all the comments given in
Consultant Comments:
MAR ,technical submittal and manufacturer drawings.
WIR - Date of
10/06/2019
Inspection:
WIR - Time of
01:00
Inspection(HH:MM):
QAQC - ITP Reference: TRA-FMT-ITP-EL-GEN-00004-[02] Installation of LV Switchgears (DB)
Discipline: Electrical
WIR - Activity: EL
WIR - Responsible
DEC
Organisation:
WIR - Activities and
Inspection for the Installation of SMDB-H1-B101 as per attached highlighted layout drawing.
Items to be Inspect:
Levels & Grids: 1 BMT Zone 12 - South East
Area/Structure/Location: Basement area 19 Electrical room B-1951
WIR - Required Date of
10/06/2019
Inspection:
WIR - Required Time of
10:00
Inspection(HH:MM):

https://mea.aconex.com/Logon 2/3
8/17/2020 Aconex

MAIL TYPE MAIL NUMBER


Response to Commissioning Inspection Test Report DECAE-RCITR-000078
REFERENCE NUMBER
SPE-CITR-000301

Re: Cold test for the SMDB-H1-B101 outgoing cables at basement as per
highlighted load schedule

From Mr Rajesh Nair - DEC Dynamic Engineering Consultants

To (9) Mr Roberto Scaioni - CML International (+8 more...)

Cc (21) Mr Mohammed Imran - DEC Dynamic Engineering Consultants (+20 more...)

Sent Thursday, 5 March 2020 8:37:25 AM GST (GMT +04:00)

Status Closed-Out

DETAILS

Project Reference Number TRA-SPE-CITR-EL-B00-00159-00

Area/Structure/Location BASEMENT

Levels & Grids 1 BMT Zone 06 - T9-T11

QAQC - ITP Reference TRA-SPE-ITP-EL-GEN-00106 [00] T & C of SMDB

Discipline Electrical

Date of Inspection 02/03/2020

Comments DEC Comments :

- This CITR done as part of Early access requirement.

- Refer comments on the 2nd page of Attached CITR Document & Comply.

- Installation WIR Related comments should be complied as part of installation prior to system final handing
over

CML Comments :

- Refer to the CML comments on CITR 2nd page attached on this mail

https://mea.aconex.com/Logon 1/2
8/17/2020 Aconex

Inspection Status B - Approved As Noted

FILE ATTACHMENTS (1)

File Name

159.pdf

ATTRIBUTES

Attribute 1 Basement

MESSAGE

From: R Nogoy
Sent: 02/03/2020 12:35:15 PM GST (GMT +04:00)
To: Alan Forteza, Jerry Magno, Gary Narag, Eman Pena, Almojil Reyes, Roberto Scaioni, Allan Valencia, Zafar Mustafa, Rajesh Nair
Cc: Ibrahim Ahmed, Muhammad Akmal, Muhammad Aslamuddin, Abhishek Balasubarmanian, Abdul Baseer, Mohammed Imran, Shoeb Kaleem, Khaled
Mohammad, Ganesha Moorthi, Shahid Mulani, Ranjith Puthen, Ghouse Quadri, Mohammed Abrar, Asfak Al Ameen, Farman Baig, Justo Caliguiran,
Bernie Escat, Jennifer Mejia, Amritpal Singh, Jess Teodosio, Aradhana Thulasi
Mail Number: SBJV-CITR-000119
Subject: Cold test for the SMDB-H1-B101 outgoing cables at basement as per highlighted load schedule

Project Reference
TRA-SPE-CITR-EL-B00-00159-00
Number:
Discipline: Electrical
Area/Structure/Location: BASEMENT
QAQC - ITP Reference: TRA-SPE-ITP-EL-GEN-00106 [00] T & C of SMDB
CITR Description: Cold test for the SMDB-H1-B101 outgoing cables at basement as per highlighted load schedule
Levels & Grids: 1 BMT Zone 06 - T9-T11
Date of Inspection: 02/03/2020

https://mea.aconex.com/Logon 2/2
8/20/2020 Aconex

MAIL TYPE MAIL NUMBER


Response to Commissioning Inspection Test Report DECAE-RCITR-000055
REFERENCE NUMBER
SPE-CITR-000283

Re: Cable cold test for MDB-H-21 to SMDB-H1-B101 at Basement as per attached
load schedule

From Mr Rajesh Nair - DEC Dynamic Engineering Consultants

To (8) Mr Roberto Scaioni - CML International (+7 more...)

Cc (21) Mr Mohammed Imran - DEC Dynamic Engineering Consultants (+20 more...)

Sent Monday, 2 March 2020 1:28:01 PM GST (GMT +04:00)

Status Closed-Out

DETAILS

Project Reference Number TRA-SPE-CITR-EL-B00-00058-00

Area/Structure/Location Basement

Levels & Grids 1 BMT Zone 08 - West

QAQC - ITP Reference TRA-SPE-ITP-EL-GEN-00146 [00] T & C of MDB Panels

Discipline Electrical

Date of Inspection 29/02/2020

Comments 1. Refer to the installation comment mentioned on WIR to be done by Specon.

2. Permanent approved identification label for cable/s on both ends to be completed / provided.

3. Refer to the comments attached for MDB functional test inspection reference TRA-SPE-WIR-EL-B00-
128285 to be done by SPECON.

4. Reports to be transfer on new test report as agreed (Zmax inclusion) and be fill-in all the data precisely.
These will be verify on the next stage of inspections.

Remaining Test to be done:

https://mea.aconex.com/Logon 1/3
8/20/2020 Aconex

- Cold Testing for the Remaining cable (3 out of 5 only is completed)


- MDB outgoing cable live testing

Summary:

Cable cold testing (Continuity and Insulation test) for outgoing cables of MDB-H-21 to SMDB-H1-B101 has
been verified and found acceptable to CML with comments mentioned above. Original Test Report will be sign
off by CML upon completion of cable testing on all circuits.

Inspection Status B - Approved As Noted

FILE ATTACHMENTS (2)

File Name

00058-00 MDB-H-21 Cable Cold Test CITR CML comments (1).xlsx

TRA-SPE-CITR-EL-B00-00058-00.pdf

ATTRIBUTES

Attribute 1 Basement

MESSAGE

From: R Nogoy
Sent: 29/02/2020 11:37:01 AM GST (GMT +04:00)
To: Alan Forteza, Jerry Magno, Gary Narag, Eman Pena, Almojil Reyes, Roberto Scaioni, Allan Valencia, Zafar Mustafa, Rajesh Nair
Cc: Ibrahim Ahmed, Muhammad Akmal, Muhammad Aslamuddin, Abhishek Balasubarmanian, Abdul Baseer, Mohammed Imran, Shoeb Kaleem, Khaled
Mohammad, Ganesha Moorthi, Shahid Mulani, Ranjith Puthen, Ghouse Quadri, Mohammed Abrar, Asfak Al Ameen, Farman Baig, Justo Caliguiran,
Bernie Escat, Jennifer Mejia, Amritpal Singh, Jess Teodosio, Aradhana Thulasi
Mail Number: SBJV-CITR-000107
Subject: Cable cold test for MDB-H-21 to SMDB-H1-B101 at Basement as per attached load schedule

Project Reference
TRA-SPE-CITR-EL-B00-00058-00
Number:
Discipline: Electrical
Area/Structure/Location: Basement
CITR Description: Cable cold test for MDB-H-21 to SMDB-H1-B101 at Basement as per attached load schedule
Levels & Grids: 1 BMT Zone 08 - West
Date of Inspection: 29/02/2020

https://mea.aconex.com/Logon 2/3