The document is an activity plan for Priscilla Medical Center for July to December 2019. It outlines 22 maintenance activities for facilities and equipment, including transformers, generators, pumps, air conditioners, fire alarms, hydrants, tanks, plumbing and more. For each item, it specifies the department responsible, target completion times ranging from monthly to yearly, and notes whether the work will be done internally or outsourced to vendors. The overall goal is to keep all equipment and infrastructure in proper working order through regularly scheduled preventative maintenance.
The document is an activity plan for Priscilla Medical Center for July to December 2019. It outlines 22 maintenance activities for facilities and equipment, including transformers, generators, pumps, air conditioners, fire alarms, hydrants, tanks, plumbing and more. For each item, it specifies the department responsible, target completion times ranging from monthly to yearly, and notes whether the work will be done internally or outsourced to vendors. The overall goal is to keep all equipment and infrastructure in proper working order through regularly scheduled preventative maintenance.
The document is an activity plan for Priscilla Medical Center for July to December 2019. It outlines 22 maintenance activities for facilities and equipment, including transformers, generators, pumps, air conditioners, fire alarms, hydrants, tanks, plumbing and more. For each item, it specifies the department responsible, target completion times ranging from monthly to yearly, and notes whether the work will be done internally or outsourced to vendors. The overall goal is to keep all equipment and infrastructure in proper working order through regularly scheduled preventative maintenance.
PRISCILLA MEDICAL CENTER BULAN JULI - DESEMBER 2019
INSTALASI PEMELIHARAAN SARANA RS.PRISCILLA MEDICAL CENTER Tanggal Dibuat : Mei 2019 JABATAN : Koordinator Dibuat oleh : Mulyo Widhi Prasetio BAGIAN : IPS TARGET JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER No RENCANA KEGIATAN PELAKSANA TOLOK UKUR KEBERHASILAN VOL WAKTU BIAYA ### ### ### ### ### ### ### ### ###2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 5 6
1 Trafo VENDOR Perangkat bekerja dengan baik 1 6 Bulan
2 LVMDB IPS 6 1 Bulan
VENDOR 1 6 Bulan
3 Capasitor Bank IPS 6 1 Bulan
VENDOR 1 6 Bulan
4 Panel Kontrol Genset IPS 2 3 Bulan
VENDOR 1 6 Bulan
4 Panel SDP (Distribusi) IPS 6 1 Bulan
VENDOR 1 6 Bulan
5 Preventive PP. Lighting IPS 6 1 Bulan
Preventive PP. Pump IPS 2 3 Bulan Preventive PP. STP IPS 6 1 Bulan Preventive PP. Lift IPS 6 1 Bulan Preventive PP. AC IPS 2 3 Bulan Preventive PP. Hydrant Pump IPS 2 3 Bulan
7 Genset maintenance IPS 6 1 Bulan
VENDOR 1 6 Bulan Genset Pemanasan (warming Up Genset) IPS 24 1 Minggu
8 UPS IPS 6 1 Bulan
9 LIFT VENDOR 4 1 Bulan
10 Pompa Transfer IPS 2 3 Bulan
Jockey Pump IPS 2 3 Bulan Hydrant Pump IPS 2 3 Bulan Booster Pump IPS 2 3 Bulan Diesel Pump IPS 2 3 Bulan Jet Pump IPS 2 3 Bulan
11 AC Split Wall VENDOR 2 3 Bulan
AC Cassete VENDOR 2 3 Bulan AC Standing VENDOR 2 3 Bulan AC Split Duct VENDOR 2 3 Bulan AHU VENDOR 2 3 Bulan Exhaust Fan / Intake Fan VENDOR 2 3 Bulan
12 Blower Pump STP VENDOR 2 3 Bulan
Equalizing Pump VENDOR 2 3 Bulan Effluent Pump VENDOR 2 3 Bulan Sumpit Pump IPS 6 1 Bulan
13 Fire Alarm Tes Fungsi Heat IPS, K3 1 6 Bulan
Fire Alarm Tes Fungsi Smoke IPS, K3 1 6 Bulan Panel Master Control Fire Alarm IPS 6 1 Bulan
14 Hydrant Tes Fungsi Electric Pump IPS, K3 1 6 Bulan
Hydrant Tes Fungsi Diesel Pump IPS, K3 1 6 Bulan Hydrant Tes Fungsi Jockey Pump IPS, K3 1 6 Bulan Hydrant Box Tes Fungsi IPS, K3 1 6 Bulan Hydrant Pilar Tes Fungsi IPS, K3 1 6 Bulan
15 Box Hydrant IPS, K3 6 1 Bulan
16 Apar IPS, K3 6 1 Bulan
Apar Revil IPS - 1 Tahun
17 Ground Tank IPS 1 6 Bulan
Roof Tank IPS 1 6 Bulan
18 Plumbing IPS 6 1 Bulan
19 Perawatan Washtafel IPS 6 1 Bulan
Perawatan Urinoir IPS 6 1 Bulan Perawatan Closet IPS 6 1 Bulan Perawatn Cubicle Toilet IPS 6 1 Bulan