CLEANING SCHEDULE -2021

S.NO CLEANING REQUIRED AREAWISE FREQUENCY

WTP/RO-FOR PANDA RO UNIT


1 BOREWELL & PIPELINE MONTHLY

2 RAW WATER STORAGE TANK(HDPE) MONTHLY

3 PRODUCT WATER STORAGE TANK (SS) MONTHLY


4 PRODUCT WATER FINAL TANK (SS) MONTHLY
ONCE IN 6M OR IN
5 RO MEMBRANE CLEANING REQUIRED WITH CHEMICALS FROM CASE OF NON-
OUTSIDE APPROVED VENDER CONFORMING OF
MICRO RESULTS

6 5 MICRON HOSSING (SS) MONTHLY

0.45 MICRON HOSSING -1-(SS) 5-SUPN MONTHLY


7
0.45 MICRON HOSSING -2-(SS) 0.45-TFI MONTHLY

8 SCALING ON DOSING PUMP-MINERALS DAILY


9 OPEN BACKWASH OF MGF MONTHLY
10 OPEN BACKWASH OF ACF MONTHLY
11 OZONATOR PANEL DAILY
12 OXYGEN CONCENTATOR DAILY
WTP/RO-FOR SUNMAN RO UNIT (OLD RO)
ONCE IN 6M OR IN
RO MEMBRANE CLEANING REQUIRED WITH CHEMICALS FROM CASE OF NON-
1
OUTSIDE APPROVED VENDER CONFORMING OF
MICRO RESULTS

2 5 MICRON HOSSING (SS) MONTHLY

3 SCALING ON DOSING PUMP-MINERALS DAILY


4 OPEN BACKWASH OF MGF MONTHLY
5 OPEN BACKWASH OF ACF MONTHLY
PREWASHER INTERNAL
1 HORIZONTAL SS GEAR SET TO ROTTER THE MACHINE WEEKLY
2 BRASS GEAR SET WEEKLY
3 TEFFLON STAR GUIDE WEEKLY
4 ROLLER BRUSH DAILY
5 BOTTOM BRUSH DAILY
6 SIDE BRUSH DAILY
7 NOZZALES AT IN TUNNAL DAILY
8 NOZZALES AT JAR SHOULDER DAILY
9 NOZZALES AT OUT TUNNAL DAILY
10 CONVEYOR  CHAIN AND TRAY DAILY
11 ALL COMPARTMENT INCLUDING WINDOW FROM INSIDE DAILY
12 ALL STAINER AT PREWASHER DAILY
13 FILTTER BAG FROM INSIDE (GOPANI) 7KG/CM2 MAXIMUM DAILY
14 SU-120 DOSING PUMP CLEAN/WORKING DAILY
RFC INTERNAL
1 FILLING VALVE DAILY
2 ALL NOZZALES DAILY
3 ALL SHOWERS DAILY
4 ALL CHAIN TRAY DAILY
5 ALL JAR HOLDER DAILY
6 ALL TANKS AT RFC DAILY
7 ALL COMPARTMENT INCLUDING WINDOW FROM INSIDE DAILY
8 FILTTER BAG FROM INSIDE (GOPANI) 7KG/CM2 MAXIMUM DAILY
9 ALL STAINER AT RFC DAILY
10 CAP LOADING UNIT INCLUDING PVC CHAIN FROM INSIDE WEEKLY
11 SHRINK MACHINE & CHAMBER FROM INSIDE WEEKLY
12 BG-DIVOSAN DOSING PUMP CLEAN/WORKING DAILY
MICRO & CHEMICAL LAB
FUMIGATION AT FILLING,PACKAGING,WTP/RO,FG STORAGE
1 WEEKLY
AREA
2 LAMINAR AIR FLLOW 3 MONTHLY
NG SCHEDULE -2021
LAST CLEANING DUE DATE OF
REMARK
DATE NEXT CLEANING

OR PANDA RO UNIT
24.04.2021- not
23.05.2021 not done in April -24.04.2021
done
Surface of tank not clean, also slightely soile
24.04.2021 23.05.2021 observed in both tank not clean in march
and april 24.04.2021
24.04.2021 23.05.2021 not done in march and April-21
24.04.2021 23.05.2021 not done in march and April-21
FOR REST OF
FOR REST OF OLD
05 MEMBRANE- OLD 05 not done in march and April-21
MEMBRANE-
25.07.2021
25.07.2021

Not Replaced in April-21 due to filter not in


27.04-2021 26.05-2021
stock
Not Replaced in April-21 due to filter not in
27.04-2021 26.05-2021
stock-running with old TFI Filter.
27.04-2021 Actual
change date- 05.08-2021 cleaning as per BIPL
06.05.21
27.04-2021 26.05-2021 Checked -OK
27.04-2021 26.05-2021 Not done From last feb-21 in Both Unit
27.04-2021 26.05-2021 Not done From last feb-21 in Both Unit
10.05.2021 11.05.21 100 GRAMS Not Working from last week
10.05.2021 11.05.21 Checked -OK
UNMAN RO UNIT (OLD RO)
MEMBRANCE 5-qty of New
Membrane 05 qty replaced- 10.03.2021
CLEANING UNDER Membrane need
(Filmtec)
PLANING to be Replaced
11.04-2021-Actual
change date 09.06-2021
10.05.21
24.04.2021  23.05.2021  Operational
24.04.2021  23.05.2021  not done in march and April-21
24.04.2021  23.05.2021  not done in march and April-21
ASHER INTERNAL
10.05.2021 16.05.21 Checked -OK
10.05.2021 16.05.21 Checked -OK
10.05.2021 16.05.21 Checked -OK
09.05.2021 10.05.2021 Checked -OK
09.05.2021 10.05.2021 Checked -OK
09.05.2021 10.05.2021 Checked -OK
09.05.2021 10.05.2021 Checked -OK
09.05.2021 10.05.2021 Checked -OK
09.05.2021 10.05.2021 Checked -OK
09.05.2021 10.05.2021 Checked -OK
09.05.2021 10.05.2021 Checked -Not Clean
09.05.2021 10.05.2021 Checked -OK
09.05.2021 10.05.2021 Checked -OK
09.05.2021 10.05.2021 Checked -OK
C INTERNAL
09.05.2021 10.05.2021 Checked -OK
09.05.2021 10.05.2021 Checked -OK
09.05.2021 10.05.2021 Checked -OK
09.05.2021 10.05.2021 Checked -OK
09.05.2021 10.05.2021 Checked -Not Clean
09.05.2021 10.05.2021 Checked -OK
09.05.2021 10.05.2021 Checked -OK
09.05.2021 10.05.2021 Checked -OK
09.05.2021 10.05.2021 Checked -OK
09.05.2021 16.05.2021 Checked -OK
09.05.2021 16.05.2021 Checked -OK
09.05.2021 10.05.2021 Checked -OK
& CHEMICAL LAB
10.05.2021 17.05.2021 Not done as per Weekly

20-Mar 19-Jun Operational


Not required
some jar holder found broken at
RFC