CONTRACT NAME :PROPOSED EXTENSION OF REGIONAL OFFICE LEGEND: ACTIVITY

LOCATION :KM6 BETAG, LA TRINIDAD, BENGUET ITEM NO. DURATION


NO.

FINISH
:ACTIVITY NOS. 1-2-3-4-5-6-7-8-9-10-11-12-13-14-15-16

START
CRITICAL PATH
-17-18-19-20-21-22-23-24-25-26-27-28 ITEM DESCRIPTION
EARLY START EARLY FINISH
PRECEDENCE DIAGRAM LATE START LATE FINISH
METHOD
1.1-1.4 1.00 5 17.0 2 2 2.1 3 10 2.2 4 3 2.3 5 12 2.6 6 2 2.7 6 2 5.0 7 12 4.0 8 10 2.4 9 3 2.5 10 4 2.7 11 2
Project Documentation, Permits and
Licenses/As-built, CADD Plotting, F-S F-S Site Clearing, Leveling of Site, F-S F-S F-S F-S F-S F-S F-S Structural Backfill from F-S Selected Fill and Compaction F-S
Blueprint and Shop MOBILIZATION Building Lay-out Structural Excavation Gravel Bedding Soil Poisoning REINFORCING STEEL BARS CONCRETE WORKS Soil Poisoning
Drawings/Project Coordination Removal of Existing Structure Excavated Materials (Volume in Placed)
Meeting (Included in the OCM)
0 5 5 7 7 17 17 20 20 32 32 34 34 36 36 48 48 58 58 61 61 65 65 67
0 5 5 7 7 17 17 20 20 32 32 34 34 36 36 48 48 58 58 61 61 65 65 67
1.4, 1.5,
29 234 3.0 30 222
1.6
Occupational Safety and Health,
Temporary Perimeter Fence,
Project Identification and
FORMS AND SCAFFOLDS
Billboard, Signages
F-S
5 239 17 239
5 239 17 239
7.2 21 10 4.0 20 15 5.0 19 3 4.0 18 8 5.0 17 4 4.0 16 16 5.0 15 5 7.1 14 4 4.0 13 8 5.0 12 4
F-S F-S F-S F-S F-S F-S F-S Steel Decking - (Revited oevery F-S F-S
Roof Trusses and Framing CONCRETE WORKS REINFORCING STEEL BARS CONCRETE WORKS REINFORCING STEEL BARS CONCRETE WORKS REINFORCING STEEL BARS CONCRETE WORKS REINFORCING STEEL BARS
1.00m on side lappings)
134 144 119 134 116 119 108 116 104 108 88 104 83 88 79 83 71 79 67 71
134 144 119 134 116 119 108 116 104 108 88 104 83 88 79 83 71 79 67 71
12.0 and
32 23 14.1 33 4
13.0
8.2 35 10
PLUMBING WORKS and Exhaust Fan for C.R, Pantry and
ELECTRICAL WORKS Food Prep. Are Water Roofing - Concrete Sealer
and Mortar Intensifier, Two (2)
Applications
149 172 149 153
F-S
149 179 149 179 197 206
F-S 199 221
F-F
S-S F-F
S-S
8.1 22 5 6.1 23 30
F-F 6.2 24 28 10.1&10.2 24 17 10.3&10.4 25 22 15.1 26 6 16.0 27 12 17.0 28 1
Tile Works and Granite Counter
Roofing CHB Laying Including RSB Plastering Works Painting Works Fire Protection MISCELLANEOUS DEMOBILIZATION
Top
F-S F-S F-S F-S F-S F-S F-S
144 149 149 179 179 182 182 199 199 221 221 227 227 239 239 240
144 149 149 179 179 182 182 199 199 221 221 227 227 239 239 240
S-S
F-F S-S 9.0 34 16
11.1&11.2 31 20 F-F
Windows and Doors CEILING WORKS
149 169 221 237
149 179 221 239
Prepared by: Reviewed by: Recommending Approval: Approved:
ENGR. JUN JUN P. ENGR. REYMAX F. BOSQUE CECILIA G. ANCHETA ATTY. EDEN D. TINGSON - RAFANAN
TAS - 1 OIC - SERVICE CHIEF ASSISTANT REGIONAL REGIONAL DIRECTOR
ANCHETA
TECHNICAL SERVICES TECHNICAL SERVICES DIRECTOR