Professional Documents
Culture Documents
3.3.3 Non
compliance to the
core capacity
requirements at
POEs
9
Avoid Avoid
Mitigate Mitigate
4 5
Critical Catastrophic
areas TOTAL
1.4 Increase working
hours without
compensation 28
16
2.4 Non-compliance
to IHR at POEs
8
23
33
Screening of crew and passenger during pandemic
Greater than 90%
FREQUENT Mitigate Fix Now! Avoid
Score: 5
50% to 90%
1.3, 3.3.1, 3.3.2
PROBABLE Lower Priority Mitigate
Fix Now!
Score: 4
10% to 50%
OCCASIONAL Lower Priority Lower Priority 2.3.1, 3.3.3 Mitigate
Score: 3
3% to 10%
REMOTE Lower Priority Lower Priority 2.3.2 Mitigate
Score: 2
0% to 3%
3.1 2.3, 3.3
IMPROBABLE Lower Priority
Lower Priority
Lower Priority
Score:1
1 2 3
6
1.2.2 Increase in
number of
emergency
procurement
6
1.2.3 increase in
request for sub-
allotment of fund
6
2. Lapses in defining standard 2.3 Crash course
for facility, equipment, training for JO =
human resource requirement hampered infection
for a major & a sub-station control program =
disease
1 3
pandemic
Avoid Avoid
4 5
Critical Catastrophic
areas TOTAL
1.4.1 Lapses in public
health
4
1.4.2 Delay in salary
of job order positions
12
1.4.3 Resignation of
job order result to 62
inefficient screening
12
1.4.4 Cases detected
in community
8
1.4.5 Overwhelmed
dedicated hospital
and holding facility
8
2.4.1 Budget for 2.5.1 Queuing of
other services passenger hampered
reduced
4 5 21
2.4.2 Increase 2.5.2 Dissatisfied
request for job order travelers and aircraft
positions operator = reduced
tourism
4 5
3.4 Lapses in 3.5.1 Reduced
screening measures tourism, reduced
trade
4 5
18
12
1.3.2 Decreased
revenue collection
12
2. Frequent resignation of 2.3 Inadequate BOQ
trained personnel services
9
process for core capacity
compliant facility
3.3.2 Decrease in
provision of services
to stake holders
9
4. Opening of new ports 4.2 Unintended 4.3 Lack of trained
without pre-consultation budget for staffing personnel
with BOQ and facility
acquisition
2 6
Avoid Avoid
Mitigate Mitigate
4 5
Critical Catastrophic
areas TOTAL
1.4.1 Inadequate
Manpower
12
52
1.4.2 Decreased
productivity among
BOQ personnel
16
2.4.1 Vulnerability to
emerging/ re-
emerging diseases
8 30
2.4.2 Lack of
personnel
16
3.4.1 Non-utilization
of funds resulting to
low succeeding
budget allocation
8 38
38
3.4.2 Incompetent
ports as per IHR
standard
12
10
Food safety
Greater than 90%
FREQUENT Mitigate Fix Now! Avoid
Score: 5
50% to 90%
2.2 1.3, 2.3.1, 3.3.1
PROBABLE Lower Priority
Mitigate Fix Now!
Score: 4
10% to 50%
3.2 2.3.2, 3.3.2
OCCASIONAL Lower Priority
Lower Priority Mitigate
Score: 3
3% to 10%
3.1
REMOTE Lower Priority
Lower Priority Mitigate
Score: 2
0% to 3%
1.2
IMPROBABLE Lower Priority
Lower Priority
Lower Priority
Score:1
1 2 3
2 12
9
3. Wide area of coverage 3.1 Decrease PBB 3.2 Under utilization 3.3.1 Low compliance
over few stations to cover of investment for to food safety law
domestic ports equipment
2 6 12
over few stations to cover
domestic ports
1.4.1, 2.4
Avoid
Avoid
3.4
Avoid
Fix Now!
1.4.2
Fix Now!
Mitigate
3.5
Mitigate
Mitigate
4 5
Critical Catastrophic
areas TOTAL
1.4.1 Bad reputation
for FSE operators
16 38
1.4.2 increase cases
of food bornew
disease
8
2.4 Low income/
closure of business
45
16
46
12 5
46