LOWERING LIFE BOAT


Job Description: Risk assessment reviewed by CHIEF OFFICER for MEMPHIS on 01.12.2023
(ABANDONSHIP DRILL)

Initial Residual

ID Codes Hazards Risk Categories Probability Consequence Risk Control Measures Probability Consequence Risk Remarks Confirmed

Service Loss 2 2 4 2 1 2
Property 2 2 4 Tool box meeting, Responsible Officer 2 1 2
1 Communication Failure designated for communication with at: 12/01/2023
Personnel 2 2 4 L/Boat crew, wheelhouse 2 1 2
Environment 2 2 4 2 1 2
Environment 2 2 4 2 1 2
Service Loss 2 2 4 L/boat and launching equipment to be 2 1 2
thoroughly inspected for readiness, to
2 Equipment failure Property 2 2 4 2 1 2 at: 12/01/2023
be tried out prior embarking crew.
Maintenance to be as per PMS.
Personnel 2 2 4 2 1 2

Personnel 3 3 9 3 2 6
Service Loss 3 2 6 Tool box meeting, adequately trained 3 1 3
Inappropriate lowering / hoisting back
3 and experienced crew to operate at: 12/01/2023
procedufre Property 3 2 6 3 1 3
mechanism
Environment 3 3 9 3 2 6
Environment 4 2 8 4 1 4
Service Loss 4 1 4 Weather forecast to be adequately 4 1 4
4 Adverse weather conditions monitored, calm conditions to be at: 12/01/2023
Personnel 4 2 8 ensured prior launching 4 1 4
Property 4 1 4 4 1 4
Service Loss 4 1 4 4 1 4
Property 4 1 4 Ensure area is adquately cleaned and 4 1 4
5 Slip, trip or fall clear of obstructions. All crew to don at: 12/01/2023
Personnel 4 1 4 proper and adequate PPE. 4 1 4
Environment 4 1 4 4 1 4
Environment 3 2 6 3 1 3
Property 3 3 9 Adquately training and experienced 3 2 6
Accidentel release of life boat hook
6 Officer and crew to ensure L/Boat at: 12/01/2023
during final securing Personnel 3 2 6 3 1 3
secured completely in position.
Service Loss 3 2 6 3 1 3
Personnel 3 2 6 3 1 3
Lack of illumination / undertaking job Service Loss 3 1 3 L/Boat launching to be carried out 3 1 3
7 at: 12/01/2023
during dark hours Environment 3 1 3 during daylight hours. 3 1 3
Property 3 1 3 3 1 3
Service Loss 2 1 2 2 1 3
All crew to adequately secure
Monitoring sea state / tides / currents. Property 2 1 2 2 1 3
themselves prior launching L/Boat. All
Follow documented procedures and
8 Personnel 2 1 2 L/Boat equiment to be adequately 2 1 3 at: 12/01/2023
Trained experience personnel to
secured prior launching. Tool box
handle life boat
Environment 2 1 2 meeting and training. 2 1 3

Personnel 3 2 6 3 1 3
All crew to adequately secure
Inadequate securing inside L/Boat / Service Loss 3 2 6 themselves prior launching L/Boat. All 3 1 3
9 Improper usage of securing Environment 3 2 6 L/Boat equiment to be adequately 3 1 3 at: 12/01/2023
arrangement provided inside L/Boat secured prior launching. Tool box
Property 3 2 6 meeting and training. 3 1 3

Personnel 2 1 2 2 1 2
Service Loss 2 1 2 No Simultaneous workes to be 2 1 2
10 No Simultaneous operations at: 12/01/2023
Environment 2 1 2 undertaken 2 1 2
Property 2 1 2 2 1 2

1/2
Overview
Initial Residual

ID Codes Hazards Risk Categories Probability Consequence Risk Control Measures Probability Consequence Risk Remarks Confirmed

Personnel 3 2 6 3 1 3
Property 3 2 6 On board training, drills, and briefing 3 1 3
11 Lack of training and/or awareness at: 12/01/2023
Service Loss 3 1 3 as per company drill matrix 3 1 3
Environment 3 2 6 3 1 3

Risk Assessment verified and accepted (date):

CHIEF OFFICER:

2/2