JRA Form

Revision 10 Feb 2022

Operation: GCC 003 Masonry works - VIP Latrine


Job Risk Assessment
Leader : Bulungu Alex Site/Location: Bugoma. Date of the JRA: 19-02-2022
Participants: Bulungu Aalex,

Initial Risk Residual Risk


Risk and consequences Risk Reduction Measure(s)
# Task Hazard S P R S P R*
Action Party Deadline
(What could go wrong?) (How harm can be prevented?)

1. Slipping and tripping over 1.1 Access ways to be kept free of obstructions
tools and wet floors leading to 1.2 Good housekeeping to be maintained at all times.
Slip Trip Falls 2 5 10 2 1 2
falls hence bruises, back and 1.3 Use of Proper PPE( Coverall ,hard hat, gloves , safety
other body injuries Hand boots, googles and Nose Masks

2.1 Only trained and competent mason shall perform to


2. Potential for property
the task
damage, materials waste due
Human errors 2 5 10 2.2 Recheck the measurement after excavation . 2.3 2 1 2
to wrong measurement.
present the drawing for the camp lay out.
Check out for Electricity
3.Deyhydration from
3.1Take enough drinking.
perspiration.
3.2Take periodic rests.
1 Measuring and marking on the VIP Latrine Weather Heat stroke. 2 5 10
3.3Use of proper PPE (Coveralls, helmet, sunglasses,
2 1 2 GCC Mason 15/03/2022
Skin rushes and sun burns.
gloves and safety shoes).
Work fatigue.

4.Hand and body cuts and 4.1Use appropriate PPE (Coverall, helmet, safety goggles
Pinch points 2 5 10 2 1 2
bruises. and safety shoes/boots).

5.1 Preinspect work area before performing the task.


5.1Bite from insects and
Insects and snake 2 5 10 5.2.Report to the concern person(snake and handler). 2 1 2
snakes thus body injuries
5.3 Spray for the insects before carrying out the task
6. Slipping and tripping over 1.1 Access ways to be kept free of obstructions
tools and wet floors leading to 1.2 Good housekeeping to be maintained at all times.
Wet floors 3 5 15 3 1 3
falls hence bruises, back and 1.3 Use of Proper PPE( Coverall ,hard hat, gloves , safety
other body injuries Hand boots, googles and Nose Masks

7.Hand and Body cuts and Use OF Aappropiate PPE (Coverals,Hard Hat,Safety
Pinch points 3 5 15 3 1 3
Bruises goggles,and Safety shoes/boots).

12.1 Precheck tools and equipment before use.


8.Potential for Fingers and 12.2 Mandatory use of all required and appropriate PPE
Tools hand Injuries when using 2 5 10 for example gloves at all times. 2 1 2
defective hand tools 12.3 Use of hand tools to be discussed during the tool
2 Excavation works box. GCC Mason 15/03/2022
7.1 Use of appropriate and proper manual handling
techniques, postures and gestures at all times( Keep back
9. Poor manual handling straight and bend at knees when lifting)
techniques and postures 7.2 Manual lifting shall be limited to items that are 25 kgs
Manual Handling 2 5 10 2 1 2
leading to general body and below individuals. otherwise loads shall be split or
strains shared.
7.3 Mechanical lifting tools shall be used for heavy items
when transferring them over a longer distance

11.1 Only trained and competent personel shall scan the


10. Potential for underground ground for underground utilities and use the exisiting
utilities, Falling in the drawings. 11.2 Cordon
Excavation 3 5 15 2 1 2
excavated pits, fly objects and the work area with the required warning signs.
dust 11.3 Use of Proper PPE( Coverall ,hard hat, gloves , safety
boots, googles and Nose Masks

11.Hand and Body cuts and Use OF Aappropiate PPE (Coverals,Hard Hat,Safety
Pinch points 3 5 15 2 1 2
Bruises goggles,and Safety shoes/boots).

3 Compaction of pit with Murrum GCC Mason 15/03/2022


8.1 Access ways to be kept free of obstructions
12. Slipping and tripping over
8.2 Good housekeeping to be maintained at all times,
tools and wet floors leading to
Slip Trip Falls 2 5 10 water from cleaning to be collected and floor kept dry. 2 1 2
falls hence bruises, back and
8.3 Use of Proper PPE( Coverall ,hard hat, gloves , safety
other body injuries Hand
boots, googles and Nose Masks

13.Deyhydration from
perspiration. 10.1Take enough drinking.
3 Compaction of pit with Murrum
Heat stroke. 10.2Take periodic rests.
GCC Mason 15/03/2022
Weather 2 5 10 2 1 2
Skin rushes and sun burns. 10.3Use of proper PPE (Coveralls, helmet, sunglasses,
Work fatigue. gloves and safety shoes).
Slip trip and fall.
7.1 Use of appropriate and proper manual handling
14. Poor manual handling
techniques, postures and gestures at all times( Keep back
techniques and postures
Manual Handling 2 5 10 straight and bend at knees when lifting) 2 1 2
leading to general body
7.2 use of appropriate PPE
strains
7.3 Mechanical lifting tools shall be used for heavy items

12.1 Precheck tools and equipment before use.


15. Potential for finger and 12.2 Mandatory use of all required and appropriate PPE
Tools hand injuries when using 2 5 10 for example gloves at all times and use tested tools. 2 1 2
defective hand tools 12.3 Use of hand tools to be discussed during the tool
box.

Toolbox talk shall cover the risk associated with cement


16.Exposure to cement by and the available reduction measures .Mandatory use
cement contact by inhaling. 2 5 15 of all required and appropiate PPE. By following the 2 1 2
Environment damage instruction given in the Material Safety Data Sheet
(MSDS).
17.Deyhydration from
perspiration. 10.1Take enough drinking.
Heat stroke. 10.2Take periodic rests.
Weather 2 5 10 2 1 2
Skin rushes and sun burns. 10.3Use of proper PPE (Coveralls, helmet, sunglasses,
Work fatigue. gloves and safety shoes).
Slip trip and fall.
7.1 Use of appropriate and proper manual handling
18. Poor manual handling
techniques, postures and gestures at all times( Keep back
techniques and postures
Manual Handling 2 5 10 straight and bend at knees when lifting) 2 1 2
4 Blinding and Casting concrete leading to general body GCC Mason 10/03/2021
7.2 Manual lifting shall be limited to items that are 25 kgs
strains
and below individuals. otherwise loads shall be split or
12.1 Precheck tools and equipment before use.
19. Potential for finger and 12.2 Mandatory use of all required and appropriate PPE
Tools hand injuries when using 2 5 10 for example gloves at all times. 2 1 2
defective hand tools 12.3 Use of hand tools to be discussed during the tool
box.
8.1 Access ways to be kept free of obstructions
20. Slipping and tripping over
8.2 Good housekeeping to be maintained at all times,
tools and wet floors leading to
Slip Trip Falls 2 5 10 water from cleaning to be collected and floor kept dry. 2 1 2
falls hence bruises, back and
8.3 Use of Proper PPE( Coverall ,hard hat, gloves , safety
other body injuries Hand
boots, googles and Nose Masks

Toolbox talk shall cover the risk associated with cement


26.Exposure to cement by and the available reduction measures .Mandatory use
cement contact by inhaling. 3 5 15 of all required and appropiate PPE. By following the 3 1 3
Environment damage instruction given in the Material Safety Data Sheet
(MSDS).
12.1 Precheck tools and equipment before use.
27. Potential for finger and 12.2 Mandatory use of all required and appropriate PPE
Tools hand injuries when using 3 5 15 for example gloves at all times. 3 1 3
defective hand tools 12.3 Use of hand tools to be discussed during the tool
box.

28.Hand and body cuts and 4.1Use appropriate PPE (Coverall, helmet, safety goggles
Pinch points 3 5 15 3 1 3
bruises. and safety shoes/boots).

29.Deyhydration from
6 Laying Bricks around Concrete Foundation
perspiration. 3.1Take enough drinking.
GCC Mason 15/03/2022
Heat stroke. 3.2Take periodic rests.
Weather 3 5 15 3 1 3
Skin rushes and sun burns. 3.3Use of proper PPE (Coveralls, helmet, sunglasses,
Work fatigue. gloves and safety shoes).
Slip trip and fall.

30. Slipping and tripping over 1.1 Access ways to be kept free of obstructions
Abandoned Tools, Wet tools and wet floors leading to 1.2 Good housekeeping to be maintained at all times.
3 5 15 3 1 3
floor falls hence bruises, back and 1.3 Use of Proper PPE( Coverall ,hard hat, gloves , safety
other body injuries Hand boots, googles and Nose Masks

5.1 Preinspect work area before performing the task.


1.Bite from insects and snakes 5.2.Report to the concern person(snake and bee
Insects and snake 2 5 10 3 1 3
thus body injuries handler). 5.3 Spray for the insects before carrying out
the task
Toolbox talk shall cover the risk associated with cement
31.Exposure to cement by and the available reduction measures .Mandatory use
cement contact by inhaling. 3 5 15 of all required and appropiate PPE. By following the 3 1 3
2.Environment damage instruction given in the Material Safety Data Sheet
(MSDS).
12.1 Precheck tools and equipment before use.
32. Potential for finger and 12.2 Mandatory use of all required and appropriate PPE
Tools hand injuries when using 3 5 15 for example gloves at all times and use tested tools 3 1 3
defective hand tools 12.3 Use of hand tools to be discussed during the tool
box.
33.Deyhydration from
perspiration. 3.1Take enough drinking.
Heat stroke. 3.2Take periodic rests.
Weather 3 5 15 3 1 3
Skin rushes and sun burns. 3.3Use of proper PPE (Coveralls, helmet, sunglasses,
Work fatigue. gloves and safety shoes).
Slip trip and fall.

34. Slipping and tripping over 1.1 Access ways to be kept free of obstructions
7 Plastering,screeding and finishing. tools and wet floors leading to 1.2 Good housekeeping to be maintained at all times. GCC Mason 15/03/2022
Slip Trip Falls 2 5 10 3 1 3
falls hence bruises, back and 1.3 Use of Proper PPE( Coverall ,hard hat, gloves , safety
other body injuries Hand boots, googles and Nose Masks

35.Hand and body cuts and 4.1Use appropriate PPE (Coverall, helmet, safety goggles
Pinch points 2 5 10 2 1 2
bruises. and safety shoes/boots).

5.1 Preinspect work area before performing the task.


36.Bite from insects and 5.2.Report to the concern person(snake and bee
Insects and snake 2 4 8 2 1 2
snakes thus body injuries handler). 5.3 Spray for the insects before carrying out
the task
Putting on Nose mask.
Continuous hand washing, hand sanitizing and avoid
covid 19 37.Sickness and death 2 4 8 touching eyes,noise and mouth. 2 1 2
Maintaining Social distancing.
Avoiding touching eyes,nose and mouth.
LEADER: HSE : Contractor:
(Name/Company/Signature) (Name/Date/Signature) (Name/Date/Signature)

You might also like