You are on page 1of 4

MS-EL-03 Installation of Distribution Board/smp

Ref No. Revision No. HSE Procedures Page Date

INTERIOR WORKS OF THE FALCON LOUNGE – BIA


MS-03 1 Page 1 of 2 26/5/2019

Process/Activity/ Potential Hazards Risk Severity Probabilit Risk Control Measures Residual Residual Residu
Layout Involved 1/2/3 y 1/2/3 level Severity probability al Risk
1/2/3 1/2/3 Level

1. Installation of Chance for slipping Wounds on 2 1 2 1.Wearing proper 1 1 1


Distribution hand , PPE
Board / smp Inflammatio 2. Try to use
n on leg , machine support
while installing
Leg Fracture
instead of manual.
2. Use of Drilling Chance for sprains on 1 2 2 1.Wearing PPE. 1 1 1
Machine damaging of hands 2. Double check for
Fingers and hands safety tags.
3. Double check for
the safety cover of
the equipment.
MS-EL-03 Installation of Distribution Board/smp

Ref No. Revision No. HSE Procedures Page Date

INTERIOR WORKS OF THE FALCON LOUNGE – BIA


MS-03 1 Page 2 of 2 26/5/2019

3. Cutting Chances for cutting Chance for 1 2 2 1.Wearing PPE. 1 1 1


the finger major cuts 2. Double check for
in hands the safety cover of
the equipment.
MS-EL-03 Installation of Distribution Board/smp

Ref No. Revision No. HSE Procedures Page Date

INTERIOR WORKS OF THE FALCON LOUNGE – BIA


MS-03 1 Page 3 of 2 26/5/2019

High(3) 3 6 9
Medium(2) 2 4 6
Low(1) 1 2 3
Minor (1) Moderate(2) Major(3)

Severity Description
Minor(1) No injury , injury or ill health requiring first aid treatment only includes minor cuts &
bruises , irritation , ill-health with temporary discomfort
Moderate(2) Injury requiring medical treatment or ill health leading to disability includes lacerations ,
burns , sprains , minor fractures , dermatitis , deafness , work related upper limb disorders
Major(3) Fatal serious injuries or life threatening occupational disease includes amputations , major
fractures , multiple injuries , occupational cancer & acute poisoning & Fatal diseases
Likelihood Description
Low(1) Not likely to occur
Medium(2 Possible to known
) to occur
High(3)
MS-EL-03 Installation of Distribution Board/smp

Ref No. Revision No. HSE Procedures Page Date

INTERIOR WORKS OF THE FALCON LOUNGE – BIA


MS-03 1 Page 4 of 2 26/5/2019

Project: Project Engineer Project Manager


INTERIOR WORKS OF THE Robin Iype Mathew HITIN
FALCON LOUNGE-BIA