20-C-850 & 20-C-851

Leopold Matrix For Environment Impacts Assessment (E.I.A) of A Hospital Located at Karachi

Construction Phase Operation


Project Action Effluent
Environmental Dismantling Supply of Construction Operational Total
land Contractor Site Soil Laying of solid waste Solid Waste
Characteristics of existing construction Excavation of phase of HVAC
Acquisition Mobilization Preparation improvement services disposal and Biogenic
structure material infrastructure hospital
Waste

1 3 2 1 3 2 5 17
Land use
2 2 3 2 3 3 3 18
Soil 2 2 1 2 3 8 18
Physical

Contamination 1 2 1 3 2 7 16
4 2 2 4 2 6 20
Air Quality
2 1 1 3 3 6 16
Surface and 2 2 4
ground Water 1 1 2
5 2 7
Ecological

Flora
3 2 5
2 2 4
Fauna
2 1 3
Noise and 1 2 1 4 3 2 4 16
vibration 1 2 2 3 2 2 3 15
Traffic 2 2 3 2 3 3 15
Socio-Economical

Congestion 2 3 2 2 4 2 15
Safety Hazard / 5 2 1 3 1 7 19
Public health
and Nuisance
3 1 2 4 2 7 19
2 3 1 2 1 9
Aesthetics
3 1 1 2 1 8
Relocation and 8 2 4 2 3 2 21
Compensation 7 2 5 2 2 2 20
13 16 17 15 6 8 4 16 4 16 5 20 10
Total
10 14 17 16 6 7 4 15 4 12 6 19 9