WORK BREAKDOWN
STATEMENT
BILL OF MATERIALS
Item
No. Description Unit Quantity Unit Cost Amount
A Earthworks
1 Soil Treatment gal 1 6105 6105
Subtotal 6105
B Concrete Works
1 Portland Cement bags 510 215 109650
2 White Sand cu.m 44 650 28600
3 Gravel 3/4" cu.m 65 820 53300
Subtotal 191550
E INST FTNG REBAR 1 1C, 1M, 2L RSB, TIEWIRES P 4000 P 1400 P 5400
F POURING CONC FTNG
2 2M, 2L MIXER, CGS P 12600 P 4000 P 16600