BILL OF MATERIALS

&
WORK BREAKDOWN
STATEMENT
BILL OF MATERIALS

Item
No. Description Unit Quantity Unit Cost Amount
A Earthworks
1 Soil Treatment gal 1 6105 6105
Subtotal 6105
B Concrete Works
1 Portland Cement bags 510 215 109650
2 White Sand cu.m 44 650 28600
3 Gravel 3/4" cu.m 65 820 53300
Subtotal 191550

Total Amount 197655


A LAY OUTING 2 2C, 2H Batter boards P 15000 P 4400 P 19400
B EXCAVATION 3 2L P 2400 P 2400
C FABR. FTNG REBAR 6 2ST RSB, TIEWIRES P 16000 P 6000 P 24000
D GRAVEL BEDDING 1 2L GRAVEL 1” P 492 P 800 P 1292

E INST FTNG REBAR 1 1C, 1M, 2L RSB, TIEWIRES P 4000 P 1400 P 5400
F POURING CONC FTNG
2 2M, 2L MIXER, CGS P 12600 P 4000 P 16600